12B30 / 12C30 / CET - B02 Slide # 1 STEEL CUTTING CHARGES Block charges Special charges

A02-Demo

Embed Size (px)

Citation preview

Page 1: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 1/38

12B30 / 12C30 / CET - B02 Slide # 1

STEEL CUTTING CHARGES

• Block charges

• Special charges

Page 2: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 2/38

12B30 / 12C30 / CET - B02 Slide # 2

BLOCK CHARGES

• P = 3 / 8 A

• Hasty Calculation

Page 3: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 3/38

12B30 / 12C30 / CET - B02 Slide # 3

FORMULA for MILD or STRUCTURAL STEEL

P = 3 / 8 A

P = Pounds of TNT

3/8 = Constant (.375)

 A = Area of cross sectionin square inches

Page 4: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 4/38

12B30 / 12C30 / CET - B02 Slide # 4

Flange

Flange

Web

CROSS SECTIONAL AREA

OF TARGET = "A"

Page 5: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 5/38

12B30 / 12C30 / CET - B02 Slide # 5

CROSS SECTIONAL AREA

OF TARGET = "A"

Flange

Flange

Web

1"

1"14"

8"

12"

= 8"x1"

= 8"x1"

= 12"x1"

=8 sq in

=8 sq in

=12 sq in

 A = 28 sq in

Page 6: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 6/38

12B30 / 12C30 / CET - B02 Slide # 6

CACULATE for TNT

P = (3/8)A or P= (.375)A

P = Pounds of TNT

3/8 (.375) = Constant

 A = Cross sectional area in

square inches

P = .375 x 28 = 10.5 lbs TNT

Page 7: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 7/38

12B30 / 12C30 / CET - B02 Slide # 7

12"

15"

1"

1"

PROBLEM

Use C-4 (M112)

Total of 4 Beams

Page 8: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 8/38

12B30 / 12C30 / CET - B02 Slide # 8

SOLUTION

Step 1. 15" x 1" = 15 sq in12" x 1" = 12 sq in

15" x 1" = 15 sq in

 A = 42 sq in

Step 2. P=3/8AP=.375 x 42 = 15.75 lbs TNT

Step 3. 15.75 = 11.75 lbs C-4

1.34

Step 4. 11.75 = 9.4 10 pkgs C-41.25

Step 5. 4beams = 4charges

Step 6. 10 x 4 = 40 pkgs C-4

Page 9: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 9/38

12B30 / 12C30 / CET - B02 Slide # 9

3/4

3/4

9.5” 1"

9"

PROBLEM

Use: M112

12 Beams

P=3/8A

Page 10: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 10/38

12B30 / 12C30 / CET - B02 Slide # 10

SOLUTION

Step 2. P=3/8AP=.375 x 23 = 8.62 lbs TNT

Step 3. 8.62 = 6.43 lbs C-4

1.34

Step 4. 6.43 =5.14 6 pkgs C-4

1.25

Step 5. 12beams = 12charges

Step 6. 6 x 12 = 72 pkgs C-4

Page 11: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 11/38

12B30 / 12C30 / CET - B02 Slide # 11

HASTY CALCULATION

TNT Needed To Cut Steel Sections Average

thickness

of 

section in

inches

Pounds of explosive* for rectangular steel sections of given dimensions

Height of section in inches

2 3 4 5 6 7 8 9 10 11 12 14 16 18 20 22 24

0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.5 1.7 1.9 2.1 2.3

0.3 0.5 0.6 0.7 0.9 1.1 1.2 1.3 1.4 1.6 1.7 2.0 2.3 2.6 2.8 3.1 3.4

0.4 0.6 0.8 1.0 1.2 1.4 1.5 1.7 1.9 2.1 2.3 2.7 3.0 3.4 3.8 4.2 4.5

0.5 0.7 1.0 1.2 1.4 1.7 1.9 2.2 2.4 2.7 2.9 3.3 3.8 4.3 4.7 5.2 5.7

0.6 0.9 1.2 1.4 1.7 2.0 2.3 2.6 2.8 3.1 3.4 4.0 4.5 5.1 5.7 6.3 6.8

0.7 1.0 1.4 1.7 2.0 2.4 2.7 3.0 3.3 3.7 4.0 4.6 5.3 6.0 6.6 7.3 7.9

0.8 1.2 1.5 1.9 2.3 2.7 3.0 3.4 3.8 4.2 4.5 5.3 6.0 6.8 7.5 8.3 9.0

1/4

3/8

1/2

5/8

3/4

7/8

1

* TNTTo Use: 1. Measure rectangular sections of members separately.

2. Using table, find charge for each section.

3. Add charges for sections to find total charge.

4. If dimensions of sections do not appear on table, use next larger dimension.

Page 12: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 12/38

12B30 / 12C30 / CET - B02 Slide # 12

Section

Thickness

(inches)

Weight of Composition C4 Required for Rectangular Steel Sections

(Height or Width, In Inches)

2 3 4 5 6 8 10 12 14 16 18 20 22 24

1/4

3/81/2

5/8

3/4

7/8

1

0.2 0.3 0.3 0.4 0.5 0.6 0.8 0.9 1.0 1.2 1.3 1.5 1.6 1.8

0.3 0.4 0.5 0.6 0.7 0.9 1.1 1.3 1.5 1.8 2.0 2.1 2.4 2.60.3 0.5 0.6 0.8 0.9 1.2 1.5 1.8 2.1 2.3 2.6 2.9 3.2 3.4

0.4 0.6 0.8 0.9 1.1 1.5 1.8 2.2 2.5 2.9 3.2 3.5 3.9 4.3

0.5 0.7 0.9 1.1 1.3 1.8 2.1 2.6 3.0 3.4 3.8 4.3 4.7 5.1

0.6 0.8 1.1 1.3 1.5 2.1 2.5 3.0 3.5 4 4.5 5.0 5.5 5.9

0.6 0.9 1.2 1.5 1.8 2.3 2.9 3.4 4.0 4.5 5.1 5.6 6.2 6.8

NOTE: Round UP to the nearest 1/10 pound when calculating charge size.

To use this table:

1. Measure each rectangular section of the total member separately.

2. Find the appropriate charge size for the rectangular section from the table. If 

the section dimension is not listed in the table, use the next larger dimension.

3. Add the individual charges for each section to obtain the total charge weight.

Hasty Steel-Cutting Chart for C4

Page 13: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 13/38

12B30 / 12C30 / CET - B02 Slide # 13

10"

1"

3/8"

5"

PROBLEM: USE HASTY CALCULATION

Use: TNT

6 Beams

Page 14: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 14/38

12B30 / 12C30 / CET - B02 Slide # 14

SOLUTIONStep 1. 5" x 1" flange Hasty TNT

10" x 3/8" web 6 Beams5" x 1" flange

5" x 1"

10" x 3/8"5" x 1"

Step 2. 1.9 lbs

1.4 lbs1.9 lbs

Total = 5.2 lbs TNT

Step 3. N/A

Step 4. 5.2 6 pkgs TNT

Step 5. 6beams = 6charges

Step 6. 6 x 6 = 36 pkgs TNT

Page 15: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 15/38

12B30 / 12C30 / CET - B02 Slide # 15

PROBLEM

HASTY CALCULATION

• How many packages of C-4, (M112)

are required to cut 5, I-beamswith dimensions of 8" x 1/2"for the flanges, and 10" x 1"for the web?

Page 16: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 16/38

12B30 / 12C30 / CET - B02 Slide # 16

SOLUTIONStep 1. 8" x 1/2" flange

10" x 1" web

8" x 1/2" flange

10" x 1"

8" x 1/2"

Step 2. 8" x 1/2" 1.2 lbs

1.2 lbs

2.9 lbs

Total = 5.3 lbs C-4

Step 3. N/A

Step 4. 5.3=4.24 5 pkgs C-41.25Step 5. 5beams = 5charges

Step 6. 5 x 5 = 25 pkgs C-4

Page 17: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 17/38

12B30 / 12C30 / CET - B02 Slide # 17

CABLES-CHAINS-RODS-BARS

"Rule of Thumb"

FORMULA: High Carbon Alloy Steel

* P = D

RULE OF THE THUMB: Structural Steel

* Up to 1" diam.- use 1 pound* Over 1" to 2" dia. - use 2 pounds* Over 2" - use P=3/8A

2

Page 18: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 18/38

12B30 / 12C30 / CET - B02 Slide # 18

RAILROAD DESTRUCTION"Rule of Thumb"

• Rails * Less than 5"Use: 1/2 pound C-4 or TNT

• Rails * 5" or moreUse: 1 pound C-4 or TNT

NOTE: Place charges at alternate rail

splices for a distance of 500 feet.

Charges

Page 19: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 19/38

12B30 / 12C30 / CET - B02 Slide # 19

RAILWAY DESTRUCTION"Rule of Thumb" FROGS CROSSOVERS SWITCHES

* figure 3-10 page 3-15

* FROGS - 2LBS

* CROSSOVERS - 1LB

* SWITCHES - 1LB

Page 20: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 20/38

12B30 / 12C30 / CET - B02 Slide # 20

SPECIAL CHARGES

• Ribbon

• Saddle

• Diamond

• NOTE: Use C-4 (M112)

or Sheet explosive (M118)

ONLY

Page 21: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 21/38

12B30 / 12C30 / CET - B02 Slide # 21

RIBBON CHARGE

• Charge thickness = 1/2 TGTbut never less than 1/2 inch

• Charge width = 3 times the

charge thickness• Charge length = length of 

TGT to be cut

• T x W x L = volume cubicinches needed

• Maximum target thickness =3 inches

Page 22: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 22/38

12B30 / 12C30 / CET - B02 Slide # 22

Top Flange (TF)

Bottom Flange (BF)

Web (W)

1"

1"14" 11"

10"

1/2

Tx Wx L =

TF .5 1.5 9 6.75

W

BF

.5 1.5 11 8.25

.5 1.5 9 6.75

Total cu. in. = 21.75

+

+

Tx Wx L =

1 3 20 60 cu. in.2"

20"

DIMENSION CALCULATING(Ribbon Charge)

I-Beam

Plate

Page 23: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 23/38

12B30 / 12C30 / CET - B02 Slide # 23

24"2"

PROBLEM

How much C-4 (M112) is required to cutthis one plate using the MINIMUM amountof explosive?

Page 24: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 24/38

12B30 / 12C30 / CET - B02 Slide # 24

SOLUTION

Tx Wx L =

1 3 24 72 cu. in.Step 2.

Step 1. one plate, 2"x24", ribbon, C-4(M112)

Step 3. N/A

Step 4. 72 = 3.6 4 pkgs C-4(M112)20

Step 5. 1plate = 1charge

Step 6. 4 x 1 = 4 pkgs C-4(M112)

Page 25: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 25/38

12B30 / 12C30 / CET - B02 Slide # 25

1"

1"15"

10"

Tx Wx L =

TF .5 1.5 9 6.75

W

BF

.5 1.5 14 10.5

.5 1.5 9 6.75

Total cu. in. = 24

+

+

TF BF& = 9" (10" - 1" web)

W = 14 (15” - 1” for charge thickness)

CHARGES LENGTHS

PROBLEMCalculate for volume/cubic inches

Page 26: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 26/38

12B30 / 12C30 / CET - B02 Slide # 26

2"

2"

19.5"

14"

PROBLEM

Use: C-4(M112)15 Beams

Ribbon Charge

Page 27: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 27/38

12B30 / 12C30 / CET - B02 Slide # 27

SOLUTIONStep 1. 15 beams, C4(M112), ribbon

Top Flange (TF)

Bottom Flange (BF)

Web (W)

2"

2"14" 12"

19.5

1"

Page 28: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 28/38

12B30 / 12C30 / CET - B02 Slide # 28

SOLUTION(cont.)

Step 2.Tx Wx L =

TF 1

1

1

3

3

3

17.5

12

17.5

52.5

52.5

W

BF

36

Total cu. in. = 141

+

+

Step 3. N/A

Step 4. 141 = 7.05 8 pkgs C-4(M112)20Step 5. 15beams = 15charges

Step 6. 8 x 15 = 120 pkgs C-4

Page 29: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 29/38

12B30 / 12C30 / CET - B02 Slide # 29

SADDLE CHARGE

• Round or rectangular steel up to 8" in diameter 

• Long Axis = distance around target in inches

• Base = 1/2 distance around target in inches

• Volume needed = Long axis X base X 1/2 = vol. cu. in.LA x B x 1/2 = vol. cu. in.

• Explosive = 1" thick

Page 30: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 30/38

12B30 / 12C30 / CET - B02 Slide # 30

C = 16"

PROBLEM

How much C-4 (M112) is required to cutone mild steel bar using a saddlecharge?

Page 31: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 31/38

12B30 / 12C30 / CET - B02 Slide # 31

SOLUTION

Step 1. one bar, C=16, C-4, saddle

Step 2. P=LA x B x .5P=16 x 8 x .5 = 64 cu. in.

Step 3. N/A

Step 4. 64 = 3.2 4 pkgs C-4

20

Step 5. 1bar = 1charge

Step 6. 1 x 4 = 4 pkgs C-4

Page 32: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 32/38

12B30 / 12C30 / CET - B02 Slide # 32

PROBLEM

How much C-4 (M112) is required

to cut a steel bar 8 timesusing the saddle charge?

* C = 15"

Page 33: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 33/38

12B30 / 12C30 / CET - B02 Slide # 33

SOLUTION

Step 1. 8 cuts, C=15, C-4, saddle

Step 2. P=LA x B x .5P=15 x 7.5 x .5 = 56.25cu. in.

Step 3. N/A

Step 4. 56.25 = 2.81 3 pkgs C-420

Step 5. 8cuts = 8charges

Step 6. 8 x 3 = 24 pkgs C-4

Page 34: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 34/38

12B30 / 12C30 / CET - B02 Slide # 34

DIAMOND CHARGE

• Used on any steel round or rectangular up to 8"in diameter (not pipe)

• Long Axis = distance around target• Short Axis = 1/2 distance around target

• Volume needed = Long Axis X Short Axis x .5

LA x SA x .5 = vol. cu. in.• Explosive = 1" thick

Page 35: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 35/38

12B30 / 12C30 / CET - B02 Slide # 35

4"

8"

Distance around target = 8" + 4" x 2 = 24"

PROBLEM

How much C-4 (M112) is required to cutone steel plate using the diamondcharge?

Page 36: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 36/38

12B30 / 12C30 / CET - B02 Slide # 36

SOLUTION

Step 1. one bar, LA=24", C-4, diamond

Step 2. P=LA x SA x .5P=24 x 12 x .5 = 144 cu. in.

Step 3. N/A

Step 4. 144 = 7.2 8 pkgs C-4

20

Step 5. 1plate = 1charge

Step 6. 1 x 8 = 8 pkgs C-4

Page 37: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 37/38

12B30 / 12C30 / CET - B02 Slide # 37

PROBLEM

• How many packages of sheet explosive (M118)

is required to cut 6 bars using thediamond charge?

• C = 14"

Page 38: A02-Demo

7/27/2019 A02-Demo

http://slidepdf.com/reader/full/a02-demo 38/38

12B30 / 12C30 / CET - B02 Slide # 38

SOLUTION

Step 1. 6 bars, C=14, pkgs of M118, diamond

Step 2. P=LA x SA x .5P=14 x 7 x .5 = 49 cu. in.

Step 3. N/A

Step 4. 49 = 5.44 6 sheets M118

9

Step 5. 6bars = 6charges

Step 6. 6 x 6 = 36 sheets M118

36 sheets 4 sheets per pkg = 9 pkgs M118..