\\hrc-engr\General\Projdocs\201905\20190539\04_Design\Final\Bidding\Bid_Docs\Addenda\Addendum 3\20200313_Add_3.docx 105 W. Grand River Avenue Suite 215 Howell, MI 48843 (517) 552-9199 www.hrcengr.com ADDENDUM NO. 3 TO SPECIFICATIONS AND DRAWINGS FOR THE CITY OF HOWELL WATER TREATMENT PLANT IMPROVEMENTS ISSUED: March 17, 2020 HRC Job No. 20190539 This Addendum is issued prior to receipt of bids to provide for certain changes and clarifications to the specifications and/or the plans, as herein specified, and is hereby made a part of the Contract Documents and shall be taken into consideration in preparing the Proposal. All other conditions remain the same. GENERAL 1. Pre-bid meeting minutes and sign-in sheets are attached to this addendum. SPECIFICATION CHANGES 1. Page 00300: a. Page 1 of 8: Bidders must acknowledge this Addendum on the Bid Form. b. Page 3 of 8: Replace row “Item 1: Replace Siding and Other Architectural Improvements” with two rows “Item 1: Replace Siding” and Item 1A: Other Architectural Improvements” c. Page 4 of 8: After Alternate 1 Add the following text: “ALTERNATE 2 – Alternate Metal Wall Panels The Specifications and Drawings indicate an alternate option for the replacement of the WTP wall panels. In lieu of the specified metal wall panels, provide 36” wide, minimum R-20 insulated panels with lite embossed texture (orange peel or similar) on both inside and outside faces (no embossed ribs/planks). MBCI “CF Mesa”, Centria “Versawall”, or Approved Equal. All other particulars, i.e., Manufacturers, material & thicknesses, coatings, etc. are to be as specified in Section 07412. The costs associated with this alternate shall be listed below and deducted from the Total Amount of the Bid for the Project above. The City will decide after the bids are opened whether to elect this alternate. ALTERNATE 2 Lump Sum Deductive Price $___________________________________________________” d. Page 3 of 8: Replace paragraph 5.03B.1 with the following: “1. Item No. 1 – Replace Siding a. Description: Remove and replace insulated wall panels and parapet cap. b. Unit of Measurement: Lump sum. 2. Item No. 1A – Other Architectural Improvements a. Description: Other improvements associated with this work. b. Unit of Measurement: Lump sum.” e. Page 6 of 8: In the table SCHEDULE OF PROPOSED MAJOR EQUIPMENT AND SUBCONTRACTORS Add “d. Signature Contracting Group” to the list of subcontractors in concrete coating and Waterproofing Subcontractor”.
ADDENDUM NO. 3 TO SPECIFICATIONS AND DRAWINGS FOR … · 2020. 3. 17. · HRC Job Number \\hrc-engr\General\Projdocs\201905\20190539\04_Design\Final\Bidding\Bid_Docs\Addenda\Addendum
611 East Grand River Avenue Howell, MI 48843 517-552-9199 www.hrcengr.com
PREBID MEETING AGENDA
CITY OF HOWELL WATER TREATMENT PLANT IMPROVEMENTS
Date: March 12, 2020, DWRF Project No. 7462-01 Time: 1:00 PM Meeting Held: City Hall Council Room, 2nd Floor and online HRC Job No. 20190539 Meeting was made available online due to precautions related to Covid-19. Link to: Microsoft Teams Meeting
1) Introductions
a) Sign-in Sheet (attached with these minutes)
2) Bidding and Contract Requirements
a) Bid Time and Date. 10:00 a.m. Thursday, April 2, at City Hall, at City Clerk’s office.
b) Addendum 1 issued March 4, 2020 and Addendum 2 issued March 12, 2020
c) DWRF Requirements (Section 00850 and DWRF Representative). i) Davis Bacon Wage Rates issued as part of an Addendum prior to the bid date. ii) DBE Requirements – Good Faith Efforts Worksheet
(1) Needs to be filled out completely per the specifications iii) Debarment/Suspension Certification iv) American Iron and Steel Requirements
3) Project Overview a) Architectural Improvements b) Lime Feed System Replacement c) Carbon Dioxide Feed System Installation d) Wells #4 and #5 Improvements e) Concrete Surface Repairs and Coating
4) Bid Proposal Form a) Bid Security (5%) b) Basis of Bid
i) Lump-Sum Base Bid Items c) Allowances
i) Wall Coating ii) Crack Repair iii) Roof Repair (only paid if Bid Alternate A is not completed)
i) Bid Security ii) Subcontractors/Manufacturers List iii) List of Similar Project References
f) EGLE Good Faith Efforts worksheet, supporting documentation and Debarment/Suspension Certification g) Addenda Acknowledgement h) Bids Firm for 90 days
5) Schedule a) DWRF FY2020 3rd Quarter Schedule:
(1) Tentative Contract Award: 4/13/2020 (2) Notice to Proceed: 6/1/2020
b) Substantial Completion: 335 days c) Final Completion: 365 days d) Liquidated Damages ($1,000/day after Final Completion and $4,500/day for extension of 14-day WTP
Shutdown) i) Temporary Shutdown requires WTP water purchase
6) Project Requirements a) Sequence of Construction – Section 01950 b) Suggested General Sequence
i) Lime Slaker and Clarifier Effluent Replacement (1) Complete during 14-day WTP shutdown
ii) CO2 Feed System iii) Wall Panel Replacement (Put up new as old is taken off to minimize exposure)
(1) Isolate from exterior at end of each day iv) Concrete Coating
(1) Surface prep completed with manufacturer visual inspection (2) Warmer than 40 deg F
7) Project Administration Items a) Contractor to provide layout. b) Utilities required for Contractor’s operation by the Contractor (coordinate as needed with WTP). c) Contractor responsible for locating all site utilities prior to construction (coordinate all utility locating with the
WTP) d) Payments. Progress payments will be made on a monthly basis on a schedule developed by the City and
DWRF Requirements. e) A detailed schedule containing the critical path is required from the Contractor prior to the start of work. The
schedule must meet the approval of the City. The Contractor is requested to distribute the schedule at the pre-construction meeting. The schedule shall be updated, by the Contractor, at the progress meetings.
f) Progress Meetings. Project meetings shall be conducted on a monthly basis. Representatives from the Engineer, Owner, and Contractor shall be present. Progress meeting schedule will be developed by the Engineer.
g) Pre-Installation Meetings. Held onsite prior to start-up of equipment as necessary.
8) Questions Q: Classification of the main treatment building for material.
A: Moderately corrosive, will be answered in Addendum 3. Q: Use of foam in concrete coating/repair? A: Not required, repair shall be Patch N Plug. Q: Disassembly of pipe to remove check valve for Well #5: A: Valve was replaced by WTP staff several years ago, please coordinate with WTP. Site Visits / Additional Questions
EJCDC C-410 Suggested Bid Form for Construction Contracts
SCHEDULE OF PROPOSED MAJOR EQUIPMENT AND SUBCONTRACTORS
Spec Section
Number (s)
Subcontractor / Equipment Item Identify Subcontractor/Manufacturer (See Notes Below)
02161 Concrete Coating and Waterproofing
Subcontractor
a. DC Byers
b. Mark 1 Restoration
c. Borner Restoration
d. Signature Contracting Group
e. Approved Substitute (see Note 5) ____________________
09900 Painting Subcontractor
11402 Carbon Dioxide Feed Equipment a. TOMCO2
b. Blue In Green
11726 Lime Slaking Equipment Integrity Municipal Systems
Div. 11,15 Mechanical Subcontractor
Div. 16 Electrical Subcontractor
Div. 16 WTP SCADA Subcontractor Commerce Control Incorporated
Div. 16 Well Houses SCADA Subcontractor Kennedy Industries
Notes: 1. Circle or list the name of one Subcontractor or Manufacturer for each of item listed to be included in the Bidder’s base price (Cross out the
others).
2. Proposal shall be considered irregular and subject to rejection if the Bidder: a. Fails to list one approved Subcontractor or Manufacturer listed.
b. Lists more than one approved Subcontractor or Manufacturer.
3. If the Bidder fails to list (by circling) a Subcontractor or Manufacturer, the Owner has the sole right to select one of the Suppliers or Manufacturers from the list of acceptable Suppliers or Manufacturers listed.
4. If the Bidder lists (by circling) more than one approved Subcontractor or Manufacturer, the Owner has the sole right to select one of the
Suppliers or Manufacturers from the list of acceptable Suppliers or Manufacturers listed. 5. The Bidder may propose a substitute for any item, product, system, or supplier in accordance with Section 6.05 of the General Conditions. The
proposed substitution shall be indicated by listing the substitute equipment, product, system, or supplier and the corresponding addition or
deduction to the Base Bid price.
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for
final payment in accordance with Paragraph 14.07 of the General Conditions on or before the dates
or within the number of calendar days indicated in the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security in the form of certified check, bank money order, or a Bid bond;
B. List of Proposed Subcontractors (not already listed above).
ARTICLE 8 – DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to
Bidders, the General Conditions, and the Supplementary Conditions.
EJCDC C-410 Suggested Bid Form for Construction Contracts
2020 Hubbell, Roth & Clark, Inc. All Rights Reserved
AutoCAD SHX Text
C
AutoCAD SHX Text
V:\201905\20190539\A\Sheets\A01plot.dwg
AutoCAD SHX Text
Kijewski, Krystyna
AutoCAD SHX Text
HRC_OLW_Clr.CTB
AutoCAD SHX Text
3/12/2020 11:21 AM
AutoCAD SHX Text
20190539
AutoCAD SHX Text
FEB 2020
AutoCAD SHX Text
ORIGINAL PLOT SIZE: ANSI D (34" X 22")
AutoCAD SHX Text
2/27/2020
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
MAIN TREATMENT BUILDING
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
A-1
AutoCAD SHX Text
6
AutoCAD SHX Text
AMM
AutoCAD SHX Text
STS
AutoCAD SHX Text
AMM
AutoCAD SHX Text
NMF
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
BUILDING DATA: APPLICABLE CODES: 2015 MICHIGAN BUILDING CODE (MBC) 2017 NATIONAL ELECTRICAL CODE 2015 MICHIGAN MECHANICAL CODE 2015 MICHIGAN PLUMBING CODE 2015 MICHIGAN REHAB CODE FOR EXISTING BUILDINGS (MRCEB) 2015 INTERNATIONAL FIRE CODE 2015 MICHIGAN UNIFORM ENERGY CODE ICC ANSI A117.1 - 2017 USE GROUP (302, 304): EXISTING TO REMAIN : EXISTING TO REMAIN CONSTRUCTION TYPE (TABLE 601 & 602): : EXISTING TO REMAIN CLASSIFICATION OF WORK (MRCEB CH 5): -- NEW WORK AREAS AT THE EXTERIOR FACADE OF THE BUILDING ARE CLASSIFIED AS A "LEVEL 2 ALTERATION" PER SECTION 504. --NEW WORK AREA AT THE ROOF OF THE BUILDING IS CLASSIFIED AS "LEVEL 1 ALTERATION" PER SECTION 503. ROOF AREA: 5,617 S.F. EXISTING TO REMAIN 5,617 S.F. EXISTING TO REMAIN NEW COMPONENTS ENERGY CODE COMPLIANCE: ROOF (INSUL. ABOVE DECK): R-20 MIN. (REROOFING) PROVIDED WINDOWS (METAL FRAMING, FIXED): U-0.42 MAX WALL PANELS R-23 (R-19 REQUIRED)
AutoCAD SHX Text
ROOFING NOTES: 1. ONLY MAJOR ROOF PENETRATIONS & EQUIP. ARE SHOWN. THE ONLY MAJOR ROOF PENETRATIONS & EQUIP. ARE SHOWN. THE ROOF PLAN REPRESENTS THE GENERAL WORK AREA ONLY. THE CONTRACTOR SHALL REFER TO DEMO SHEET, REFERENCE DWGS. & FIELD VERIFY ALL CONDITIONS, OPENINGS, ETC. PRIOR TO BEGINNING WORK, WHETHER OR NOT THEY ARE SPECIFICALLY SHOWN ON THIS PLAN OR REF DWGS. 2. THE EXISTING ROOF, IN WORK AREA SHOWN, SHALL BE REMOVED & THE EXISTING ROOF, IN WORK AREA SHOWN, SHALL BE REMOVED & REPLACED WITH A NEW ROOFING SYSTEM - SEE SPECIFICATIONS. PROVIDE MINIMUM R-20 INSULATION AT ALL ROOF AREAS. 3. PROVIDE WALKWAY PADS FROM ROOF HATCH TO ALL H&V UNITS, PROVIDE WALKWAY PADS FROM ROOF HATCH TO ALL H&V UNITS, FANS, ROOF SUMPS, ETC. IN THE MOST DIRECT ROUTE OF TRAVEL. VERIFY EXACT LAYOUT/LOCATIONS IN FIELD WITH OWNER. 4. NEW METAL PERIMETER EDGING SHALL BE INSTALLED. METALS FOR NEW METAL PERIMETER EDGING SHALL BE INSTALLED. METALS FOR NEW FLASHING SHALL BE AS SPECIFIED IN SECTION 07620. 5. PROVIDE NEW FLASHING AT EXIST. PENETRATIONS PER NRCA PROVIDE NEW FLASHING AT EXIST. PENETRATIONS PER NRCA ROOFING & WATERPROOFING MANUAL (TYP.) 6. ALL REMAINING CURBS SHALL BE EXTENDED OR RAISED TO MIN. 8" ALL REMAINING CURBS SHALL BE EXTENDED OR RAISED TO MIN. 8" ABOVE TOP OF NEW ROOFING. INSTALL NEW MEMBRANE UP AND OVER CURBS, FASTEN TO INSIDE FACE OF CURBS PER ROOFING MFR. STANDARD DETAIL. ALL VENT PIPING TO BE EXTENDED AS REQ'D TO ACCOMMODATE SIM. FLASHING REQ'MENTS. (TYP.) 7. TAPERED INSULATION REQ'D IN AREAS INDICATED ON DWGS. TAPERED INSULATION REQ'D IN AREAS INDICATED ON DWGS. MAINTAIN MIN. SLOPE PER ROOFING MFR. WARRANTY REQUIREMENTS. 8. ROOF SADDLES ARE TO HAVE A MIN. SLOPE OF 1/4" PER FT. ROOF SADDLES ARE TO HAVE A MIN. SLOPE OF 1/4" PER FT. SLOPE (U.N.O.) PER ROOFING MFR. WARRANTY REQUIREMENTS. 9. PROVIDE CRICKETS ON HIGH SIDE OF ALL CURBED ITEMS. MIN PROVIDE CRICKETS ON HIGH SIDE OF ALL CURBED ITEMS. MIN ALL CURBED ITEMS. MIN CURBED ITEMS. MIN 1/4" PER FOOT (U.N.O.) PER ROOFING MANUFACTURERS WARRANTY REQUIREMENTS. 10. EXISTING BLOCKING TO REMAIN. REPLACE AS-NEEDED ONLY EXISTING BLOCKING TO REMAIN. REPLACE AS-NEEDED ONLY WHERE DAMAGED OR DETERIORATED.
AutoCAD SHX Text
GENERAL REQUIREMENTS: 1. CONTRACTOR SHALL COORDINATE ALL WORK PRIOR TO INSTALLATION OR CONTRACTOR SHALL COORDINATE ALL WORK PRIOR TO INSTALLATION OR SHALL COORDINATE ALL WORK PRIOR TO INSTALLATION OR SHALL COORDINATE ALL WORK PRIOR TO INSTALLATION OR COORDINATE ALL WORK PRIOR TO INSTALLATION OR COORDINATE ALL WORK PRIOR TO INSTALLATION OR ALL WORK PRIOR TO INSTALLATION OR ALL WORK PRIOR TO INSTALLATION OR WORK PRIOR TO INSTALLATION OR WORK PRIOR TO INSTALLATION OR PRIOR TO INSTALLATION OR PRIOR TO INSTALLATION OR TO INSTALLATION OR TO INSTALLATION OR INSTALLATION OR INSTALLATION OR OR OR FABRICATION OF ANY COMPONENTS. ALL OPENINGS SHALL ALSO BE COORDINATED OF ANY COMPONENTS. ALL OPENINGS SHALL ALSO BE COORDINATED OF ANY COMPONENTS. ALL OPENINGS SHALL ALSO BE COORDINATED ANY COMPONENTS. ALL OPENINGS SHALL ALSO BE COORDINATED ANY COMPONENTS. ALL OPENINGS SHALL ALSO BE COORDINATED COMPONENTS. ALL OPENINGS SHALL ALSO BE COORDINATED COMPONENTS. ALL OPENINGS SHALL ALSO BE COORDINATED ALL OPENINGS SHALL ALSO BE COORDINATED ALL OPENINGS SHALL ALSO BE COORDINATED OPENINGS SHALL ALSO BE COORDINATED OPENINGS SHALL ALSO BE COORDINATED SHALL ALSO BE COORDINATED SHALL ALSO BE COORDINATED ALSO BE COORDINATED ALSO BE COORDINATED BE COORDINATED BE COORDINATED COORDINATED COORDINATED WITH REFERENCE DRAWINGS. 2. ALL WORK MUST CONFORM TO ALL STATUTES OF THE MICHIGAN BUILDING CODE ALL WORK MUST CONFORM TO ALL STATUTES OF THE MICHIGAN BUILDING CODE WORK MUST CONFORM TO ALL STATUTES OF THE MICHIGAN BUILDING CODE WORK MUST CONFORM TO ALL STATUTES OF THE MICHIGAN BUILDING CODE MUST CONFORM TO ALL STATUTES OF THE MICHIGAN BUILDING CODE MUST CONFORM TO ALL STATUTES OF THE MICHIGAN BUILDING CODE CONFORM TO ALL STATUTES OF THE MICHIGAN BUILDING CODE CONFORM TO ALL STATUTES OF THE MICHIGAN BUILDING CODE TO ALL STATUTES OF THE MICHIGAN BUILDING CODE TO ALL STATUTES OF THE MICHIGAN BUILDING CODE ALL STATUTES OF THE MICHIGAN BUILDING CODE ALL STATUTES OF THE MICHIGAN BUILDING CODE STATUTES OF THE MICHIGAN BUILDING CODE STATUTES OF THE MICHIGAN BUILDING CODE OF THE MICHIGAN BUILDING CODE OF THE MICHIGAN BUILDING CODE THE MICHIGAN BUILDING CODE THE MICHIGAN BUILDING CODE MICHIGAN BUILDING CODE MICHIGAN BUILDING CODE BUILDING CODE BUILDING CODE CODE CODE (EDITION IN EFFECT AT THE TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL IN EFFECT AT THE TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL IN EFFECT AT THE TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL EFFECT AT THE TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL EFFECT AT THE TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL AT THE TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL AT THE TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL THE TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL THE TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL TIME OF PERMIT), ALL STATE, COUNTY AND LOCAL OF PERMIT), ALL STATE, COUNTY AND LOCAL OF PERMIT), ALL STATE, COUNTY AND LOCAL PERMIT), ALL STATE, COUNTY AND LOCAL PERMIT), ALL STATE, COUNTY AND LOCAL ALL STATE, COUNTY AND LOCAL ALL STATE, COUNTY AND LOCAL STATE, COUNTY AND LOCAL STATE, COUNTY AND LOCAL COUNTY AND LOCAL COUNTY AND LOCAL AND LOCAL AND LOCAL LOCAL LOCAL ORDINANCES, CURRENT BARRIER FREE REGULATIONS, MIOSHA STRUCTURAL CURRENT BARRIER FREE REGULATIONS, MIOSHA STRUCTURAL CURRENT BARRIER FREE REGULATIONS, MIOSHA STRUCTURAL BARRIER FREE REGULATIONS, MIOSHA STRUCTURAL BARRIER FREE REGULATIONS, MIOSHA STRUCTURAL FREE REGULATIONS, MIOSHA STRUCTURAL FREE REGULATIONS, MIOSHA STRUCTURAL REGULATIONS, MIOSHA STRUCTURAL REGULATIONS, MIOSHA STRUCTURAL MIOSHA STRUCTURAL MIOSHA STRUCTURAL STRUCTURAL STRUCTURAL GUIDELINES, ASTM STANDARD TESTING PROCEDURES, OWNER'S PRACTICES AND ASTM STANDARD TESTING PROCEDURES, OWNER'S PRACTICES AND ASTM STANDARD TESTING PROCEDURES, OWNER'S PRACTICES AND STANDARD TESTING PROCEDURES, OWNER'S PRACTICES AND STANDARD TESTING PROCEDURES, OWNER'S PRACTICES AND TESTING PROCEDURES, OWNER'S PRACTICES AND TESTING PROCEDURES, OWNER'S PRACTICES AND PROCEDURES, OWNER'S PRACTICES AND PROCEDURES, OWNER'S PRACTICES AND OWNER'S PRACTICES AND OWNER'S PRACTICES AND PRACTICES AND PRACTICES AND AND AND GENERALLY ACCEPTED DESIGN PRACTICES. IF DISCREPANCIES IN DRAWING APPEAR, ACCEPTED DESIGN PRACTICES. IF DISCREPANCIES IN DRAWING APPEAR, ACCEPTED DESIGN PRACTICES. IF DISCREPANCIES IN DRAWING APPEAR, DESIGN PRACTICES. IF DISCREPANCIES IN DRAWING APPEAR, DESIGN PRACTICES. IF DISCREPANCIES IN DRAWING APPEAR, PRACTICES. IF DISCREPANCIES IN DRAWING APPEAR, PRACTICES. IF DISCREPANCIES IN DRAWING APPEAR, IF DISCREPANCIES IN DRAWING APPEAR, IF DISCREPANCIES IN DRAWING APPEAR, IF DISCREPANCIES IN DRAWING APPEAR, DISCREPANCIES IN DRAWING APPEAR, DISCREPANCIES IN DRAWING APPEAR, IN DRAWING APPEAR, IN DRAWING APPEAR, DRAWING APPEAR, DRAWING APPEAR, APPEAR, APPEAR, WORK MUST BE DONE PER CODE. 3. EXISTING CONDITIONS OF BUILDING SHOWN ON CONSTRUCTION DOCUMENTS ARE EXISTING CONDITIONS OF BUILDING SHOWN ON CONSTRUCTION DOCUMENTS ARE CONDITIONS OF BUILDING SHOWN ON CONSTRUCTION DOCUMENTS ARE CONDITIONS OF BUILDING SHOWN ON CONSTRUCTION DOCUMENTS ARE OF BUILDING SHOWN ON CONSTRUCTION DOCUMENTS ARE OF BUILDING SHOWN ON CONSTRUCTION DOCUMENTS ARE BUILDING SHOWN ON CONSTRUCTION DOCUMENTS ARE BUILDING SHOWN ON CONSTRUCTION DOCUMENTS ARE SHOWN ON CONSTRUCTION DOCUMENTS ARE SHOWN ON CONSTRUCTION DOCUMENTS ARE ON CONSTRUCTION DOCUMENTS ARE ON CONSTRUCTION DOCUMENTS ARE CONSTRUCTION DOCUMENTS ARE CONSTRUCTION DOCUMENTS ARE DOCUMENTS ARE DOCUMENTS ARE ARE ARE ILLUSTRATIVE OF CONDITIONS VISIBLE TO ARCHITECT AND BASED ON EXISTING OF CONDITIONS VISIBLE TO ARCHITECT AND BASED ON EXISTING OF CONDITIONS VISIBLE TO ARCHITECT AND BASED ON EXISTING CONDITIONS VISIBLE TO ARCHITECT AND BASED ON EXISTING CONDITIONS VISIBLE TO ARCHITECT AND BASED ON EXISTING VISIBLE TO ARCHITECT AND BASED ON EXISTING VISIBLE TO ARCHITECT AND BASED ON EXISTING TO ARCHITECT AND BASED ON EXISTING TO ARCHITECT AND BASED ON EXISTING ARCHITECT AND BASED ON EXISTING ARCHITECT AND BASED ON EXISTING AND BASED ON EXISTING AND BASED ON EXISTING BASED ON EXISTING BASED ON EXISTING ON EXISTING ON EXISTING EXISTING EXISTING DRAWINGS. ALL EXISTING DIMENSIONS, CONDITIONS, SIZES & LOCATIONS ARE TO BE ALL EXISTING DIMENSIONS, CONDITIONS, SIZES & LOCATIONS ARE TO BE ALL EXISTING DIMENSIONS, CONDITIONS, SIZES & LOCATIONS ARE TO BE ALL EXISTING DIMENSIONS, CONDITIONS, SIZES & LOCATIONS ARE TO BE EXISTING DIMENSIONS, CONDITIONS, SIZES & LOCATIONS ARE TO BE EXISTING DIMENSIONS, CONDITIONS, SIZES & LOCATIONS ARE TO BE DIMENSIONS, CONDITIONS, SIZES & LOCATIONS ARE TO BE DIMENSIONS, CONDITIONS, SIZES & LOCATIONS ARE TO BE CONDITIONS, SIZES & LOCATIONS ARE TO BE CONDITIONS, SIZES & LOCATIONS ARE TO BE SIZES & LOCATIONS ARE TO BE SIZES & LOCATIONS ARE TO BE & LOCATIONS ARE TO BE & LOCATIONS ARE TO BE LOCATIONS ARE TO BE LOCATIONS ARE TO BE ARE TO BE ARE TO BE TO BE TO BE BE BE FIELD VERIFIED. 4. THE CONTRACTOR SHALL KEEP THE SITE IN A NEAT AND ORDERLY CONDITION AND THE CONTRACTOR SHALL KEEP THE SITE IN A NEAT AND ORDERLY CONDITION AND CONTRACTOR SHALL KEEP THE SITE IN A NEAT AND ORDERLY CONDITION AND CONTRACTOR SHALL KEEP THE SITE IN A NEAT AND ORDERLY CONDITION AND SHALL KEEP THE SITE IN A NEAT AND ORDERLY CONDITION AND SHALL KEEP THE SITE IN A NEAT AND ORDERLY CONDITION AND KEEP THE SITE IN A NEAT AND ORDERLY CONDITION AND KEEP THE SITE IN A NEAT AND ORDERLY CONDITION AND THE SITE IN A NEAT AND ORDERLY CONDITION AND THE SITE IN A NEAT AND ORDERLY CONDITION AND SITE IN A NEAT AND ORDERLY CONDITION AND SITE IN A NEAT AND ORDERLY CONDITION AND IN A NEAT AND ORDERLY CONDITION AND IN A NEAT AND ORDERLY CONDITION AND A NEAT AND ORDERLY CONDITION AND A NEAT AND ORDERLY CONDITION AND NEAT AND ORDERLY CONDITION AND NEAT AND ORDERLY CONDITION AND AND ORDERLY CONDITION AND AND ORDERLY CONDITION AND ORDERLY CONDITION AND ORDERLY CONDITION AND CONDITION AND CONDITION AND AND AND SHALL REMOVE RUBBISH DAILY OR AS DIRECTED BY OWNER. DUST CONTROL REMOVE RUBBISH DAILY OR AS DIRECTED BY OWNER. DUST CONTROL REMOVE RUBBISH DAILY OR AS DIRECTED BY OWNER. DUST CONTROL RUBBISH DAILY OR AS DIRECTED BY OWNER. DUST CONTROL RUBBISH DAILY OR AS DIRECTED BY OWNER. DUST CONTROL DAILY OR AS DIRECTED BY OWNER. DUST CONTROL DAILY OR AS DIRECTED BY OWNER. DUST CONTROL OR AS DIRECTED BY OWNER. DUST CONTROL OR AS DIRECTED BY OWNER. DUST CONTROL AS DIRECTED BY OWNER. DUST CONTROL AS DIRECTED BY OWNER. DUST CONTROL DIRECTED BY OWNER. DUST CONTROL DIRECTED BY OWNER. DUST CONTROL BY OWNER. DUST CONTROL BY OWNER. DUST CONTROL OWNER. DUST CONTROL OWNER. DUST CONTROL DUST CONTROL DUST CONTROL DUST CONTROL CONTROL CONTROL MEASURES ARE TO BE ERECTED BY THE CONTRACTOR TO PROTECT PATRONS AND ARE TO BE ERECTED BY THE CONTRACTOR TO PROTECT PATRONS AND ARE TO BE ERECTED BY THE CONTRACTOR TO PROTECT PATRONS AND TO BE ERECTED BY THE CONTRACTOR TO PROTECT PATRONS AND TO BE ERECTED BY THE CONTRACTOR TO PROTECT PATRONS AND BE ERECTED BY THE CONTRACTOR TO PROTECT PATRONS AND BE ERECTED BY THE CONTRACTOR TO PROTECT PATRONS AND ERECTED BY THE CONTRACTOR TO PROTECT PATRONS AND ERECTED BY THE CONTRACTOR TO PROTECT PATRONS AND BY THE CONTRACTOR TO PROTECT PATRONS AND BY THE CONTRACTOR TO PROTECT PATRONS AND THE CONTRACTOR TO PROTECT PATRONS AND THE CONTRACTOR TO PROTECT PATRONS AND CONTRACTOR TO PROTECT PATRONS AND CONTRACTOR TO PROTECT PATRONS AND TO PROTECT PATRONS AND TO PROTECT PATRONS AND PROTECT PATRONS AND PROTECT PATRONS AND PATRONS AND PATRONS AND AND AND VEHICLES DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. ALL STAGING AND DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. ALL STAGING AND DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. ALL STAGING AND DEMOLITION AND CONSTRUCTION ACTIVITIES. ALL STAGING AND DEMOLITION AND CONSTRUCTION ACTIVITIES. ALL STAGING AND AND CONSTRUCTION ACTIVITIES. ALL STAGING AND AND CONSTRUCTION ACTIVITIES. ALL STAGING AND CONSTRUCTION ACTIVITIES. ALL STAGING AND CONSTRUCTION ACTIVITIES. ALL STAGING AND ACTIVITIES. ALL STAGING AND ACTIVITIES. ALL STAGING AND ALL STAGING AND ALL STAGING AND ALL STAGING AND STAGING AND STAGING AND AND AND MATERIALS STORAGE IS TO BE COORDINATED WITH THE OWNER. THE CONTRACTOR STORAGE IS TO BE COORDINATED WITH THE OWNER. THE CONTRACTOR STORAGE IS TO BE COORDINATED WITH THE OWNER. THE CONTRACTOR IS TO BE COORDINATED WITH THE OWNER. THE CONTRACTOR IS TO BE COORDINATED WITH THE OWNER. THE CONTRACTOR TO BE COORDINATED WITH THE OWNER. THE CONTRACTOR TO BE COORDINATED WITH THE OWNER. THE CONTRACTOR BE COORDINATED WITH THE OWNER. THE CONTRACTOR BE COORDINATED WITH THE OWNER. THE CONTRACTOR COORDINATED WITH THE OWNER. THE CONTRACTOR COORDINATED WITH THE OWNER. THE CONTRACTOR WITH THE OWNER. THE CONTRACTOR WITH THE OWNER. THE CONTRACTOR THE OWNER. THE CONTRACTOR THE OWNER. THE CONTRACTOR OWNER. THE CONTRACTOR OWNER. THE CONTRACTOR THE CONTRACTOR THE CONTRACTOR THE CONTRACTOR CONTRACTOR CONTRACTOR SHALL TAKE PRECAUTIONS TO ISOLATE CONSTRUCTION ACTIVITIES FROM ADJACENT TAKE PRECAUTIONS TO ISOLATE CONSTRUCTION ACTIVITIES FROM ADJACENT TAKE PRECAUTIONS TO ISOLATE CONSTRUCTION ACTIVITIES FROM ADJACENT PRECAUTIONS TO ISOLATE CONSTRUCTION ACTIVITIES FROM ADJACENT PRECAUTIONS TO ISOLATE CONSTRUCTION ACTIVITIES FROM ADJACENT TO ISOLATE CONSTRUCTION ACTIVITIES FROM ADJACENT TO ISOLATE CONSTRUCTION ACTIVITIES FROM ADJACENT ISOLATE CONSTRUCTION ACTIVITIES FROM ADJACENT ISOLATE CONSTRUCTION ACTIVITIES FROM ADJACENT CONSTRUCTION ACTIVITIES FROM ADJACENT CONSTRUCTION ACTIVITIES FROM ADJACENT ACTIVITIES FROM ADJACENT ACTIVITIES FROM ADJACENT FROM ADJACENT FROM ADJACENT ADJACENT ADJACENT AREAS THAT ARE TO REMAIN IN OPERATION DURING CONSTRUCTION - CONFIRM THAT ARE TO REMAIN IN OPERATION DURING CONSTRUCTION - CONFIRM THAT ARE TO REMAIN IN OPERATION DURING CONSTRUCTION - CONFIRM ARE TO REMAIN IN OPERATION DURING CONSTRUCTION - CONFIRM ARE TO REMAIN IN OPERATION DURING CONSTRUCTION - CONFIRM TO REMAIN IN OPERATION DURING CONSTRUCTION - CONFIRM TO REMAIN IN OPERATION DURING CONSTRUCTION - CONFIRM REMAIN IN OPERATION DURING CONSTRUCTION - CONFIRM REMAIN IN OPERATION DURING CONSTRUCTION - CONFIRM IN OPERATION DURING CONSTRUCTION - CONFIRM IN OPERATION DURING CONSTRUCTION - CONFIRM OPERATION DURING CONSTRUCTION - CONFIRM OPERATION DURING CONSTRUCTION - CONFIRM DURING CONSTRUCTION - CONFIRM DURING CONSTRUCTION - CONFIRM CONSTRUCTION - CONFIRM CONSTRUCTION - CONFIRM - CONFIRM - CONFIRM CONFIRM CONFIRM SCHEDULE AND REQUIRED BARRICADES WITH OWNER PRIOR TO COMMENCEMENT. 5. CONTRACTOR SHALL PROVIDE NEW OPENINGS AND SUPPORTS AS NOTED. FINAL CONTRACTOR SHALL PROVIDE NEW OPENINGS AND SUPPORTS AS NOTED. FINAL SHALL PROVIDE NEW OPENINGS AND SUPPORTS AS NOTED. FINAL SHALL PROVIDE NEW OPENINGS AND SUPPORTS AS NOTED. FINAL PROVIDE NEW OPENINGS AND SUPPORTS AS NOTED. FINAL PROVIDE NEW OPENINGS AND SUPPORTS AS NOTED. FINAL NEW OPENINGS AND SUPPORTS AS NOTED. FINAL NEW OPENINGS AND SUPPORTS AS NOTED. FINAL OPENINGS AND SUPPORTS AS NOTED. FINAL OPENINGS AND SUPPORTS AS NOTED. FINAL AND SUPPORTS AS NOTED. FINAL AND SUPPORTS AS NOTED. FINAL SUPPORTS AS NOTED. FINAL SUPPORTS AS NOTED. FINAL AS NOTED. FINAL AS NOTED. FINAL NOTED. FINAL NOTED. FINAL FINAL FINAL FINAL OPENING DIMENSIONS, CONNECTION SIZES, CLEARANCES, ETC. MUST BE COORDINATED DIMENSIONS, CONNECTION SIZES, CLEARANCES, ETC. MUST BE COORDINATED DIMENSIONS, CONNECTION SIZES, CLEARANCES, ETC. MUST BE COORDINATED CONNECTION SIZES, CLEARANCES, ETC. MUST BE COORDINATED CONNECTION SIZES, CLEARANCES, ETC. MUST BE COORDINATED SIZES, CLEARANCES, ETC. MUST BE COORDINATED SIZES, CLEARANCES, ETC. MUST BE COORDINATED CLEARANCES, ETC. MUST BE COORDINATED CLEARANCES, ETC. MUST BE COORDINATED ETC. MUST BE COORDINATED ETC. MUST BE COORDINATED MUST BE COORDINATED MUST BE COORDINATED BE COORDINATED BE COORDINATED COORDINATED COORDINATED DURING CONSTRUCTION WITH APPROVED COMPONENTS. SEAL TIGHT ALL OPENINGS CONSTRUCTION WITH APPROVED COMPONENTS. SEAL TIGHT ALL OPENINGS CONSTRUCTION WITH APPROVED COMPONENTS. SEAL TIGHT ALL OPENINGS WITH APPROVED COMPONENTS. SEAL TIGHT ALL OPENINGS WITH APPROVED COMPONENTS. SEAL TIGHT ALL OPENINGS APPROVED COMPONENTS. SEAL TIGHT ALL OPENINGS APPROVED COMPONENTS. SEAL TIGHT ALL OPENINGS COMPONENTS. SEAL TIGHT ALL OPENINGS COMPONENTS. SEAL TIGHT ALL OPENINGS SEAL TIGHT ALL OPENINGS SEAL TIGHT ALL OPENINGS TIGHT ALL OPENINGS TIGHT ALL OPENINGS ALL OPENINGS ALL OPENINGS OPENINGS OPENINGS (ROOF, WALL AND CEILING), EQUIPMENT AND/OR PENETRATIONS - FROM AIR AND WALL AND CEILING), EQUIPMENT AND/OR PENETRATIONS - FROM AIR AND WALL AND CEILING), EQUIPMENT AND/OR PENETRATIONS - FROM AIR AND AND CEILING), EQUIPMENT AND/OR PENETRATIONS - FROM AIR AND AND CEILING), EQUIPMENT AND/OR PENETRATIONS - FROM AIR AND CEILING), EQUIPMENT AND/OR PENETRATIONS - FROM AIR AND CEILING), EQUIPMENT AND/OR PENETRATIONS - FROM AIR AND EQUIPMENT AND/OR PENETRATIONS - FROM AIR AND EQUIPMENT AND/OR PENETRATIONS - FROM AIR AND AND/OR PENETRATIONS - FROM AIR AND AND/OR PENETRATIONS - FROM AIR AND PENETRATIONS - FROM AIR AND PENETRATIONS - FROM AIR AND - FROM AIR AND - FROM AIR AND FROM AIR AND FROM AIR AND AIR AND AIR AND AND AND MOISTURE. MATCH EXISTING FINISHES. FIRE CAULK AND SEAL ALL NEW RATED MATCH EXISTING FINISHES. FIRE CAULK AND SEAL ALL NEW RATED MATCH EXISTING FINISHES. FIRE CAULK AND SEAL ALL NEW RATED EXISTING FINISHES. FIRE CAULK AND SEAL ALL NEW RATED EXISTING FINISHES. FIRE CAULK AND SEAL ALL NEW RATED FINISHES. FIRE CAULK AND SEAL ALL NEW RATED FINISHES. FIRE CAULK AND SEAL ALL NEW RATED FIRE CAULK AND SEAL ALL NEW RATED FIRE CAULK AND SEAL ALL NEW RATED FIRE CAULK AND SEAL ALL NEW RATED CAULK AND SEAL ALL NEW RATED CAULK AND SEAL ALL NEW RATED AND SEAL ALL NEW RATED AND SEAL ALL NEW RATED SEAL ALL NEW RATED SEAL ALL NEW RATED ALL NEW RATED ALL NEW RATED NEW RATED NEW RATED RATED RATED PENETRATIONS. 6. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND APPROVED REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND APPROVED TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND APPROVED TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND APPROVED SPECIFICATIONS FOR ADDITIONAL INFORMATION AND APPROVED SPECIFICATIONS FOR ADDITIONAL INFORMATION AND APPROVED FOR ADDITIONAL INFORMATION AND APPROVED FOR ADDITIONAL INFORMATION AND APPROVED ADDITIONAL INFORMATION AND APPROVED ADDITIONAL INFORMATION AND APPROVED INFORMATION AND APPROVED INFORMATION AND APPROVED AND APPROVED AND APPROVED APPROVED APPROVED MANUFACTURERS. 7. ALL INSTALLATIONS TO BE COORDINATED WITH EXISTING CONDITIONS FOR PROPER ALL INSTALLATIONS TO BE COORDINATED WITH EXISTING CONDITIONS FOR PROPER INSTALLATIONS TO BE COORDINATED WITH EXISTING CONDITIONS FOR PROPER INSTALLATIONS TO BE COORDINATED WITH EXISTING CONDITIONS FOR PROPER TO BE COORDINATED WITH EXISTING CONDITIONS FOR PROPER TO BE COORDINATED WITH EXISTING CONDITIONS FOR PROPER BE COORDINATED WITH EXISTING CONDITIONS FOR PROPER BE COORDINATED WITH EXISTING CONDITIONS FOR PROPER COORDINATED WITH EXISTING CONDITIONS FOR PROPER COORDINATED WITH EXISTING CONDITIONS FOR PROPER WITH EXISTING CONDITIONS FOR PROPER WITH EXISTING CONDITIONS FOR PROPER EXISTING CONDITIONS FOR PROPER EXISTING CONDITIONS FOR PROPER CONDITIONS FOR PROPER CONDITIONS FOR PROPER FOR PROPER FOR PROPER PROPER PROPER SIZE, LOCATION AND PROVISIONS REQUIRED TO INSTALL COMPONENTS. 8. PROVIDE ADDITIONAL BLOCKING TO MATCH EXISTING AT WALLS/ CEILINGS TO PROVIDE ADDITIONAL BLOCKING TO MATCH EXISTING AT WALLS/ CEILINGS TO ADDITIONAL BLOCKING TO MATCH EXISTING AT WALLS/ CEILINGS TO ADDITIONAL BLOCKING TO MATCH EXISTING AT WALLS/ CEILINGS TO BLOCKING TO MATCH EXISTING AT WALLS/ CEILINGS TO BLOCKING TO MATCH EXISTING AT WALLS/ CEILINGS TO TO MATCH EXISTING AT WALLS/ CEILINGS TO TO MATCH EXISTING AT WALLS/ CEILINGS TO MATCH EXISTING AT WALLS/ CEILINGS TO MATCH EXISTING AT WALLS/ CEILINGS TO EXISTING AT WALLS/ CEILINGS TO EXISTING AT WALLS/ CEILINGS TO AT WALLS/ CEILINGS TO AT WALLS/ CEILINGS TO WALLS/ CEILINGS TO WALLS/ CEILINGS TO CEILINGS TO CEILINGS TO TO TO ACCOMMODATE NEW INSTALLATIONS. MAINTAIN FIRE RATED ASSEMBLIES AND FIRE NEW INSTALLATIONS. MAINTAIN FIRE RATED ASSEMBLIES AND FIRE NEW INSTALLATIONS. MAINTAIN FIRE RATED ASSEMBLIES AND FIRE INSTALLATIONS. MAINTAIN FIRE RATED ASSEMBLIES AND FIRE INSTALLATIONS. MAINTAIN FIRE RATED ASSEMBLIES AND FIRE MAINTAIN FIRE RATED ASSEMBLIES AND FIRE MAINTAIN FIRE RATED ASSEMBLIES AND FIRE MAINTAIN FIRE RATED ASSEMBLIES AND FIRE FIRE RATED ASSEMBLIES AND FIRE FIRE RATED ASSEMBLIES AND FIRE RATED ASSEMBLIES AND FIRE RATED ASSEMBLIES AND FIRE ASSEMBLIES AND FIRE ASSEMBLIES AND FIRE AND FIRE AND FIRE FIRE FIRE STOPPING PER LOCAL GOVERNING CODES AND ORDINANCES. 9. CONTRACTOR SHALL PROVIDE ALL REQUIRED TRANSITIONS, FITTINGS AND CONTRACTOR SHALL PROVIDE ALL REQUIRED TRANSITIONS, FITTINGS AND SHALL PROVIDE ALL REQUIRED TRANSITIONS, FITTINGS AND SHALL PROVIDE ALL REQUIRED TRANSITIONS, FITTINGS AND PROVIDE ALL REQUIRED TRANSITIONS, FITTINGS AND PROVIDE ALL REQUIRED TRANSITIONS, FITTINGS AND ALL REQUIRED TRANSITIONS, FITTINGS AND ALL REQUIRED TRANSITIONS, FITTINGS AND REQUIRED TRANSITIONS, FITTINGS AND REQUIRED TRANSITIONS, FITTINGS AND TRANSITIONS, FITTINGS AND TRANSITIONS, FITTINGS AND FITTINGS AND FITTINGS AND AND AND APPURTENANT CONNECTIONS. 10. CONFIRM ANY COLOR SELECTIONS WITH OWNER. COLORS TO MATCH/ COORDINATE CONFIRM ANY COLOR SELECTIONS WITH OWNER. COLORS TO MATCH/ COORDINATE ANY COLOR SELECTIONS WITH OWNER. COLORS TO MATCH/ COORDINATE ANY COLOR SELECTIONS WITH OWNER. COLORS TO MATCH/ COORDINATE COLOR SELECTIONS WITH OWNER. COLORS TO MATCH/ COORDINATE COLOR SELECTIONS WITH OWNER. COLORS TO MATCH/ COORDINATE SELECTIONS WITH OWNER. COLORS TO MATCH/ COORDINATE SELECTIONS WITH OWNER. COLORS TO MATCH/ COORDINATE WITH OWNER. COLORS TO MATCH/ COORDINATE WITH OWNER. COLORS TO MATCH/ COORDINATE OWNER. COLORS TO MATCH/ COORDINATE OWNER. COLORS TO MATCH/ COORDINATE COLORS TO MATCH/ COORDINATE COLORS TO MATCH/ COORDINATE COLORS TO MATCH/ COORDINATE TO MATCH/ COORDINATE TO MATCH/ COORDINATE MATCH/ COORDINATE MATCH/ COORDINATE COORDINATE COORDINATE WITH EXISTING BUILDING. 11. PREVENT GALVANIC ACTION AND OTHER FORMS OF CORROSION BY INSULATING PREVENT GALVANIC ACTION AND OTHER FORMS OF CORROSION BY INSULATING GALVANIC ACTION AND OTHER FORMS OF CORROSION BY INSULATING GALVANIC ACTION AND OTHER FORMS OF CORROSION BY INSULATING ACTION AND OTHER FORMS OF CORROSION BY INSULATING ACTION AND OTHER FORMS OF CORROSION BY INSULATING AND OTHER FORMS OF CORROSION BY INSULATING AND OTHER FORMS OF CORROSION BY INSULATING OTHER FORMS OF CORROSION BY INSULATING OTHER FORMS OF CORROSION BY INSULATING FORMS OF CORROSION BY INSULATING FORMS OF CORROSION BY INSULATING OF CORROSION BY INSULATING OF CORROSION BY INSULATING CORROSION BY INSULATING CORROSION BY INSULATING BY INSULATING BY INSULATING INSULATING INSULATING METALS OR OTHER MATERIALS FROM DIRECT CONTACT WITH INCOMPATIBLE OR OTHER MATERIALS FROM DIRECT CONTACT WITH INCOMPATIBLE OR OTHER MATERIALS FROM DIRECT CONTACT WITH INCOMPATIBLE OTHER MATERIALS FROM DIRECT CONTACT WITH INCOMPATIBLE OTHER MATERIALS FROM DIRECT CONTACT WITH INCOMPATIBLE MATERIALS FROM DIRECT CONTACT WITH INCOMPATIBLE MATERIALS FROM DIRECT CONTACT WITH INCOMPATIBLE FROM DIRECT CONTACT WITH INCOMPATIBLE FROM DIRECT CONTACT WITH INCOMPATIBLE DIRECT CONTACT WITH INCOMPATIBLE DIRECT CONTACT WITH INCOMPATIBLE CONTACT WITH INCOMPATIBLE CONTACT WITH INCOMPATIBLE WITH INCOMPATIBLE WITH INCOMPATIBLE INCOMPATIBLE INCOMPATIBLE MATERIALS. 12. SHOP DRAWINGS AND PRODUCT DATA - THE CONTRACTOR SHALL SUBMIT TO THE SHOP DRAWINGS AND PRODUCT DATA - THE CONTRACTOR SHALL SUBMIT TO THE DRAWINGS AND PRODUCT DATA - THE CONTRACTOR SHALL SUBMIT TO THE DRAWINGS AND PRODUCT DATA - THE CONTRACTOR SHALL SUBMIT TO THE AND PRODUCT DATA - THE CONTRACTOR SHALL SUBMIT TO THE AND PRODUCT DATA - THE CONTRACTOR SHALL SUBMIT TO THE PRODUCT DATA - THE CONTRACTOR SHALL SUBMIT TO THE PRODUCT DATA - THE CONTRACTOR SHALL SUBMIT TO THE DATA - THE CONTRACTOR SHALL SUBMIT TO THE DATA - THE CONTRACTOR SHALL SUBMIT TO THE - THE CONTRACTOR SHALL SUBMIT TO THE - THE CONTRACTOR SHALL SUBMIT TO THE THE CONTRACTOR SHALL SUBMIT TO THE THE CONTRACTOR SHALL SUBMIT TO THE CONTRACTOR SHALL SUBMIT TO THE CONTRACTOR SHALL SUBMIT TO THE SHALL SUBMIT TO THE SHALL SUBMIT TO THE SUBMIT TO THE SUBMIT TO THE TO THE TO THE THE THE OWNER AND PROJECT ENGINEER, SHOP DRAWINGS & PRODUCT DATA SUBMITTALS AND PROJECT ENGINEER, SHOP DRAWINGS & PRODUCT DATA SUBMITTALS AND PROJECT ENGINEER, SHOP DRAWINGS & PRODUCT DATA SUBMITTALS PROJECT ENGINEER, SHOP DRAWINGS & PRODUCT DATA SUBMITTALS PROJECT ENGINEER, SHOP DRAWINGS & PRODUCT DATA SUBMITTALS ENGINEER, SHOP DRAWINGS & PRODUCT DATA SUBMITTALS ENGINEER, SHOP DRAWINGS & PRODUCT DATA SUBMITTALS SHOP DRAWINGS & PRODUCT DATA SUBMITTALS SHOP DRAWINGS & PRODUCT DATA SUBMITTALS DRAWINGS & PRODUCT DATA SUBMITTALS DRAWINGS & PRODUCT DATA SUBMITTALS & PRODUCT DATA SUBMITTALS & PRODUCT DATA SUBMITTALS PRODUCT DATA SUBMITTALS PRODUCT DATA SUBMITTALS DATA SUBMITTALS DATA SUBMITTALS SUBMITTALS SUBMITTALS FOR ALL PRODUCTS AND COMPONENTS TO BE USED ON THIS PROJECT. MAINTAIN ALL PRODUCTS AND COMPONENTS TO BE USED ON THIS PROJECT. MAINTAIN ALL PRODUCTS AND COMPONENTS TO BE USED ON THIS PROJECT. MAINTAIN PRODUCTS AND COMPONENTS TO BE USED ON THIS PROJECT. MAINTAIN PRODUCTS AND COMPONENTS TO BE USED ON THIS PROJECT. MAINTAIN AND COMPONENTS TO BE USED ON THIS PROJECT. MAINTAIN AND COMPONENTS TO BE USED ON THIS PROJECT. MAINTAIN COMPONENTS TO BE USED ON THIS PROJECT. MAINTAIN COMPONENTS TO BE USED ON THIS PROJECT. MAINTAIN TO BE USED ON THIS PROJECT. MAINTAIN TO BE USED ON THIS PROJECT. MAINTAIN BE USED ON THIS PROJECT. MAINTAIN BE USED ON THIS PROJECT. MAINTAIN USED ON THIS PROJECT. MAINTAIN USED ON THIS PROJECT. MAINTAIN ON THIS PROJECT. MAINTAIN ON THIS PROJECT. MAINTAIN THIS PROJECT. MAINTAIN THIS PROJECT. MAINTAIN PROJECT. MAINTAIN PROJECT. MAINTAIN MAINTAIN MAINTAIN MAINTAIN ONE COPY OF ALL APPROVED SUBMITTALS AT THE SITE FOR THE OWNER'S COPY OF ALL APPROVED SUBMITTALS AT THE SITE FOR THE OWNER'S COPY OF ALL APPROVED SUBMITTALS AT THE SITE FOR THE OWNER'S OF ALL APPROVED SUBMITTALS AT THE SITE FOR THE OWNER'S OF ALL APPROVED SUBMITTALS AT THE SITE FOR THE OWNER'S ALL APPROVED SUBMITTALS AT THE SITE FOR THE OWNER'S ALL APPROVED SUBMITTALS AT THE SITE FOR THE OWNER'S APPROVED SUBMITTALS AT THE SITE FOR THE OWNER'S APPROVED SUBMITTALS AT THE SITE FOR THE OWNER'S SUBMITTALS AT THE SITE FOR THE OWNER'S SUBMITTALS AT THE SITE FOR THE OWNER'S AT THE SITE FOR THE OWNER'S AT THE SITE FOR THE OWNER'S THE SITE FOR THE OWNER'S THE SITE FOR THE OWNER'S SITE FOR THE OWNER'S SITE FOR THE OWNER'S FOR THE OWNER'S FOR THE OWNER'S THE OWNER'S THE OWNER'S OWNER'S OWNER'S REFERENCE. 13. "RECORD" DRAWINGS - THE CONTRACTOR SHALL MAINTAIN A SET OF "AS-BUILT" "RECORD" DRAWINGS - THE CONTRACTOR SHALL MAINTAIN A SET OF "AS-BUILT" DRAWINGS - THE CONTRACTOR SHALL MAINTAIN A SET OF "AS-BUILT" DRAWINGS - THE CONTRACTOR SHALL MAINTAIN A SET OF "AS-BUILT" - THE CONTRACTOR SHALL MAINTAIN A SET OF "AS-BUILT" - THE CONTRACTOR SHALL MAINTAIN A SET OF "AS-BUILT" THE CONTRACTOR SHALL MAINTAIN A SET OF "AS-BUILT" THE CONTRACTOR SHALL MAINTAIN A SET OF "AS-BUILT" CONTRACTOR SHALL MAINTAIN A SET OF "AS-BUILT" CONTRACTOR SHALL MAINTAIN A SET OF "AS-BUILT" SHALL MAINTAIN A SET OF "AS-BUILT" SHALL MAINTAIN A SET OF "AS-BUILT" MAINTAIN A SET OF "AS-BUILT" MAINTAIN A SET OF "AS-BUILT" A SET OF "AS-BUILT" A SET OF "AS-BUILT" SET OF "AS-BUILT" SET OF "AS-BUILT" OF "AS-BUILT" OF "AS-BUILT" "AS-BUILT" "AS-BUILT" PRINTS, MARKED UP AT THE SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN MARKED UP AT THE SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN MARKED UP AT THE SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN UP AT THE SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN UP AT THE SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN AT THE SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN AT THE SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN THE SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN THE SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN SITE, CONTAINING ALL "AS-BUILT" INFORMATION. TURN CONTAINING ALL "AS-BUILT" INFORMATION. TURN CONTAINING ALL "AS-BUILT" INFORMATION. TURN ALL "AS-BUILT" INFORMATION. TURN ALL "AS-BUILT" INFORMATION. TURN "AS-BUILT" INFORMATION. TURN "AS-BUILT" INFORMATION. TURN INFORMATION. TURN INFORMATION. TURN TURN TURN TURN SET OVER TO OWNER UPON COMPLETION OF THE WORK. 14. INSTALL ALL MATERIALS IN COMPLIANCE W/ MFR. RECOMMENDATIONS AND CODE INSTALL ALL MATERIALS IN COMPLIANCE W/ MFR. RECOMMENDATIONS AND CODE ALL MATERIALS IN COMPLIANCE W/ MFR. RECOMMENDATIONS AND CODE ALL MATERIALS IN COMPLIANCE W/ MFR. RECOMMENDATIONS AND CODE MATERIALS IN COMPLIANCE W/ MFR. RECOMMENDATIONS AND CODE MATERIALS IN COMPLIANCE W/ MFR. RECOMMENDATIONS AND CODE IN COMPLIANCE W/ MFR. RECOMMENDATIONS AND CODE IN COMPLIANCE W/ MFR. RECOMMENDATIONS AND CODE COMPLIANCE W/ MFR. RECOMMENDATIONS AND CODE COMPLIANCE W/ MFR. RECOMMENDATIONS AND CODE W/ MFR. RECOMMENDATIONS AND CODE W/ MFR. RECOMMENDATIONS AND CODE MFR. RECOMMENDATIONS AND CODE MFR. RECOMMENDATIONS AND CODE RECOMMENDATIONS AND CODE RECOMMENDATIONS AND CODE AND CODE AND CODE CODE CODE REQUIREMENTS. 15. CONTRACTOR MUST VERIFY ALL EXISTING UTILITY LOCATIONS PRIOR TO START OF CONTRACTOR MUST VERIFY ALL EXISTING UTILITY LOCATIONS PRIOR TO START OF MUST VERIFY ALL EXISTING UTILITY LOCATIONS PRIOR TO START OF MUST VERIFY ALL EXISTING UTILITY LOCATIONS PRIOR TO START OF VERIFY ALL EXISTING UTILITY LOCATIONS PRIOR TO START OF VERIFY ALL EXISTING UTILITY LOCATIONS PRIOR TO START OF ALL EXISTING UTILITY LOCATIONS PRIOR TO START OF ALL EXISTING UTILITY LOCATIONS PRIOR TO START OF EXISTING UTILITY LOCATIONS PRIOR TO START OF EXISTING UTILITY LOCATIONS PRIOR TO START OF UTILITY LOCATIONS PRIOR TO START OF UTILITY LOCATIONS PRIOR TO START OF LOCATIONS PRIOR TO START OF LOCATIONS PRIOR TO START OF PRIOR TO START OF PRIOR TO START OF TO START OF TO START OF START OF START OF OF OF DEMOLITION AND MAKE EVERY EFFORT TO PROTECT THEM OR RELOCATE AS AND MAKE EVERY EFFORT TO PROTECT THEM OR RELOCATE AS AND MAKE EVERY EFFORT TO PROTECT THEM OR RELOCATE AS MAKE EVERY EFFORT TO PROTECT THEM OR RELOCATE AS MAKE EVERY EFFORT TO PROTECT THEM OR RELOCATE AS EVERY EFFORT TO PROTECT THEM OR RELOCATE AS EVERY EFFORT TO PROTECT THEM OR RELOCATE AS EFFORT TO PROTECT THEM OR RELOCATE AS EFFORT TO PROTECT THEM OR RELOCATE AS TO PROTECT THEM OR RELOCATE AS TO PROTECT THEM OR RELOCATE AS PROTECT THEM OR RELOCATE AS PROTECT THEM OR RELOCATE AS THEM OR RELOCATE AS THEM OR RELOCATE AS OR RELOCATE AS OR RELOCATE AS RELOCATE AS RELOCATE AS AS AS REQUIRED. 16. ALL DEMO'D COMPONENTS TO BE PROTECTED AND CAREFULLY REMOVED FOR ALL DEMO'D COMPONENTS TO BE PROTECTED AND CAREFULLY REMOVED FOR DEMO'D COMPONENTS TO BE PROTECTED AND CAREFULLY REMOVED FOR DEMO'D COMPONENTS TO BE PROTECTED AND CAREFULLY REMOVED FOR COMPONENTS TO BE PROTECTED AND CAREFULLY REMOVED FOR COMPONENTS TO BE PROTECTED AND CAREFULLY REMOVED FOR TO BE PROTECTED AND CAREFULLY REMOVED FOR TO BE PROTECTED AND CAREFULLY REMOVED FOR BE PROTECTED AND CAREFULLY REMOVED FOR BE PROTECTED AND CAREFULLY REMOVED FOR PROTECTED AND CAREFULLY REMOVED FOR PROTECTED AND CAREFULLY REMOVED FOR AND CAREFULLY REMOVED FOR AND CAREFULLY REMOVED FOR CAREFULLY REMOVED FOR CAREFULLY REMOVED FOR REMOVED FOR REMOVED FOR FOR FOR SALVAGE/ REUSE AS NOTED. DEMOLISHED ITEMS THAT ARE NOT TO BE REUSED REUSE AS NOTED. DEMOLISHED ITEMS THAT ARE NOT TO BE REUSED REUSE AS NOTED. DEMOLISHED ITEMS THAT ARE NOT TO BE REUSED AS NOTED. DEMOLISHED ITEMS THAT ARE NOT TO BE REUSED AS NOTED. DEMOLISHED ITEMS THAT ARE NOT TO BE REUSED NOTED. DEMOLISHED ITEMS THAT ARE NOT TO BE REUSED NOTED. DEMOLISHED ITEMS THAT ARE NOT TO BE REUSED DEMOLISHED ITEMS THAT ARE NOT TO BE REUSED DEMOLISHED ITEMS THAT ARE NOT TO BE REUSED DEMOLISHED ITEMS THAT ARE NOT TO BE REUSED ITEMS THAT ARE NOT TO BE REUSED ITEMS THAT ARE NOT TO BE REUSED THAT ARE NOT TO BE REUSED THAT ARE NOT TO BE REUSED ARE NOT TO BE REUSED ARE NOT TO BE REUSED NOT TO BE REUSED NOT TO BE REUSED TO BE REUSED TO BE REUSED BE REUSED BE REUSED REUSED REUSED ARE TO BE REMOVED FROM PROJECT SITE PROMPTLY AND DISPOSED IN TO BE REMOVED FROM PROJECT SITE PROMPTLY AND DISPOSED IN TO BE REMOVED FROM PROJECT SITE PROMPTLY AND DISPOSED IN BE REMOVED FROM PROJECT SITE PROMPTLY AND DISPOSED IN BE REMOVED FROM PROJECT SITE PROMPTLY AND DISPOSED IN REMOVED FROM PROJECT SITE PROMPTLY AND DISPOSED IN REMOVED FROM PROJECT SITE PROMPTLY AND DISPOSED IN FROM PROJECT SITE PROMPTLY AND DISPOSED IN FROM PROJECT SITE PROMPTLY AND DISPOSED IN PROJECT SITE PROMPTLY AND DISPOSED IN PROJECT SITE PROMPTLY AND DISPOSED IN SITE PROMPTLY AND DISPOSED IN SITE PROMPTLY AND DISPOSED IN PROMPTLY AND DISPOSED IN PROMPTLY AND DISPOSED IN AND DISPOSED IN AND DISPOSED IN DISPOSED IN DISPOSED IN IN IN ACCORDANCE WITH OWNER STANDARDS. PROTECT EXISTING FACILITIES IN A MANNER WITH OWNER STANDARDS. PROTECT EXISTING FACILITIES IN A MANNER WITH OWNER STANDARDS. PROTECT EXISTING FACILITIES IN A MANNER OWNER STANDARDS. PROTECT EXISTING FACILITIES IN A MANNER OWNER STANDARDS. PROTECT EXISTING FACILITIES IN A MANNER STANDARDS. PROTECT EXISTING FACILITIES IN A MANNER STANDARDS. PROTECT EXISTING FACILITIES IN A MANNER PROTECT EXISTING FACILITIES IN A MANNER PROTECT EXISTING FACILITIES IN A MANNER PROTECT EXISTING FACILITIES IN A MANNER EXISTING FACILITIES IN A MANNER EXISTING FACILITIES IN A MANNER FACILITIES IN A MANNER FACILITIES IN A MANNER IN A MANNER IN A MANNER A MANNER A MANNER MANNER MANNER AS TO NOT ADVERSELY AFFECT THE EXISTING FACILITIES OPERATIONS. 17. ALL NEW PERMANENT WOOD BLOCKING, SHEATHING, FRAMING, ETC. UTILIZED IN ALL NEW PERMANENT WOOD BLOCKING, SHEATHING, FRAMING, ETC. UTILIZED IN NEW PERMANENT WOOD BLOCKING, SHEATHING, FRAMING, ETC. UTILIZED IN NEW PERMANENT WOOD BLOCKING, SHEATHING, FRAMING, ETC. UTILIZED IN PERMANENT WOOD BLOCKING, SHEATHING, FRAMING, ETC. UTILIZED IN PERMANENT WOOD BLOCKING, SHEATHING, FRAMING, ETC. UTILIZED IN WOOD BLOCKING, SHEATHING, FRAMING, ETC. UTILIZED IN WOOD BLOCKING, SHEATHING, FRAMING, ETC. UTILIZED IN BLOCKING, SHEATHING, FRAMING, ETC. UTILIZED IN BLOCKING, SHEATHING, FRAMING, ETC. UTILIZED IN SHEATHING, FRAMING, ETC. UTILIZED IN SHEATHING, FRAMING, ETC. UTILIZED IN FRAMING, ETC. UTILIZED IN FRAMING, ETC. UTILIZED IN ETC. UTILIZED IN ETC. UTILIZED IN UTILIZED IN UTILIZED IN IN IN CONSTRUCTION TO BE FIRE RETARDANT TREATED. 18. WORKING HOURS AT BUILDING ARE AT THE DISCRETION OF THE OWNER. CONFIRM WORKING HOURS AT BUILDING ARE AT THE DISCRETION OF THE OWNER. CONFIRM HOURS AT BUILDING ARE AT THE DISCRETION OF THE OWNER. CONFIRM HOURS AT BUILDING ARE AT THE DISCRETION OF THE OWNER. CONFIRM AT BUILDING ARE AT THE DISCRETION OF THE OWNER. CONFIRM AT BUILDING ARE AT THE DISCRETION OF THE OWNER. CONFIRM BUILDING ARE AT THE DISCRETION OF THE OWNER. CONFIRM BUILDING ARE AT THE DISCRETION OF THE OWNER. CONFIRM ARE AT THE DISCRETION OF THE OWNER. CONFIRM ARE AT THE DISCRETION OF THE OWNER. CONFIRM AT THE DISCRETION OF THE OWNER. CONFIRM AT THE DISCRETION OF THE OWNER. CONFIRM THE DISCRETION OF THE OWNER. CONFIRM THE DISCRETION OF THE OWNER. CONFIRM DISCRETION OF THE OWNER. CONFIRM DISCRETION OF THE OWNER. CONFIRM OF THE OWNER. CONFIRM OF THE OWNER. CONFIRM THE OWNER. CONFIRM THE OWNER. CONFIRM OWNER. CONFIRM OWNER. CONFIRM CONFIRM CONFIRM AND ABIDE BY ALL SECURITY RESTRICTIONS AND LOGISTICS PRIOR TO START OF ABIDE BY ALL SECURITY RESTRICTIONS AND LOGISTICS PRIOR TO START OF ABIDE BY ALL SECURITY RESTRICTIONS AND LOGISTICS PRIOR TO START OF BY ALL SECURITY RESTRICTIONS AND LOGISTICS PRIOR TO START OF BY ALL SECURITY RESTRICTIONS AND LOGISTICS PRIOR TO START OF ALL SECURITY RESTRICTIONS AND LOGISTICS PRIOR TO START OF ALL SECURITY RESTRICTIONS AND LOGISTICS PRIOR TO START OF SECURITY RESTRICTIONS AND LOGISTICS PRIOR TO START OF SECURITY RESTRICTIONS AND LOGISTICS PRIOR TO START OF RESTRICTIONS AND LOGISTICS PRIOR TO START OF RESTRICTIONS AND LOGISTICS PRIOR TO START OF AND LOGISTICS PRIOR TO START OF AND LOGISTICS PRIOR TO START OF LOGISTICS PRIOR TO START OF LOGISTICS PRIOR TO START OF PRIOR TO START OF PRIOR TO START OF TO START OF TO START OF START OF START OF OF OF CONSTRUCTION.
AutoCAD SHX Text
25 PSF 19 PSF 0.9 1.2 1.0
AutoCAD SHX Text
ULTIMATE WIND SPEED, V : ULT: ALLOWABLE WIND SPEED, V : ASD: RISK CATEGORY: WIND IMPORTANCE FACTOR, I : W: WIND EXPOSURE CATEGORY: INTERNAL PRESSURE COEFFICIENT, GC :pi:
AutoCAD SHX Text
120 MPH 93 MPH IV 1.0 B ± 0.18
AutoCAD SHX Text
IV 1.5 0.083g 0.045g 0.089g 0.072g D C 0.07 2.0 ELF 32,000 LBS
AutoCAD SHX Text
GROUND SNOW LOAD, P : g: FLAT ROOF SNOW LOAD, BUILDING P : f: SNOW LOAD EXPOSURE FACTOR, C : e: SNOW LOAD IMPORTANCE FACTOR I : S: THERMAL FACTOR, C :t:
AutoCAD SHX Text
RISK CATEGORY: SEISMIC IMPORTANCE FACTOR, I : E: MAPPED SPECTRAL RESPONSE ACCELERATION, S : S: MAPPED SPECTRAL RESPONSE ACCELERATION, S : 1: SPECTRAL RESPONSE COEFFICIENT, S : DS: SPECTRAL RESPONSE COEFFICIENT, S : D1: SITE CLASS: SEISMIC DESIGN CATEGORY: BUILDING: BASIC SEISMIC - FORCE RESISTING SYSTEM: ORDINARY REINFORCED MASONRY SHEAR WALLS SEISMIC RESPONSE COEFFICIENT, C : S: RESPONSE MODIFICATION FACTOR, R: ANALYSIS PROCEDURE: DESIGN BASE SHEAR:
AutoCAD SHX Text
STRUCTURAL DESIGN CRITERIA
AutoCAD SHX Text
LIVE LOADS:
AutoCAD SHX Text
SNOW LOAD
AutoCAD SHX Text
WIND LOAD
AutoCAD SHX Text
SEISMIC LOAD
AutoCAD SHX Text
DESIGN CODE:
AutoCAD SHX Text
2015 MICHIGAN BUILDING CODE (IBC, 2012 EDITION, 1st PRINTING) PER ASCE 7-10 SECTION 2.3.2 (IBC SECTION 1605.2.1)
AutoCAD SHX Text
DESIGN LOAD COMBINATIONS:
AutoCAD SHX Text
MINIMUM COMPONENT AND CLADDING LOADS (SEE ASCE 7-10 FIGURE 30,4-1 & 30.4-2 FOR DETAILS):
AutoCAD SHX Text
ROOF INTERIOR ZONE 1: ROOF END ZONE 2: ROOF CORNER ZONE 3: WALL INTERIOR ZONE 4: WALL END ZONE 5: (± INDICATES PRESSURE ACTING TOWARD/AWAY FROM PROJECTED SURFACE, RESPECTIVELY)