Upload
gliftan
View
216
Download
0
Embed Size (px)
Citation preview
7/30/2019 Action Plan for CRBSI JUNE 2013
1/2
Prepared by Usha K Nair ward 26
Action plan for catheter related blood steam in ward 26 June 2013
S:NO Issues causes Action for implementation Review
date
1
2
Klebsiella Pneumonia in Blood
related to RT. Femoral CVC
line for Patient Simon
Mampallil
Failure of Propofol line
change for two days
Melena
Non-compliance
Forgot
Instruct the staff for assessment of the necessity of FemoralCVC line on Daily basis
Remind the doctors to change the site of line once patientstable.
Reinforce the CDC recommendation for change of line protocolsince it is inserted in A/E (change after 48hrs).
Apply flexiseal continuous drainage system to avoid stoolexpulsion.
Instruct staff about change of gloves and hand scrub betweenthe clustering of care
Periodic Observation of CVC site for redness & tendernesss. Make sure the seal of dressing is adequate as per
recommendation.
Send email notification to all staff Failure of compliance report to C/N Feda with staff name
High light the Propofol line change interval in an A4 paper anddisplay at the bedside those who are on Propofol infusion.
31.8.13
Sustainability plan
CVC Dressing Refreshment of
knowledge
Display laminated copy of line protocol (soc)at bed side Strict observation of dressing technique and timely correction
from the team members
Periodic observation of CVC dressing changing time period Reinforce the staff for the strict use of Chlorehexidine wipe for
31.8.13
7/30/2019 Action Plan for CRBSI JUNE 2013
2/2
Prepared by Usha K Nair ward 26
all patients whom has CVC or Dialysis cath.
CVC insertion technique Reminders Display audit file at the bed side just before the time ofinsertion
All PPE are clearly display in the trolley Monthly audit reports send to the head of the department forfurther reinforcement. Gentle reminder to the doctors by words
31.8.13
Early removal of CVC or
Dialysis line
Reminders Encourage the staff whom has taken the initiative to removethe line will be rewarded
Periodic review of patient related to the necessity of line byteam members and staffs.
Always include notification of line removal decision during theconsultant round
31.8.13
Chlorehrxidine anti septics Motivation Motivate the staffs for the use of chlorehexidine as perrequirement
Facilitate the adequate supply of chlorehexidine swap stickand wipes
Motivates the staff with verbal rewards regarding the properusage of chlorehexidine.
Always initiate the process by the team members in front ofthe staffs.
31.8.13