AAE450 Spring 2009
Launch Vehicles
Zarinah Blockton
Mission Operations
1/29/2009
BlocktonOps
AAE450 Spring 2009
GTO - Geostationary transfer orbit TLI - Translunar Injection
[Blockton] [OPS]
Launch Vehicle
Launch Price (Million)
Payload to GTO (kg)
Cost/kg GTO ($) Year cost (M)
Proton (USA) 85 4600 1800 2001 8M
Falcon 9 (USA)1925kg TLI 35 3100 7143 2006 31M
GSLV (India) 45 2500 1999
Zenit 3SL (Soviet) 90 5250 2006
Long March 2F (China) 55 3500 1999 9M
Ariane 4 (ESA) 85 4800 2200 2001 10M
Soyuz (Soviet) 50 3150
AAE450 Spring 2009 [Name] [Group]
Costing Clv = P ((mp/mt) + E/100) * (1-i/100)^(n-2009)
Clv - Cost of launch vehicle for our payload P = Launch Cost
Mt = total payload mass deliverable to GEOMp = payload mass that we want to GEO (~2200 kg)E = Premium for piggy-backing (10%)i = inflation rate, 3.8% (from US govt. inflation stats)n = year of quote