Addendum to Land Acquisition and Resettlement Plan (LARP) ICB-05 Project Number: 37231-023 July 2017 Loan 2299-PAK: Punjab Irrigated Agriculture Investment Project Tranche 1 Lower Bari Doab Canal Improvement Project The Addendum to LARP is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Asian Development Bank

Addendum to Land Acquisition and Resettlement … Acquisition and Resettlement Plan (LARP) ICB-05 ... Ahmad Khan 8 5 3 5.15 0.64 ... Mohd Yasin s/o Ghulam Dastgir

Embed Size (px)

Citation preview

Addendum to

Land Acquisition and Resettlement Plan (LARP) ICB-05

Project Number: 37231-023

July 2017

Loan 2299-PAK: Punjab Irrigated Agriculture Investment Project – Tranche 1

Lower Bari Doab Canal Improvement Project

The Addendum to LARP is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Asian Development Bank

IRRIGATION DEPARTMENT

GOVERNMENT OF THE PUNJAB

Addendum for Land Acquisition and Resettlement Plan (LARP) ICB-05

Tranche - 1

July 2017

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

1

Background

1. This addendum is prepared to incorporate the changes came in the approved Land

Acquisition & Resettlement Plan (LARP) for ICB-05. The sub-project consists of 85

distributaries and minors. The ICB-05 falls in Sahiwal Irrigation divisions. In original LARP

for ICB 05, total 65 Affected Persons (AP) of various categories were estimated to be

impacted due to civil works implementation.

2. Due to some changes in design and scope of civil works, the impact of resettlement of the

sub-project has been minimized. Most of the proposed civil works activities are kept

within the available land of the Irrigation Department (ID), Government of Punjab along

the distys/ minors, without involving any further private agricultural land. Design and

Construction Supervision Consultant (DCSC) has confirmed the changes in scope of civil

works from replacement of structures to rehabilitation (Annex 01). As well as, civil works

at some sites carried out during canal closure periods therefore consequently all of

structure APs and some of Land APs are avoided from any sub project impact during the

civil works execution.

Scope of Land Acquisition & Affected Persons (APs)

3. In the sub-project, 65 APs were estimated to be impacted under sub-project civil works.

Out of these 65 APs, land of 56 APs was to be temporarily acquired and structures of 09

APs were to be impacted. Whereas, no permanent acquisition of agricultural or non-

agricultural land is involved.

4. None of the private structures is impacted under sub-project civil works execution. Real

time impact assessment for structure APs has been conducted to confirm that structures

of private persons to be affected have been avoided from any sub-project impact (Annex

02).

5. Due to change in scope of work, many Falls structures have been changed from

replacement to rehabilitation therefore only 25 farmers’ land have been temporarily

acquired for construction of diversion channels instead of 56 farmers. Real time impact

assessments for Land APs have been conducted to confirm that only 25 APs have been

affected due to construction of diversion channels (Annex 03). The affected APs have

been fully compensated. Diversion channels have been removed and filled. Temporarily

acquired private land has been satisfactorily handed over to the farmers in cultivable

form.

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

2

6. GRC meeting was held with the community to share and get their confirmation of the sub-

project progress.

Impacts on Women Headed Households

7. No woman headed households is impacted during the implementation of ICB-05.

Impacts on Private Trees

8. There are no private trees being impacted during the execution of the civil works of the sub-project.

Impacts on Govt. Trees

9. There are no govt. trees being impacted during the execution of the civil works of the sub-project.

Impact on Community Assets / Structures

10. There are no community assets / structures being impacted during the execution of the civil works of the sub-project.

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

3

Annexure: 01 Change in Scope of Work of Construction of Falls including Temporary

Diversions

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

4

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

5

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

6

Annexure: 02 Real Time Impact Assessment of Structure Category ICB-05

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

7

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

1

Annexure: 03 Real Time Impact Assessment of Land Category ICB-05

Sr.

No. RD Location

Canal

Side Name of AP

Total

Area

(K)

Affected Area Estimated

Lease for 1

Years

Estimated

Lease for

three Years

Compensation

of Trees Estimated

Cost of

Trees

Total Cost Remarks

K M Equal

to Kanal

Equal

to Acre

Affected

Area %

Type of

Tree Total

4-R Jhilwala

1 2+050 54/4-R RS

Mumtaz

Hussain s/o Ahmad Khan

8 5 3 5.15 0.64 64.38 35,000 105,000 - - - 105,000 Paid

2 2+050 54/4-R RS Allah Yar s/o

Manzoor Ali 8 0 0 0 0.00 0.00 0 0 - - - 0

Not Affected

3 8+200 55/4-R LS Ilam Din s/o

Noor Mohd 44 0 0 0 0.00 0.00 0 0 - - - 0

Not Affected

5-L Disty

4 1+420 55/5-L RS Tariq

Mehmood Jutt 8 5 5 5.25 0.66 65.63 35,000 105,000 105,000 Paid

9-L Ganjibar

5 34+136 136/9L RS M.Afzal s/o

Khushi ad 64 17 5 17.25 2.16 26.95 119,000 357,000 - - - 357,000 Paid

6 34+136 136/9L RS Majeedan Bibi

w/o M.Aslam 14 0 0 0 0.00 0.00 0 0 - - - 0

Not Affected

7 81+400 142/9-L LS M. Akram etc

s/o M. Ibrahim 21 13 0 13 1.63 61.90 91,000 273,000 - - - 273,000 Paid

8 93+000 144/9-L LS

Hameedan Bibi w/o

Zahoor

Ahmad

18 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

9 113+084 146/9-L LS Azmat Ali s/o Fateh Mohd

24 16 8 16.4 2.05 68.33 112,000 336,000 - - - 336,000 Paid

10 113+084 146/9-L LS M. Anwar s/o

M. Shafi 22 0 0 0 0.00 0.00 0 0 - - - 0

Not Affected

11 113+084 146/9-L LS

M. Ramzan

s/o M. Jhanda

8 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

2

12 117+515 175/9-L RS Muhammad Waseem s/o

M. Ameen

84 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

13 127+420 161/9-L LS

Mohd Yasin

s/o Ghulam

Dastgir

56 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

14 120+600 161/9-L RS Ch Ihsan s/o Fazal Deen

84 11 10 11.5 1.44 13.69 77,000 231,000 231,000 Paid

15 127+420 161/9-L LS

Amanat Ali

etc s/o Mohd

Din

108 8 6 8.3 1.04 7.69 56,000 168,000 - - - 168,000 Paid

16 137+825 162-9L LS

Tariq

Mehmood s/o Mohd Shafi

30 6 10 6.5 0.81 21.67 42,000 126,000 - - - 126,000 Paid

17 142+570 162/9-L LS

Javaid Mumtaz s/o

Mumtaz

Akhtar

64 8 7 8.35 1.04 13.05 56,000 168,000 - - - 168,000 Paid

18 148+700 163/9-L LS

Tahir Khan s/o

Ghulam Hassan

64 9 10 9.5 1.19 14.84 63,000 189,000 189,000 Paid

1L/9L Pandatwala Disty

19 12+324 94/9-L RS Yasin Jutt s/o

Munir Jutt 30 7 4 7.2 0.90 24.00 49000 147,000 147,000 Paid

20 11+974 93/9L RS

M. Yousaf s/o

Ahmad

(Punnu s/o Samanda)

12 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

21 16+457 99/9L RS Bashir/Hoot 72 6 0 6 0.75 8.33 42,000 126,000 - - - 126,000 Paid

22 16+457 99/9L RS

Abdul

Rasheed s/o Mohd Munshi

4.4 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

11-L Dad Fatiana Distributary

23 15+200 9/11-L RS

Muzaffar

Hussain s/o

Jalal Din

84 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

24 15+200 9/11-L RS

Ghulam Qadir

s/o Sharafat

Ali

24 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

3

25 24+500 9/11-L RS

Asif Javeed

s/o Niaz Ahmad

24 7 10 7.5 0.94 31.25 49,000 147,000 147,000 Paid

26 24+500 9/11-L RS Manzoor Qadir s/o

Mehmood Ali

24 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

27 24+500 9/11-L RS Ghulam Ali

s/o Nazir

Ahmad

24 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

28 33-300 8/11-L LS Manzoor

Dogar s/o Des

Mohd

20 6 10 6.5 0.81 32.50 42,000 126,000 - - - 126,000 Paid

29 33+300 8/11-L LS

Naseem

Vincent Masih

s/o Rehmat

8.8 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

30 36+590 8/11-L LS

Naseem

Hassan s/o

Khuda Bux

36 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

31 42+500 12/11-L LS Allah Ditta s/o Fazal Ahmad

32 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

32 47+250 13/11-L LS M.Khurshid

s/o M.Din 80 4 2 4.1 0.51 5.13 28,000 84,000 - - - 84,000 Paid

33 52+725 13/11-L LS

M.Asif s/o

Ghulam Dastgir

28 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

34 59+200 18/11-L LS

Taras

Mahhayuddin

s/o Fayyaz Meeran

25 7 6 7.3 0.91 29.20 49,000 147,000 147,000 Paid

35 59+200 18/11-L LS

Manzoorn

Begum w/o Faiz Meeran

200 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

12-L Chichawatni Disty

36 25+200 38/12-L RS Muhammad

Irfan s/o Khusi

Mohd

72 8 6 8.3 1.04 11.53 56,000 168,000 - - - 168,000 Paid

37 20+350 37/12-L LS

Zia Mushtaq

s/o Mushtaq

ahmad

72 6 0 6 0.75 8.33 42,000 126,000 126,000 Paid

38 54+700 44/12-L LS

Muhammad

Afzal s/o Abdullah

100 6 0 6 0.75 6.00 42,000 126,000 - - - 126,000 Paid

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

4

39 98+200 Deh

Kameean LS

Anayat Babu

s/o Ali Ahmad 100 0 0 0 0.00 0.00 0 0 - - - 0

Not Affected

40 110+500 87/12-L LS Asim Aziz s/o

Abdul Aziz 30 7 5 7.25 0.91 24.17 49,000 147,000 147,000 Paid

41 122+300 84/12-L RS

Hafiz M.

Akram s/o

Ghulam M.

56 6 10 6.5 0.81 11.61 42,000 126,000 126,000 Paid

1R/12L Minor

42 30+970 110/12-L RS

M. Maqsood

Khan s/o M.

Iqbal Khan

12.5 8 0 8 1.00 64.00 56,000 168,000 - - - 168,000 Paid

43 38+385 111/12-L RS Rana Javaid

s/o Rana Riaz 16 0 0 0 0.00 0.00 0 0 - - - 0

Not Affected

44 38+385 111/12-L RS Faqeer Mohd s/o Delawar

36 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

45 72+000 101/12-L RS Mohd Afzal s/o Manzoor

4.6 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

46 72+000 101/12-L RS Jan Mohd s/o

Dilbar 18.5 0 0 0 0.00 0.00 0 0 - - - 0

Not Affected

47 72+000 101/12-L RS

Bashir Ahmad

s/o Bootay Khan

3.4 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

48 72+000 101/12-L RS Bashrian Bibi

d/o Bootay 2 0 0 0 0.00 0.00 0 0 - - - 0

Not Affected

49 76+411 101/12-L RS

Ghulam

Mustafa s/o

M. Nawaz

208 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

50 76+411 101/12-L RS M.Akram s/o

M. Sher 203 0 0 0 0.00 0.00 0 0 - - - 0

Not Affected

14-L Kassowal Disty

51 9+500 3/14-L RS Nazeer Ahmad

s/o Din Mohd 72 16 0 16 2.00 22.22 112,000 336,000 - - - 336,000 Paid

52 27+650 9/14-L RS M. Saddiq s/o

Ali Mohd 56 16 8 16.4 2.05 29.29 112,000 336,000 - - - 336,000 Paid

53 27+950 9/14-L RS Mohd Irshad

s/o Rehmat Ali 15 0 0 0 0.00 0.00 0 0 - - - 0

Not Affected

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

5

54 39+900 14/14-L RS

M. Ramzan

s/o Noor Mohd

65 16 0 16 2.00 24.62 112,000 336,000 - - - 336,000 Paid

Wahab Disty 0 0

55 4+865 100 WM RS

Bashir Ahmad

s/o Allah Ditta Jutt

78 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

56 4+865 100WM RS

Mohd Afzal

etc s/o Ghulam

Sarwar Jutt

78 0 0 0 0.00 0.00 0 0 - - - 0 Not

Affected

Addendum for Short Resettlement Plan ICB-05 Lower Bari Doab Canal Improvement Project

6