Bloomfield Township, Michigan , , proposed landscape plan for: , , note: unless noted otherwise, numerical value on landscape quantities specified on plan take precedence over graphic representation. north developer: A.F. JONNA DEVELOPMENT AND MANAGEMENT CO. Tel-Square Plaza tree replacement landscape requirements: parking lot trees greenbelt 48' 32' 8' 0' scale: 16' key reference map Office Building Square Lake Road Telegraph Road existing Office existing Retail Building proposed Building enlarge area Telegraph Road ph. (248) 557-5588 fax. (248) 557-5416 A.F. JONNA Development and Management Co. 4036 Telegraph Road, suite 201 Bloomfield Hills, Michigan 48302 ph. (248) 593-6200 TEL-SQUARE PLAZA Bloomfield Township, Michigan Telegraph Road and Square Lake Road LS-1 seal: client: project: project location: sheet title: drawn by: checked by: date: notice: project no: sheet no: This document and the subject matter contained therein is proprietary and is not to be used or reproduced without the written permission of Felino Pascual and Associates Copyright Do Not scale drawings. Use figured dimensions only LANDSCAPE PLAN SZ, JP, CZ FP of 4 Farmington Hills, MI 48336 24333 Orchard Lake Rd, Suite G registered Landscape Architect Community Land Planner and and FELINO A. PASCUAL ASSOCIATES FP A ph. (248) 557-5588 fax. (248) 557-5416 job no./issue/revision date: Tel-Square Plaza Building proposed Square Lake Road 2015 2-2-2015 LP15.020.02 1-28-2013 SPA 3-26-2013 SPA 4-8-2013 SPA 5-20-2013 SPA 7-15-2013 SPA LS13.007.01 LS13.007.01 LS13.007.01 LS13.007.07 LS13.007.07 10-14-2013 SPA LS13.007.10 LS14.061.06 6-24-2014 ENG UPD. LS14.061.12 12-23-2014 ENG UPD. LS15.020.02 2-2-2015 township comments.

A.F. JONNA Development and Telegraph · PDF fileBloomfield Township, Michigan, Office Building Complex, existing parking island landscape improvement plan for:,, Tel-Square Plaza proposed

  • Upload
    phambao

  • View
    213

  • Download
    1

Embed Size (px)

Citation preview

Bloomfield Township, Michigan

,,proposed landscape plan for: ,,

note:unless noted otherwise, numerical value onlandscape quantities specified on plan takeprecedence over graphic representation.

north

developer:A.F. JONNADEVELOPMENT AND MANAGEMENT CO.

Tel-Square Plaza

tree replacement

landscape requirements:

parking lot trees

greenbelt

48'32'8'0'scale:

16'

key reference map

Office Building

Square Lake Road

Telegraph Road

existing

Officeexisting

Retail Buildingproposed

Building

enlarge area

Telegraph Road

ph. (248) 557-5588fax. (248) 557-5416

A.F. JONNADevelopment andManagement Co.4036 Telegraph Road, suite 201Bloomfield Hills, Michigan 48302

ph. (248) 593-6200

TEL-SQUAREPLAZA

Bloomfield Township,Michigan

Telegraph Road and SquareLake Road

LS-1

seal:

client:

project:

project location:

sheet title:

drawn by:

checked by:

date:

notice:

project no:

sheet no:

This document and the subjectmatter contained therein isproprietary and is not to be usedor reproduced without the writtenpermission of Felino Pascual andAssociates

Copyright

Do Not scale drawings. Use figureddimensions only

LANDSCAPE PLAN

SZ, JP, CZ

FP

of 4

Farmington Hills, MI 4833624333 Orchard Lake Rd, Suite G

registered Landscape ArchitectCommunity Land Planner and

andFELINO A. PASCUAL

ASSOCIATES

FP A

ph. (248) 557-5588fax. (248) 557-5416

job no./issue/revision date:

Tel-Square Plaza Buildingproposed

Square Lake Road

2015

2-2-2015

LP15.020.02

1-28-2013SPA

3-26-2013SPA

4-8-2013SPA

5-20-2013SPA

7-15-2013SPA

LS13.007.01

LS13.007.01

LS13.007.01

LS13.007.07

LS13.007.07

10-14-2013SPALS13.007.10

LS14.061.06 6-24-2014ENG UPD.

LS14.061.12 12-23-2014ENG UPD.

LS15.020.02 2-2-2015township comments.

no scale

shrub planting detail

mulch 3" depth with shreddedhardwood bark. mulch shall beneutral in color.

mound to form saucer aroundshrub.

remove all non-biodegradablematerials from the rootball. all burlapfrom top 1/3 of rootball.

scarify subgrade.

planting mixture. amend soil per siteconditions and requirements ofplants.

mulch 2" depth with shreddedhardwood bark. mulch shall beneutral in color.

perennial planting detailno scale

planting mixture -6"-10" depth.

subgrade.

no scale

evergreen planting detailno scale

tree planting detail

stake trees - just below first branch using2 - 3" wide belt-like nylon. connect fromtree to stake opposite. allow for someflexing of the tree. remove after one (1)year.

use 3 hardwood stakes per tree. 2" x 2" x 8'stakes. drive stakes into undisturbed soil 6"-8"outside of rootball to a depth of 18" below treepit. remove after one (1) year. do not use wire orrope thru a hose.

tree wrap- secure with biodegradablematerial at top and bottom. removeafter first winter.

mulch 4" depth with shredded hardwoodbark. mulch shall be neutral in color.leave 3" circle of bare soil at base of treetrunk.

mound to form tree saucer.

remove all non-biodegradablematerials from the rootball. cut downwire basket and fold down all burlapfrom top 1/3 of rootball.

planting mixture. amend soil per siteconditions and requirements ofplants.

scarify subgrade and planting pitsides to 4" depth.

planting mixture. amend soil per siteconditions and requirements ofplants.

mound to form tree saucer.

scarify subgrade and planting pitsides to 4" depth.

stake trees - using 2 - 3" widebelt-like nylon. connect from tree tostake opposite. allow for some flexingof the tree. remove after one (1) year.

use 3 hardwood stakes per tree. 2" x 2" x 8'stakes. drive stakes into undisturbed soil 6"-8"outside of rootball to a depth of 18" below treepit. remove after one (1) year. do not use wireor rope thru a hose.

mulch 4" depth with shredded hardwood bark.mulch shall be neutral in color. leave 3" circleof bare soil at base of tree trunk.

remove all non-biodegradablematerials from the rootball. cut downwire basket and fold down all burlapfrom top 1/3 of rootball.

no scale

tree staking detail

stake trees - just below first branchusing 2 - 3" wide belt-like nylon.connect from tree to stake opposite.allow for some flexing of the tree.remove after one (1) year.

use 3 hardwood stakes per tree. 2" x2" x 8' stakes. drive stakes intoundisturbed soil 6"-8" outside ofrootball to a depth of 18" below treepit. remove after one (1) year.do not use wire or rope thru a hose.

stake trees -just below first branchusing 2 - 3" wide belt-like nylon.connect from tree to stake opposite.allow for some flexing of the tree.remove after one (1) year.

120° 120°

120°

Orient staking/guying to prevailingwinds, except on slopes greater than3:1 orient to slope.

Use same staking/guying orientationfor all plants within each grouping orarea.

Plant Material List, Planting Details and Notes

tree protection notes

general landscape notes:

ph. (248) 557-5588fax. (248) 557-5416

A.F. JONNADevelopment andManagement Co.4036 Telegraph Road, suite 201Bloomfield Hills, Michigan 48302

ph. (248) 593-6200

TEL-SQUAREPLAZA

Bloomfield Township,Michigan

Telegraph Road and SquareLake Road

LS-2

seal:

client:

project:

project location:

sheet title:

drawn by:

checked by:

date:

notice:

project no:

sheet no:

This document and the subjectmatter contained therein isproprietary and is not to be usedor reproduced without the writtenpermission of Felino Pascual andAssociates

Copyright

Do Not scale drawings. Use figureddimensions only

plant material list,notes and details

SZ, JP, CZ

FP

of 4

Farmington Hills, MI 4833624333 Orchard Lake Rd, Suite G

registered Landscape ArchitectCommunity Land Planner and

andFELINO A. PASCUAL

ASSOCIATES

FP A

ph. (248) 557-5588fax. (248) 557-5416

job no./issue/revision date:

sizecommon name

plant material list

key commentsquant. LS-1

corner plaza site plan2A

walk section detail

2C

2B

2C

2B

crosswalk section detail (pavement)

2B

botanical name

approved

SPA

10-14 2013

revised

6-24 2014

2015

2-2-2015

LP15.020.02

1-28-2013SPA

3-26-2013SPA

4-8-2013SPA

5-20-2013SPA

7-15-2013SPA

LS13.007.01

LS13.007.01

LS13.007.01

LS13.007.07

LS13.007.07

10-14-2013SPALS13.007.10

LS14.061.06 6-24-2014ENG UPD.

LS14.061.12 12-23-2014ENG UPD.

LS15.020.02 2-2-2015township comments.

Bloomfield Township, MichiganOffice Building Complex,,existing parking island landscape improvement plan for: ,,

Tel-Square Plazaproposed

Telegraph Road 90'60'15'0'scale:

30'

north

OfficeBuilding

Office Buildingexisting

developer:A.F. JONNADEVELOPMENT AND MANAGEMENT CO.Square Lake Road

sizecommon namebotanical name

parking lot plant material list

keyquant. L-3

PLANTING DETAILSEE SHT.L-1

ph. (248) 557-5588fax. (248) 557-5416

A.F. JONNADevelopment andManagement Co.4036 Telegraph Road, suite 201Bloomfield Hills, Michigan 48302

ph. (248) 593-6200

TEL-SQUAREPLAZA

Bloomfield Township,Michigan

Telegraph Road and SquareLake Road

LS-3

seal:

client:

project:

project location:

sheet title:

drawn by:

checked by:

date:

notice:

project no:

sheet no:

This document and the subjectmatter contained therein isproprietary and is not to be usedor reproduced without the writtenpermission of Felino Pascual andAssociates

Copyright

Do Not scale drawings. Use figureddimensions only

existing parkingislands landscapeimprovement plan

SZ, JP, CZ

FP

of 4

Farmington Hills, MI 4833624333 Orchard Lake Rd, Suite G

registered Landscape ArchitectCommunity Land Planner and

andFELINO A. PASCUAL

ASSOCIATES

FP A

ph. (248) 557-5588fax. (248) 557-5416

note:unless noted otherwise, numerical value onlandscape quantities specified on plan takeprecedence over graphic representation.

approved

SPA

10-14 2013

revised

2-2-2014

job no./issue/revision date:

2015

2-2-2015

LP15.020.02

1-28-2013SPA

3-26-2013SPA

4-8-2013SPA

5-20-2013SPA

7-15-2013SPA

LS13.007.01

LS13.007.01

LS13.007.01

LS13.007.07

LS13.007.07

10-14-2013SPALS13.007.10

LS14.061.06 6-24-2014ENG UPD.

LS14.061.12 12-23-2014ENG UPD.

LS15.020.02 2-2-2015township comments.

Bloomfield Township, Michigan

,,existing tree inventory plan for: ,,

north

OfficeBuilding

existing

developer:A.F. JONNADEVELOPMENT AND MANAGEMENT CO.

Tel-Square Plaza

tree replacement

60'40'10'0'scale:

20'

OfficeBuilding

existing

exisitng tree inventory summary

existing tree inventory plan

Telegraph Road

Square Lake Road ph. (248) 557-5588fax. (248) 557-5416

A.F. JONNADevelopment andManagement Co.4036 Telegraph Road, suite 201Bloomfield Hills, Michigan 48302

ph. (248) 593-6200

TEL-SQUAREPLAZA

Bloomfield Township,Michigan

Telegraph Road and SquareLake Road

LS-4

seal:

client:

project:

project location:

sheet title:

job no./issue/revision date:

drawn by:

checked by:

date:

notice:

project no:

sheet no:

This document and the subjectmatter contained therein isproprietary and is not to be usedor reproduced without the writtenpermission of Felino Pascual andAssociates

Copyright

Do Not scale drawings. Use figureddimensions only

Existing Tree Survey

SZ, JP, CZ

FP

of 4

Farmington Hills, MI 4833624333 Orchard Lake Rd, Suite G

registered Landscape ArchitectCommunity Land Planner and

andFELINO A. PASCUAL

ASSOCIATES

FP A

ph. (248) 557-5588fax. (248) 557-5416

2015

2-2-2015

LP15.020.02

1-28-2013SPA

3-26-2013SPA

4-8-2013SPA

5-20-2013SPA

7-15-2013SPA

LS13.007.01

LS13.007.01

LS13.007.01

LS13.007.07

LS13.007.07

10-14-2013SPALS13.007.10

LS14.061.06 6-24-2014ENG UPD.

LS14.061.12 12-23-2014ENG UPD.

LS15.020.02 2-2-2015township comments.