PW/DEN001/480770 ADDENDUM NO. 4 MARCH 6, 2015 00 91 13 - 1 ©COPYRIGHT 2015 CH2M HILL ADDENDUM NO. 4 Date: March 6, 2015 TO THE CONTRACT DOCUMENTS Project No.: 480770 for the construction of the NAMPA WWTP PHASE I UPGRADES: GROUP A—LIQUID STREAM UPGRADES To All Planholders and/or Prospective Bidders: The following changes, additions, and/or deletions are hereby made a part of the Contract Documents for the construction of the Nampa WWTP Phase I Upgrades: Group A—Liquid Stream Upgrades, dated December 2014, as fully and completely as if the same were fully set forth therein: A. PART 3, SPECIFICATIONS 1. Section 02 41 00, Demolition, subparagraph 3.06.B.3: CHANGE to “Trickling Filter No. 2 mechanism, only the bearings and the seals from the center support structure as shown in the details on Drawing 321-M-REF-1.” 2. Section 26 42 01, Pipe Bonding (added by Addendum No. 2), subparagraph 1.01.A.5: ADD subparagraphs a. and b. as follows: a. NSF/ANSI 61, Drinking Water System Components – Health-Effects. b. NSF/ANSI 372, Drinking Water System Components – Lead Content.” 3. Section 40 27 00, Process Piping – General, paragraph 3.06.E (added by Addendum No. 2): CHANGE to read “Maintain clearance between potable and non-potable water lines in accordance with ISPWC 405 and SD407.” 4. Section 40 27 02, Process Valves and Operators, paragraph 2.05.A: CHANGE “V201” to “V202”. 5. Section 40 42 13, Process Piping Insulation: CHANGE the footer from “PROCESS PIPING SPECIALTIES 40 27 01” TO “PROCESS PIPING INSULATION 40 42 13” on the even numbered pages. 6. Section 41 22 23.19, Monorail Hoists 1 : ADD in its entirety. B. DRAWINGS 1. Drawing 010-G-025: Under the REMARKS column for service Air, Low Pressure, ADD “STEEL PIPE FOR AIR LOW PRESSURE SERVICE SHALL BE UNLINED.” 2. Drawing 050-D-108 2 : REPLACE drawing in its entirety. 3. Drawing 050-D-109 3 : REPLACE drawing in its entirety.

ADDENDUM NO. 4 Date: March 6, 2015 NAMPA WWTP ...gov.findrfp.com/docs/23151_00_91_13A_Addendum_4s.pdfA. Monorail System: Specifications for Underhung Cranes and Monorail Systems, ANSI

Embed Size (px)

Citation preview

PW/DEN001/480770 ADDENDUM NO. 4 MARCH 6, 2015 00 91 13 - 1 ©COPYRIGHT 2015 CH2M HILL

ADDENDUM NO. 4 Date: March 6, 2015 TO THE CONTRACT DOCUMENTS Project No.: 480770 for the construction of the NAMPA WWTP PHASE I UPGRADES: GROUP A—LIQUID STREAM UPGRADES

To All Planholders and/or Prospective Bidders:

The following changes, additions, and/or deletions are hereby made a part of the Contract Documents for the construction of the Nampa WWTP Phase I Upgrades: Group A—Liquid Stream Upgrades, dated December 2014, as fully and completely as if the same were fully set forth therein:

A. PART 3, SPECIFICATIONS

1. Section 02 41 00, Demolition, subparagraph 3.06.B.3: CHANGE to “Trickling Filter No. 2 mechanism, only the bearings and the seals from the center support structure as shown in the details on Drawing 321-M-REF-1.”

2. Section 26 42 01, Pipe Bonding (added by Addendum No. 2), subparagraph 1.01.A.5: ADD subparagraphs a. and b. as follows:

a. NSF/ANSI 61, Drinking Water System Components – Health-Effects. b. NSF/ANSI 372, Drinking Water System Components – Lead

Content.”

3. Section 40 27 00, Process Piping – General, paragraph 3.06.E (added by Addendum No. 2): CHANGE to read “Maintain clearance between potable and non-potable water lines in accordance with ISPWC 405 and SD407.”

4. Section 40 27 02, Process Valves and Operators, paragraph 2.05.A: CHANGE “V201” to “V202”.

5. Section 40 42 13, Process Piping Insulation: CHANGE the footer from “PROCESS PIPING SPECIALTIES 40 27 01” TO “PROCESS PIPING INSULATION 40 42 13” on the even numbered pages.

6. Section 41 22 23.19, Monorail Hoists1: ADD in its entirety.

B. DRAWINGS

1. Drawing 010-G-025: Under the REMARKS column for service Air, Low Pressure, ADD “STEEL PIPE FOR AIR LOW PRESSURE SERVICE SHALL BE UNLINED.”

2. Drawing 050-D-1082: REPLACE drawing in its entirety.

3. Drawing 050-D-1093: REPLACE drawing in its entirety.

ADDENDUM NO. 4 PW/DEN001/480770 00 91 13 - 2 MARCH 6, 2015 ©COPYRIGHT 2015 CH2M HILL

4. Drawing 050-D-113: REPLACE Keynote 4 on Drawing 050-D-113 with the following text: “MAINTAIN POWER TO AND CONTROLS TO SECONDARY CLARIFIER NO. 2 DRIVE AND WALKWAY LIGHTS FROM THE ADMIN BUILDING THROUGHOUT CONSTRUCTION. IT IS ANTICIPATED THAT THE CURRENT CIRCUIT WILL BE DISRUPTED BY THE CONSTRUCTION OF AERATION BASIN 3. PROVIDE TEMPORARY WIRING AND WATER PROOF SPLICING AS REQUIRED TO ACHIEVE CONSTRUCTION SEQUENCE. RESTORE EXISTING CIRCUITS TO ORIGINAL FUNCTIONALITY, USING EXISTING CONDUCTORS AND RACEWAYS WHEN POSSIBLE. REPLACE DEMOLISHED CONDUITS AND CONDUCTORS WHERE REQUIRED. PROVIDE WATERPROOF SPLICES IN HANDHOLES WHERE SPLICES ARE REQUIRED. ASSUME SECONDARY CLARIFIER CIRCUITS INCLUDE [1"C-2#12, 1#12G (LIGHTING)], [1"C-3#12,6#14, 1#10G(CLARIFIER)], [1"C SPARE].”

5. Drawing 050-C-1034: REPLACE drawing in its entirety.

6. Drawing 050-CY-100: CHANGE “15" TOF” to “16" TOF” in the center of the Drawing.

7. Drawing 050-CY-109: CHANGE “15" TOF” to “16" TOF” in the center of the Drawing.

8. Drawing 050-CY-110: REVISE Keynote “12” south of the Blower Building to read Keynote “6”.

9. Drawing 050-CY-401: CHANGE “15" TOF” to “16" TOF” for the new TOF line at four locations on this drawing. The existing TOF remains 15".

10. Drawing 050-E-1035: REPLACE Drawing 050-E-103 with the attached drawing.

11. Drawing 050-E-1086: REPLACE drawing in its entirety.

12. Drawing 050-E-1097: REPLACE drawing in its entirety.

13. Drawing 050-E-602:

a. ADD the following circuit to DB-1P: CIRCUIT [P16], FROM 4488ABHST2, TO: 3115PP12, COMMENTS: 4488ABHST2 POWER.

b. ADD the following circuit to DB-3P: CIRCUIT [P16], FROM 4488ABHST2, TO: 3115PP12, COMMENTS: 4488ABHST2 POWER.

PW/DEN001/480770 ADDENDUM NO. 4 MARCH 6, 2015 00 91 13 - 3 ©COPYRIGHT 2015 CH2M HILL

c. ADD the following circuit to DB-29P: CIRCUIT [P16], FROM 4488ABHST2, TO: 3115PP12, COMMENTS: 4488ABHST2 POWER.

14. Drawing 050-E-604:

a. ADD the following circuit to DB-1P: CIRCUIT {P16}, FROM 4488ABHST2, TO: 3115PP12, COMMENTS: 4488ABHST2 POWER.

b. ADD the following circuit to DB-3P: CIRCUIT [P16], FROM 4488ABHST2, TO: 3115PP12, COMMENTS: 4488ABHST2 POWER.

c. ADD the following circuit to DB-29P: CIRCUIT [P16}, FROM 4488ABHST2, TO: 3115PP12, COMMENTS: 4488ABHST2 POWER.

15. Drawing 050-E-610, Handhole Schedule:

a. REVISE model numbers of all handholes with dimensions 42"Lx64"Wx38"D to “644-LA”.

b. ADD two rows to the bottom of Handhole Schedule as shown below:

Name Dimensions Manufacturer

HH-16A UTILITY VAULT 444-LA 42"LX42"WX38"D

HH-16P UTILITY VAULT 444-LA 42"LX42"WX38"D

16. Drawing 371-M-111: CHANGE “15" TOF” to “16" TOF” on the left side of the Drawing.

17. Drawing 371-M-301, Sections A, B and D: CHANGE “15" TOF” to “16" TOF”.

18. Drawing 381-E-601: ADD 20 amp, three-pole circuit breaker to distribution panel 3115PP12 to provide power to dewatering pump hoist. Load served information shall be “4488ABHST2”. New breaker shall be placed in poles 31, 33, and 35.

19. Drawing 423-S-1118: REPLACE drawing in its entirety.

20. Drawing 423-S-3019: REPLACE drawing in its entirety

21. Drawing 423-S-40110: REPLACE drawing in its entirety.

ADDENDUM NO. 4 PW/DEN001/480770 00 91 13 - 4 MARCH 6, 2015 ©COPYRIGHT 2015 CH2M HILL

22. Drawing 423-E-111:

a. ADD a connection point at coordinates 5C across the walkway from 4487DWCS3.

b. LABEL the connection point 4488ABHST2.

c. ADD a disconnect symbol adjacent to 4488ABHST2.

23. Drawing 423-E-510:

a. PROVIDE a new cable block diagram.

b. LABEL diagram “Dewatering Sump Pump Hoist”. Diagram shall show a connection point, labeled 4488ABHST2, circuited to a disconnect then on to panelboard 3115PP12. The circuit line shall have a call-out labeled “[P16]” indicating the circuit size. The diagram shall look similar to cable block diagram labeled “Effluent Box Actuated Gate”.

C. DESIGN DETAILS

1. Design Detail 3212-21211: ADD in its entirety.

D. OTHER INFORMATION

1. Project Site Visit and Tour Documentation12: A Project site visit and tour was held March 4, 2015. REFERENCE attached documentation from the meeting for the use of the bidders.

2. Bidders’ Questions/Engineer Responses13: REFERENCE attached list of Bidders’ questions (written) and the associated response form the Engineer.

All Bidders shall acknowledge receipt and acceptance of this addendum in the Bid Form or by submitting the Addendum with the bid package. Bid Forms submitted without acknowledgment or without this Addendum will be considered in nonconformance.

CH2M HILL

Gregg Thompson, P.E.

END OF ADDENDUM

PW/DEN001/480770 ADDENDUM NO. 4 MARCH 6, 2015 00 91 13 - 5 ©COPYRIGHT 2015 CH2M HILL

1 Section 41 22 23.19, Monorail Hoists 2 Drawing 050-D-108 3 Drawing 050-D-109 4 Drawing 050-C-103 5 Drawing 050-E-103 6 Drawing 050-E-108 7 Drawing 050-E-109 8 Drawing 423-S-111 9 Drawing 423-S-301 10 Drawing 423-S-401 11 Design Detail 3212-212 12 Project Site Visit and Tour Documentation 13 Bidders’ Questions/Engineer Responses

CITY OF NAMPA, ID NAMPA WWTP PHASE 1 EXPANSION PROJECT GROUP A

PW/DEN001/480770 MONORAIL HOISTS

MARCH 6, 2015 41 22 23.19 - 1

©COPYRIGHT 2015 CH2M HILL ADDENDUM NO. 4

SECTION 41 22 23.19

MONORAIL HOISTS

PART 1 GENERAL

1.01 REFERENCES

A. The following is a list of standards which may be referenced in this section:

1. American National Standards Institute (ANSI): MH27.1, Underhung

Cranes and Monorail Systems.

2. American Society of Mechanical Engineers (ASME):

a. B30.10, Hooks.

b. B30.11, Monorails and Underhung Cranes.

c. HST 1M, Performance Standard for Electric Chain Hoists.

d. HST 2M, Performance Standard for Hand Chain Manually

Operated Chain Hoists.

e. HST 4M, Performance Standard for Overhead Electric Wire Rope

Hoists.

3. National Electrical Manufacturer’s Association (NEMA):

a. MG 1, Motors and Generators.

b. 250, Enclosures for Electrical Equipment (1,000 volts maximum).

4. National Fire Protection Association (NFPA): 70, National Electrical

Code (NEC).

5. Occupational Safety and Health Act (OSHA).

6. Underwriters Laboratory (UL): 674, Electric Motors and Generators for

Use in Division 1 Hazardous (Classified) Locations.

1.02 DESIGN REQUIREMENTS

A. Monorail System: Specifications for Underhung Cranes and Monorail

Systems, ANSI MH27.1 and ASME B30.11.

B. Hoist: ASME B30.11, Hoist Manufacturers’ Institute.

C. Trolley: ANSI MH27.1.

D. Wire Rope Hoist Service Class: ASME HST 4M.

E. Chain Hoist Service Class: ASME HST 1M.

F. Hook: ASME 30.10.

G. Stress and Safety Factors: ANSI MH27.1 and ASME B30.11. Properly select

materials of construction for stresses to which subjected.

NAMPA WWTP PHASE 1 EXPANSION PROJECT GROUP A CITY OF NAMPA, ID

MONORAIL HOISTS PW/DEN001/480770

41 22 23.19 - 2 MARCH 6, 2015

ADDENDUM NO. 4 ©COPYRIGHT 2015 CH2M HILL

H. Safety of Operation, Accessibility, Interchangeability, and Durability of Parts:

ASME B30.11 and OSHA requirements.

I. Provide system, equipment, and components, including supports and

anchorages, designed in accordance with Section 01 61 00, Common Product

Requirements, and Drawing 010-G-013.

1.03 SUBMITTALS

A. Action Submittals:

1. Shop Drawings:

a. Make, model, weight, and horsepower of each equipment

assembly.

b. Complete catalog information, descriptive literature, materials of

construction, and specifications on hoist, wheels, gears and

bearing, trolley drive system, hoist motor and assemblies, hook,

brakes, starting system, variable speed drive system, conductors

(bus bar, festoon, cable reel), controls, remote control system, and

accessories.

c. Detail Shop Drawings of monorail track, brackets, hangers, and

their attachments to building structural steel.

d. Power and control wiring diagrams, including terminals and

numbers.

e. Motor nameplate data in accordance with NEMA MG 1, and

include any motor modifications.

f. Factory finish system.

B. Informational Submittals:

1. Special shipping, storage and protection, and handling instructions.

2. Manufacturer’s printed installation instructions.

3. Factory Functional Test Report.

4. Suggested spare parts list to maintain the equipment in service for a

period of 5 years. Include a list of special tools required for checking,

testing, parts replacement, and maintenance with current price

information.

5. List special tools, materials, and supplies furnished with equipment for

use prior to and during startup and for future maintenance.

6. Operation and Maintenance Data: As specified in Section 01 78 23,

Operation and Maintenance Data.

7. Manufacturer’s Certificate of Proper Installation, in accordance with

Section 01 43 33, Manufacturers’ Field Services.

CITY OF NAMPA, ID NAMPA WWTP PHASE 1 EXPANSION PROJECT GROUP A

PW/DEN001/480770 MONORAIL HOISTS

MARCH 6, 2015 41 22 23.19 - 3

©COPYRIGHT 2015 CH2M HILL ADDENDUM NO. 4

1.04 ENVIRONMENTAL REQUIREMENTS

A. Temperature: Maximum 110 degrees F; minimum minus 10 degrees F.

B. Humidity: 90 percent.

C. Atmosphere: Mildly corrosive.

D. Location: Outdoors.

PART 2 PRODUCTS

2.01 GENERAL

A. Hoist and trolley manufacturer to coordinate equipment requirements with

steel structures, drive motor, hoisting cable or chain, hook, track, stops, and

electrical equipment controls.

2.02 SUPPLEMENTS

A. See supplements to this section for additional requirements.

2.03 TROLLEY

A. Frame: Welded steel, cast steel, or ductile iron construction, or a combination

thereof. Construct to control deflection of trolley assembly while transmitting

the carrying load to running surface.

B. Drive shall consist of chain sprocket mounted on shaft. Furnish chain to

within 2 feet of operating floor level with trolley at end of beam travel. Drive

shaft shall drive the trolley wheels directly

C. Furnish roller assembly stabilizers on single-girder trolley units to prevent

tipping during load pickup.

D. Wheels: Rolled or forged steel, accurately machined and ground to receive

inner bearing races. Furnish fixed alloy steel axles. Minimum tread hardness

210 Brinell.

E. Drive Gears: Helical, spur or herringbone type, rolled or cast steel, with

machine cut teeth.

F. Bearings: Combination radial and thrust type, double row, angular contact ball

bearings or single-row tapered roller bearings. Bearings prelubricated and

sealed, or fitted for pressure lubrication. Locate pressure lubrication fittings

for accessibility during maintenance.

NAMPA WWTP PHASE 1 EXPANSION PROJECT GROUP A CITY OF NAMPA, ID

MONORAIL HOISTS PW/DEN001/480770

41 22 23.19 - 4 MARCH 6, 2015

ADDENDUM NO. 4 ©COPYRIGHT 2015 CH2M HILL

G. Brakes: Suitable for service class and rated torque capacities as specified in

ASME B30.11.

2.04 HOIST

A. Hoisting Machinery: Load chain wheel driven through gear reductions, an

electric motor, load blocks, sheaves, chain, hook and hoist braking.

B. Chain: Non-jamming, Type 316 stainless steel type. Chain hoists shall have

chain storage adequate for storing full lift length of chain and shall be

designed and located to avoid interference while hoisting.

C. Hook: Construct with sufficient ductility to open noticeably before hook

failure, equipped with safety latch, free to rotate 360 degrees with rated load

and positively held in place with locknuts, collars or other devices.

D. Brakes: In accordance with ASME HST 1M and ASME HST 2M, adjustable

to compensate for wear, spring set, electric release load brake system, which

releases load when drive motor is energized and holds load when the drive

motor is de-energized.

2.05 ELECTRICAL

A. Furnish electrical equipment including motors, motor starters, pendant control,

control systems, wire, and conduit. Control and electrical cabinets shall be

NEMA 250, Type 4 enclosures.

B. Electrical: In accordance with NFPA 70, NEC Article 610.

C. Monorail conductor voltage drops from monorail track supply taps shall

permit the hoist and trolley motors to operate within voltage tolerances of plus

or minus 10 percent, when building supply voltage is at plus or minus

5 percent of design voltage.

D. Cable Conductors: Provide outdoor rated flexible cable from fixed power

conduit or disconnect switch to hoist with sufficient free length to allow the

hoist to be moved from the dewatering pump in Aeration Basin 3 to a

dewatering pump in future Aeration Basin 4. Arrange cable so that hoist can

be moved from one aeration basin to the other without the cable catching or

kinking.

E. Grounding: External in accordance with NFPA 70, NEC Article 250.

CITY OF NAMPA, ID NAMPA WWTP PHASE 1 EXPANSION PROJECT GROUP A

PW/DEN001/480770 MONORAIL HOISTS

MARCH 6, 2015 41 22 23.19 - 5

©COPYRIGHT 2015 CH2M HILL ADDENDUM NO. 4

2.06 CONTROLS

A. Hoist and Trolley: Pendant control having momentary contact pushbuttons

with a device which will disconnect motors from line on failure of power.

Device shall not permit any motor to be restarted until controller handle is

brought to the OFF position, or a reset switch or button is operated. Furnish

with undervoltage protection as a function of each motor controller, or by

magnetic main line contactor.

B. Pushbuttons: Fully magnetic, plain reversing type, housed in NEMA 250,

Type 4 enclosure, with contactors of sufficient size and quantity for starting,

accelerating, reversing, and stopping duty for specified hoist service class.

C. Pendant Pushbutton Control Stations: Heavy-duty, oiltight, suspended from

hoist, with control transformers to supply 120V ac power to pushbutton

control station. Pushbutton enclosure supported with chain or wire rope.

Control wire cable attached to support chain or wire rope at not more than

6-foot intervals. Furnish control station buttons for control of hoist and trolley

ON/OFF main line contactor power switch which removes all power from

control station.

2.07 ACCESSORIES

A. Equipment Identification Plate: 16-gauge stainless steel with 1/4-inch die-

stamped equipment tag number securely mounted in a readily visible location.

B. Lifting Lugs: Equipment weighing over 100 pounds.

2.08 FACTORY FINISHING

A. Prepare and prime coat in accordance with manufacturer’s optional epoxy

coating for outdoor service in a mildly corrosive environment.

2.09 SOURCE QUALITY CONTROL

A. Factory Inspections: Inspect control panels and equipment for required

construction, electrical connection, and intended function.

B. Factory Tests and Adjustments: No-load run test all equipment furnished.

PART 3 EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturer’s printed instructions.

B. Provide lubrication and lubrication fittings.

NAMPA WWTP PHASE 1 EXPANSION PROJECT GROUP A CITY OF NAMPA, ID

MONORAIL HOISTS PW/DEN001/480770

41 22 23.19 - 6 MARCH 6, 2015

ADDENDUM NO. 4 ©COPYRIGHT 2015 CH2M HILL

3.02 FIELD QUALITY CONTROL

A. Functional Tests: Conduct on each hoist and monorail system.

1. Alignment: Test complete assemblies for proper alignment and

connection, and quiet operation.

B. Performance Test:

1. Conduct on each hoist and monorail system.

2. Load tests in compliance with OSHA, ASME B30.11, and

ANSI MH27.1

3.03 MANUFACTURER’S SERVICES

A. Manufacturer’s Representative: Present at Site or classroom designated by

Owner or Engineer, for minimum person-days listed below, travel time

excluded:

1. 1/2 person-day for functional testing and completion of Manufacturer’s

Certificate of Proper Installation.

B. See Section 01 43 33, Manufacturers’ Field Services, and Section 01 75 00,

Testing, Equipment Startup and Commissioning.

3.04 SUPPLEMENTS

A. The supplements listed below, following “End of Section,” are a part of this

Specification.

1. Hoist/Monorail Data Sheet.

2. Hoist/Monorail Dimension Sheet.

END OF SECTION

CITY OF NAMPA, ID NAMPA WWTP PHASE 1 EXPANSION PROJECT GROUP A

PW/DEN001/480770 MONORAIL HOISTS

MARCH 6, 2015 41 22 23.19 SUPPLEMENT 01 - 1

©COPYRIGHT 2015 CH2M HILL ADDENDUM NO. 4

HOIST/MONORAIL DATA SHEET

Project: Nampa WWTP Phase 1 Project Group A Manufacturer: Coffing

Owner: City of Nampa Model No.:ECGT-2016

Service: Dewatering pump hoisting over an aeration basin Number of Units: 1

Equip. Tag Number(s): AB 3-4 Dewatering Sump Pump Hoist 4488ABHST2 Rev/Date/By: _____/_____/_____

GENERAL REQUIREMENTS

Equipment Capacity: 1 tons Factory Testing: Power Supply:

Method of Control: 2-speed Required Not Required Voltage 460

Location of Control: Pendant Field Testing: Not required Phase 3

Equipment Location: Required, functional and Frequency 60

Indoors Outdoors performance

HOIST TROLLEY

Type: Type:

Electric, Chain Hand Operated, Chain Top Running Underhung

Service Class (ANSI): Service Class (ANSI):

H1 (standby) H2 (light) H3 (standard) A1 (standby) A2 (infrequent) B (light)

H4 (heavy) H5 (severe) C (moderate) D (heavy)

Two Speed (fpm): 5 and 15approximately___ Speed (fpm): _____ to _____

Constant Speed Two Speed Variable Speed Constant Speed Variable Speed Hand Operated

Motor hp: 3 or less Motor hp: Chain operated

Electric Conductors:

Bus Bar Festoon Free hanging with sufficient

slack for hoist travel

Cable Reel

SPECIAL REQUIREMENTS

Accessories: Remote Controls: Special Electrical Requirements:

Central Lubrication System Infrared, line-of-sight

OSHA operating and safety Frequency modulated (FM)

devices Manufacturer:

Extended Grease Fittings

See Hoist/Monorail Dimension Sheet for clearances, lift distances, and details.

CITY OF NAMPA, ID NAMPA WWTP PHASE 1 EXPANSION PROJECT GROUP A

PW/DEN001/480770 MONORAIL HOISTS

MARCH 6, 2015 41 22 23.19 SUPPLEMENT 02 - 1

©COPYRIGHT 2015 CH2M HILL ADDENDUM NO. 4

HOIST/MONORAIL DIMENSION SHEET

Building Clearances for Monorail Cranes

Project: Nampa WWTP Phase 1 Project Group A

Owner: City of Nampa

Equipment Tag Number(s): AB 3-4 Dewatering Sump Pump Hoist 4488ABHST2

A: 11’-0” D: 21 feet G: See Drawings

B: 1’-0” E: 2’-6” H: 0 feet

C: Elevation 2463.3 F: 31 feet

TPLUGGED

42" SS

10" NO.4

4" NO.4

8" SS

42" FE

4"

NO.4

2459.6

32460.6

6

2457.97

2459.9

5

2003

TO

E1

2459.6

4

2004

TO

E1

2460.6

7

2005

TO

P1

2459.6

3

2006

FE

2458.6

6

2080

TOP2 PC

2458.6

0

2081

TO

P2

2457.8

9

2082

TOP2 PT

2457.8

5

2083

TOP2 PC

2458.4

3

2084

TO

P2

2458.6

8

2085

TOP2 PT

2457.7

4

2086

TOE2 PC

2457.5

3

2087

TO

E2

2457.5

1

2088

TOE2 PT

2457.9

4

2089

TO

E2

2457.8

1

2090

TO

E2

2457.4

6

2091

TOE2 PC

2457.6

8

2092

TO

E2

2457.7

5

2093

TO

E2

2458.5

0

2094

JB

2461.0

1

2095

LP-SO

UTH

TOP

OFB

ASE

2458.2

1

2096

TO

E2

2458.9

2

2097

TO

P2

2459.0

1

2098

TO

P2

2457.8

3

2099

TO

E2

2457.8

2

2100

TO

E2

2459.5

3

2101

TO

P2

2459.3

4

2104

GS

WV

2457

2457

2458

2458

2458

2459

2459

PLOT DATE: PLOT TIME:2015\03\03 7:09:37 AM

CH

2M HIL

L 2

013. A

LL RIG

HTS R

ES

ER

VE

D.

THIS D

OC

UM

EN

T,

AN

D T

HE I

DE

AS A

ND D

ESIG

NS I

NC

OR

PO

RA

TE

D H

ER

EIN,

AS A

N I

NS

TR

UM

EN

T O

F P

RO

FE

SSIO

NA

L S

ER

VIC

E, IS T

HE P

RO

PE

RT

Y O

FR

EU

SE O

F D

OC

UM

EN

TS:

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

c

PROJ

DATE

DA

TE

NO.

DS

GN

DR

RE

VISIO

N

CH

K

AP

VD

BY

AP

VD

SHEET

DWG

A

PR

OJE

CT G

RO

UP A

of

CH

2M HIL

L A

ND IS N

OT T

O B

E U

SE

D, IN W

HO

LE O

R I

N P

AR

T, F

OR A

NY O

TH

ER P

ROJE

CT W

ITH

OU

T T

HE W

RIT

TE

N A

UT

HO

RIZ

ATIO

N O

F C

H2

M HIL

L.

NA

MP

A W

WTP P

HA

SE 1 U

PG

RA

DE

S

NA

MP

A, ID

AH

O

CIT

Y O

F N

AM

PA

FILENAME: 050-01-DEM-D-108.dgn

480770

157

DECEMBER 2014

BID D

OC

UM

EN

TS

REGISTRANT ON DECEMBER 16, 2014.

ORIGINAL DOCUMENT SIGNED BY

STORED AT CH2MHILL/BOISE, ID.

ORIGINAL DOCUMENT

OH

A

DI FO E

TA

TS

DERETSIGER R

EE

NIGNE LANOISSE

F

OR

P

HTI

MS

EIR

AM

AD

NA

MA

13300

HTI

MS EIRAM ADN

AM

A

12

AS NOTED

A T

OL

MA

NA T

HO

MP

SO

N

CIVIL

AR

EA 8

DE

MO

LITIO

N P

LA

N

050-D-108

G T

HO

MP

SO

N

N

KEY PLAN

0 20 40 60

TRICKLING FILTER NO. 2

TRICKLING FILTER NO. 3

STATION

RECIRCULATION PUMP

TRICKLING FILTER

PUMP STATION NO. 2

PRIMARY SLUDGE

NO. 2

PRIMARY CLARIFIER

2STATION

EFFLUENT PUMP

TRICKLING FILTER

4

3

4

59 8

14

10

13

4

1

TRICKLING FILTER NO. 1

Scale in Feet

10

9

9

8

6

7

4

4

8" SS

6

MA

TC

H LIN

E, S

EE 0

50-D-1

09

MATCH LINE, SEE 050-D-113

4

4

SW

EFFLUENT BOX

RECIRCULATION

TRICKLING FILTER

SHEET KEYNOTES

NO. 2

BOX

DIVERSION

4" NO. 4

10" NO. 4

4" NO. 4

42" FE

A

050-D-

301

B

050-D-3

01

6

11

4

42" SS

ENLARGED DEMOLITION PLAN

SEE SHEET 050-D-402 FOR

4

10" NO. 4

(BELOW)

4" NO. 4

4

4 ELECTRICAL

ELECTRICAL

4

4

HANDHOLE

12

13

14

C

050-D-

301

E

050-D-

302

3

HOLE

HAND-

8" SS

8

B R

OB

ER

TS

15

NO. 3

COLLECTION BOX

26

2

2

18

2

2

16

17

ELECT

18

19

AT

2015/0

2/2

3A

TA

DD

EN

DU

M 3

1

1

1

CABLE SHALL BE [1”C-1TYPE 3]. SPLICING IS NOT ACCEPTABLE. NEW NETWORK

EXISTING CABLE WITH A NEW CABLE. CABLE

DEMOLISHED CONDUITS AS REQUIRED. REPLACE

EXISTING RACEWAYS WHEN POSSIBLE. REPLACE

CIRCUIT TO ORIGINAL FUNCTIONALITY, USING

CONSTRUCTION SEQUENCE. RESTORE EXISTING

TEMPORARY WIRING AS REQUIRED TO ACHIEVE

CONSTRUCTION OF AERATION BASIN 3. PROVIDE

CURRENT CIRCUIT WILL BE DISRUPTED BY THE

ADMIN BUILDING. IT IS ANTICIPATED THAT THE

TRICKLING FILTER EFFLUENT PUMP STATION FROM

MAINTAIN NETWORK COMMUNICATIONS TO 21.

AT HEAD BOX AND SALVAGE TO OWNER.

REMOVE WEIR GATE TO TRICKLING FILTER NO. 1 20.

FROM TRICKLING FILTER NO. 1 AT EFFLUENT BOX.

INSTALL CONCRETE PLUG IN 36" RETURN PIPE 19.

ELECTRICAL DUCTBANK PER DETAIL .

CONTRACTOR FOR FUTURE INSTALLATION OF

ORDER TO PROVIDE ADEQUATE ROOM FOR

SAWCUT AND REMOVE ASPHALT PAVEMENT IN 18.

STRAW WATTLES PER BMP-35.17.

SILT FENCE PER BMP-36.16.

FACILITATE THE ABANDONMENT OF THE 8" LINE.

CONTRACTOR TO REROUTE THE HOSE TO

THE SUMP IN THE DIGESTER CONTROL BUILDING.

8" LINE IS CONNECTED TO A FLEXIBLE HOSE FROM 15.

CONSTRUCTION.

APPROXIMATE LIMITS OF EXCAVATION FOR PEPS 14.

AERATION BASIN 3 CONSTRUCTION.

APPROXIMATE LIMITS OF EXCAVATION FOR 13.

FILTER NO. 1 DEMOLITION.

APPROXIMATE EXCAVATION LIMITS OF TRICKLING 12.

TRICKLING FILTER EFFLUENT PUMP STATION.

CLARIFIER NO. 1. PLUG AT FITTING NEAREST

EFFLUENT PUMP STATION AND SECONDARY

DEMOLISH 30" FE BETWEEN TRICKLING FILTER 11.

REROUTE TO SECONDARY CLARIFIER NO. 2.

DEMOLISH NO. 4 WATER SERVICE PER 050-CY-108. 10.

PLUG, FIELD LOCATE.

DEMOLISH 8" SS PIPE TO FITTING SHOWN AND 9.

ABANDON IN PLACE.8.

DEMOLISH 8" SS PIPE.7.

FOR REUSE.

AND STOCKPILE GRAVEL SURFACE TREATMENT

DEMOLISH CONCRETE RIBBON CURB. REMOVE 6.

PIPING AND VALVES. BYPASS PER 050-CY-108.

CONCRETE STRUCTURE INCLUDING INTERNAL

DEMOLISH PRIMARY EFFLUENT SPLITTER BOX 5.

RETAIN AND PROTECT.4.

VAULT. CAP AND ABANDON PIPES IN PLACE.

DEMOLISH CONVEYANCE STRUCTURE/CONCRETE 3.

SAWCUT AND DEMOLISH CONCRETE SIDEWALK.2.

SPECIFICATIONS FOR SALVAGE INFORMATION.

INCLUDING, BUT NOT LIMITED TO, DEPTH. SEE

RECORD DRAWINGS FOR MORE INFORMATION

DEMOLISH TRICKLING FILTER NO. 1. REFER TO 1.

212

MR

2015/0

3/0

3TP

AD

DE

ND

UM 4

2

WV

WW

VWV

SD

T

48"

ML

48" ML

30" RAS

15" TOF

6" NO.4

8"

NO.4

3"

NO.4

6"

NO.1

8" S

DD

15" TOF

6" NO.4

6" NO.1

6" N

O.1

6" S

CU

M

6" SCUM

48" ML

3" N

O.4

8" NO.4

10" NO.4

42" ML

30" ALP

20" AIR HEADER

WV

SD

WV

WV

WV

H

SD

PLOT DATE: PLOT TIME:2015\03\03 11:42:52 AM

CH

2M HIL

L 2

013. A

LL RIG

HTS R

ES

ER

VE

D.

THIS D

OC

UM

EN

T,

AN

D T

HE I

DE

AS A

ND D

ESIG

NS I

NC

OR

PO

RA

TE

D H

ER

EIN,

AS A

N I

NS

TR

UM

EN

T O

F P

RO

FE

SSIO

NA

L S

ER

VIC

E, IS T

HE P

RO

PE

RT

Y O

FR

EU

SE O

F D

OC

UM

EN

TS:

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

c

PROJ

DATE

DA

TE

NO.

DS

GN

DR

RE

VISIO

N

CH

K

AP

VD

BY

AP

VD

SHEET

DWG

A

PR

OJE

CT G

RO

UP A

of

CH

2M HIL

L A

ND IS N

OT T

O B

E U

SE

D, IN W

HO

LE O

R I

N P

AR

T, F

OR A

NY O

TH

ER P

ROJE

CT W

ITH

OU

T T

HE W

RIT

TE

N A

UT

HO

RIZ

ATIO

N O

F C

H2

M HIL

L.

NA

MP

A W

WTP P

HA

SE 1 U

PG

RA

DE

S

NA

MP

A, ID

AH

O

CIT

Y O

F N

AM

PA

FILENAME: 050-01-DEM-D-109.dgn

480770

157

DECEMBER 2014

BID D

OC

UM

EN

TS

REGISTRANT ON DECEMBER 16, 2014.

ORIGINAL DOCUMENT SIGNED BY

STORED AT CH2MHILL/BOISE, ID.

ORIGINAL DOCUMENT

OH

A

DI FO E

TA

TS

DERETSIGER R

EE

NIGNE LANOISSE

F

OR

P

HTI

MS

EIR

AM

AD

NA

MA

13300

HTI

MS EIRAM ADN

AM

A

42" SI

123

AS NOTED

A T

OL

MA

NA T

HO

MP

SO

N

CIVIL

AR

EA 9

DE

MO

LITIO

N P

LA

N

050-D-109

G T

HO

MP

SO

N

N

KEY PLAN

0 20 40 60

NO. 1

PRIMARY DIGESTER

1

2

3

4

5

7

6

8

12

10

11

NO. 1

SECONDARY DIGESTER

NO. 1

PUMP STATION

PRIMARY SLUDGENO. 1

PRIMARY CLARIFIER

9 8

14 13

10

Scale in Feet

13

14

15

17

8

8

5

5

9

PUMP STATION

DEWATERING

FLUME

PARSHALL

EFFLUENT LINES

INFLUENT AND

PRIMARY CLARIFIER

MATCH LINE, SEE 050-D-114

MA

TC

H LIN

E, S

EE 0

50-D-1

10

MA

TC

H LIN

E, S

EE 0

50-D-1

08BASIN 1

AERATION

BASIN 2

AERATION

FLUME NO. 1

PARSHALL

OPERATION LAB

14

20

18

21

10" NO. 4

NO. 4

10"

SLUDGE

PRIMARY

8" SS TO

HEADWORKS

8" SS TO

23

23

19

6

24

24

C

050-D-

301

6

21

DEMOLITION PLAN

FOR ENLARGED

SEE SHEET 050-D-401

26

26

25

25

5

27

16

28

29D

050-D-3

02

E

050-D-

302

SHEET KEYNOTES

31

33

33

32

31

33

33

3

34

LAMP

POST,

LIGHT

34

LAMP

POST,

LIGHT

8

STAIRS

8

STAIRS

8

8" NO. 4

8

10" NO. 4

MATCH LINE, SEE 050-D-103

SHEET KEYNOTES

35

28

B R

OB

ER

TS

36

36

27

SHEET KEYNOTES

050-CY-109.

DEMOLISH 15" TOF AND REROUTE TO PEPS, SEE 6.

SAWCUT AND DEMOLISH CONCRETE SIDEWALK.5.

DEMOLISH PARSHALL FLUME NO. 3.4.

DEMOLISH SECONDARY SLUDGE PUMP STATION. 3.

DEMOLISH SECONDARY EFFLUENT PUMP STATION. 2.

DEMOLISH SECONDARY CLARIFIER NO. 1.1.

31

39

41

41

38

38 40

37

TYP

5

38

39

2

2

2

2

AT

2015/0

2/1

1A

TA

DD

EN

DU

M 1

2

22

2

8

8" NO. 4

2

2

10" NO. 4

8" NO.4

22

2

1

AT

2015/0

2/2

3A

TA

DD

EN

DU

M 3

1

422

SOUTH SIDE AT A DEPTH OF ABOUT 5 FEET.

WALKWAY THAT ENTERS PUMP STATION FROM THE

4-INCH DIAMETER DRAIN LINE FROM AB 1 AND 2

PLUG THE WET WELL WALL PENETRATION FOR THE

RETAIN AND PROTECT PUMP STATION. CAP OR 42.

AND 2.

IMMEDIATELY ADJACENT TO AERATION BASINS 1

DEMOLITION INFORMATION ON PIPING

422-D-111, 422-D-112 AND 422-D-301 FOR DETAILED

SEE SHEETS 421-D-111, 421-D-112, 421-D-301, 41.

TO DIGESTER.

PREVENT RUNOFF FROM TRAVELING DOWN RAMP 40.

SILT FENCE PER BMP-36.39.

STRAW WATTLES PER BMP-35.38.

INLET PROTECTION PER BMP-34.37.

CRITERIA.

TEMPORARY FLOW CONTROL, FOR DESIGN

110. SEE SPECIFICATION SECTION 01 57 28 -

AERATION BASINS 1 AND 2, SEE 050-CY-109 AND

AND PIPING TO DIVERT TOF AND UD/SD PIPING TO

CONSTRUCT TEMPORARY UTILITY PUMP STATION

EFFLUENT PUMP STATION, CONTRACTOR TO

PRIOR TO THE DEMOLITION OF THE SECONDARY 36.

SECONDARY CLARIFIER NO. 1 DEMOLITION.

APPROXIMATE LIMITS OF EXCAVATION FOR 35.

REMOVE AND RETAIN FOR REUSE.34.

HANDHOLES TO ADMINISTRATION BUILDING.

SLUDGE PUMP STATION BACK THROUGH

REMOVE ALL CONDUCTORS TO SECONDARY 33.

DEMOLISH HANDHOLE.32.

BACK TO PRIMARY SLUDGE PUMP STATION NO. 1.

REMOVE ALL CONDUCTORS TO PUMP STATION 31.

CIRCUIT.

CONDUCTORS TO PREVIOUS LIGHT POLE IN

DEMOLISH LIGHT POLE AND REMOVE 30.

CONSTRUCTION OF PEPS.

APPROXIMATE EXCAVATION LIMITS FOR 29.

CONSTRUCTION OF AERATION BASIN 3.

APPROXIMATE LIMITS OF EXCAVATION FOR 28.

DEMOLISH CONCRETE VALLEY GUTTER.27.

FITTINGS.

26.

DEMOLISH 30" ALP AND FITTINGS.25.

DEMOLISH 42" PE.24.

PIPING MANHOLES AND CATCH BASINS.

DEMOLISH 8" UD AND ASSOCIATED STORM WATER 23.

EXCAVATION OF PEPS.

TEMPORARY REROUTE OF 8" NO. 4 FOR

AERATION BASIN 3 AND EXCAVATION OF PEPS AND

OF 10" NO. 4 AS NEEDED FOR EXCAVATION OF

CONTRACTOR TO PROVIDE TEMPORARY REROUTE 22.

3 AND PRIMARY EFFLUENT SPLITTER BOX.

DEMOLISH 42'' PE BETWEEN PARSHALL FLUME NO. 21.

SHOWN.

DEMOLISH 8" UD TO APPROXIMATE LOCATION 20.

DEMOLISH 6" NO. 4.19.

DEMOLISH 42" SI.18.

DEMOLISH 21" SI.17.

TRICKLING FILTER DEMOLITION.

APPROXIMATE LIMITS OF EXCAVATION FOR 16.

WALL, REMOVE AS REQUIRED TO PROVIDE WORK.

APPROXIMATE LOCATION OF SOIL BENTONITE 15.

SAWCUT AND DEMOLISH ASPHALT PAVEMENT.14.

SURFACE TREATMENT.

DEMOLISH CONCRETE RIBBON CURB AND GRAVEL 13.

2

2

DEMOLISH 8" SS.12.

050-CY-108.

DEMOLISH 8" SS AND REROUTE TO HEADWORKS, SEE 11.

AND CAP.

DEMOLISH NO. 4 WATER SERVICE TO EXISTING CONNECTION 10.

SECONDARY CLARIFIER NO. 2, SEE 050-CY-113 AND 114.

DEMOLISH NO. 4 WATER SERVICE AND REROUTE TO 9.

RETAIN AND PROTECT.8.

DEMOLISH 48" ML TO APPROXIMATE LOCATION SHOWN.7.

HH-D43

3

SHEET KEYNOTES

3

MR

2015/0

3/0

3TP

AD

DE

ND

UM 4

43HH-C

3

TFEPS NETWORK CIRCUIT.

CIRCUITS AND KEYNOTE 21 ON DRAWING 050-E-108 FOR

DRAWING 050-D-113 FOR SECONDARY CLARIFIER NO. 2

SECONDARY SLUDGE PUMP STATION. SEE KEY NOTE 4 ON

PHONE AND PA CIRCUIT FROM ADMIN BUILDING TO

VARIOUS POWER AND CONTROL CONDUCTORS. DEMOLISH

IN MCC. ASSUME 21 DIFFERENT CIRCUITS CONTAINING

ADMIN BUILDING AS “NOT USED”, AND LEAVE STARTER UNITS ADMIN BUILDING. MARK EXISTING ASSOCIATED STARTERS IN

STATION SHALL BE REMOVED BACK TO THEIR SOURCE IN THE

TO SECONDARY CLARIFIER 1 AND SECONDARY SLUDGE PUMP

DEMOLISH HANDHOLES HH-C AND HH-D. ALL CIRCUITS 43.

WV

WV

WV

WV

WV

WV

WV

WV

WV

WV

C

DYH

DYH

EP

SD

HW

V

WV

2457

2458

2458

2458

2458

245924592459

2459

2459

2459

2459

2459

2459

2459

2459

2459

2459

2460

2460

2460

2461

2461

PLOT DATE: PLOT TIME:2015\03\04 8:51:33 AM

CH

2M HIL

L 2

013. A

LL RIG

HTS R

ES

ER

VE

D.

THIS D

OC

UM

EN

T,

AN

D T

HE I

DE

AS A

ND D

ESIG

NS I

NC

OR

PO

RA

TE

D H

ER

EIN,

AS A

N I

NS

TR

UM

EN

T O

F P

RO

FE

SSIO

NA

L S

ER

VIC

E, IS T

HE P

RO

PE

RT

Y O

FR

EU

SE O

F D

OC

UM

EN

TS:

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

c

PROJ

DATE

DA

TE

NO.

DS

GN

DR

RE

VISIO

N

CH

K

AP

VD

BY

AP

VD

SHEET

DWG

A

PR

OJE

CT G

RO

UP A

of

CH

2M HIL

L A

ND IS N

OT T

O B

E U

SE

D, IN W

HO

LE O

R I

N P

AR

T, F

OR A

NY O

TH

ER P

ROJE

CT W

ITH

OU

T T

HE W

RIT

TE

N A

UT

HO

RIZ

ATIO

N O

F C

H2

M HIL

L.

NA

MP

A W

WTP P

HA

SE 1 U

PG

RA

DE

S

NA

MP

A, ID

AH

O

CIT

Y O

F N

AM

PA

FILENAME: 050-02-YRD-C-103.dgn

480770

157

DECEMBER 2014

BID D

OC

UM

EN

TS

REGISTRANT ON DECEMBER 16, 2014.

ORIGINAL DOCUMENT SIGNED BY

STORED AT CH2MHILL/BOISE, ID.

ORIGINAL DOCUMENT

GB

GB

GB G

B

1

AS NOTED

A T

OL

MA

NA T

HO

MP

SO

N

CIVIL

N

AR

EA 3

KEY PLAN

050-C-103

G T

HO

MP

SO

N

Contour Interval = 1 Foot

Scale in Feet

0 20 40 60

MATCH LINE, SEE 050-C-109

NO. 2

DIGESTER

SECONDARY

NO. 2

DIGESTER

PRIMARY

NO. 3

DIGESTER

PRIMARY

BUILDING

ADMINISTRATION

ENTRANCE ROAD

NO. 1

DIGESTER

PRIMARY

3

10 9 8

14 13

SHEET KEYNOTES

3212-211

3215-260

1

2

2

3

1

SIT

E L

AY

OU

T A

ND G

RA

DIN

G P

LA

N

B R

OB

ER

TS

PROPERTY LINE

3123-918

36

5’

1

4’

4 5

5

AT

2015/0

3/0

2A

TA

DD

EN

DU

M 4

3212-212

1

3

1

HANDHOLES SEE DETAIL .

FOR ASPHALT RESTORATION AROUND ELECTRICAL 6.

DRAIN SIMILAR TO ADJACENT CURB.

EXISTING ADJACENT CURB AND GRADES. SLOPE TO

CONCRETE CURB PER ISPWC SD-701A. MATCH 5.

LAWN/SOD SURFACE RESTORATION, PER 4.

GRAVEL SURFACE RESTORATION, PER .3.

SIMILAR TO ADJACENT SIDEWALK.

EXISTING ADJACENT GRADES. SLOPE TO DRAIN

ISPWC SD-709 WIDTH AS SHOWN ON PLANS. MATCH

CONCRETE SIDEWALK (4" CONCRETE, 2" BASE) PER 2.

GRADES, PROVIDE SMOOTH TRANSITION.

SAWCUT AND MATCH EXISTING AC PAVEMENT

STANDARD AC PAVEMENT SECTION, PER 1.

WV

WV

WV

WV

WV

WV

WV

WV

WV

WV

DYH

DYH

EP

SD

HW

V

WV

T

T

Abandoned

phone

Abandoned

Abandoned conduits, 4 and one 3" pipe

Abandoned

Abandoned

8" S

DD

4" N

O.4

PLOT DATE: PLOT TIME:2015\02\27 7:59:31 AM

CH

2M HIL

L 2

013. A

LL RIG

HTS R

ES

ER

VE

D.

THIS D

OC

UM

EN

T,

AN

D T

HE I

DE

AS A

ND D

ESIG

NS I

NC

OR

PO

RA

TE

D H

ER

EIN,

AS A

N I

NS

TR

UM

EN

T O

F P

RO

FE

SSIO

NA

L S

ER

VIC

E, IS T

HE P

RO

PE

RT

Y O

FR

EU

SE O

F D

OC

UM

EN

TS:

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

c

PROJ

DATE

DA

TE

NO.

DS

GN

DR

RE

VISIO

N

CH

K

AP

VD

BY

AP

VD

SHEET

DWG

A

PR

OJE

CT G

RO

UP A

of

CH

2M HIL

L A

ND IS N

OT T

O B

E U

SE

D, IN W

HO

LE O

R I

N P

AR

T, F

OR A

NY O

TH

ER P

ROJE

CT W

ITH

OU

T T

HE W

RIT

TE

N A

UT

HO

RIZ

ATIO

N O

F C

H2

M HIL

L.

NA

MP

A W

WTP P

HA

SE 1 U

PG

RA

DE

S

NA

MP

A, ID

AH

O

CIT

Y O

F N

AM

PA

FILENAME: 050-26-YRD-E-103.dgn

480770

157

DECEMBER 2014

BID D

OC

UM

EN

TS

REGISTERED

PR

O

FES

SIONAL ENG

INEER

P

11623

O

B

AT

OT

STE

YA

N

HA

D

L

F

I

I

O

REGISTRANT ON DECEMBER 16, 2014.

ORIGINAL DOCUMENT SIGNED BY

STORED AT CH2MHILL/BOISE, ID.

ORIGINAL DOCUMENT

CE

J

CE

CECE

CE

CE

CE

J

1

AS NOTED

N

480770

AR

EA 3

KEY PLAN

G T

HO

MP

SO

N

0 20 40 60

Scale in Feet

NO. 3

DIGESTER

PRIMARY

NO. 2

DIGESTER

PRIMARY

BUILDING

ADMINISTRATION

ENTRANCE ROAD

MATCH LINE, SEE 050-E-109

NO. 1

DIGESTER

PRIMARY

NO. 2

DIGESTER

SECONDARY

K B

AR

TLE

TT

T P

ALIN

ELE

CT

RIC

AL

YA

RD E

LE

CT

RIC

AL P

LA

N

050-E-103

SWGR-EG

4

2605-304 35

GENERATOR BUIL

DING

HH-8A

2605-400

[DB-16A]

HH-11P

HH-11A

[DB-19A]

[DB-19P]

2605-400

2605-444TYP

2

1[DB-16P]

[DB-25]

GENERAL SHEET NOTES

050-E-602 & 050-E-603.

SEE DUCT BANK SCHEDULES ON DRAWINGS 050-E-601, A.

SWBD-EG

[DB-16A][DB-16P]

SHEET KEYNOTES

BUILDING.

PAINT JUNCTION BOX AND CONDUIT TO MATCH 6.

EXISTING HANDHOLE.5.

FOR MORE DETAILS.

SEE ONE-LINE DIAGRAM ON DRAWING 381-E-002 4.

FROM THE TOP.

CONDUIT UP INTERIOR WALL AND ENTER SWBD-EG

BOX SHALL BE 304 STAINLESS STEEL. ROUTE

THE BUILDING WALL ABOVE GRADE. JUNCTION

LARGE JUNCTION BOX TO PENETRATE THROUGH

ROUTE CONDUITS UP OUTSIDE OF BUILDING TO A 3.

OPTIC PATCH PANEL.

ABOVE THE CEILING TO THE NETWORK FIBER

ABOVE THE LAY-IN CEILING. ROUTE CONDUITS

INTO THE BUILDING PENETRATING INTO THE SPACE

X 12"D JUNCTION BOX. PROVIDE (2) 5" CONDUITS

ADMIN BUILDING AND TERMINATE IN A 24"W X 24"T

ROUTE (2) 5" CONDUITS UP THE OUTSIDE WALL OF 2.

PANEL.

ADMIN BUILDING NETWORK FIBER OPTIC PATCH 1.

6

6

[DB-17P]

M M

AC

RO

STIE

53

HH-16P

[DB-16P]

1

MR

2015/0

3/0

3TP

AD

DE

ND

UM 4

HH-16A

[DB-16A]

13

2

10 9 8

14

4 3

42" SS

10" NO.4

4" NO.4

8" SS

42" FE

4"

NO.4

TPLUGGED

PLOT DATE: PLOT TIME:2015\03\04 10:01:53 AM

CH

2M HIL

L 2

013. A

LL RIG

HTS R

ES

ER

VE

D.

THIS D

OC

UM

EN

T,

AN

D T

HE I

DE

AS A

ND D

ESIG

NS I

NC

OR

PO

RA

TE

D H

ER

EIN,

AS A

N I

NS

TR

UM

EN

T O

F P

RO

FE

SSIO

NA

L S

ER

VIC

E, IS T

HE P

RO

PE

RT

Y O

FR

EU

SE O

F D

OC

UM

EN

TS:

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

c

PROJ

DATE

DA

TE

NO.

DS

GN

DR

RE

VISIO

N

CH

K

AP

VD

BY

AP

VD

SHEET

DWG

A

PR

OJE

CT G

RO

UP A

of

CH

2M HIL

L A

ND IS N

OT T

O B

E U

SE

D, IN W

HO

LE O

R I

N P

AR

T, F

OR A

NY O

TH

ER P

ROJE

CT W

ITH

OU

T T

HE W

RIT

TE

N A

UT

HO

RIZ

ATIO

N O

F C

H2

M HIL

L.

NA

MP

A W

WTP P

HA

SE 1 U

PG

RA

DE

S

NA

MP

A, ID

AH

O

CIT

Y O

F N

AM

PA

FILENAME: 050-26-YRD-E-108.dgn

480770

157

DECEMBER 2014

BID D

OC

UM

EN

TS

REGISTERED

PR

O

FES

SIONAL ENG

INEER

P

11623

O

B

AT

OT

STE

YA

N

HA

D

L

F

I

I

O

REGISTRANT ON DECEMBER 16, 2014.

ORIGINAL DOCUMENT SIGNED BY

STORED AT CH2MHILL/BOISE, ID.

ORIGINAL DOCUMENT

TRICKLING FILTER NO. 2

TRICKLING FILTER NO. 3

CE

CE

CE

CE C

E

CE

CE

CE

CE

UT

CE

1

AS NOTED

N

480770

AR

EA 8

G T

HO

MP

SO

N

0 20 40 60

NO. 2

PRIMARY CLARIFIER

PUMP STATION NO. 2

PRIMARY SLUDGE

STATION

RECIRCULATION PUMP

TRICKLING FILTER

STATION

EFFLUENT PUMP

TRICKLING FILTER

Scale in Feet

KEY PLAN

9 8

14

2

10

4 3

13

MA

TC

H LIN

E, S

EE 0

50-E-1

09

MATCH LINE, SEE 050-E-113

K B

AR

TLE

TT

T P

ALIN

ELE

CT

RIC

AL

YA

RD E

LE

CT

RIC

AL P

LA

N

050-E-108

ELECTRICAL BUILDING

PRIMARY EFFLUENT PUMP STATION

PUMP STATION

PRIMARY EFFLUENT

5

HH-14A

2605-400TYP

HH-13 6

2605-400TYP

2605-444TYP

[DB-19P]

[DB-19A]

HH-7P

HH-7A

[DB-26]

[DB-24]

T-72

[DB-11]

T

HH-1P

HH-1A[DB-2A]

[DB-2P]

[DB-1P]

[DB-1A]

[DB-3A]

3

4

[DB-22A]

[DB-23P],[DB-23A]

[DB-18P], [DB-18A]

[DB-27A]

GENERAL SHEET NOTES

050-E-602 & 050-E-603.

SEE DUCT BANK SCHEDULES ON DRAWINGS 050-E-601, A.

[DB-15]

[DB-3P]

[DB-32P]

[DB-33P]

200

7

9

ELECTRICAL BUILDING

TRICKLING FILTER

(EXISTING)

MCC-2A1

(EXISTING)

MCC-2B1

10

8

[DB-31U]1

1[DB-30U]

[2"C-3#3/0,1#6G] 7

9

(EXST)

T-2

[DB-10P]

M M

AC

RO

STIE

54

12

13

14

HH-E (EXISTING)

SHEET KEYNOTES

CIRCUIT, AND TFEPS NETWORK CIRCUIT.

SECONDARY CLARIFIER CIRCUITS, SITE LIGHTING

PROVIDE NEW CIRCUITS TO REPLACE DEMOLISHED 14.

STATION. SEE KEYNOTE 21 ON DWG 050-D-108.

CONDUIT TO TRICKLING FILTER EFFLUENT PUMP

ROUTE NEW OMRON NETWORK CABLE IN EXISTING 13.

KEYNOTE 4 ON DWG 050-D-113.

WATERPROOF SPLICE CONNECTORS. SEE

CLARIFIER CONDUCTORS IN EXISTING HH-E. USE

CONDUCTORS TO EXISTING SECONDARY

SPLICE NEW SECONDARY CLARIFIER 12.

DIVERSION BOX 3, SEE DWG 050-E-301.

DIVERSION BOX 3. FOR ELECTRICAL WORK NEAR 11.

CONDITION.

REPLACE ANY DISTURBED SIDEWALK TO EXISTING

CONDUIT TO MATCH BUILDING COLOR AND

EAST WALL, AND DOWN EAST WALL. PAINT

ROUTE CONDUIT OUT TOP OF MCC, THROUGH 10.

BURIED CONDUIT IN PLACE.

PUMPING IS NO LONGER REQUIRED. ABANDON

DISCONNECT AND CONDUCTORS WHEN BYPASS

REMOVE ENCLOSED CIRCUIT BREAKER 9.

FREEDOM 2100 SERIES.

PUMPING CIRCUIT. EXISTING MCC IS EATON

UNUSED SPACE OF EXISTING MCC2A1 FOR BYPASS

PROVIDE NEW 200A CIRCUIT BREAKER IN 18" 8.

DISCONNECT ON PEDESTAL.

PROVIDE 200A ENCLOSED CIRCUIT BREAKER

STATION (TTFEPS) DURING CONSTRUCTION.

TEMPORARY TRICKLING FILTER EFFLUENT PUMP

PROVIDE TEMPORARY CIRCUIT FOR BYPASS 7.

GATES IN HH-13.

TERMINATE THE SPARE CONDUITS FOR FUTURE 6.

SEE DWG 050-EL-301.

FOR WORK IN SECONDARY SLUDGE METER VAULT, 5.

381-E-111.

FOR WORK IN ELECTRICAL BUILDING, SEE DWG 4.

SEE DWG 371-E-111.

FOR WORK IN PRIMARY EFFLUENT PUMP STATION, 3.

COORDINATE WORK WITH UTILITY.

AT THE SECONDARY OF THE TRANSFORMER.

SECONDARY CIRCUITS INCLUDING TERMINATIONS

EQUIPMENT PAD. CONTRACTOR SHALL PROVIDE

UTILITY TO PROVIDE TRANSFORMER AND 2.

CONDUCTORS AND TERMINATIONS.

CONCRETE ENCASEMENT. UTILITY WILL PROVIDE

SHALL PROVIDE TRENCH, CONDUIT, AND

MEDIUM VOLTAGE UTILITY FEEDER. CONTRACTOR 1.

1

1

MR

2015/0

3/0

3TP

AD

DE

ND

UM 4

WV

WW

VWV

SD

48"

ML

48" ML

30" RAS

15" TOF

6" NO.4

8"

NO.4

3"

NO.4

6"

NO.1

8" S

DD

15" TOF

6" NO.4

6" NO.1

6" N

O.1

6" S

CU

M

6" SCUM

48" ML

3" N

O.4

8" NO.4

10" NO.4

42" SI

42" ML

30" ALP

20" AIR HEADER

2456

2456

2457

2457

2457

2456

2456

J

PLOT DATE: PLOT TIME:2015\03\04 10:04:18 AM

CH

2M HIL

L 2

013. A

LL RIG

HTS R

ES

ER

VE

D.

THIS D

OC

UM

EN

T,

AN

D T

HE I

DE

AS A

ND D

ESIG

NS I

NC

OR

PO

RA

TE

D H

ER

EIN,

AS A

N I

NS

TR

UM

EN

T O

F P

RO

FE

SSIO

NA

L S

ER

VIC

E, IS T

HE P

RO

PE

RT

Y O

FR

EU

SE O

F D

OC

UM

EN

TS:

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

c

PROJ

DATE

DA

TE

NO.

DS

GN

DR

RE

VISIO

N

CH

K

AP

VD

BY

AP

VD

SHEET

DWG

A

PR

OJE

CT G

RO

UP A

of

CH

2M HIL

L A

ND IS N

OT T

O B

E U

SE

D, IN W

HO

LE O

R I

N P

AR

T, F

OR A

NY O

TH

ER P

ROJE

CT W

ITH

OU

T T

HE W

RIT

TE

N A

UT

HO

RIZ

ATIO

N O

F C

H2

M HIL

L.

NA

MP

A W

WTP P

HA

SE 1 U

PG

RA

DE

S

NA

MP

A, ID

AH

O

CIT

Y O

F N

AM

PA

FILENAME: 050-26-YRD-E-109.dgn

480770

157

DECEMBER 2014

BID D

OC

UM

EN

TS

REGISTERED

PR

O

FES

SIONAL ENG

INEER

P

11623

O

B

AT

OT

STE

YA

N

HA

D

L

F

I

I

O

REGISTRANT ON DECEMBER 16, 2014.

ORIGINAL DOCUMENT SIGNED BY

STORED AT CH2MHILL/BOISE, ID.

ORIGINAL DOCUMENT

CECE

CECEC

E

CE

CE

CE

CE

CE

CE

1

AS NOTED

N

480770

AR

EA 9

G T

HO

MP

SO

N

0 20 40 60

Scale in Feet

NO. 1

PUMP STATION

PRIMARY SLUDGE

NO. 1

SECONDARY DIGESTER

NO. 1

PRIMARY DIGESTER

NO. 1

PRIMARY CLARIFIER

KEY PLAN

9 8

14

2

13

4 3

10

MA

TC

H LIN

E, S

EE 0

50-E-1

10

MATCH LINE, SEE 050-E-114

MA

TC

H LIN

E, S

EE 0

50-E-1

08

MATCH LINE, SEE 050-E-103

MIXING BOX

STATION NO. 1

OVERFLOW PUMP

AERATION BASIN 1

AERATION BASIN 2

AERATION BASIN 3

K B

AR

TLE

TT

T P

ALIN

ELE

CT

RIC

AL

YA

RD E

LE

CT

RIC

AL P

LA

N

050-E-109

2

3

4

[DB-19A]

[DB-19P]

2605-400TYP

2605-400TYP

HH-3P

HH-3A

[DB-8A]

HH-10A

HH-10P

2605-444TYP

[DB-21P],[DB-21A][DB-13P]

[DB-13A]

HH-4P

HH-4A

2605-420TYP

2605-420

[DB-4P],[DB-4A]

[DB-12A][DB-12P]

HH-5A

[DB-9A]

HH-2A

[DB-6P]

[DB-6A]

[DB-29A]

[DB-29P]

[DB-7P],[DB-7A]

GENERAL SHEET NOTES

1

CIRCUIT DETAILS.

SEE DUCT BANK SCHEDULE FOR SITE ELECTRICAL A.

T-4

9

5

[DB-20A]

7

2003NCPSP

MCC-5A

6

60

[P22]

[DB-30]

HH-15A

HH-15P

[DB-29P]

[F2]

M M

AC

RO

STIE

55

STATION NO. 2

OVERFLOW PUMP

1112 13

SHEET KEYNOTES

[1"C-10#12,1#12G].

[1"C-3#10,1#10G], [1"C-3#10,1#10G],

ASSUME THE FOLLOWING CIRCUITS: 13

WATERPROOF SPLICE IN HH-B.

FROM HH-B TO JUNCTION BOX. PROVIDE

JUNCTION BOX. PROVIDE NEW CONDUCTORS

DEMOLISHING HH-C. RECONNECT TO LOADS AT

RECEPTACLES THAT WILL BE DISRUPTED BY

CLARIFIER NO. 1 AND TO DEWATERING

INTERRUPT EXISTING CIRCUITS TO PRIMARY 12.

21 ON DWG 050-D-108.

SEE KEY NOTE 4 ON DWG 050-D-113 AND KEYNOTE

EXTEND TO HH-15P AND EXISTING HH-E AS SHOWN.

CLARIFIER NO. 2, TFEPS, AND SITE LIGHTING, AND

INTERRUPT EXISTING CIRCUITS TO SECONDARY 11.

435-E-111.

BUILDING. FOR CONTINUATION SEE DWG

PROVIDE FIBER OPTIC CIRCUIT TO BLOWER 10.

ROOM.

INSTALL 2003NCPSP ABOVE DOOR IN ELECTRICAL 9.

CONDUIT FOR ROUTING TO ELECTRICAL ROOM.

ROUTE CIRCUIT TO MCC-5A. USE EXISTING 2" 8.

GE 7700 LINE CONTROL CENTER MCC FOR TUPS.

5A. INSTALL NEW 50A CB AND CUBICLE IN EXISTING

REMOVE EXISTING "OUT OF USE" STARTER IN MCC 7.

UTILITY PUMP STATION. (TUPS).

PEDESTAL TO PROVIDE POWER FOR TEMPORARY

PROVIDE 60A DISCONNECT ON A WOOD POST 6.

CONDUIT FROM ROOF ENTRANCE TO 2003 NCPSP.

2" CONDUIT ON NORTH SIDE OF BUILDING. EXTEND

ROUTE SMFOC CABLE BY INTERCEPTING EXISTING 5.

423-E-111 AND 423-E-112.

FOR WORK IN AERATION BASIN 3, SEE DWGS 4.

422-E-111 AND 422-E-112.

FOR WORK IN AERATION BASIN 2, SEE DWGS 3.

421-E-111 AND 421-E-112.

FOR WORK IN AERATION BASIN 1, SEE DWGS 2.

WORK WITH UTILITY.

CONDUCTORS AND TERMINATIONS. COORDINATE

CONCRETE ENCASEMENT. UTILITY SHALL PROVIDE

SHALL PROVIDE TRENCH, CONDUIT, AND

MEDIUM VOLTAGE UTILITY FEEDER. CONTRACTOR 1.

HH-B

[DB-33P]

[DB-33A]

[DB-29A]

1

1

1

MR

2015/0

3/0

3TP

AD

DE

ND

UM 4

135'-2"

53'-4"

27'-8"

PLOT DATE: PLOT TIME:2015\03\03 9:38:45 AM

CH

2M HIL

L 2

013. A

LL RIG

HTS R

ES

ER

VE

D.

THIS D

OC

UM

EN

T,

AN

D T

HE I

DE

AS A

ND D

ESIG

NS I

NC

OR

PO

RA

TE

D H

ER

EIN,

AS A

N I

NS

TR

UM

EN

T O

F P

RO

FE

SSIO

NA

L S

ER

VIC

E, IS T

HE P

RO

PE

RT

Y O

FR

EU

SE O

F D

OC

UM

EN

TS:

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

c

PROJ

DATE

DA

TE

NO.

DS

GN

DR

RE

VISIO

N

CH

K

AP

VD

BY

AP

VD

SHEET

DWG

A

PR

OJE

CT G

RO

UP A

of

CH

2M HIL

L A

ND IS N

OT T

O B

E U

SE

D, IN W

HO

LE O

R I

N P

AR

T, F

OR A

NY O

TH

ER P

ROJE

CT W

ITH

OU

T T

HE W

RIT

TE

N A

UT

HO

RIZ

ATIO

N O

F C

H2

M HIL

L.

NA

MP

A W

WTP P

HA

SE 1 U

PG

RA

DE

S

NA

MP

A, ID

AH

O

CIT

Y O

F N

AM

PA

FILENAME: 423-05-AB3-S-111.dgn

480770

157

DECEMBER 2014

BID D

OC

UM

EN

TS

REGISTRANT ON DECEMBER 16, 2014.

ORIGINAL DOCUMENT SIGNED BY

STORED AT CH2MHILL/BOISE, ID.

ORIGINAL DOCUMENT

1

A

2

B

AERATION BASIN 3

C BASINL

17'-2"

5'-4"

A

423-S-301

A

423-S-301

B

423-S-301

B

423-S-301

4'-10"

1'-0"

A

423-S-302

B

423-S-302

A

423-S-303

A

423-S-302

C

423-S-302

LC WALL

1'-0""2179'-3

5'-4"

5'-4"

SEE 423-S-112

TOC WALKWAY

EL 2463.30

ALUM STAIRS,SEE TYPICAL ENLARGED PLAN DWG 423-S-201

1

1

1 1

0315-253

OMIT WATERSTOP

AT ELEVATED

WALKWAY

FUTURE

AERATION

BASIN 4

11

22'-8" 17'-2"

1/4"/F

T

1/4"/FT

1/4"/FTOPEN TO BASIN

BELOW

OPEN TO BASIN

BELOW

OPEN TO BASIN

BELOW

TOW 2461.67

2 1/2" DIA DRAIN

@ 10'-0" OC

2 1/2" DIA DRAIN

@ 10'-0" OC

TOP OF WALKWAY

EL 2463.30 (TYP AT

INSIDE PERIM)

CONC WALKWAY

ALUM GUARDRAIL

WITH TYPE "A" BASE

(TYP) 0552-001

TOP OF WALKWAY

EL 2463.30

0315-253

TOW 2461.67

TYP

2

2

2

2

2

1

423-S-401

1

423-S-401

1

423-S-401

8'-9"4'-6"4'-6"34'-3"4'-6"29'-6"

FACILITY

LOCATION

CONTROL

POINT,

SEE CIVIL

TOC EL

2455.90

TOC EL

2457.25

ALUM STAIRS,SEE TYPICAL ENLARGED PLAN DWG 423-S-201

TOW 2462.17

A

423-S-303

SIM

SELECTOR ZONE FAZ ZONE

1'-3"

HOIST FRAME

3

423-S-401

1

AS NOTED

G T

HO

MP

SO

N

1/8"=1'-0"

N

423-S-111

L H

EN

DE

RS

HO

TT

ST

RU

CT

UR

AL

B H

ER

MA

N

GENERAL SHEET NOTES

SHEET KEYNOTES

W K

OH

LE

R

SEE STANDARD DETAILS FOR ADDITIONAL INFORMATION.B.

SEE DRAWINGS 010-G-013, 010-G-014, AND 010-G-015.

FOR GENERAL STRUCTURAL NOTES AND ABBREVIATIONS, A.

0315-216

AERATION BASIN 3 NORTH UPPER LEVEL PLAN

KEY PLANNTS

UP

PE

R L

EV

EL P

LA

N

AE

RA

TIO

N B

ASIN 3 N

OR

TH

4'-6" 8'-5"

ELECTRICAL. SEE DETAIL 2 ON DWG 421-S-301.

LIGHT POST PILASTER. COORDINATE LOCATION WITH 2.

JOINT LOCATIONS. SEE

PROVIDE EXPANSION JOINT IN GUARDRAIL AT EXPANSION

WATERSTOP. FOR LOCATIONS SEE FOUNDATION PLAN.

EXPANSION JOINT AT ELEVATED WALKWAY ONLY, OMIT 1.

137

0315-228

OMIT WATERSTOP

1

LH

2015/0

3/2

3W

KA

DD

EN

DU

M 4

1 2 3 1 2

A

B

C

D

421-S-111 422-S-111 423-S-111

423-S-112

AERATION BASIN 1 AERATION BASIN 2 AERATION BASIN 3

A

B

C

D

53'-4"55'-4"53'-4"

135'-2"

PLOT DATE: PLOT TIME:2015\03\03 1:22:50 PM

CH

2M HIL

L 2

013. A

LL RIG

HTS R

ES

ER

VE

D.

THIS D

OC

UM

EN

T,

AN

D T

HE I

DE

AS A

ND D

ESIG

NS I

NC

OR

PO

RA

TE

D H

ER

EIN,

AS A

N I

NS

TR

UM

EN

T O

F P

RO

FE

SSIO

NA

L S

ER

VIC

E, IS T

HE P

RO

PE

RT

Y O

FR

EU

SE O

F D

OC

UM

EN

TS:

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

c

PROJ

DATE

DA

TE

NO.

DS

GN

DR

RE

VISIO

N

CH

K

AP

VD

BY

AP

VD

SHEET

DWG

A

PR

OJE

CT G

RO

UP A

of

CH

2M HIL

L A

ND IS N

OT T

O B

E U

SE

D, IN W

HO

LE O

R I

N P

AR

T, F

OR A

NY O

TH

ER P

ROJE

CT W

ITH

OU

T T

HE W

RIT

TE

N A

UT

HO

RIZ

ATIO

N O

F C

H2

M HIL

L.

NA

MP

A W

WTP P

HA

SE 1 U

PG

RA

DE

S

NA

MP

A, ID

AH

O

CIT

Y O

F N

AM

PA

FILENAME: 423-05-AB3-S-301.dgn

480770

157

DECEMBER 2014

BID D

OC

UM

EN

TS

REGISTRANT ON DECEMBER 16, 2014.

ORIGINAL DOCUMENT SIGNED BY

STORED AT CH2MHILL/BOISE, ID.

ORIGINAL DOCUMENT

A B C D

BSECTION1/8"=1'-0"

423-S-101

423-S-102

423-S-111

423-S-112

TOW 2460.75

A

423-S-302

CONC BASIN WALL,

SEE

STEP IN WALL

BEYOND

WALKWAY

SEE PLAN

TOP OF

SEE PLAN

TOF

A

423-S-303

SIM

CONC BAFFLE WALL,

SEE

12" CONCRETE BASE

SLAB, SEE PLAN

C

423-S-302

CONC BASIN WALL,

SEE

A

423-S-304

SEE ENLARGED

EFFLUENT BOX

LOWER PLAN,

DWG 423-S-201

SEE ENLARGED

EFFLUENT BOX

UPPER PLAN,

DWG 423-S-201

B

423-S-302

A

CONCRETE GUARD WALL

(TYP)

ALUM GUARDRAIL

(TYP)

SUMP BEYOND

1 2

ASECTION1/8"=1'-0"

423-S-101

423-S-111

ALUM GUARDRAIL

(TYP)

TOP OF WALKWAY

SEE PLAN

TOF

SEE PLAN

TOP OF WALKWAY

SEE PLAN

PIPE ENCASEMENT PIPE ENCASEMENT

SUMP

C

423-S-302

D

423-S-303

B

423-S-302

CONC BASIN WALL,

SEEA

423-S-302

CONC BASIN WALL,

SEE

"T" WALKWAY

WALL BEYOND

TRENCHC

423-S-303

12" CONC BASE

SLAB, SEE PLAN

SEE PLAN

TOW

FUTURE

AERATION

BASIN 4

B

7" SQ BLOCKOUT

THROUGH WALL

(TYP EA SUMP)

3

423-S-401

SEE PLAN &

HOIST FRAME,

1

AS NOTED

G T

HO

MP

SO

N

423-S-301

L H

EN

DE

RS

HO

TT

ST

RU

CT

UR

AL

AE

RA

TIO

N B

ASIN 3

B H

ER

MA

N

OV

ER

ALL S

EC

TIO

NS

W K

OH

LE

R

140

LH

2015/0

2/2

6W

KA

DD

EN

DU

M 4

1

4'-0"

PLOT DATE: PLOT TIME:2015\03\03 1:33:56 PM

CH

2M HIL

L 2

013. A

LL RIG

HTS R

ES

ER

VE

D.

THIS D

OC

UM

EN

T,

AN

D T

HE I

DE

AS A

ND D

ESIG

NS I

NC

OR

PO

RA

TE

D H

ER

EIN,

AS A

N I

NS

TR

UM

EN

T O

F P

RO

FE

SSIO

NA

L S

ER

VIC

E, IS T

HE P

RO

PE

RT

Y O

FR

EU

SE O

F D

OC

UM

EN

TS:

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

c

PROJ

DATE

DA

TE

NO.

DS

GN

DR

RE

VISIO

N

CH

K

AP

VD

BY

AP

VD

SHEET

DWG

A

PR

OJE

CT G

RO

UP A

of

CH

2M HIL

L A

ND IS N

OT T

O B

E U

SE

D, IN W

HO

LE O

R I

N P

AR

T, F

OR A

NY O

TH

ER P

ROJE

CT W

ITH

OU

T T

HE W

RIT

TE

N A

UT

HO

RIZ

ATIO

N O

F C

H2

M HIL

L.

NA

MP

A W

WTP P

HA

SE 1 U

PG

RA

DE

S

NA

MP

A, ID

AH

O

CIT

Y O

F N

AM

PA

FILENAME: 423-05-AB3-S-401.dgn

480770

157

DECEMBER 2014

BID D

OC

UM

EN

TS

REGISTRANT ON DECEMBER 16, 2014.

ORIGINAL DOCUMENT SIGNED BY

STORED AT CH2MHILL/BOISE, ID.

ORIGINAL DOCUMENT

3/4"=1'-0"2

423-S-111

423-S-112

LIGHT POST PILASTER

2"

TY

P

CL

R

1'-2"

1'-2"(4) #5 VERTS

MATCH TOC

2"

TY

P

CL

R

1'-2"

1'-2"

#4@12" OC

(4) #5 VERTS

MATCH TOC

GUARDWALL

8" CONCRETE

#4@12" OC (2 MIN)

2"

TY

P

CL

R

1'-2"

1'-2"(2) #4 VERTS

MATCH TOC

#4@12" OC (2 MIN)

8" CURB

CURB REINF

REINF

GUARD WALL

WALL

8" CONC GUARD

2"

TY

P

CL

R

1'-2"

1'-2"

#4@12" OC

(4) #5 VERTS

GUARDWALL

8" CONCRETE MATCH TOC

TYPICAL PILASTER PLAN

PILASTER AT CURB PLAN

CORNER PILASTER PLANS

WALL BELOW

A

A

A

A

WALL BELOW

WALL BELOW

A

A

REINF

GUARD WALLREINF

GUARD WALL

WALKWAY

CONC

B

B

SECTION B-B

8"

(2) ADDTL #5 T&B

NOT SHOWN, SEE PLAN

CONC WALKWAY, REINF

NOT SHOWN

CURB BEYOND, REINFANCHORS

LIGHT POLE &

TIES

VERTS

SECTION A-A

3'-6"

VERTS

TIES

REINF NOT SHOWN

(WHERE OCCURS)

GUARDWALL BEYOND

ELECTRICAL.

COORDINATE EXACT PILASTER LOCATIONS WITH 2.

PATTERN, SEE ELECTRICAL.

COORDINATE REINF WITH LIGHT BASE BOLT 1.

NOTES:

(2) ADDTL #5 T&B

NOT SHOWN, SEE PLAN

CONC WALKWAY, REINF

REINF NOT SHOWN

OCCURS) SEE PLAN,

BASIN WALL (WHERE

BELOW (WHERE OCCURS)

LENGTH INTO WALL

EXTEND VERTS EMBED

LIGHT POLE & ANCHORS

8"

5'-6"

3'-6"

L

L

ELEVATIONLOOKING SOUTH

C OPNG

4'-6" (UON)

GUARD WALL

TOP OF CONC

WALKWAY

TOP OF CONC

1DETAIL3/4"=1'-0"

423-S-111

TYP, SEE NOTE 2

(ON WALKWAY SIDE)

CTR ON OPENING

GUARDRAIL TO

REMOVABLE ALUM

(WHERE OCCURS)

SEE PROCESS

C MIXER SHAFT

31/2"=1'-0"

S103

4'-0"

6"

2'-0"

8"8"

TOC EL

11'-0"

9"

TYP

W8x31 CROSS BEAM

(TYP)

TY

P

5'-0" (TYP)

L3x3x1/4 END

STOP EA SIDE

OF BEAM

3'-6"

SEE PLAN

TOC EL

SEE PLAN

PL 1/2"x4"xREQD

(TYP)

1/2" DIA x 5" EMBED

ADHESIVE ANCHOR

IN VERTICAL SHORT

SLOTTED HOLE (TYP)

CONC WALWAY

W6x15 POST (TYP)

1/2"x7" SQUARE

BASEPLATE

1 1/2" MIN GROUT

CONC GUARD

WALL

W6x15 POST (TYP)

CONC WALKWAY

CONC WALL BELOW

W8x31 CROSS BEAM

(TYP)

1/4

1/4

TYP1/4

TYP1/4

1/4

"21

TYP

TYP

4"

2"

TYP

CONC GUARD WALL

HOIST FRAME

SECTION A-A

ELEVATION

A

A

BB

2"2"

1/2"

5/8" DIA x 6" EMBED

ANCHOR BOLTS

FACE OF CONC

GUARD WALL

1/4

SECTION B-B

S8x18.4 MONORAIL

S8X18.4 MONORAIL

A325N BOLTS

(2) 3/4" DIA

6"

1 1/2"

1

G T

HO

MP

SO

N

423-S-401

L H

EN

DE

RS

HO

TT

B H

ER

MA

NW K

OH

LE

R

ST

RU

CT

UR

AL

DE

TAIL

S

AE

RA

TIO

N B

ASIN 3

144

AS NOTED

LH

2015/0

3/1

0W

KA

DD

EN

DU

M 4

1

3212-212NTS

DOUBLE HANDHOLE

ASPHALT RESTORATION AT

GB

GB

GB

GB

10’

EXST GRADE

EXST GRADE

EXST GRADE

EXST GRADE

+ 0.2’

EXST GRADE

+ 0.2’

EXST GRADE

GRADE + 0.2’

EL = EXST

ELEC HH RIM

2%2

%

PLAN

PER ELEC

ELEC HH

PLAN

PER ELEC

ELEC HH

1’

MIN

TY

P

10’

1’ MIN

TYP

1

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Nampa Wastewater Treatment Plant Phase I Upgrades: Group A-Liquid Stream Upgrades

Response to Written Bidder Questions – Addendum 4

Internal

Tracking

Spec/Drawing Bidder Question/Comment Response

18 010-G-022

and 010-G-

023

Can you clarify the sources of the temporary flows called out in the Process

Flow Diagrams?

Flows 3 and 5 into Primary Clarifier 1 as shown on 010-G-022: These are

an existing 15" TOF (may also be labeled TUF) and 8" UD that run south of aeration basins 1 and 2 as shown on sheet 050-CY-109 where they are identified by note 7. Temporary pumps are to be installed in Primary Clarifier 1 to pump these flows into aeration basins 1 and 2 as shown on that sheet. Temporary Trickling Filter Effluent pump station and Secondary Clarifier 2 Effluent Bypass to Aeration Basins 1

and 2 as shown on 010-G-022: This piping is shown on 050-CY-108 (notes 7, 8 and 9), 050-CY-109 ((note 11), 050-CY-113 (notes 1 and 5) and 050-CY-114 ((notes 8, 9 and 10). Aeration Basin 1 and 2 Underdrain Piping as shown on 010-G-023: This piping is shown on 050-CY-109 (note 9) and diverts the underdrain pump station discharge into aeration basins 1 and 2.

19 The steel fabricator would like to confirm that you want cement lining on the air piping. The reason for his asking is that the air will dry out the cement causing it to break and fall off which could possibly cause serious problems in the air system. Normally what they see is no lining and primer coated. Please let me know what you would like.

See Addendum 4.

20 Is there a domestic material requirements

for this project? We have not been able to find anything in the specs.

This contract does not include

domestic materials requirements.

21 050-CY-109 The TOF line. Per the piping schedule this is called out as Cement Lined Ductile iron pipe. The drawing calls it as 15", could you clarify is this pipe indeed Ductile iron, if so is it 14" or 16" (15" DI not made) or is it 15" C3034 sewer pipe?

See addendum 4

22 423-M-301 Valve Tag V202 appears on sheet 423-M-301 but is not defined in the valve specifications. Please specify the valve required at this location.

See Addendum 4.

23 321-M-11 Drawing 321-M-111 indicates that the existing Trickling Filter Mechanism is to be removed and turned over to the Owner. 1. To what extent is the mechanism be

broken down to. 2. Location of where the mechanism is to be delivered to.

See Addendum 4

25 371-E-111 The only pole lighting I have found is at Aeration Basin #3, P2's and P3's. Are there some I didn't see maybe on the site Drawings?

Two P1 luminaires and poles are shown on drawing 371-E-111 to illuminate the Primary Effluent Pump Station.