May 3, 2016Beverly Middle School ‐ Beverly, MA

Beverly Middle School Advanced Learning Community

Page 2: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

Since the Last BCM…..

• Abutters Meetings (3.8.16, 3.23.16 and 4.5.16)• Geo-technical / Structural Coordination Meeting (PARE, LGCI, EDG, Agostini) (3.9.16, 3.31.16

and 4.7.16)• Police & Fire Coordination Meeting (3.13.16)• Bus Depot Coordination Conference Call (AI3, G&V, City) (3.21.16)• Revit Clash Detection Coordination Meeting (3.22.16)• Student Personal Storage Meetings (District Administration)• Signage Discussions (Administration)• Conservation Commission Meeting (4.12.16)• 60% CD Commissioning Specification from BR+A (4.12.16)• NGRID Energy Efficiency / Rebate Conference Call (4.13.16)• ADA Accessibility Review (4.14.16)• Door Hardware Conference Call (4.14.16)• Coordination meeting with Building Commissioner (4.26.16)• 60% CD Revit Clash Detection Coordination Meeting (4.26.16)

Page 3: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

Since the Last BCM…..

• Development of Initial Acoustic Evaluation / Report (Acentech Consultants)• Structural Steel Coordination Meetings• Mechanical / Electrical / Plumbing / FP Coordination Meetings• Site & Building Lighting Coordination Meetings• Site / Civil / Landscaping Coordination Meetings• Signage Consultant Meetings• Technology Coordination Meetings• Food Service Coordination Meetings / Conference Calls• Theater Lighting & Rigging Coordination Meetings / Conference Calls• Code Consultant Review Meeting / Conference Calls• Accessibility Consultant Review Meeting / Conference Calls• Building Envelope Review (PACE Representatives)

Page 4: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

Since the Last BCM…..

Building Product Representatives

• FSR – Technology Integration• Epoxy Terrazzo Flooring (Key Resin)• Corbin-Hufcor• Wenger• Apex Lighting Solutions• Beacon Rep. Group• Nichiha• Summit Lockers (Phenolic)• Crossville Tile• Hussey Seating• Sika Sarnafil• EFCO Corporation• Spaulding Brick• Tri-State Brick

60% Construction Documents:

484Drawings

3,480Specification sheets

Early Package #3:Structural Steel / Civil / Landscaping

4.19.16

Page 5: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

Student Personal Storage Units

The design includes:

125 units per neighborhood1500 total units within the building

• 12"high x 18" wide x 12" deep lockable storage units in the corridor.• The positioning of the units seamlessly integrate into the current porcelain wall tile configuration.• The integration of the storage units in the corridor….

• reduces the required quantity of porcelain wall tile• reduces, consolidates and simplifies the amount of net casework area required within the

classrooms• increases the net usable floor area within each typical classroom

• Maintains the small group break-out space planned within the corridors• Maintains the transparency between the classrooms and corridors• Maintains the appropriate corridor width previously planned

Page 6: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

TYPICAL NEIGHBORHOOD PLAN

Page 7: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

NEIGHBORHOOD CORRIDOR PLAN & ELEVATION

Page 8: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

Porcelain Wall Tile

Room ID Signage

Small Group Learning Area – Writable surface

Window to Classroom

Fire: Horn/Strobe

Student Personal Storage Units

Mechanical Ductwork

Acoustical Ceiling Cloud

Fire: Pull Station

ENLARGED CORRIDOR ELEVATION

Page 9: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

1 2

3

4

4

1

3

2

TYPICAL CLASSROOM

Exterior Window

Counter

Lockable Storage Cabinets

Tablet charging power / Shelving

Teacher personal storage

ADA Accessible Sink andBubbler

Writable Surface

Open Shelf Storage

General Ceiling Ht. at 11’-0”

Small Group Learning SpaceCoat Hooks

LCD TVWritable Surface

Trash / Recycling Station

Tackable Surface Strips

Page 10: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

BUS DEPOT ADJUSTMENTS

Original Layout

Page 11: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

BUS DEPOT ADJUSTMENTS

Updated Layout

65’ 185’235’ 80’

65’

Page 12: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

March 29, 2016

Page 13: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

May 2, 2016

Page 14: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

March 29, 2016

Page 15: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

May 2, 2016

Page 16: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA

Page 17: Advanced Learning Community - beverlyschools.org · Beverly Middle School ‐Beverly, MA May 3, 2016 Since the Last BCM….. Building Product Representatives • FSR –Technology

May 3, 2016Beverly Middle School ‐ Beverly, MA