A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 1
Meeting of Working Group A: 13 Aug 07
Proposal for an
Experimental Area
With only One Large Shaft
A. Hervé/CERN
A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 2
Starting point
• On the suggestion of Andrei, we have looked at the possibility of having only one large 18 m shaft, plus another 9 m shaft.
• We have positioned these two shafts outside the footprint of the main underground hall to to do away with interferences between loading/unloading areas and working areas.
• This solution has been used for 3 of the 4 LEP experiments, Aleph, Delphi, Opal.
.
A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 3
Implications
• It necessitates horizontal transport from under the shafts to the experimental cavern, but this is not a problem for a full surface assembly scenario.
• The experiments are assembled underground on their own transport platform.
.
A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 4
General view
.
Main servicecavern machine & Exp B
Second servicecavern Exp A
A
B
Main 18 m shaft
Secondary9 m shaft
A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 5
Top view
.
Pressurized Egress tunnels
Second servicecavern Exp A
Main servicecavern machine & Exp B
Access 20-t loads Exp B
Access Heavy Loads
80-t loads Exp A & B
A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 6
Side view
.
QuickTime™ et undécompresseur TIFF (LZW)
sont requis pour visionner cette image.
18 mLift
Stair80-t craneExp A & B
9 mLift
Stair20-t craneMachine& Exp B
Main ventilation ductsAnd services Exp A
A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 10
Movements of Experiment A
Exp B
1
2
3
1: to main unloading zone2: to garage position and leave space for experimentB in unloading zone3: beam/garage position
A
A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 12
Movements of Experiment B
3
21
1: to main unloading zone2: to garage position3: beam/garage position
A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 13
Surface
• During 1st phase, there is only one large assembly halls for Exp A and Exp B, sharing three 80-ton cranes
• During second phase, there is a side hall covering the main shaft. One 80-ton crane is used there with a 12 m crane hook, reaching to half the main assembly hall.
• The main assembly hall is left witht two 80-ton cranes with a 19-m crane hook, allowing easing transfer of loads between the three cranes.
.
A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 14
B
A
Surface 1st phase
3 80-ton cranes19-m crane hook
A. Hervé - 13 august 2007 ILC-IRENG07-0813-4347 15
B
A
Surface 2nd phase
2 80-ton cranes19 m crane hook
1 80-ton cranes12 m crane hook
Trucks