12B30 / 12C30 / CET - B02 Slide # 1
STEEL CUTTING CHARGES
• Block charges
• Special charges
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 2/38
12B30 / 12C30 / CET - B02 Slide # 2
BLOCK CHARGES
• P = 3 / 8 A
• Hasty Calculation
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 3/38
12B30 / 12C30 / CET - B02 Slide # 3
FORMULA for MILD or STRUCTURAL STEEL
P = 3 / 8 A
P = Pounds of TNT
3/8 = Constant (.375)
A = Area of cross sectionin square inches
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 4/38
12B30 / 12C30 / CET - B02 Slide # 4
Flange
Flange
Web
CROSS SECTIONAL AREA
OF TARGET = "A"
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 5/38
12B30 / 12C30 / CET - B02 Slide # 5
CROSS SECTIONAL AREA
OF TARGET = "A"
Flange
Flange
Web
1"
1"14"
8"
12"
= 8"x1"
= 8"x1"
= 12"x1"
=8 sq in
=8 sq in
=12 sq in
A = 28 sq in
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 6/38
12B30 / 12C30 / CET - B02 Slide # 6
CACULATE for TNT
P = (3/8)A or P= (.375)A
P = Pounds of TNT
3/8 (.375) = Constant
A = Cross sectional area in
square inches
P = .375 x 28 = 10.5 lbs TNT
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 7/38
12B30 / 12C30 / CET - B02 Slide # 7
12"
15"
1"
1"
PROBLEM
Use C-4 (M112)
Total of 4 Beams
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 8/38
12B30 / 12C30 / CET - B02 Slide # 8
SOLUTION
Step 1. 15" x 1" = 15 sq in12" x 1" = 12 sq in
15" x 1" = 15 sq in
A = 42 sq in
Step 2. P=3/8AP=.375 x 42 = 15.75 lbs TNT
Step 3. 15.75 = 11.75 lbs C-4
1.34
Step 4. 11.75 = 9.4 10 pkgs C-41.25
Step 5. 4beams = 4charges
Step 6. 10 x 4 = 40 pkgs C-4
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 9/38
12B30 / 12C30 / CET - B02 Slide # 9
3/4
3/4
9.5” 1"
9"
PROBLEM
Use: M112
12 Beams
P=3/8A
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 10/38
12B30 / 12C30 / CET - B02 Slide # 10
SOLUTION
Step 2. P=3/8AP=.375 x 23 = 8.62 lbs TNT
Step 3. 8.62 = 6.43 lbs C-4
1.34
Step 4. 6.43 =5.14 6 pkgs C-4
1.25
Step 5. 12beams = 12charges
Step 6. 6 x 12 = 72 pkgs C-4
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 11/38
12B30 / 12C30 / CET - B02 Slide # 11
HASTY CALCULATION
TNT Needed To Cut Steel Sections Average
thickness
of
section in
inches
Pounds of explosive* for rectangular steel sections of given dimensions
Height of section in inches
2 3 4 5 6 7 8 9 10 11 12 14 16 18 20 22 24
0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.5 1.7 1.9 2.1 2.3
0.3 0.5 0.6 0.7 0.9 1.1 1.2 1.3 1.4 1.6 1.7 2.0 2.3 2.6 2.8 3.1 3.4
0.4 0.6 0.8 1.0 1.2 1.4 1.5 1.7 1.9 2.1 2.3 2.7 3.0 3.4 3.8 4.2 4.5
0.5 0.7 1.0 1.2 1.4 1.7 1.9 2.2 2.4 2.7 2.9 3.3 3.8 4.3 4.7 5.2 5.7
0.6 0.9 1.2 1.4 1.7 2.0 2.3 2.6 2.8 3.1 3.4 4.0 4.5 5.1 5.7 6.3 6.8
0.7 1.0 1.4 1.7 2.0 2.4 2.7 3.0 3.3 3.7 4.0 4.6 5.3 6.0 6.6 7.3 7.9
0.8 1.2 1.5 1.9 2.3 2.7 3.0 3.4 3.8 4.2 4.5 5.3 6.0 6.8 7.5 8.3 9.0
1/4
3/8
1/2
5/8
3/4
7/8
1
* TNTTo Use: 1. Measure rectangular sections of members separately.
2. Using table, find charge for each section.
3. Add charges for sections to find total charge.
4. If dimensions of sections do not appear on table, use next larger dimension.
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 12/38
12B30 / 12C30 / CET - B02 Slide # 12
Section
Thickness
(inches)
Weight of Composition C4 Required for Rectangular Steel Sections
(Height or Width, In Inches)
2 3 4 5 6 8 10 12 14 16 18 20 22 24
1/4
3/81/2
5/8
3/4
7/8
1
0.2 0.3 0.3 0.4 0.5 0.6 0.8 0.9 1.0 1.2 1.3 1.5 1.6 1.8
0.3 0.4 0.5 0.6 0.7 0.9 1.1 1.3 1.5 1.8 2.0 2.1 2.4 2.60.3 0.5 0.6 0.8 0.9 1.2 1.5 1.8 2.1 2.3 2.6 2.9 3.2 3.4
0.4 0.6 0.8 0.9 1.1 1.5 1.8 2.2 2.5 2.9 3.2 3.5 3.9 4.3
0.5 0.7 0.9 1.1 1.3 1.8 2.1 2.6 3.0 3.4 3.8 4.3 4.7 5.1
0.6 0.8 1.1 1.3 1.5 2.1 2.5 3.0 3.5 4 4.5 5.0 5.5 5.9
0.6 0.9 1.2 1.5 1.8 2.3 2.9 3.4 4.0 4.5 5.1 5.6 6.2 6.8
NOTE: Round UP to the nearest 1/10 pound when calculating charge size.
To use this table:
1. Measure each rectangular section of the total member separately.
2. Find the appropriate charge size for the rectangular section from the table. If
the section dimension is not listed in the table, use the next larger dimension.
3. Add the individual charges for each section to obtain the total charge weight.
Hasty Steel-Cutting Chart for C4
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 13/38
12B30 / 12C30 / CET - B02 Slide # 13
10"
1"
3/8"
5"
PROBLEM: USE HASTY CALCULATION
Use: TNT
6 Beams
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 14/38
12B30 / 12C30 / CET - B02 Slide # 14
SOLUTIONStep 1. 5" x 1" flange Hasty TNT
10" x 3/8" web 6 Beams5" x 1" flange
5" x 1"
10" x 3/8"5" x 1"
Step 2. 1.9 lbs
1.4 lbs1.9 lbs
Total = 5.2 lbs TNT
Step 3. N/A
Step 4. 5.2 6 pkgs TNT
Step 5. 6beams = 6charges
Step 6. 6 x 6 = 36 pkgs TNT
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 15/38
12B30 / 12C30 / CET - B02 Slide # 15
PROBLEM
HASTY CALCULATION
• How many packages of C-4, (M112)
are required to cut 5, I-beamswith dimensions of 8" x 1/2"for the flanges, and 10" x 1"for the web?
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 16/38
12B30 / 12C30 / CET - B02 Slide # 16
SOLUTIONStep 1. 8" x 1/2" flange
10" x 1" web
8" x 1/2" flange
10" x 1"
8" x 1/2"
Step 2. 8" x 1/2" 1.2 lbs
1.2 lbs
2.9 lbs
Total = 5.3 lbs C-4
Step 3. N/A
Step 4. 5.3=4.24 5 pkgs C-41.25Step 5. 5beams = 5charges
Step 6. 5 x 5 = 25 pkgs C-4
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 17/38
12B30 / 12C30 / CET - B02 Slide # 17
CABLES-CHAINS-RODS-BARS
"Rule of Thumb"
FORMULA: High Carbon Alloy Steel
* P = D
RULE OF THE THUMB: Structural Steel
* Up to 1" diam.- use 1 pound* Over 1" to 2" dia. - use 2 pounds* Over 2" - use P=3/8A
2
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 18/38
12B30 / 12C30 / CET - B02 Slide # 18
RAILROAD DESTRUCTION"Rule of Thumb"
• Rails * Less than 5"Use: 1/2 pound C-4 or TNT
• Rails * 5" or moreUse: 1 pound C-4 or TNT
NOTE: Place charges at alternate rail
splices for a distance of 500 feet.
Charges
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 19/38
12B30 / 12C30 / CET - B02 Slide # 19
RAILWAY DESTRUCTION"Rule of Thumb" FROGS CROSSOVERS SWITCHES
* figure 3-10 page 3-15
* FROGS - 2LBS
* CROSSOVERS - 1LB
* SWITCHES - 1LB
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 20/38
12B30 / 12C30 / CET - B02 Slide # 20
SPECIAL CHARGES
• Ribbon
• Saddle
• Diamond
• NOTE: Use C-4 (M112)
or Sheet explosive (M118)
ONLY
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 21/38
12B30 / 12C30 / CET - B02 Slide # 21
RIBBON CHARGE
• Charge thickness = 1/2 TGTbut never less than 1/2 inch
• Charge width = 3 times the
charge thickness• Charge length = length of
TGT to be cut
• T x W x L = volume cubicinches needed
• Maximum target thickness =3 inches
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 22/38
12B30 / 12C30 / CET - B02 Slide # 22
Top Flange (TF)
Bottom Flange (BF)
Web (W)
1"
1"14" 11"
10"
1/2
Tx Wx L =
TF .5 1.5 9 6.75
W
BF
.5 1.5 11 8.25
.5 1.5 9 6.75
Total cu. in. = 21.75
+
+
Tx Wx L =
1 3 20 60 cu. in.2"
20"
DIMENSION CALCULATING(Ribbon Charge)
I-Beam
Plate
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 23/38
12B30 / 12C30 / CET - B02 Slide # 23
24"2"
PROBLEM
How much C-4 (M112) is required to cutthis one plate using the MINIMUM amountof explosive?
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 24/38
12B30 / 12C30 / CET - B02 Slide # 24
SOLUTION
Tx Wx L =
1 3 24 72 cu. in.Step 2.
Step 1. one plate, 2"x24", ribbon, C-4(M112)
Step 3. N/A
Step 4. 72 = 3.6 4 pkgs C-4(M112)20
Step 5. 1plate = 1charge
Step 6. 4 x 1 = 4 pkgs C-4(M112)
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 25/38
12B30 / 12C30 / CET - B02 Slide # 25
1"
1"15"
10"
Tx Wx L =
TF .5 1.5 9 6.75
W
BF
.5 1.5 14 10.5
.5 1.5 9 6.75
Total cu. in. = 24
+
+
TF BF& = 9" (10" - 1" web)
W = 14 (15” - 1” for charge thickness)
CHARGES LENGTHS
PROBLEMCalculate for volume/cubic inches
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 26/38
12B30 / 12C30 / CET - B02 Slide # 26
2"
2"
19.5"
14"
PROBLEM
Use: C-4(M112)15 Beams
Ribbon Charge
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 27/38
12B30 / 12C30 / CET - B02 Slide # 27
SOLUTIONStep 1. 15 beams, C4(M112), ribbon
Top Flange (TF)
Bottom Flange (BF)
Web (W)
2"
2"14" 12"
19.5
1"
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 28/38
12B30 / 12C30 / CET - B02 Slide # 28
SOLUTION(cont.)
Step 2.Tx Wx L =
TF 1
1
1
3
3
3
17.5
12
17.5
52.5
52.5
W
BF
36
Total cu. in. = 141
+
+
Step 3. N/A
Step 4. 141 = 7.05 8 pkgs C-4(M112)20Step 5. 15beams = 15charges
Step 6. 8 x 15 = 120 pkgs C-4
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 29/38
12B30 / 12C30 / CET - B02 Slide # 29
SADDLE CHARGE
• Round or rectangular steel up to 8" in diameter
• Long Axis = distance around target in inches
• Base = 1/2 distance around target in inches
• Volume needed = Long axis X base X 1/2 = vol. cu. in.LA x B x 1/2 = vol. cu. in.
• Explosive = 1" thick
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 30/38
12B30 / 12C30 / CET - B02 Slide # 30
C = 16"
PROBLEM
How much C-4 (M112) is required to cutone mild steel bar using a saddlecharge?
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 31/38
12B30 / 12C30 / CET - B02 Slide # 31
SOLUTION
Step 1. one bar, C=16, C-4, saddle
Step 2. P=LA x B x .5P=16 x 8 x .5 = 64 cu. in.
Step 3. N/A
Step 4. 64 = 3.2 4 pkgs C-4
20
Step 5. 1bar = 1charge
Step 6. 1 x 4 = 4 pkgs C-4
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 32/38
12B30 / 12C30 / CET - B02 Slide # 32
PROBLEM
How much C-4 (M112) is required
to cut a steel bar 8 timesusing the saddle charge?
* C = 15"
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 33/38
12B30 / 12C30 / CET - B02 Slide # 33
SOLUTION
Step 1. 8 cuts, C=15, C-4, saddle
Step 2. P=LA x B x .5P=15 x 7.5 x .5 = 56.25cu. in.
Step 3. N/A
Step 4. 56.25 = 2.81 3 pkgs C-420
Step 5. 8cuts = 8charges
Step 6. 8 x 3 = 24 pkgs C-4
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 34/38
12B30 / 12C30 / CET - B02 Slide # 34
DIAMOND CHARGE
• Used on any steel round or rectangular up to 8"in diameter (not pipe)
• Long Axis = distance around target• Short Axis = 1/2 distance around target
• Volume needed = Long Axis X Short Axis x .5
LA x SA x .5 = vol. cu. in.• Explosive = 1" thick
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 35/38
12B30 / 12C30 / CET - B02 Slide # 35
4"
8"
Distance around target = 8" + 4" x 2 = 24"
PROBLEM
How much C-4 (M112) is required to cutone steel plate using the diamondcharge?
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 36/38
12B30 / 12C30 / CET - B02 Slide # 36
SOLUTION
Step 1. one bar, LA=24", C-4, diamond
Step 2. P=LA x SA x .5P=24 x 12 x .5 = 144 cu. in.
Step 3. N/A
Step 4. 144 = 7.2 8 pkgs C-4
20
Step 5. 1plate = 1charge
Step 6. 1 x 8 = 8 pkgs C-4
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 37/38
12B30 / 12C30 / CET - B02 Slide # 37
PROBLEM
• How many packages of sheet explosive (M118)
is required to cut 6 bars using thediamond charge?
• C = 14"
7/27/2019 A02-Demo
http://slidepdf.com/reader/full/a02-demo 38/38
12B30 / 12C30 / CET - B02 Slide # 38
SOLUTION
Step 1. 6 bars, C=14, pkgs of M118, diamond
Step 2. P=LA x SA x .5P=14 x 7 x .5 = 49 cu. in.
Step 3. N/A
Step 4. 49 = 5.44 6 sheets M118
9
Step 5. 6bars = 6charges
Step 6. 6 x 6 = 36 sheets M118
36 sheets 4 sheets per pkg = 9 pkgs M118..