5
AB-ABP Group Meeting ABP Group meeting; 1.6.2007 1 Introduction and motivation Group structure and members Update on the LHC schedule Summary of the 2007 MARS exercise: achievements and future objectives AOB: Feedback on the future of the ABP group forum? feedback via section leaders

AB-ABP Group Meeting

Embed Size (px)

DESCRIPTION

AB-ABP Group Meeting. Introduction and motivation. Summary of the 2007 MARS exercise: achievements and future objectives. Group structure and members. Update on the LHC schedule. AOB:. Feedback on the future of the ABP group forum? - PowerPoint PPT Presentation

Citation preview

AB-ABP Group Meeting

ABP Group meeting; 1.6.2007 1

Introduction and motivation

Group structure and members

Update on the LHC schedule

Summary of the 2007 MARS exercise: achievements and future objectives

AOB:

Feedback on the future of the ABP group forum? feedback via section leaders

S. Baird2 R. Scrivensms

O. Berrig C. Carlims

M. Chanelms

S. Gilardonims

M. Martini0 S. Maury3 E. Métralms I. Papaphilippoums

G. Rumolo(ms)

R. Assmann4,CIC

H. Burkhardt5

S. Fartoukh6,CIC W. HerrJ. JowettM. MeddahiE. Métralms T. Risselada F. Schmidt7

R. Tomas F. ZimmermannCIC

H. Burkhardt R. Corsini J.- B. JeanneretM. MartiniI. Papaphilippoums

L. Rinolfi0

G. Rumolo D. Schulte R. Tomas

S. Baird M. Macchi (AB/ADM)

Rings & Transfer Lines

Hadrons Sources & Linacs

LHC InjectorSynchrotrons

LHC Commissioning& Upgrade

CLIC & CTF3

M. VitasseM. Cayla1

O. Brüning

MS: Machine supervisors (0): AB Training Officer MSI:Machine superintendents t : TSO; dt : Deputy TSO

RTL HSL LIS LCU CC3

(7) : MADX Custodian(8) : CTF3 Dep. P. Leader; CLIC Design (9) : LINAC4 dep. Project Leader

(4) : Collimation Project Leader(5) : Computer Administration (6) : Magnet Evaluation Activity Leader

G. Bellodims

S. Bertolo G. BourgeoisB. HadornC. HillD. Kuchlerms

A. Lombardi9,ms C. Mastrostefanot,msi

M. O’Neildt,ms

F. Wenanderms

R. Brownt, msi

S. De Man1,t, dt,msi

N. Gilbertt, msi (M. Korazinos)C. Lacroixt, msi

J. Monteiromsi

B. Pirest, dt

R. PrincipeM. Samson

G. ArduiniCIC M. GiovannozziCIC H. Braun8

ABP Organization Chart 2007ABP Organization Chart 2007

1.2.2007 2

(1) : detached to TS/IC(2) : Consolidation Project Leader(3) : I-LHC Project Leader

S. Baird R. ScrivensElena BenedettoAndrea FranchiJavier BarrancoBenoit SalvantDiego Quatraro Hubert MedinaSandra Aumon Marius JuchnoThomas Edgecock

Ilya AgapovThomas WeilerChiara Bracco Roderik BruceUlrich Dorda Riccardo de Maria Tatiana PieloniValentina PrevitaliSimon WhitePaul Anton LetnesGlenn Vanbavinckove Santiago IbonMikael Jorgensen Rama Calaga Federico RoncaroloDobrin Kalchev Alexander Ryazanov

Maxim KorostelevAndrea LatinaPeter UrschützErik AdliGabriel Gourie Hamed Shaker Warner Bruns Arnaud Ferrari

Rings & Transfer Lines

Hadrons Sources & Linacs

LHC InjectorSynchrotrons

LHC Commissioningand Upgrade

CLIC & CTF3

RTL HSL LI S LCU CC3

Thomas MeinschadSara LanzoneJean-Babtist LallementMohammed Sayed

EshraquiEdgar Sargsyan

G. Arduini M. Giovannozzi H. Braun

ABP Students, Fellows and External MembersABP Students, Fellows and External Members

1.6.2007 3

8 Fellows; 2 Marie Curie Fellows; 10 Doctoral Students; 4 Technical Students; 4 External Students; 2 Summer Students; 9 PSA & UPAS

39 additional active group members (+9; difference w.r.t September. 2006)

5 (-2)

9 (+4)

17 (+10)

8 (-3)

R.Bailey, LTC, May 2007R.Bailey, LTC, May 2007

Schedule – draft to be consolidatedSchedule – draft to be consolidated

Prepared by Katy Foraz

.

.

Operation testing

1011121314151617

1918

2021222324252627

2928

3031323334353637

3938

4041424344454647

4948

5051520102030405

0706

08091011121314151617

1918

2021222324252627

2928

3031323334353637

3938

4041424344454647

4948

505152

1011121314151617

1918

2021222324252627

2928

3031323334353637

3938

4041424344454647

4948

5051520102030405

0706

08091011121314151617

1918

2021222324252627

2928

3031323334353637

3938

4041424344454647

4948

505152

12 23 34 45 56 67 78 81

Repairs

Machine Checkout

Beam Commissioning to 7 TeV

Sector Test

Interconnect; Leak test; Pressure test; Flushing; Cool down; Powering tests;

R.Bailey, LTC, May 2007R.Bailey, LTC, May 2007

Transfer line test with beam in 2007 (Jan)Transfer line test with beam in 2007 (Jan)

Low I then High I for both linesLow I then High I for both lines Film badges needed afterwardsFilm badges needed afterwards

Must be avoidedMust be avoided

ProposalsProposals TI8TI8

Delay testsDelay tests Low I in SeptemberLow I in September Sector testSector test High I AfterwardsHigh I Afterwards

TI2TI2 Maintain datesMaintain dates Reduce scope (only Low I)Reduce scope (only Low I) Stop beam before end of lineStop beam before end of line Add shieldingAdd shielding

More studies neededMore studies needed