Testing Freshly Mixed Testing Freshly Mixed ConcreteConcrete

Sampling - ASTM C172Sampling - ASTM C172 Slump - ASTM C143Slump - ASTM C143 Temperature - ASTM C1064Temperature - ASTM C1064 Density - ASTM C138Density - ASTM C138 Air Content - ASTM C231/C173Air Content - ASTM C231/C173 Strength Specimens - ASTM Strength Specimens - ASTM

C31C31

Sampling - ASTM C 172Sampling - ASTM C 172

1 ft1 ft33 Composite Composite

samplesample Middle of truckMiddle of truck Protect sampleProtect sample

Slump - ASTM C143Slump - ASTM C143

Consistency: The Consistency: The ability of freshly ability of freshly mixed concrete mixed concrete to flow as to flow as measured in the measured in the slump test. slump test. (expressed in (expressed in inches of slump)inches of slump)

Temperature ASTM C1064Temperature ASTM C1064

• Affects concrete behavior• May be important in trouble-shooting

problems• May be a specification issue

Density - ASTM C138 Density - ASTM C138 Density (Unit Density (Unit

Weight)Weight)– Weight of concrete Weight of concrete

divided by a known divided by a known volume.volume.

– Conventional Conventional concrete has a unit concrete has a unit weight in the range weight in the range of 137 to 150 pcfof 137 to 150 pcf

Lightweight: 15 pcfLightweight: 15 pcf Heavyweight: 375 pcfHeavyweight: 375 pcf

– Measured primarily Measured primarily to compute yieldto compute yield

Yield Yield

Yield is the volume of concrete produced Yield is the volume of concrete produced in a batch (typically expressed in yd in a batch (typically expressed in yd 33))

yield =yield = Batch weights Batch weights

(Cement,FA,CA,H(Cement,FA,CA,H22O) O) Unit Unit WeightWeight

Air Content Air Content ASTM C 173 - ASTM ASTM C 173 - ASTM C231C231

Measures entrained (tiny) and Measures entrained (tiny) and entrapped (larger) air voids, expressed entrapped (larger) air voids, expressed as a percentage of the total volume of as a percentage of the total volume of concreteconcrete

Entrained: generally 0.0004” to 0.04” ØEntrained: generally 0.0004” to 0.04” Ø Entrapped: 0.04” Ø and upEntrapped: 0.04” Ø and up Somewhat a function of aggregate Somewhat a function of aggregate

characteristicscharacteristics– Non-air-entrained concrete w/ 1” coarse Non-air-entrained concrete w/ 1” coarse

aggregate has about 1-1/2% entrapped airaggregate has about 1-1/2% entrapped air

Volumetric Method Volumetric Method ASTM C173ASTM C173

Pressure Method ASTM C231Pressure Method ASTM C231

Strength SpecimensStrength Specimens

CylindersCylinders– 6 X 126 X 12– 4 X 84 X 8

BeamsBeams– 6 X 6 X 206 X 6 X 20

Curing SpecimensCuring Specimens– Standard curing Standard curing – Field curingField curing

Making & Curing Concrete Test

Specimens

ASTM C31 Field

ASTM C192 Lab

Compressive Strength of Cylindrical Specimens

ASTM C39

ASTM C 78Flexural Strength - Third Point Loading

Making & Curing Concrete

Test Specimens

ASTM C31 Field

ASTM C192 Lab

Standard CuringStandard Curing Curing procedures required by Curing procedures required by

ASTM C 31 for strength specimens ASTM C 31 for strength specimens that are made for:that are made for:– Acceptance testingAcceptance testing– Checking adequacy of mix proportions Checking adequacy of mix proportions – Quality controlQuality control

Includes 2 curing stages:Includes 2 curing stages:– Initial curingInitial curing– Final curingFinal curing

Initial CuringInitial Curing

TemperatureTemperature– < 6000 psi – 60 to < 6000 psi – 60 to

80 80 ° F° F– ≥ ≥ 6000 psi – 68 to 6000 psi – 68 to

78 ° F78 ° F MoistureMoisture

– Prevent moisture Prevent moisture lossloss

Time Time – Up to 48 hoursUp to 48 hours

Transportation of Transportation of Cylinders To Cylinders To LaboratoryLaboratory

Wait 8 hours after final setWait 8 hours after final set Protect with suitable cushioning materialProtect with suitable cushioning material Protect from freezingProtect from freezing Prevent moisture lossPrevent moisture loss Transportation time not to exceed 4 hoursTransportation time not to exceed 4 hours

Final CuringFinal Curing

TemperatureTemperature– 73° ± 3° F73° ± 3° F

MoistureMoisture– Free moisture on Free moisture on

surface at all timessurface at all times TimeTime

– Within 30 minutes Within 30 minutes after removing the after removing the molds until testingmolds until testing

Field CuringField Curing

Temperature and moisture conditions as Temperature and moisture conditions as close as possible to those of the in-place close as possible to those of the in-place concrete for curing specimens that are concrete for curing specimens that are made for:made for:

– Strength verification prior to putting the Strength verification prior to putting the structure or pavement into servicestructure or pavement into service

– Comparison with test results of standard cured Comparison with test results of standard cured specimens or various in-place test methodsspecimens or various in-place test methods

– Adequacy of curing and protection of concrete Adequacy of curing and protection of concrete in the structurein the structure

– Strength check for form or shoring removalStrength check for form or shoring removal

Questions?Questions?Mississippi Concrete Industries Mississippi Concrete Industries AssociationAssociation

Phone: (601) 957-5274Phone: (601) 957-5274

email: email: [email protected]@mississippiconcrete.com

website: mississippiconcrete.comwebsite: mississippiconcrete.com