32
1 The 2010 White Flint Sector Plan establishes a vision for transforming White Flint from an auto-oriented environment to a mixed-use walkable district served by multiple modes of transportation. Advancing the Pike District is a Planning Department initiative to accelerate the transformation of White Flint’s core into a vibrant urban core by identifying short- and medium-term implementation-focused solutions that build on the Sector Plan’s recommendations, enhance mobility, and promote economic development, urban design and placemaking. This study is envisioned as a Planning Department work product, with a 12-18-month timeline. Following the presentation of the scope, staff will update the Planning Board in fall 2020 and deliver a final briefing in spring 2021. Area 2 staff will collaborate with staff from the Functional Planning & Policy and Research and Special Projects Divisions to release standalone deliverables as they are completed. These deliverables will identify solutions and equip county agencies and stakeholders with implementable projects that further the vision of the White Flint Sector Plan and respond to the community’s mandate to activate and transform the Pike District into a cohesive, livable district. Summary MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 3-12-20 Advancing the Pike District: White Flint Sector Plan’s Metrorail Station Area - Ten-Year Check-Up Walker Freer, Transportation Planner Coordinator, [email protected], 301-495-4651 Natasha Fahim, Planner Coordinator, [email protected], 301-495-4639 Atul Sharma, Supervisor, Special Projects Team, [email protected], 301-495-4658 Carrie Sanders, Chief, Area 2 Division, [email protected], 301-495-4653 Completed: 3/5/20 AS

Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

1

The 2010 White Flint Sector Plan establishes a vision for transforming White Flint from an auto-oriented environment to a mixed-use walkable district served by multiple modes of transportation. Advancing the Pike District is a Planning Department initiative to accelerate the transformation of White Flint’s core into a vibrant urban core by identifying short- and medium-term implementation-focused solutions that build on the Sector Plan’s recommendations, enhance mobility, and promote economic development, urban design and placemaking.

This study is envisioned as a Planning Department work product, with a 12-18-month timeline. Following the presentation of the scope, staff will update the Planning Board in fall 2020 and deliver a final briefing in spring 2021. Area 2 staff will collaborate with staff from the Functional Planning & Policy and Research and Special Projects Divisions to release standalone deliverables as they are completed. These deliverables will identify solutions and equip county agencies and stakeholders with implementable projects that further the vision of the White Flint Sector Plan and respond to the community’s mandate to activate and transform the Pike District into a cohesive, livable district.

Summary

MONTGOMERY COUNTY PLANNING DEPARTMENTTHE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MCPB Item No. Date: 3-12-20

Advancing the Pike District: White Flint Sector Plan’s Metrorail Station Area - Ten-Year Check-Up

Walker Freer, Transportation Planner Coordinator, [email protected], 301-495-4651

Natasha Fahim, Planner Coordinator, [email protected], 301-495-4639

Atul Sharma, Supervisor, Special Projects Team, [email protected], 301-495-4658

Carrie Sanders, Chief, Area 2 Division, [email protected], 301-495-4653

Completed: 3/5/20

AS

Page 2: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

2

Project Purpose

This project will build on the White Flint Sector Plan’s vision, focusing on four key goals:

• Provide an up-to-date Progress Snapshot: Summarize development patterns and trends todate, and identify challenges inhibiting development around the White Flint Metro Station area.Highlight successful planning and development practices and lessons learned since the SectorPlan’s adoption.

• Implement Vision Zero in White Flint’s core: Integrate Vision Zero concepts and principles toreduce conflicts between vehicles and pedestrians and create a safe environment for all modesof transportation around the Metro Station area.

• Position the White Flint Metro Station for success: Create an urban design developmentframework and common vision that maximizes the Metro site’s potential, advances countygoals, and enhances access alternatives to the Metro Station.

• Create an identity for the Pike District through Placemaking: Host a community placemakingevent in coordination with the Better Block Foundation and the Pike District rebrandingcampaign.

Scope

The areas of focus for this project are mobility and circulation, economic development and implementation strategies, and placemaking and urban design. Deliverables outlined below will be produced and released individually. The final report will compile these deliverables and serve as an implementation-oriented resource that will guide near-term development in the Pike District.

Mobility and Circulation

1. Examine mobility in White Flint with a Vision Zero perspective and identify opportunities forimproving pedestrian and transit access while prioritizing safety for all users equitably.

• Planning Department staff will conduct a Pedestrian Level of Comfort (PLOC) analysis toidentify sidewalk segments that are uncomfortable or unsafe due to inadequate orincomplete sidewalks and crossings and quantify how potential investments mayincrease connectivity.

• Planning Department staff will identify short- and medium-term improvements tostreets and sidewalks that connect major destinations.

2. Consider mobility and circulation alternatives that will enhance connectivity and movementwithin White Flint.

• Examine short-term improvements to facilitate bus rapid transit (BRT) on Rockville Pike(MD 355), in coordination with the Montgomery County Department of Transportation(MCDOT) and the Maryland Department of Transportation State HighwayAdministration (SHA).

• Consider impact of micromobility, on-demand transit, fixed-route circulators, orautonomous shuttles in White Flint.

• Analyze the use of commuter shuttles, such as operators, routes/destinations, ridership,and curbside management impacts.

Page 3: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

3

Deliverables:

• Active Transportation Strategy that identifies short-and medium-term improvements tostreets, sidewalks, and bikeways connecting major destinations.

• Evaluation of interim mobility and transit opportunities.

Economic Development and Implementation Strategies

3. Assess development progress since the implementation of the White Flint Sector Plan. Reviewcompleted and proposed development, evaluate performance metrics (e.g. absorption, rentalrates, etc.), and identify development limitations.

• Identify development achievements, lessons learned, and highlight gaps requiringimmediate attention to further the vision and implementation of the Sector Plan in theMetro Station area.

• Engage property owners with low-intensity development to understand theirrequirements for redevelopment.

• Engage property owners with entitled but stalled proposed development to understandchallenges to further growth.

• Identify specific public and private policies and strategies than can accelerate thepreferred development vision in the near- to mid-term.

Deliverable:

• Produce a Development Progress Report that complements the bi-annual monitoringreports and analyzes the current zoning and regulatory mechanisms in place andprovides key lessons learned.

4. Identify the major barriers limiting transformative development at the Metro Station site.Coordinate with the Washington Metropolitan Area Transit Authority (WMATA) and keystakeholders to craft and communicate the vision for future development at the Metro Stationsite to maximize the potential of transit-oriented development.

Deliverable:

• Create an urban design development framework that establishes a commondevelopment vision for the Metro Station site.

5. Work with a consultant to provide an analysis of similar Metro Stations and peer developmentsites nationally that have achieved transformative developments in similar market conditions.

• Research and develop case studies of interim uses for transit-adjacent sites thatstrengthen the local market and enable additional development.

• Research and develop case studies that identify phasing strategies, economicdevelopment tools, and financing mechanisms employed at peer sites and similarmarkets to fund transportation and infrastructure improvements.

• Prepare a matrix summarizing the applicability of the tools evaluated, in relation toWhite Flint, for the county’s consideration.

Page 4: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

4

Deliverable:

• Report summarizing the case studies and lessons learned, and the evaluation of the economic development tools and financing mechanisms.

Placemaking and Urban Design

6. Develop an urban design vision for the Metro Station site in coordination with WMATA and key stakeholders that establishes the White Flint Metro Station as the multimodal hub for the White Flint Sector Plan, anchored by a transformative development.

• Evaluate the development considerations and design elements for the Metro Station site in coordination with WMATA to attract economic development opportunities.

• Create guidelines that clearly articulate the common vision for the site, provide flexibility, and streamline design review of proposed developments in the future.

• Evaluate the existing Development Plan and its binding elements, the site’s current zoning, and create a clear regulatory process for future development.

• Analyze existing urban form and functionality and identify potential improvements benefitting the public realm, including a review of open space hierarchy and distribution, streetscape elements, and pedestrian connectivity through large parcels.

• Create visually compelling imagery that showcases the development potential for White Flint’s core, highlights assets, and summarizes existing challenges.

Deliverable:

• Create an urban design development framework that establishes a common development vision for the Metro Station site.

7. Explore the creation of comprehensive streetscape standards in White Flint. Work with property

owners and County stakeholders to identify inadequate streetscape components impeding the creation of a walkable street network and vibrant public realm.

• Consider standards for landscaping, paving, lighting, access, and circulation, in coordination with the ongoing Pike District rebranding effort, MCDOT and the Bethesda-Chevy Chase Regional Services Center.

Deliverable:

• Report assessing existing streetscape components in White Flint and evaluating the creation of new standards or policies.

8. Support the creation of a clear framework to guide and implement placemaking activities in

White Flint by coordinating with the Pike District rebranding, engaging with key property owners, committees and advocacy organizations, and County/State agencies.

Deliverable:

• Plan and implement a placemaking activity in partnership with the Better Block Foundation and Maier Warner that reinforces the Pike District brand, supports Vision Zero, and enhances connectivity between sub-districts.

Page 5: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

5

Outreach and Engagement The project team is drafting a communications plan with the Planning Department’s Communications Division that will define the goals, audiences, approach, and strategies for the plan’s public outreach and community engagement. Outreach strategies grouped by concept are summarized below. Community engagement will be multifaceted and include outreach at the Plan area’s principal destinations. When feasible, engagement activities will be coordinated with planned or existing community events in White Flint. In addition to informing the deliverables, public feedback will refine the purpose and direction of the placemaking event, which is tentatively scheduled for fall 2020.

• Mobility & Circulation: Engage residents, commuters, businesses, and property owners through the use of intercept surveys, interviews, pop-up events, and online surveys.

• Economic Development & Implementation Strategies: Engage with WMATA, County stakeholders, advisory committees, major property owners, and residents to develop a cohesive vision and framework for redeveloping the White Flint Metro Station site.

• Placemaking & Urban Design: Engage community members and stakeholders through the Better Block placemaking event, tactical urbanism interventions, pop-up activities, online surveys, and social media.

Project staff will meet periodically with the Pike District’s advisory groups, including the Downtown Advisory Committee, the Implementation Advisory Committee, and the North Bethesda Transportation Management District. The project team is coordinating closely with the campaign rebranding White Flint as the Pike District, to avoid public confusion. Schedule Following the presentation of the scope, staff will update the Planning Board in fall 2020 and deliver a final briefing in spring 2021. As noted, the Advancing the Pike District project will deliver implementable, short-term solutions for the Pike District. Staff will release standalone deliverables as they are completed. These deliverables will identify solutions and equip county agencies and stakeholders with implementable projects that further the vision of the White Flint Sector Plan and respond to the community’s mandate to activate and transform the Pike District into a cohesive, livable district. Background for the Study Area Montgomery County’s planning policies have supported high-density, mixed-use development in White Flint since the 1970s, following approval of WMATA’s regional heavy rail system in 1968. The White Flint Metro Station subsequently opened in December 1984 as part of a seven-mile extension of WMATA’s Red Line from Grosvenor-Strathmore to Shady Grove. Today, White Flint is a significant commercial and residential hub in Montgomery County. Rockville Pike (MD 355) is a historic travel and trade route that links communities in Montgomery County to Washington, D.C., and Frederick County, and is the backbone of the newly formed Pike District.

Page 6: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

6

The 2010 White Flint Sector Plan establishes a vision for transforming White Flint from an auto-oriented environment to a mixed-use walkable district served by multiple modes of transportation. Mixed-use developments delivered in the last decade, including North Bethesda Market, Pike & Rose, and the North Bethesda Town Center, are starting to realize the Sector Plan’s vision. However, the grid street network envisioned by the White Flint Sector Plan is incomplete, isolating the District’s activated pockets and limiting connectivity. Infill development is incrementally enhancing the pedestrian and bicycle network, but the Pike District does not function as a coherent, walkable district. Major roadways such as Rockville Pike, Old Georgetown Road, and Montrose Parkway form barriers that discourage pedestrian movements between destinations. Likewise, walking and biking to the White Flint Metro Station is not a comfortable experience: access is constrained by the station’s proximity to Rockville Pike, limited secondary street network, and a lack of pedestrian and bike connections to local destinations. Additionally, transportation principles and mobility options have evolved since 2010. This initiative will apply Vision Zero principles to the Pike District and consider the impact of alternative mobility options such as ride-hailing, micromobility, and autonomous shuttles. District-wide transportation infrastructure improvements are programmed through the 2010 White Flint Sector Plan, the 2013 Countywide Transit Corridors Functional Master Plan, and the 2018 Bicycle Master Plan. The White Flint Special Taxing District, established following the adoption of the Sector Plan to fund transportation infrastructure improvements, is forward funded by approximately $26 million, limiting the county’s ability to finance and construct capital projects. Since the White Flint Sector Plan was adopted in 2010, most new and approved development in White Flint is multifamily residential. The White Flint 2 Sector Plan expanded the development capacities associated with the White Flint Sector Plan by adding 1,800 residential units and 750,000 square feet of non-residential development to the first two phases of the recommended staging plan in the 2010 Sector Plan. Still, significant residential and non-residential capacity exists in Phase 1 of the White Flint Sector Plan (Figure 1). Figure 1 – Status of White Flint Sector Plan Phase 1 Development

Despite these challenges, several policies, initiatives, and transportation services have been implemented since the Sector Plan was approved in 2010. These recent developments, briefly summarized below, present an opportunity for Montgomery County to creatively reevaluate how to successfully achieve the vision for White Flint, with a focus on near-term improvements that can accelerate the ultimate transformation of the area.

Page 7: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

7

• MCDOT is constructing the White Flint West Workaround, which will realign Old GeorgetownRoad, Executive Boulevard, and establish several new through-block connections.

• In 2017, MCDOT launched “Ride On extRa,” a limited-stop, peak-period bus service on RockvillePike.

• MCDOT is currently studying alternatives for FLASH BRT on Rockville Pike.• Montgomery County approved a Vision Zero Action Plan in 2017, with the goal of eliminating

severe and fatal traffic collisions by 2030.• WMATA terminated its Joint Development Agreement (JDA) with LCOR and is pursuing a blue-

sky approach to reimagine future development at the White Flint Metro Station.• WMATA completed the White Flint Metrorail Station North Entrance Feasibility Study in 2019.

The study evaluated three alternatives for a new station entrance, with projected constructioncosts of $32.7M to $34.8M.

• Montgomery County is rebranding White Flint as the “Pike District.”• In 2018, MCDOT installed eight Capital Bikeshare stations in White Flint and Twinbrook.• MCDOT and SHA have advanced district-wide transportation and infrastructure improvements,

chiefly new separated bike lanes and the construction of multiple secondary streets.• The County Executive’s 2021 Recommended Budget includes $2.9M to fund the preliminary

engineering and construction of access improvements to the White Flint Metro Station.

Figure 2 – Aerial view of the Pike District (2018)

Page 8: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

8

Previous Planning Efforts

White Flint is the focus of multiple previous planning and design studies. The 1992 North Bethesda/Garrett Park Master Plan recognized the need to transition from low-density, single-use development patterns that promote auto-dependency. More recently, the 2010 White Flint Sector Plan and the 2017 White Flint 2 Sector Plan accelerated the goal of transforming the district into a vibrant and sustainable urban center.

North Bethesda/Garrett Park Master Plan (1992)

The 1992 North Bethesda/Garrett Park Master Plan builds on the major principles and land use provisions of the 1978 Sector Plan for Nicholson Lane, supporting the County’s desire to create a mixed-use environment in White Flint. The plan recommends that White Flint become the main urban center for North Bethesda and proposes a “loop circulation street system” to provide additional capacity and to provide an alternative to Rockville Pike for short trips, and to connect the area’s activity centers. The Plan also recognizes the transformational impact of Metrorail by encouraging a shift to public transit, introducing floating zones that support higher residential densities and promote mixed-use development near the Metro station, and advocating for policies that ensure a “lively” pedestrian environment.

White Flint Sector Plan (2010)

The 2010 White Flint Sector Plan establishes the framework to transform primarily single-use commercial properties within the White Flint Sector Plan area into a mixed-use and urban environment that is supported by new public amenities, including parks and open spaces, a recreation center and a fire and emergency station. Creating an urban boulevard for Rockville Pike (MD 355) with BRT service is a major mobility goal of the Sector Plan, along with a new grid of streets and bikeways that promotes a multimodal environment (Figure 3). Unique to the implementation of the Sector Plan is a special taxing district that assesses an ad valorem tax on commercial properties to fund new mobility infrastructure.

Page 9: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

9

Figure 3 – White Flint Concept Sketch

Countywide Transit Corridors Functional Master Plan (2013)

The 2013 Countywide Transit Corridors Functional Master Plan recommends the implementation of 10 BRT corridors to support the County’s land use, environmental, and economic development goals and to provide a reliable alternative to driving in the County’s developed core (Figure 4). Two BRT routes may eventually provide service to the Pike District: the MD 355 South corridor and the North Bethesda Transitway.

The MD 355 BRT will connect Clarksburg with downtown Bethesda, via the Pike District. In the Pike District, BRT stations are proposed on Rockville Pike at the White Flint Metro Station and at Security Lane. MCDOT is currently evaluating conceptual alternatives to identify a recommended alternative for BRT on Rockville Pike; preliminary engineering is expected to be completed in FY23. The North Bethesda

Page 10: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

10

Transitway will provide BRT service to Rock Spring. There are two alternative routes for the easternmost portion of the route, connecting to either the Grosvenor-Strathmore Metro Station or the Pike District, with stations proposed at the intersection of Old Georgetown Road / Executive Boulevard and the White Flint Metro Station.

Figure 4 – Proposed Countywide BRT Network

White Flint 2 Sector Plan (2017)

The White Flint 2 Sector Plan envisions the future of the area between the 2010 White Flint Sector Plan area and the City of Rockville. The plan recommends opportunities for infill and transitional development at key locations and envisions the transformation of commercial properties and shopping centers along Rockville Pike into mixed-use urban places. The Plan also focuses on the residential and industrial uses located on the district’s periphery. The plan recommends retaining some existing multifamily residential development, to support a broad range of affordable housing options in the Plan area and supporting existing light industrial properties to provide needed services for down-county residents and incubation spaces for small businesses and entrepreneurs.

Attachment: White Flint Walkability Analysis

Page 11: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

WAL

KING

IN W

HITE

FLI

NT:

EXPE

RIEN

TIAL

ANA

LYSI

S &

PRO

POSE

D IM

PROV

EMEN

TS

1

Page 12: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9 2

PURP

OSE

The

2010

Whi

te F

lint S

ecto

r Pla

n se

t for

th a

visi

on fo

r

tran

sfor

min

g th

e ar

ea su

rrou

ndin

g th

e W

hite

Flin

t Met

ro

Sta

on

from

an

auto

-orie

nted

set o

f dev

elop

men

ts to

a

mixe

d-us

e, w

alka

ble

dist

rict,

serv

iced

by m

ul p

le m

odes

of

tran

spor

ta o

n.

Sinc

e th

e ad

op o

n of

the

Sect

or P

lan,

incr

emen

tal p

rogr

ess h

as

occu

rred

, cre

a n

g ur

ban

bloc

k pa

ern

s on

indi

vidu

al p

rope

r es

and

impr

oved

ped

estr

ian

expe

rienc

e al

ong

shor

t seg

men

ts.

How

ever

, the

Whi

te F

lint a

rea

s ll

does

not

func

on

as a

cohe

rent

, wal

kabl

e di

stric

t.

To fa

cilita

te th

e cr

ea o

n of

a p

edes

tria

n fri

endl

y en

viro

nmen

t

in W

hite

Flin

t’s co

re, M

ontg

omer

y Co

unty

Pla

nnin

g st

aff

unde

rtoo

k an

Exp

erie

n a

l Wal

king

Ana

lysis

. We

iden

fi ed

and

wal

ked

a nu

mbe

r of t

rips t

o an

d fro

m lo

cal d

es n

a o

ns,

docu

men

ng

exis

ng

cond

i on

s, ch

alle

nges

and

trav

el

impe

dim

ents

in th

e ar

ea. T

hese

trip

s ena

bled

us t

o ga

in a

nuan

ced

unde

rsta

ndin

g of

wha

t it f

eels

like

to w

alk

in th

e ar

ea

toda

y.

The

goal

of t

his a

naly

sis w

as to

iden

fy sh

ort a

nd m

ediu

m

term

reco

mm

enda

ons

that

can

help

crea

te a

ple

asan

t wal

king

envi

ronm

ent i

n W

hite

Flin

t’s co

re a

nd e

xped

ite th

e re

aliza

on

of th

e Se

ctor

Pla

ns’ l

ong

term

visi

on. T

hese

are

list

ed o

n th

e

follo

win

g pa

ges a

long

with

det

aile

d ob

serv

a o

ns fr

om e

ach

wal

king

trip

.

EXEC

UTIV

E BL

VD.

MO

NTRO

SE R

D. MO

NTGO

MER

Y CO

UNTY

CO

NFER

ENCE

CE

NTER

JEFF

ERSO

N ST

. &

MO

NTRO

SE

RD.

MAR

INEL

LI R

D.

NORT

H BE

THES

DA

TOW

N CE

NTER

OLD

GEO

RGET

OWN

RD.

ROCKVILLE PIKE

NoBe

MAR

KET

WHI

TE F

LINT

M

ALL S

ITE

PIKE

&

ROSE

RAND

OLP

H HI

LLS

SHO

PPIN

G CE

NTER

NICHOLSON LA

NE

WHI

TE F

LINT

M

ETRO

STA

TIO

N

Map

show

ing

key

des

na

ons

and

com

plet

ed w

alki

ng tr

ips

Page 13: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9 3

MET

HODO

LOGY

To u

nder

stan

d th

e w

alki

ng e

xper

ienc

e, a

tota

l of 1

1 w

alki

ng

trip

s wer

e un

dert

aken

bet

wee

n m

ajor

des

na

ons

with

in th

e

Whi

te F

lint a

rea.

The

se m

ajor

des

na

ons

inclu

ded:

• W

hite

Flin

t Met

ro S

ta o

n

• Pi

ke &

Ros

e

• No

Be M

arke

t

• Be

thes

da N

orth

Con

fere

nce

Cent

er

• No

rth

Beth

esda

Tow

n Ce

nter

• Ra

ndol

ph H

ills S

hopp

ing

Cent

er

• W

hite

Flin

t Mal

l site

• In

ters

ec o

n of

Jeff e

rson

Str

eet &

Mon

tros

e Ro

ad

Thes

e de

s na

ons

wer

e ch

osen

due

to th

eir p

roxi

mity

to th

e

met

ro st

a o

n, st

atus

as a

n an

chor

for s

hopp

ing

or o

ther

ac

vity

,

and

thei

r pro

xim

ity to

surr

ound

ing

resid

en a

l nei

ghbo

rhoo

ds.

Deta

iled

obse

rva

ons

rega

rdin

g th

ese

wal

king

trip

s are

desc

ribed

in th

e fo

llow

ing

page

s.

Thes

e w

alki

ng tr

ips g

ener

ated

qua

lita

ve

data

that

des

crib

es

the

curr

ent w

alki

ng e

nviro

nmen

t. T

his d

ata

was

ana

lyze

d to

prop

ose

pote

n a

l im

prov

emen

ts fo

r wal

king

in th

e sh

ort,

med

i-

um, a

nd lo

ng te

rm

me

fram

es.

EXEC

UTIV

E BL

VD.

MO

NTRO

SE R

D. MO

NTGO

MER

Y CO

UNTY

CO

NFER

ENCE

CE

NTER

JEFF

ERSO

N ST

. &

MO

NTRO

SE

RD.

MAR

INEL

LI R

D.

NORT

H BE

THES

DA

TOW

N CE

NTER

OLD

GEO

RGET

OWN

RD.

ROCKVILLE PIKE

NoBe

MAR

KET

WHI

TE F

LINT

M

ALL S

ITE

PIKE

&

ROSE

RAND

OLP

H HI

LLS

SHO

PPIN

G CE

NTER

NICHOLSON LA

NE

WHI

TE F

LINT

M

ETRO

STA

TIO

N

Map

show

ing

key

des

na

ons

and

com

plet

ed w

alki

ng tr

ips

Page 14: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

IMPR

OVEM

ENT

PLAN

4

Page 15: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

PHAS

ED IM

PROV

EMEN

T PL

ANKE

Y O

BSER

VATI

ONS

• Dr

ivin

g is

s ll

the

mos

t con

veni

ent a

nd le

ast c

onfu

sing

met

hod

to g

et to

des

na

ons

with

in

the

Whi

te F

lint a

rea.

• Cr

ossin

g la

rge,

mul

-lan

e ro

adw

ays s

uch

as R

ockv

ille

Pike

, Mon

tros

e Pa

rkw

ay, a

nd E

xecu

ve

Boul

evar

d sig

nifi c

antly

leng

then

s tra

vel

mes

and

pre

sent

s haz

ardo

us co

ndi

ons f

or w

alke

rs

and

bicy

clist

s.

• Pe

dest

rian

amen

i es

are

une

venl

y di

strib

uted

thro

ugho

ut th

e ar

ea, l

eadi

ng to

a d

isjoi

nted

and

unev

en w

alki

ng e

xper

ienc

e.

• Ne

w d

evel

opm

ents

in th

e ar

ea co

n n

ue to

be

inw

ardl

y fo

cuse

d, w

ith b

uild

ing

entr

ance

s not

facin

g st

reet

s, cr

ea n

g a

less

des

irabl

e w

alki

ng e

nviro

nmen

t alo

ng th

e la

rger

road

s.

• Th

ere

are

mul

ple

are

as a

long

maj

or ro

ads a

nd a

t int

erse

c o

ns w

here

ther

e is

a he

ight

ened

risk

to p

edes

tria

ns a

nd cy

clist

s as t

hey

exist

toda

y.

• W

hile

the

dist

ance

s bet

wee

n de

s n

a o

ns a

re n

ot g

reat

, wid

e st

reet

s, la

rge

inte

rsec

ons

and

a

gene

ral l

ack

of p

edes

tria

n am

eni

es m

akes

the

trip

app

ear m

uch

long

er a

nd u

nple

asan

t.

POTE

NTIA

L IM

PROV

EMEN

TS

Shor

t Ter

m

Appr

oxim

ate

cost

: $50

0,00

0

Tim

e fra

me:

2 y

ears

• Cr

eate

a w

alka

ble

core

aro

und

the

Whi

te F

lint M

etro

Sta

on

area

that

conn

ects

hig

h de

nsity

resid

en a

l are

as, t

he m

etro

sta

on,

and

loca

l des

na

ons

. Th

is co

re sh

ould

be

prio

ri ze

d fo

r

wal

king

env

ironm

ent i

mpr

ovem

ents

. Th

e w

alka

ble

core

enc

ompa

sses

Old

Geo

rget

own

Road

,

Rock

ville

Pike

, Exe

cu v

e Bo

ulev

ard,

Mar

inel

li Ro

ad, a

nd C

itade

l Ave

nue.

Med

ium

Term

Appr

oxim

ate

cost

: $

TBD

Tim

e fra

me:

5 y

ears

• Ex

tend

the

wal

kabl

e co

re n

orth

alo

ng R

ockv

ille

Pike

to R

ose

Aven

ue a

nd so

uth

alon

g Ro

ckvi

lle

Pike

to N

ichol

son

Lane

by

prov

idin

g su

itabl

e pe

dest

rian

amen

i es

.

• Im

plem

ent a

n in

terim

“BRT

” ser

vice

alo

ng R

ockv

ille

Pike

with

in th

e ex

is n

g rig

ht-o

f-way

that

also

impr

oves

the

wal

king

exp

erie

nce

in th

e ar

ea.

• Cr

eate

“Ba

rnes

Dan

ce” s

tyle

ped

estr

ian

cros

sings

at t

he in

ters

ec o

n of

Roc

kvill

e Pi

ke a

nd O

ld

Geor

geto

wn

Road

and

Roc

kvill

e Pi

ke a

nd M

arin

elli

Road

.

• Ad

d on

-str

eet p

arki

ng o

n O

ld G

eorg

etow

n Ro

ad.

• Co

mpl

ete

desig

n an

d st

art c

onst

ruc

on

of th

e No

rthe

rn E

ntra

nce

at th

e W

hite

Flin

t Met

ro

Sta

on.

Long

Term

Appr

oxim

ate

cost

: $ T

BD

Tim

e fra

me:

10

year

s

• Im

plem

ent l

ong

term

infra

stru

ctur

e pr

ojec

ts in

cludi

ng b

us ra

pid

tran

sit a

long

Roc

kvill

e Pi

ke

(Mar

ylan

d St

ate

Rout

e 35

5), t

he W

este

rn W

ork

Arou

nd th

at in

clude

s the

real

ignm

ent o

f

Exec

u v

e Bo

ulev

ard,

the

impl

emen

ta o

n of

the

plan

ned

grid

of s

tree

ts th

roug

hout

the

area

,

and

requ

ire p

edes

tria

n an

d bi

cycle

facil

i es

with

the

rede

velo

pmen

t of p

arce

ls as

wel

l as

unde

r-gro

undi

ng o

f u li

es.

5

Page 16: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

SHO

RT T

ERM

IMPR

OVEM

ENTS

Crea

te a

wal

kabl

e co

re a

roun

d th

e W

hite

Flin

t Met

ro S

ta o

n ar

ea th

at c

onne

cts

high

den

sity

resid

en a

l are

as,

the

met

ro st

a o

n, a

nd lo

cal d

es n

a o

ns b

y ta

rge

ng

impr

ovem

ents

alo

ng O

ld G

eorg

etow

n Ro

ad, C

itade

l Ave

nue,

M

arin

elli

Road

, & E

xecu

ve

Boul

evar

d.

Prio

ri ze

d Im

prov

emen

ts1.

Clo

sure

of “

hot r

ight

s” o

n Ro

ckvi

lle P

ike &

Old

Geo

rget

own

Road

2. A

ddi

on o

f lan

dsca

ping

ele

men

ts su

ch a

s pla

nter

s, st

reet

tree

s or

shru

bs a

long

segm

ents

of R

ockv

ille

Pike

, Old

Geo

rget

own

Road

and

Exec

u v

e Bo

ulev

ard

to cr

eate

buff

er b

etw

een

road

way

and

pede

stria

ns:

--

Both

side

s of R

ockv

ille

Pike

bet

wee

n M

arin

elli

Road

an

d O

ld G

eorg

etow

n Ro

ad

--

Nort

h sid

e of

Old

Geo

rget

own

Road

bet

wee

n

Ro

ckvi

lle P

ike a

nd Tr

ade

Stre

et

--

Sout

h sid

e of

Old

Geo

rget

own

Road

bet

wee

n Ro

ckvi

lle

Pi

ke a

nd G

rand

Par

k Av

enue

--

East

side

of E

xecu

ve

Boul

evar

d be

twee

n O

ld

Ge

orge

tow

n Ro

ad a

nd M

arin

elli

Road

3. W

ayfi n

ding

ele

men

ts a

t maj

or d

es n

a o

ns a

nd tr

ansi

on

poin

ts:

Met

ro st

a o

n, R

ockv

ille

Pike

& O

ld G

eorg

etow

n Ro

ad in

ters

ec o

n,

Pike

& R

ose,

Wal

l Par

k, C

itade

l Ave

nue

& M

arin

elli

Road

, Old

Geor

geto

wn

Road

& C

itade

l Ave

nue

--W

ayfi n

ding

to in

clude

dire

c o

n, w

alki

ng/b

ikin

g

di

stan

ce, a

nd

me

to d

es n

a o

ns

6

3

3

1

4 25

6

Old

Geo

rget

own

Road

Mar

inel

li Roa

d

Citadel Avenue

Rockville Pike

Exec

u ve Bl

vd

Page 17: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

SHO

RT T

ERM

IMPR

OVEM

ENTS

Crea

te a

wal

kabl

e co

re a

roun

d th

e W

hite

Flin

t Met

ro S

ta o

n ar

ea th

at c

onne

cts

high

den

sity

resid

en a

l are

as,

the

met

ro st

a o

n, a

nd lo

cal d

es n

a o

ns b

y ta

rge

ng

impr

ovem

ents

alo

ng O

ld G

eorg

etow

n Ro

ad, C

itade

l Ave

nue,

M

arin

elli

Road

, & E

xecu

ve

Boul

evar

d.

Prio

ri ze

d Im

prov

emen

ts (C

ontd

.)4.

Pro

vide

tem

pora

ry la

ndsc

ape

impr

ovem

ents

such

as fl

ow

er

plan

ngs

on

the

traffi

c is

land

on

nort

h sid

e of

Old

Geo

rget

own

Road

.

5. A

djus

t sig

nal

min

gs to

pro

vide

fully

aut

omat

ed cr

ossin

g lig

ht a

t the

inte

rsec

on

of E

xecu

ve

Boul

evar

d an

d M

arin

elli

Road

.

6. C

lean

up

and

rem

oval

of o

verg

row

n ve

geta

on

and

enha

ncem

ent

of fe

ncin

g el

emen

ts a

long

side

wal

ks a

roun

d th

e W

MAT

A sit

e al

ong

Cita

del A

venu

e an

d O

ld G

eorg

etow

n Ro

ad.

7

3

3

1

4 25

6

Old

Geo

rget

own

Road

Mar

inel

li Roa

d

Citadel Avenue

Rockville Pike

Exec

u ve Bl

vd

Page 18: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

MED

IUM

TER

M IM

PROV

EMEN

TSEx

tend

wal

kabl

e co

re n

orth

to in

ters

ec o

n of

Ros

e Av

enue

& R

ockv

ille

Pike

and

sou

th to

inte

rsec

on

of N

icho

lson

Lane

&

Roc

kvill

e Pi

ke b

y pr

ovid

ing

suita

ble

pede

stria

n am

eni

es.

Prio

ri ze

d Im

prov

emen

ts

1. P

rovi

de la

ndsc

apin

g el

emen

ts a

long

Roc

kvill

e Pi

ke to

crea

te b

uff e

r

betw

een

road

way

and

ped

estr

ians

:

--A

dd b

uff e

r bet

wee

n sid

ewal

k an

d tr

affi c

on

east

side

of

Ro

ckvi

lle P

ike b

etw

een:

- Nich

olso

n La

ne a

nd th

e st

art

of si

dew

alk

infra

stru

ctur

e in

fron

t of U

.S. N

ucle

ar

Regu

lato

ry C

omm

issio

n

- Ros

e Av

enue

and

the

entr

ance

to F

orum

Cond

omin

ium

com

plex

--A

dd b

uff e

r bet

wee

n sid

ewal

k an

d tr

affi c

on

wes

t sid

e

of

Roc

kvill

e Pi

ke b

etw

een:

- Nich

olso

n La

ne a

nd M

arin

elli

Road

2. W

ayfi n

ding

ele

men

ts a

t maj

or d

es n

a o

ns a

nd tr

ansi

on

poin

ts:

Inte

rsec

on

of R

ockv

ille

Pike

& R

ose

Aven

ue, I

nter

sec

on

of R

ockv

ille

Pike

& N

ichol

son

Lane

.

--W

ayfi n

ding

to in

clude

dire

c o

n, w

alki

ng/ b

ikin

g

di

stan

ce, a

nd

me

to d

es n

a o

ns

3. I

mpl

emen

t an

inte

rim “B

RT” s

ervi

ce a

long

Roc

kvill

e Pi

ke th

at a

lso

impr

oves

the

over

all w

alki

ng e

xper

ienc

e in

the

area

.

8

32

1

Shor

t-Ter

m “W

alka

ble

Core

4O

ld G

eorg

etow

n Ro

ad

Mar

inel

li Roa

d

Citadel Avenue

Rockville Pike

Exec

u ve Bl

vd

Old

Geo

rget

own

Road

Mar

inel

li Roa

d

Citadel Avenue

Rockville Pike

Exec

u ve Bl

vd

Rose

Ave

nue

Nich

olso

n La

ne

5 6

1

Page 19: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

MED

IUM

TER

M IM

PROV

EMEN

TSEx

tend

wal

kabl

e co

re n

orth

to in

ters

ec o

n of

Ros

e Av

enue

& R

ockv

ille

Pike

and

sou

th to

inte

rsec

on

of N

icho

lson

Lane

&

Roc

kvill

e Pi

ke b

y pr

ovid

ing

suita

ble

pede

stria

n am

eni

es.

Prio

ri ze

d Im

prov

emen

ts (C

ontd

.)

4. C

reat

e a

Barn

es D

ance

styl

e pe

dest

rian

cros

sings

at t

he in

ters

ec o

n

of R

ockv

ille

Pike

and

Old

Geo

rget

own

Road

and

Roc

kvill

e Pi

ke a

nd

Mar

inel

li Ro

ad.

5. C

ompl

ete

desig

n of

nor

ther

n en

tran

ce a

nd st

art c

onst

ruc

on

6. A

dd o

n-st

reet

par

king

on

Old

Geo

rget

own

Road

9

32

1

Shor

t-Ter

m “W

alka

ble

Core

4O

ld G

eorg

etow

n Ro

ad

Mar

inel

li Roa

d

Citadel Avenue

Rockville Pike

Exec

u ve Bl

vd

Old

Geo

rget

own

Road

Mar

inel

li Roa

d

Citadel Avenue

Rockville Pike

Exec

u ve Bl

vd

Rose

Ave

nue

Nich

olso

n La

ne

5 6

11

Page 20: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

LONG

TER

M IM

PROV

EMEN

TSIm

plem

ent l

ong

term

infr

astr

uctu

re p

roje

cts

in th

e ar

ea in

clud

ing

BRT,

Wes

tern

Wor

k Ar

ound

, nor

ther

n M

etro

en

tran

ce, s

tree

t grid

stru

ctur

e, a

nd a

ddi

onal

ped

estr

ian/

bic

ycle

faci

li e

s.

Prio

ri ze

d Im

prov

emen

ts

1. I

mpl

emen

ta o

n of

BRT

alo

ng R

ockv

ille

Pike

2. C

ompl

e o

n of

Wes

tern

Wor

k Ar

ound

3. B

uild

nor

ther

n en

tran

ce to

Whi

te F

lint M

etro

sta

on

4. C

on n

ued

impl

emen

ta o

n of

stre

et g

rid st

ruct

ure

(sel

ecte

d st

reet

s

inclu

ded

on m

ap to

the

right

from

201

0 W

hite

Flin

t Sec

tor P

lan)

5. A

ddi

onal

ped

estr

ian

and

bicy

cle fa

cili

es w

ith co

n n

ued

deve

lopm

ent

6. A

ddi

onal

wayfi n

ding

ele

men

ts a

s nec

essa

ry w

ith co

n n

ued

deve

lopm

ent

7. U

nder

grou

nd u

li e

s

12

4

Shor

t-Ter

m “W

alka

ble

Core

”Lo

nger

Term

Grid

of S

tree

ts

3Ol

d Ge

orge

tow

n Ro

ad Mar

inel

li Roa

d

Citadel Avenue

Rockville Pike

Exec

u ve Bl

vd

Towne Road

Nich

olso

n La

ne

Rose

Ave

nue

10

Page 21: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

WAL

KING

TRI

P DO

CUM

ENTA

TIO

N

11

Page 22: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

1:W

hite

Flin

t Met

ro S

ta o

n to

Pik

e &

Ros

e

PIKE

& R

OSE

WHI

TE F

LINT

ST

ATIO

N

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e: 1

1 m

inut

es

• To

tal D

istan

ce: .

3 m

iles

• Ro

ckvi

lle P

ike a

nd O

ld G

eorg

etow

n Ro

ad

inte

rsec

on

is a

signifi c

ant p

edes

tria

n ba

rrie

r

with

four

“hot

righ

ts”

• Cr

ossin

g th

is in

ters

ec o

n to

ok ~

3 m

in.,

15 se

c

(30%

of t

otal

trip

)

• Ge

nera

l wal

king

env

ironm

ent l

acks

ped

estr

ian

com

fort

s and

safe

ty:

─No

isy e

nviro

nmen

t fro

m tr

affi c

(com

fort

)

─St

rong

exh

aust

odo

r fro

m tr

affi c

(com

fort

)

─M

inim

al sh

ade

(com

fort

)

─M

inim

al b

uff e

r bet

wee

n ro

adw

ay &

sidew

alk

(saf

ety)

• No

wayfi n

ding

ele

men

t to

guid

e pe

ople

to

des

na o

ns

• Bi

kesh

are

and

bike

rack

s are

loca

ted

at th

e

met

ro st

a o

n bu

t the

re a

re n

o sa

fe b

ike la

nes

to a

cces

s the

sta

on

itsel

f

• Sh

ort c

ross

ing

mes

& la

ck o

f ped

estr

ian

refu

ge a

reas

in cr

ossw

alks

alo

ng O

ld

Geor

geto

wn

Road

and

Roc

kvill

e Pi

ke

• De

velo

pmen

ts a

re in

tern

ally

focu

sed,

resu

l ng

in le

ss p

edes

tria

n fri

endl

y fro

ntag

es a

long

Rock

ville

Pike

• M

etro

Sta

on

entr

ance

doe

s not

hav

e a

“sen

se

of p

lace

Side

wal

ks a

long

Old

Geo

rget

own

Road

at P

ike

& R

ose

prov

ide

buff e

r for

ped

estr

ians

Pede

stria

n cr

ossin

g ac

ross

Gra

nd P

ark

Aven

ue

is w

ell m

arke

d an

d sh

ort i

n di

stan

ce

Pede

stria

ns a

long

Roc

kvill

e Pi

ke a

re e

xpos

ed to

fa

st m

ovin

g tr

affi c

Bus s

tops

alo

ng R

ockv

ille

Pike

pro

vide

wid

er

sidew

alk

area

s but

lack

land

scap

ing

& sh

ade

Whi

te F

lint M

etro

Sta

on

entr

ance

doe

s not

ha

ve a

sens

e of

pla

ce

Cros

swal

k ac

ross

Roc

kvill

e Pi

ke a

re n

ot

wel

l str

iped

Mul

ple

lane

s of t

raffi

c cre

ate

long

cros

sing

dist

ance

s for

ped

estr

ians

Hot r

ight

s at t

he in

ters

ec o

n Ro

ckvi

lle P

ike &

O

ld G

eorg

etow

n Ro

ad ca

use

pede

stria

n de

lays

12

Page 23: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

2:P

ike

& R

ose

to N

orth

Bet

hesd

a To

wn

Cent

er

PIKE

& R

OSE

HARR

IS T

EETE

R

Capi

tal B

ikesh

are

sta

on

at O

ld G

eorg

etow

n Rd

. is n

ot d

irect

ly

conn

ecte

d to

any

bike

lane

sM

any

child

ren

live

in th

e No

rth

Beth

esda

Tow

n Ce

nter

apa

rtm

ent c

ompl

ex a

nd u

se M

CPS

buse

s to

go

to sc

hool

Rock

ville

Pike

& O

ld G

eorg

etow

n Rd

. Int

erse

c o

n is

wid

e an

d diffi

cult

to cr

oss f

or p

edes

tria

ns

Pede

stria

n ro

u n

ely

cut a

cros

s WM

ATA

prop

er-

ty to

shor

ten

thei

r trip

sPl

aza

at th

e No

rth

Beth

esda

Tow

n Ce

nter

has

pe-

dest

rian

amen

i es

like

sea

ng

and

a bi

kesh

are

Publ

ic sp

ace

at N

orth

Bet

hesd

a To

wn

Cent

er

prov

ides

an

area

of r

efug

e fo

r wal

kers

New

cros

swal

ks a

t the

inte

rsec

on

of O

ld

Geor

geto

wn

Road

and

Neb

el S

tree

t

13

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e: 9

min

., 30

sec.

• To

tal D

istan

ce: .

5 m

iles

• Tr

ip re

quire

s ind

ivid

uals

to cr

oss R

ockv

ille

Pike

whi

ch e

xten

ds th

e tr

ip

me

due

to m

ul p

le tr

avel

lane

s and

hig

h tr

affi c

volu

mes

• Si

dew

alks

cond

i on

s cha

nge

acro

ss

Rock

ville

Pike

: Wes

t sid

e ha

s few

er a

nd

smal

ler t

rees

; Eas

t sid

e ha

s ext

ensiv

e tr

ee

cove

r and

is q

uiet

er a

nd w

ider

• Ap

artm

ent c

ompl

exes

line

the

nort

h sid

e

of O

ld G

eorg

etow

n Ro

ad, b

ut a

re se

t bac

k

and

buff e

red

from

side

wal

k cr

ea n

g a

less

ac

ve

front

age

• M

ul p

le C

apita

l Bike

shar

e st

a o

ns a

long

wal

king

rout

e, b

ut n

o bi

ke la

nes

• M

ost c

ross

wal

ks a

cros

s Old

Geo

rget

own

Road

and

Roc

kvill

e Pi

ke a

re n

ot cl

early

mar

ked

and

cont

ain

smal

l or n

o pe

dest

ri-

an a

reas

of r

efug

e

• Pa

rk a

nd p

laza

in fr

ont o

f Har

ris Te

eter

are

wel

l lan

dsca

ped

with

sea

ng

op o

ns,

prov

idin

g an

are

a of

rest

and

refu

ge fo

r

wal

kers

Page 24: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

Lack

of s

idew

alks

alo

ng th

e ex

is n

g Ex

ecu

ve

Boul

evar

d

Ther

e ar

e no

are

as fo

r ped

estr

ian

refu

ge a

long

Ex

ecu

ve

Boul

evar

d

Cros

swal

ks a

cros

s Exe

cu v

e Bl

vd. a

t Wal

l Par

k re

quire

ac

va

on

by p

edes

tria

nsCu

rb cu

t int

o th

e pa

rkin

g ga

rage

at P

ike a

nd

Rose

is w

ide

and

lack

s a cl

ear w

alki

ng a

rea

Hot r

ight

on

Old

Geo

rget

own

Road

exp

oses

pe

dest

rians

to fa

st m

ovin

g tr

affi c

Side

wal

k al

ong

Old

Geo

rget

own

Road

is w

ide

but l

acks

any

ped

estr

ian

buff e

r

New

ly co

nstr

ucte

d ro

ads a

s a p

art o

f the

Wes

t-er

n W

ork-

arou

nd p

rovi

de p

edes

tria

n am

eni

es

The

Wes

tern

Wor

k-Ar

ound

will

reco

nstr

uct t

he

inte

rsec

on

of O

ld G

eorg

etow

n Rd

. & To

wne

Rd.

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

3:P

ike

& R

ose

to B

ethe

sda

Nor

th C

onfe

renc

e Ce

nter

/ Wal

l Par

k

PIKE

& R

OSE

CONF

EREN

CE

CENT

ER

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e: 8

min

., 15

sec.

• To

tal D

istan

ce: .

3 m

iles

• Ex

tens

ive

por

on o

f exi

s n

g Ex

ecu

ve

Boul

evar

d la

cks s

idew

alk

infra

stru

ctur

e

for p

edes

tria

ns

• Re

trofi

ed

grid

stru

ctur

e be

ing

inst

alle

d

betw

een

Exec

u v

e Bo

ulev

ard

and

Rock

ville

Pike

• La

rge

por

ons o

f Exe

cu v

e Bo

ulev

ard

have

no

tree

s or a

reas

for p

edes

tria

ns

refu

ge

• Cr

ossin

g Ex

ecu

ve

Boul

evar

d an

d

Mar

inel

li Ro

ad to

Wal

l Par

k to

ok

appr

oxim

atel

y 1

min

.

• Cr

ossw

alks

are

not

aut

omat

ed a

nd

requ

ire p

edes

tria

ns to

pre

ss b

u o

n fo

r a

wal

k sig

nal

• W

alk

signa

l too

k m

ul p

le tr

affi c

sign

al

cycle

s to

ac v

ate

• Th

ere

is m

inim

al to

no

wayfi n

ding

elem

ents

to g

uide

peo

ple

from

Pike

&

Rose

to th

e Be

thes

da N

orth

Con

fere

nce

Cent

er

14

Page 25: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

Met

ro u

nder

pass

pro

vide

s acc

ess t

o th

e st

a o

n bu

t is

poor

ly li

t and

uni

nvi

ngPe

dest

rian

Cros

sing

Mar

inel

li Rd

. is w

ell m

arke

d an

d re

la v

ely

shor

t

Side

wal

k al

ong

Mar

inel

li Rd

. is w

ell l

ands

cape

d

Cros

swal

k ac

ross

Exe

cu v

e Bl

vd. n

eeds

ac

va

on

thro

ugh

the

pres

s of a

bu

on

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

4:C

onfe

renc

e Ce

nter

/ Wal

l Par

k to

Whi

te F

lint M

etro

Sta

on

WHI

TE F

LINT

ST

ATIO

N

CONF

EREN

CE

CENT

ER

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e: 6

min

., 30

sec.

• To

tal D

istan

ce: .

25 m

iles

• Si

dew

alk

infra

stru

ctur

e fro

m C

onfe

renc

e Ce

nter

to W

hite

Flin

t Sta

on

is w

ide

and

lined

with

tree

s, an

d ha

s a la

rge

setb

ack

from

road

way

• Ge

nera

l wal

king

env

ironm

ent i

s ple

asan

t an

d re

laxi

ng•

Side

wal

k di

d no

t hav

e la

rge

num

bers

of

pede

stria

ns d

urin

g th

e da

y•

Sout

h sid

e of

Mar

inel

li Ro

ad h

as n

o sid

e-w

alk

buff e

r and

is n

ot li

ned

with

tree

s•

Pede

stria

ns ca

n cr

oss R

ockv

ille

Pike

to th

e W

hite

Flin

t Sta

on

at st

reet

leve

l or v

ia

the

pede

stria

n un

derp

ass

• St

reet

leve

l cro

ssw

alk

at R

ockv

ille

Pike

is

not a

utom

ated

and

ther

e is

no m

eani

ng-

ful a

rea

of re

fuge

in th

e ce

nter

of r

oad-

way

• M

id-b

lock

cros

sing

of M

arin

elli

Road

has

a

wel

l mar

ked

cros

swal

k w

ith a

ped

estr

i-an

refu

ge a

rea

• Si

dew

alk

mat

eria

l is b

rick

and

is cle

arly

de

linea

ted

in d

rivew

ays o

r oth

er cr

ossin

gs

Entr

ance

to th

e Co

nven

on

Cent

er is

dom

inat

ed

by a

veh

icula

r dro

p-off

are

a

Pede

stria

n ar

ea o

f ref

uge,

at t

he m

id-b

lock

cr

ossin

g on

Mar

inel

li Rd

. nea

r the

conf

eren

ce

cent

er h

otel

15

Page 26: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

5:W

hite

Flin

t Met

ro S

ta o

n to

NoB

e M

arke

t

WHI

TE F

LINT

ST

ATIO

N

NoBe

MAR

KET

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e: 7

min

., 30

sec.

• To

tal D

istan

ce: .

4 m

iles

• Ge

nera

l wal

king

env

ironm

ent l

acks

pe

dest

rian

com

fort

s:

─No

isy e

nviro

nmen

t fro

m tr

affi c

─St

rong

exh

aust

odo

r fro

m tr

affi c

─M

inim

al sh

ade

• Th

ere

is li

le to

no

buff e

r bet

wee

n Ro

ckvi

lle P

ike &

side

wal

k. e

xpos

ing

wal

kers

to h

igh

spee

d tr

affi c

• M

ul p

le v

ehicu

lar e

ntra

nces

to p

rope

r- e

s fro

m R

ockv

ille

Pike

crea

te in

terr

up-

ons

in si

dew

alks

Poor

ped

estr

ian

line

of si

ght w

hen

cros

sing

Exec

u v

e Bo

ulev

ard

• No

Be M

arke

t is i

nter

nally

focu

sed

and

does

not

crea

te a

ped

estr

ian

frien

dly

front

age

on R

ockv

ille

Pike

Min

imal

ped

estr

ian

refu

ge a

rea,

Roc

kvill

e Pi

ke

Side

wal

k is

inte

rrup

ted

by m

ul p

le cu

rb cu

ts

alon

g Ro

ckvi

lle P

ike

Ther

e is

no b

uff e

r bet

wee

n th

e sid

ewal

k an

d fa

st

mov

ing

traffi

c a

long

Roc

kvill

e Pi

keNo

Be M

arke

t has

min

imal

com

mer

cial f

ront

age

dire

ctly

ope

ning

on

to R

ockv

ille

Pike

Exec

u v

e Bl

vd. c

ross

ing

at R

ockv

ille

Pike

NoBe

Mar

ket i

nter

ior c

ourt

yard

16

Page 27: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

6:W

hite

Flin

t Mal

l Site

to W

hite

Flin

t Met

ro S

ta o

n

WHI

TE F

LINT

ST

ATIO

N WHI

TE F

LINT

M

ALL S

ITE

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e: 9

min

., 30

sec.

• To

tal D

istan

ce: .

4 m

iles

• Ge

nera

l wal

king

env

ironm

ent l

acks

pe

dest

rian

com

fort

s:

─No

isy e

nviro

nmen

t fro

m tr

affi c

─St

rong

exh

aust

odo

r fro

m tr

affi c

─M

inim

al sh

ade

• Th

ere

is li

le to

no

buff e

r bet

wee

n Ro

ckvi

lle P

ike &

side

wal

k. e

xpos

ing

wal

kers

to h

igh

spee

d tr

affi c

• Si

dew

alk

alon

g th

e Nu

clear

Reg

ulat

ory

Com

miss

ion

build

ing

is bu

ff ere

d fro

m

road

way

by

larg

e pl

an n

gs, m

ul p

le

tree

s, an

d gr

eene

ry, b

ut h

as lo

w v

isibi

lity

from

Roc

kvill

e Pi

ke.

─Cr

eate

s a p

leas

ant w

alki

ng

envi

ronm

ent f

or p

edes

tria

ns•

Uses

like

gas

sta

ons

with

mul

ple

cu

rb cu

ts o

n Ro

ckvi

lle P

ike h

ave

a hi

gh

frequ

ency

of c

ars t

urni

ng in

to th

e pr

oper

es f

rom

fast

mov

ing

traffi

c off

the

Pike

, cre

a n

g a

pote

n a

l haz

ard

for

pede

stria

ns

Side

wal

k tr

ansi

oni

ng fr

om

alon

g ro

adw

ay n

ear N

ucle

ar

Regu

lato

ry C

omm

issio

n

Side

wal

k al

ong

Rock

ville

Pike

with

min

imal

buff

er

Side

wal

k al

ong

Nucle

ar R

egul

ator

y Co

mm

issio

n is

buff e

red

from

traffi

c o

n Ro

ckvi

lle P

ike

Side

wal

k al

ong

Nucle

ar R

egul

ator

y Co

m-

miss

ion

is pe

dest

rian

frien

dly

but i

t is

uncle

ar w

heth

er it

is p

ublic

ly a

cces

sible

17

Page 28: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

7:W

hite

Flin

t Met

ro S

ta o

n to

Pik

e &

Ros

e (a

ltern

ate

rout

e)

WHI

TE F

LINT

ST

ATIO

N

PIKE

& R

OSE

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e: 1

0 m

inut

es

• To

tal D

istan

ce: .

35 m

iles

• Al

tern

ate

rout

e fro

m W

hite

Flin

t Met

ro

Sta

on

to P

ike &

Ros

e vi

a th

e Ro

ckvi

lle

Pike

und

erpa

ss

• Si

dew

alk

wid

th v

arie

s alo

ng th

e ro

ute

• Pe

dest

rian

com

fort

s are

lack

ing

alon

g

Rock

ville

Pike

and

sout

h sid

e of

Old

Geor

geto

wn

Road

:

─No

isy e

nviro

nmen

t fro

m tr

affi c

─St

rong

exh

aust

odo

r fro

m tr

affi c

─M

inim

al sh

ade

• Th

ere

is li

le to

no

buff e

r bet

wee

n Ro

ckvi

lle P

ike &

side

wal

k, e

xpos

ing

wal

kers

to h

igh

spee

d tr

affi c

• W

hile

trip

is sh

orte

r tha

n W

alki

ng Tr

ip

1, in

divi

dual

s s ll

nee

d to

cros

s “ho

t

right

s” o

n O

ld G

eorg

etow

n Ro

ad

Inte

rior o

f Pike

& R

ose

is in

vi n

g an

d re

laxi

ng fo

r ped

estr

ians

Curb

cuts

thro

ugh

sidew

alk

alon

g Ro

ckvi

lle P

ike cr

eate

confl

icts

be

twee

n pe

dest

rians

and

veh

icles

turn

ing

onto

/ off

the

pike

.W

ide

sidew

alks

alo

ng R

ockv

ille

Pike

with

no

gree

n bu

ff er b

e-tw

een

road

way

and

side

wal

k

Min

imal

ped

estr

ian

area

of r

efug

e al

ong

Old

Geo

rget

own

Road

crea

tes

unsa

fe co

ndi

ons

18

Page 29: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

MO

NTRO

SE

PARK

WAY

&

TOW

NE R

D IN

TERS

ECTI

ON

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

8:P

ike

& R

ose

to E

. Jeff

ers

on S

tree

t

PIKE

& R

OSE

E. JE

FFER

SON

ST. &

M

ONT

ROSE

RD

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e: 1

6 m

inut

es

• To

tal D

istan

ce: .

65 M

iles

• Pe

dest

rian

com

fort

s are

lack

ing:

─M

inim

al sh

ade

alon

g sid

ewal

ks

─M

inim

al b

uff e

r bet

wee

n ro

adw

ay

• M

ontr

ose

Road

lack

s ade

quat

e bu

ff er

betw

een

the

stre

et a

nd th

e sid

ewal

k

• Si

dew

alks

alo

ng To

wne

Roa

d ar

e se

t bac

k

from

the

stre

et b

ut la

ck a

ny la

ndsc

apin

g

buff e

r

• Cr

ossw

alk

at M

ontr

ose

Park

way

and

Tow

ne R

oad

is lo

ng a

nd ta

kes s

ignifi c

ant

amou

nt o

f m

e to

cros

s. Th

ere

is no

cros

swal

k on

the

east

side

of T

owne

Roa

d

at th

is in

ters

ec o

n.

• M

ontr

ose

Park

way

has

fast

mov

ing

traf

-

fi c. T

he si

dew

alk

is se

tbac

k, b

ut la

cks a

ny

land

scap

e bu

ff ers

.

• M

ontr

ose

Road

has

“hot

righ

ts” w

hich

pres

ent a

pot

en a

l haz

ard

to w

alke

rs

• Co

mm

ercia

l and

resid

en a

l are

as a

re se

t

back

from

Mon

tros

e Ro

ad a

nd se

para

ted

from

stre

et/s

idew

alk

by h

edge

s and

/or

fenc

es

Mon

tros

e Ro

ad “h

ot ri

ght”

crea

tes

safe

ty h

azar

d fo

r ped

estr

ians

cr

ossin

g th

e ro

adw

ay

Mon

tros

e Pa

rkw

ay cr

ossw

alk

is ve

ry w

ide

and

take

s sig

nifi c

ant

amou

nt o

f m

e to

cros

sM

ontr

ose

Road

cros

swal

k is

signa

led

and

has s

etba

ck

for p

edes

tria

ns

Side

wal

k al

ong

Mon

tros

e Ro

ad h

as g

reen

buff

er,

but n

o la

ndsc

apin

gCo

mm

ercia

l are

as a

long

Mon

tros

e Ro

ad a

re se

t bac

k fro

m ro

ad cr

ea n

g ba

rrie

r to

stre

et

19

Page 30: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

9:E

. Jeff

ers

on S

tree

t To

Pike

& R

ose

PIKE

& R

OSE

E. JE

FFER

SON

ST. &

M

ONT

ROSE

RD

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e: 1

8 m

inut

es

• To

tal D

istan

ce: .

75 m

iles

• Pe

dest

rian

com

fort

s are

lack

ing

alon

g

Mon

tros

e Pa

rkw

ay:

─No

isy e

nviro

nmen

t fro

m tr

affi c

─Tr

affi c

is h

eavy

and

fast

alo

ng

Mon

tros

e Pa

rkw

ay

• M

ontr

ose

Park

way

has

fast

mov

ing

traf

-

fi c. T

he si

dew

alk

is se

tbac

k, b

ut la

cks

any

land

scap

e bu

ff ers

.

• Pe

dest

rian

envi

ronm

ent a

long

por

ons

of E

xecu

ve

Boul

evar

d is

plea

sant

with

larg

e tr

ees,

buff e

red

sidew

alks

, and

min

imal

traffi

c

• Ca

pita

l Bike

shar

e st

a o

n lo

cate

d on

Exec

u v

e Bl

vd, b

ut n

o bi

ke la

nes

• Co

mm

ercia

l bui

ldin

gs a

re se

t bac

k

from

the

stre

et, i

nwar

dly

focu

sed,

and

sepa

rate

d fro

m si

dew

alk

by p

hysic

al

barr

iers

such

as l

ands

capi

ng, l

arge

park

ing

lots

, or f

ence

s

Path

alo

ng M

ontr

ose

Park

way

has

la

rge

buff e

r fro

m ro

adw

ay

Side

wal

k al

ong

Exec

. Blv

d. is

w

ell b

uff e

red

from

road

way

Capi

tal B

ikesh

are

Sta

on

alon

g Ex

ecu

ve

Blvd

.Si

dew

alk

alon

g Ex

ecu

ve

Blvd

. is s

et b

ack

from

road

way

, has

tree

bu

ff er,

and

is w

ell s

hade

d

Cros

sing

of E

. Jeff

ers

on S

t. &

Mon

tros

e Rd

has

no

ped

estr

ian

area

of r

efug

e an

d is

wel

l wor

n

20

Page 31: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

10:

Pike

& R

ose

to W

hite

Flin

t Met

ro S

ta o

n

PIKE

& R

OSE

WHI

TE F

LINT

ST

ATIO

N

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e: 9

min

utes

• To

tal D

istan

ce: .

45 m

iles

• Pe

dest

rian

com

fort

s are

lack

ing

alon

g

Rock

ville

Pike

:

─No

isy e

nviro

nmen

t fro

m tr

affi c

─St

rong

exh

aust

odo

r fro

m tr

affi c

─M

inim

al sh

ade

─M

inim

al b

uff e

r bet

wee

n ro

adw

ay a

nd

wal

kers

• Si

dew

alk

wid

ths v

ary

alon

g ro

ute

• Gr

and

Park

pro

vide

s a p

ublic

spac

e al

ong

the

rout

e th

at is

ple

asan

t and

rela

xing

• Ge

ng

acro

ss R

ockv

ille

Pike

at R

ose

Aven

ue ta

kes a

sign

ifi ca

nt a

mou

nt o

f

cros

sing

me

• M

inim

al si

dew

alk

ac v

a o

n al

ong

som

e

exis

ng

com

mer

cial d

evel

opm

ents

acr

oss

from

Pike

& R

ose

crea

tes b

lank

faca

des

and

less

a ra

c v

e w

alki

ng e

xper

ienc

e

Offi

ce b

uild

ing

by P

ike &

Ros

e is

loca

ted

on R

ockv

ille

Pike

, ac

va

ng

front

age

Gran

d Pa

rk, P

ike &

Ros

eLa

rge

sidew

alk

near

Met

ro st

a o

n in

cludi

ng b

uff e

r fro

m ro

adw

ay

Cons

truc

on

near

Met

ro st

a o

n

Side

wal

k w

ith m

inim

al b

uff e

r, Ro

ckvi

lle P

ikeBl

ank

spac

es/ e

mpt

y fa

cade

s al

ong

Rock

ville

Pike

Cros

swal

k by

Pike

& R

ose

at

Rock

ville

Pike

is w

ell d

efi n

ed

21

Page 32: Advancing the Pike District: White Flint Sector Plan’s ... › wp-content › ...1 The 2010 White Flint Sector Planestablishes a vision for transforming White Flint from an auto-oriented

WAL

KIN

G IN

WHI

TE F

LINT

Dece

mbe

r 201

9

TRIP

11:

Whi

te F

lint M

etro

Sta

on

to R

ando

lph

Hill

s Sh

oppi

ng C

ente

r

RAND

OLP

H HI

LLS

SHO

PPIN

G CE

NTER

WHI

TE F

LINT

ST

ATIO

N

OBS

ERVA

TIO

NS•

Tota

l Trip

Tim

e:23

min

., 45

sec.

• To

tal D

istan

ce: 1

.1 m

iles

• Pe

dest

rian

com

fort

s are

lack

ing

alon

g

the

rout

e:

─No

isy e

nviro

nmen

t fro

m tr

affi c

─St

rong

exh

aust

odo

r fro

m tr

affi c

─M

inim

al b

uff e

r bet

wee

n ro

adw

ay

and

sidew

alk

• Si

dew

alk

wid

ths v

ary

alon

g ro

ute

• Pr

otec

ted

bike

lane

s alo

ng N

ebel

Str

eet

prov

ide

acce

ss b

etw

een

Mar

inel

li Ro

ad

& R

ando

lph

Road

• CS

X tr

ain

trac

ks a

re a

phy

sical

barr

ier s

epar

a n

g th

e Ra

ndol

ph H

ills

neig

hbor

hood

from

Whi

te F

lint M

etro

sta

on

area

• Dr

ivin

g be

twee

n th

e tw

o ar

eas i

s mor

e

conv

enie

nt th

an w

alki

ng

• Th

e w

alk

from

Ran

dolp

h Hi

lls to

Met

ro

sta

on

is to

o lo

ng fo

r mos

t wal

kers

• St

eep

slope

alo

ng N

ichol

son

Lane

mak

es w

alk

unco

mfo

rtab

le &

inac

cess

ible

for p

eopl

e w

ith li

mite

d

mob

ility

Bus M

aint

enan

ce F

acili

ty o

n M

arin

elli

Road

cr

eate

s bar

rier a

long

road

alo

ng si

dew

alk

Old

Geo

rget

own

Road

side

wal

k co

ndi

ons

Bike

lane

s alo

ng N

ebel

St c

reat

es b

uff e

r alo

ngsid

ewal

k

Bike

lane

s alo

ng N

ebel

St.

crea

tes b

uff e

r. Si

dew

alk

slope

crea

tes d

iffi c

ult e

nviro

nmen

t for

whe

elch

air

user

s

Side

wal

ks a

long

Nich

olso

n La

ne h

as n

o bu

ff er

betw

een

road

way

and

side

wal

kPl

acem

akin

g ne

ar R

ando

lph

Hills

Sho

ppin

g Ce

nter

Plac

emak

ing

near

Ran

dolp

h Hi

lls S

hopp

ing

Cent

er

Slop

e al

ong

Nich

olso

n La

ne cr

eate

s diffi

cul

t wal

k-in

g e

nviro

nmen

t

22