DEEP - Detailed, estimatable, emergent and priorized NPV takesfactors in costs with benefits while pv factors in only benefits PV and NPV may not be equal Cumulative flow - status includes backlog, development, tetsing and done Wireframe is a one of the techniques of prototyping Iteration backlog prioritization is doen by the team Hardening iteration - testing, documentation and administration Burn rate - labor costs for upcoming sprint velocity - number of story points completed at the end of an iteration Compliance to external org,value based and then working software is the priority orde EVM applied at iteration level Articat - spritn backlog,product backlog and an increment of a product - A tangible b produced during product development. Also, includes charts and any plans

ACP Notes- RM

Embed Size (px)

DESCRIPTION

ACP Notes used for my test

Citation preview

Page 1: ACP Notes- RM

DEEP - Detailed, estimatable, emergent and priorized

NPV takesfactors in costs with benefits while pv factors in only benefits

PV and NPV may not be equal

Cumulative flow - status includes backlog, development, tetsing and done

Wireframe is a one of the techniques of prototyping

Iteration backlog prioritization is doen by the team

Hardening iteration - testing, documentation and administration

Burn rate - labor costs for upcoming sprint

velocity - number of story points completed at the end of an iteration

Compliance to external org,value based and then working software is the priority order

EVM applied at iteration level

Articat - spritn backlog,product backlog and an increment of a product - A tangible by-product produced during product development. Also, includes charts and any plans

Page 2: ACP Notes- RM

Go thru emotional intelligence and other related topics

cycle time - inception to completion(feature enter into backlog, design, developed, tested and completed)

Progrssive elaboration - Visioning, release planning and iteration planning

Spike is also used to estimate time and cost

Active listening - listening, understandin, retaining, responsing and reflecting

Escaped defect - an error in the product delivered to the customer

scrum embraces 3 values - visibility, transparency, frequent inspection and adaptation

servant leadership is a participative leadership, facilitative and involded hands on with daily activities of the team

epic = capability

Page 3: ACP Notes- RM
Page 4: ACP Notes- RM
Page 5: ACP Notes- RM

new scope added removal of work

Page 6: ACP Notes- RM

Fibonacci series for relative scoring - plannign which stories can be worked on in the upcoming sprint

Definition of done is provided by "The Team"

high performance teams trust each other - transparency is key

Risk adjusted backlog will have value driven features and costly risks

story board is when team is documents to understand the need and flow of the product

wire frame a raw sketch of how a screen looks like

schedule is by estimating story points and applying velocity

kaizen - small changes

kanban - signal

a spike is an experiment performed to provide a basis for making a design or developemnt decision or to answer the questions posed by an uncertainity or risk

ATDD is the technique based on the test driven approach where the team discusses the acceptance criteria with the Business so that a detailed set of tests are designed in advance and is accepted by the business and stakeholders. The ATDD cycle starts from story discussions and then team distill this, followed by development and demo of item as mentioned in acceptance before marking this as DONE

Page 7: ACP Notes- RM

asynchronous continuous integration -

This is a mitigate strategy as by taking this step team is trying to lessen the probability of risk.

This not ‘evade’- since this implies that team does nothing about it and expecting to be lucky which not the case here is.

Release duration is 3-12 months for new develoment lon term projects

Ground rules - Team is responsible for creating and enforcing the ground rules, scrum master should ensure that team does it

Agile manifesto - agile alliance in 2001

A project manager in an XP team ensures that the team works well with the rest of the organization. A PM is more focused in managing external stakeholders.

Sync continuous integrationPair integrates their code after each pair-programming episode in no more than a couple of hours and waits for the build to complete and the entire test suite to run before proceeding is an example of synchronous continuous integration

Contain risk - since team is keeping some contingency reserve to take care of unexpected tasks it falls in Contain. In contain, we plan contingency reserve to take care of risk

This is not ‘avoid’-since team is not trying to steer clear of the risk. If team has decided not to release the product as a risk response, that could have been categorized as avoid

This is not ‘contain’- because team is working on mitigation plan rather than having contingency plan , if team decided to keep some developers on standby for next 3 months to take care of any escape defect, that would have been the contain strategy

Business value delivered chart. The entire enterprise (business, management, and development teams) needs the line of sight to velocity (points/time) dashboard-type view of work management which in other terms is a business value delivered chart

Page 8: ACP Notes- RM

Scope is not fixed in Agile

7 types of waste - Transportation, Inventory, Motion, Waiting, Over-production, Over-processing, Defects

4 steps in XP - listening, designing, coding and testing

Lost opportunity cost – the cost of fixing errors introduced due to team members not communicating with one another

Contingency activities are carried out to reduce the impact of the risk only when it occurs

Multistage Integration builds user for?

Parking lot chart –

Risk Census –

Risk burndown chart is used to - monitor the overall risk on a project by plotting the sum of exposure values, which is the probability multiplied by the size of the loss

Multistage integrstion builds involve the running of additional tests for performance, load, and stability. These are slow to run and are in most cases run asynchronously as part of a slower secondary build

This contains a large rectangular box for each theme in a release annotated with the name of the release, number of stories and their total estimate and a swim lane to indicate completion of the theme. It is great for compressing a great deal of

information into a small space.

Risk census is the terminology used to describe a list of risks that are faced by a project and are not common to all projects.These risks are specific and unique to that particular project

Page 9: ACP Notes- RM

Seven principles for Lean software development are: 

1.      Respect people

2.      Eliminate waste

3.      Defer commitment

4.      Create knowledge

5.      Deliver fast

6.      Build quality in

7.      Optimize the whole

Product backlog has got 400 story points worth work. 

Baseline velocity is 25 story points. 

Total budget to complete this whole work is 200,000. 

Page 10: ACP Notes- RM

What is the SPI value?

Explanation:

Correct answer is option A.

Cost per story point = total budget / total story points = 200,000/400 = 500

PV = baseline velocity *no of iterations*cost per story point = 25*2*500 = 25,000

EV = 60*cost per story points = 60*500 = 30,000

SPI = EV / PV = 30,000/25,000 = 1.2

AC is just extra information which is not required to answer this question.

Bottom of the bar is lowered when additional work is added.

Bottom of the bar is raised when scope is removed.

Top of the bar will be lowered when work is delivered.

http://www.mountaingoatsoftware.com/agile/scrum/release-burndown/alternative

At the end of second iteration, actual cost = 22,500 and story points completed = 60. 

Page 11: ACP Notes- RM
Page 12: ACP Notes- RM

burndown - remaining work burn up - work completed

burn down - amount of work on a vertical(y axis) and timeline (x axis) on a horizontal axis.

As time progresses we keep track how much work is still not done

burnup - we track how much work we’ve completed, so the curve is going up, not down.

scope change is tracked along with the progress so burnup is better

Page 13: ACP Notes- RM

New scope added