102
A Group of Engineers & Contractors 1

A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

  • Upload
    lamdiep

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

1

Page 2: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

2

TABLE OF CONTENTS

SECTION TITLE PAGE NO.

A About us 3

B Introduction 5

C Corporate Details 8

D Services offered to Oil and Gas Industry 11

E Technical know-how and Associated Facilitators 13

F Company Experience 14

G List of Completed Projects 28

H Financial Status 35

H Control of the Work 57

I Quality 61

J

Administrative & Technical Staff

(a) List of Administrative & Technical Staff

Civil Staff

Electrical & Instrumentation Staff

Telecommunication Staff

Administrative Staff (b) Resumes of Technical Staff Machineries Equipment, Tools & Vehicles

Services

Mechanical Page 90

Electrical ] Page 92

Instrumentation ]

Civil Page 88

Telecommunication Page 32

Procurement Page 95

Industrial Safety & Security Mgt. Page 96

Enlistment

64

80

84 & 101

Page 3: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

3

About us

AGEC (A Group of Engineers and Contractors) (Ex-Teams International) is an integrated Engineering and

Contracting Services Company operating in Pakistan approved by Pakistan Engineering Council [License #

21555]. For several successful many years, we are in the business of delivering client-specific solutions for

projects related services. The integrated package of services encompasses Engineering, Procurement,

Manufacturing, Construction, Commissioning Maintenance, Electronic Safety and Security

Management, House-keeping and Catering Services.

We are renowned Engineering Company in Pakistan for its Quality, Safety and on-time delivery of projects and

products. We deliver turnkey Projects to our satisfied Customers in conformance to their entire technical

Page 4: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

4

specifications. This unique strength enables us to provide solutions as an EPCC (Engineering, Procurement,

Construction and Commissioning) services provider to a host of our valued clients.

AGEC have executed numerous Projects in the sectors for:

Oil and Gas,

Chemical,

Petrochemical,

Fertilizer,

Power,

Cement and

Other leading industries

These Projects have been successfully delivered to the clients who are investors, operators or themselves EPC contractors. Exploration and Production Companies, oil marketing companies and owners/operators have had their investments secured by entrusting AGEC to implement their projects according to their budgets and time schedules while adhering to international quality standards and with zero tolerance towards unsafe practices and damage to the environment. The combination of an experienced human resource pool and well established project management systems have enabled us to succeed and grow in a competitive environment. We believe in Quality and not in Quantity. Client satisfaction is our prime objective and the reason to our success. We have come up with diverse solutions to meet our client needs and for this reason we encourage active client participation. We at AGEC stand highly privilege that, we are in communication with one of the most prestigious organization operating in Pakistan. Taking this opportunity we would like to give you a brief about our company and its activities. AGEC is one of the pioneer Companies in Oil & Gas Exploration and Production infrastructure development in Pakistan and have been providing the services since 1986 to various multinational Oil & Gas Companies like British Petroleum Exploration & Production Inc. (Formerly known as Union Texas Pakistan), Lasmo Oil Pak, Pakistan Petroleum Ltd. (PPL), SSGC, PARCO, etc. We have contributed a major part in the development of infrastructure for Oil & Gas Exploration activities in Badin Concession Block with British Petroleum Exploration & Production Inc. (Formerly known as Union Texas Pakistan). We had constructed numerous Kilometers of Dirt Road, Well side locations, temporary bridges etc.

Page 5: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

5

INTRODUCTION

Page 6: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

6

SERVICES OFFERED – in a Nutshell

a. ENGINEERING & CONSTRUCTION

b. MECHANICAL

c. ELECTRICAL AND INSTRUMENTATION [E&I]

d. PIPELINE

e. CATHODIC PROTECTION

f. TESTING AND INSPECTION

g. INDUSTRIAL SAFETY

h. TELECOMMUNICATION TOWERS

i. INDUSTRIAL SAFETY AND SECURITY MANAGEMENT

j. HOUSE-KEEPING AND CATERING AT WELL-SITES

k. MATERIALS AND EQUIPMENT SUPPLIES.

Page 7: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

7

INTRODUCTION PROFILE

Professional integrity of our performance is our strength. Since our inception as AGEC (A

Group of Engineers & Contractors), we stand actively and continually attached with one of the

most prestigious and internationally established Oil & Gas Company i.e. BP (BRITISH

PETROLEUM Pakistan) Ex-UTP (Union Texas Petroleum) presently UEP [United Energy

Pakistan]. UEP is one of the offshoots of its parent multi-billion Dollar company based in the

United States of America. Leading members of AGEC are originally from the Oil and Gas

Industry with outstanding prominence at track of our records, we have successfully proven

track record of our professional worth and competence not only in the OIL & GAS INDUSTRY

but also in the other INDUSTRAL SECTORS as well.

The very basis of our present success is due meeting Clients foremost requirements in the areas

of:

a. SAFETY: Maintaining the highest safety standards on assigned job. The strict safety standards stand defined by UTP itself and pattern is generally based on defined procedure originated from their Head Office in Houston, Texas USA is beacon for us to follow.

b. QUALITY: Keeping abreast even on the minute technical details of the assigned job / project in respect of Quality desired which has been our exclusive pride.

c. COMPLETION DATES: Meeting Clients completion schedule is our specialty for which we are proud of.

With the given introduction, we stand pre-qualified with various organizations; our second

major field of operations has been with Oil & Gas Development Corporation (OGDC) in way of

services for erection of high capacity storage tanks at their fields in the province of Sindh,

Fabrication of Port-a-Cabins / Caravans mobile storage container etc.

Page 8: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

8

CORPORATE DETAILS

Page 9: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

9

AT A GLANCE AGEC [A Group of Engineers and Contractors]

MISSION : To solve un-resolved problems innovatively

STATUS OF THE FIRM : A Registered Partnership Firm

ADDRESS : 130-S, Off Allama Iqbal Road, PECHS, Block-2,

Karachi – 75400 – Pakistan

NTN # : 3931322-7

Telephone Contacts : Office - 021 3452-4696 Cell - 0336 255-4678

0346 301-3178

Email address: [email protected] Website: http://LaoJee.com/AGEC/

NAME OF THE PARTNERS : 1) Dr. Saleem Siddiqi CICCM, CIPM, [USA] MBA, PhD

http://qa.linkedin.com/in/saleemsiddiqi

2) Mr. Abdul Talib Sheikh Ex-Field Superintendent –

Union Texas Petroleum

Project Consultant [hired] : Mr. G. R. Abbasi – Ex-Construction Superintendent – Union Texas Petroleum

Industrial Safety and Security Management : SILVER SEAL INTERNATIONAL – Karachi Consultants.

Business Bank Account Details: Current Account Number: 0160-0100613822

Meezan Bank Limited, Sir Syed Road Branch, PECHS Block-2, Karachi-75400

Page 10: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

10

Registration with PEC [Pakistan Engineering Council]

Page 11: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

11

SERVICES OFFERED

TO

OIL & GAS INDUISTRY

Specialized in providing Supporting services to

Exploration, Production & Infrastructure Development

Page 12: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

12

Page 13: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

13

Technical know-how

&

Associated Facilitators

Page 14: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

14

TECHNICAL KNOW-HOW FACILITATORS

TEAMS INTERNATIONAL

A TOTAL SERVICE TO MODERN ENGINEERING TECHNOLOGY

33-C, Block – 2, PECHS, Karachi

Note: They provided us Technical support only.

ASSOCIATED FACILITATORS

Technia Consulting Engineers,

Mukhtar Centre, SB – 38, Block – 13 – B II Floor, Flat # 15, Gulshan-e-Iqbal, Karachi.

G.R. Consulting Engineers,

House # 31/II/1, 9th Gizri Lane, Phase – IV Defense Housing Authority Karachi

Page 15: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

15

COMPANY EXPERIENCE

Page 16: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

16

EXPLORATION SUPPORT FACILITIES SERVICES

AGEC offers a complete and satisfactory range of Engineering & Contracting Support Services for:

1. DRILLING WELL LOCATIONS: We can physically build and as well as can also provide technical assistance and economic feasibility on

DRILLING SITE SELECTION based on Drilling Point identified by seismic and exploration. You will agree that

in order to select the proper drilling site requires many aspects to ponder. It includes an access which could

cover economic, social and environmental aspects for easy and safe Rig moves. We have both engineering

& designing capability to provide most economical design of Access Road that includes length, width &

thickness. Best selection of locally availability of materials.

CLIENT: BRITISH PETROLEUM EXPLORATION & PRODUCTION INC. (Formerly known as Union Texas Petroleum)

DRILLING, EXPLORATION AND PRODUCTION SUPPORT

- ENGINEERING AND CONSTRUCTION. Complete package for:

Drilling Well-site locations, including cellar & conductor pipe. A. Construction of 20 exploratory and development well locations B. Construction of 5 single span bridge ranging from 15 ft. to 35 ft. with the use of steel girder and pre-

cast desk slabs over irrigation & drain canals. Environmental Engineering for Rig – site septic tanks. Temporary steel girder bridges and pre-cast desk slabs. Aqua duct and siphon. Quality assurance services for construction jobs.

PRODUCTION Complete package for:

Civil work – contracting services Civil work for Aqua – water plant at Khaskheli base camp. Civil work for Dhabi staff camp. (Rs. 0.2 Million) Casting of RCC boundary posts all over the Right of way of UTP. Construction of communication facilities in Badin Concession area at Mazari and North Akri Oil fields. Construction for foundations of equipment and pipe support at various locations (Rs. 4.2 Million) Civil work – Tangri Amine Project. Civil work – Beach Huts Karachi. Civil work – Dhabi Sports complex.

Page 17: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

17

CIVIL WORK

- Engineering and Construction

Complete Package for:

- Skim pits - Burns pits - Control rooms - Equipment foundations - Dykes around oil storage tanks - Check Post - Water Reservoir up to 1.2 million gallons. - Pre-cast foundation for Port- a – Cabins.

MECHANICAL WORK - Engineering and Construction

Complete Package for:

Fabrication & Installation of FPS – Fall protection systems loading docks at 14 locations in Badin Concession. (Rs. 4.3 million)

Fabrication of mobile & based steel tank for oil storage. Complete Refurbishing of 7 Port - a – Cabins at Bukhari Camp. De-Sludging & gas freeing of 2 Nos. 19000 capacities each crude oil storage tank for UTP at caltax

storage terminal at West Wharf Karachi. Construction of bridges over canals for transportations of Drilling Rigs / Equipment. (Rs. 0.42 million) Fabrication & Erection of storage shed at Khaskheli oil fields. (Rs. 2.4 million) Fabrication & Erection of Storage shed at Dhabi & Khaskheli oil fields. (Rs. 1.2 Million) Fabrication of Pipe line storage rack at Khaskheli oil fields. (Rs. 1.4 million) Fabrication of loading docks 5 nos. (Rs. 2.9 million) Fabrication of well head piping system at 5 different locations including instrumentation control (Rs. 2.2

millions) Fabrication of transportable fractionating steel storage tanks capacity 500 bbl’s each Fabrication of spare parts storage containers as per given specification (Rs. 1.8 million). Fabrication & Erection of communication towers. (Rs. 5.2 million). Erection of equipment / valve station at various locations over last two years. (Rs. 4.6 million) Fabrication of chain link fencing & gates at various locations over last two years. (Rs. 2.2 million) Generator sheds. Chemical injection sheds.

Page 18: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

18

2. ACCESS ROAD / DIRT ROADS: We are capable of making access Roads, Dirt Roads, Crushed Rock & Maram and Black Top Roads. These

Roads are strongly built for easy movement of the Drilling / Work – Over Rigs and heavy Vehicles.

PRODUCTION FACILITIES

AGEC offers a complete range of Engineering & Contracting Support Services in the following fields:

Engineering & Construction of o Foundations for separators, Manifold skids, glycol contractor, generators, compressors,

pumps, storage tanks.

o Chain link fencing for well sites, camp sites.

o protection dykes around storage tanks.

o steel structure sheds, platforms.

o emergency drainage for over flow oil.

o burn pits, flame pits, skim pits.

o underground & over ground pipelines.

o Safety, Security Management Fire-fighting system. o control room, radio room & other facilities building

o Internal road – network

o Communication tower.

CIVIL WORK

Equipment Foundation We can design & construct the equipment foundations for production facilities like foundations for separators, manifold skids, glycol contactor, generators, compressors, pumps, storage tanks & flares etc.

Protection Dykes: We can engineer and construct the different capacity protection dyes either concrete wall or dirt embankment protected by local material available.

Emergency Drainage for overflow oil. Skim pits, Burn Pits:

We have the capability to design & construct Skim pits, Burn pits for oil facilities of different volumes. Building Work:

We can design & construct the Control Room for oil/ gas facilities, radio rooms, security guard room etc. Road work.

Page 19: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

19

MECHANICAL WORK Pipeline / flow lines construction Surveying:

We have experienced crew for surveying to establish elevation, location and alignment for pipelines. Civil Work:

We have the earth moving equipment for excavation of ditches, mechanical devices for cased road crossing (thrust bore method) lowering of pipes, backfilling of ditches, compaction.

Pipe welding: We have very experienced pipeline welders, who can do pipe welding according to API standard 1104-Pre-Heat and carry out stress relieving of welded joints method.

Radiography: We have associates for Radiography

Testing equipment: - Testing of pipe coating with Holiday Detector. - Hydro Testing – 1800 psig equipment

MECHANICAL STRUCTURE Based on our Oil & Gas industry vast & comprehensive experience we are able to provide following services:

Fabrication spools of different loading docks.

Pipe spools of different dia.

Pipe supports

Platforms

Ladder + grating

Generator sheds.

Scrubber

Chemical injunction skid etc

STEEL STORAGE TANKS We fabricate different capacity Oil & condensing storage tanks Diameter ranging from 35 X 50 and capacity ranging up to 45,000 liters.

SAND BLASTING & PAINTING We have very experienced crew for Sand blasting & painting work equipped with latest sand blasting equipment, airlines spray gun Safety kits etc.

HYDROTESTING We have different capacity pumps for Hydro testing including Air – Compressor with hydro testing accessories up to the capacity of 3,500 psi.

SHUT – DOWN JOBS We have engineers, supervisors, foreman, skilled / unskilled workmen and all required equipment for shut down /

Turnaround emergency jobs.

Page 20: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

20

Engineering and Construction Installation & commissioning of Cathodic Protection system at Golrachi Gas facilities.

(Rs. 12 million) Up-grading of full electric system of existing fields under BPO (Rs. 3.2 million) Installation testing and commissioning of fire alarm system at Khaskheli base camp. Electrical & instrumentation up gradation at following facilities.

1. Golrachi Gas Facility

2. Truck Gas Facility

3. Laghari Oil Field

4. Dhabi Oil Field

5. Mazari Oil Field

6. Matli Remote Facility

7. Nori Remote Facility

8. Ghungroo Epf

9. North Akri Epf

10. Tajidi Epf

11. Rind Facility

12. Key Hole G Facility

13. Tangri Facility

14. Bukhari Facility

15. South Buzdar

Page 21: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

21

ENGINEERING & CONSTRUCTION SERVICES CLIENT: BRITISH PETROLEUM EXPLORATION & PRODUCTION INC.(Formerly Union Texas Pakistan)

PRODUCTION FACILITIES: Construction of equipment foundations, pipe supports, skim pits, flame pits, burn pits, fire water ponds, Oil storage tank’s foundation, protection dykes, service roads, control room, buildings, chain link fencing, security guards rooms for the following production facilities.

1. Golrachi Gas Facility 2. Turk Gas Facility 3. Laghari Oil Field 4. Dhabi Oil Field 5. Mazari Oil Field 6. Matli Remote Facility 7. Nori Remote Facility 8. Ghungroo EPF 9. North Akri EPF 10. Tajidi EPF 11. Rind Facility 12. Key Hole G Facility 13. Tangri Facility 14. Bukhari Facility 15. South Buzdar

3. CONDUCTOR PIPE: Selection of appropriate Conductor Pipe for Cellar, its erection in the Ground, either Cohesive or non-

cohesive soil. We have a complete Engineering & Designing know – how by which the conductor pipe can

be erected in shortest period of time. We have qualified & experience staff which can handle the safest

execution of this job on the site.

4. CELLAR & PAD: We have both engineering & designing capability of RCC Designing of CELLAR and PAD, placement of steel

re-bars, and thickness of structures. We have necessary equipments required for this job, such as Concrete

Mixer, Vibrator, Re-Bar cutting machine & other related items.

5. TEMPORARY STEEL BRIDGES: We have capability to undertake / execute and design of Temporary Steel Bridges, which includes, selection

of appropriate Steel girders (I & H Beams), designing of abutment foundation, height, breadth and thickness

of Bricks, Blocks abutment. Structure designing of pre-cast or cast at SITE, Deck – Slabs for bridges

Page 22: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

22

equipment. Structural designing of pre-cast or cast at site, deck – slabs for bridges. Equipment required for

above is crane, Welding Machines, Flat Bed Trailers etc.

6. PIPE CULVERT: We have successfully engineering designed pipe culverts, RCC Box Culverts, Aqua – Duct and siphon as per

requirements of the existing water flow rate at the water course. Equipment used such as Tripod, Chain

pulley, etc.

7. BACK TOP ROAD / AIR STRIP CONSTRUCTION: We have successfully made various metal roads between oil fields / gas fields / facilities and production

gathering system. These roads are heavily used not only by oil well personnel but local population is also

playing their tractor / trolley and other vehicles. Due to over supervisor workmanship, these roads are still

intact for years, despite heavy NLC Bowsers (Tankers) traffic extreme hot & rainy weather in Sindh Area.

Equipment used were Road Rollers, concrete Mixer, Vibrator, Re-Bar cutting machine and other related

items such as cranes, welding machines, flat bed trailers, etc.

8. QUALITY ASSURANCE: We have highly trained & qualified staff who can supervise and do the field Density Test of each layer of

Dirt work and Concrete Test i.e. Slump Test at site and crushing strength test at laboratory, to get quality

assurance of the job.

9. ENVIRONMENT PROTECTION: In Order to work in the Safety Environment and to keep Healthy & polluted free atmosphere of Rig Sites.

We can disposal. Water and chemical Disposals / Treatments etc. we assists to upholding of Local Social

Traditions / Habits in mind. We have been able to work and as well as technically guiding Drilling &

Exploration Crew as how to coordinate with local people and work in harmony. We also assist in Land

Acquisition work.

10. OIL & GAS FACILITIES (EPF): We offer to provide complete construction services for installation of EPF, which includes;

Civil Work: Providing Pre-cast in site foundations for separators, pumps, loading docks, Porta cabins etc.

Page 23: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

23

Mechanical Work: Fabrication & Installation of portable Oil Storage Tanks, Temporary Loading Docks, Laying of Pipe Lines

from Well Head to Manifold and all other structure work

11. DRILLING / PRODUCTION CAMP SITE MANAGEMENT INCLUDING CATERING: We can engineer & camp sites for the seismic / drilling / exploration and production crew. This includes selection of appropriate cabins, pre-cast foundations for Porta cabins. We can arrange and supply all sorts of utilities including telephones, electricity, water supply & drainage. We can also make road – network at camp besides disposal system of solid and liquid waste.

12. WAREHOUSE / PIPE – YARD / CHEM – YARD DESIGNING: Based on our experience, we can plan, design and execute site ware house, pipe yards for safe storage of casing. Tubing drill pipes / jars, lie pipes, conductor pipes etc. chemical yards / sheds for storage of Drilling Mud / Additives, lubricants etc. with latest safety concepts.

13. LAYING – REPAIRS OF CRUDE OIL / GAS PIPELINES: We offer the services to lay and or repair of high pressure pipelines for crude oil & gas transmission from well head to manifold skid which includes topographic survey. Trenching road, crossing laying, radiography, hydro testing and commissioning.

14. INDUSTRIAL SAFETY & SECURITY MANAGEMENT

PPE (Personal Protective Equipment) and other Safety items / Equipment BUILDING SECURITY MANAGEMENT SYSTEM CONNECTIVITY SOLUTIONS [Please see details at page No: 108

Page 24: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

24

15. PROCUREMENT AND SUPPLY OF MATERIALS & SPECIALIZED SERVICES We also offer services for the supply of different types of steel structure, fixtures, pipes chemicals, safety items - tools & equipment, personal safety equipment specially used in the oil industry. Having well experienced material specialist / procurement engineers to render services for the same, including Rig site material co-ordination. We also support our Client organizations and provide our best resources and services to source, purchase and supply Local and overseas materials and Equipment. We are especially specialized in arranging HOT SHOT items

even by hand-carry and deliver at the remote Drilling / Production sites to meet Clients Emergencies.

CATHODIC PROTECTION We have very experienced crew for improving IMPRESSED current Cathodic protection levels, providing anode beds, transformers, rectifiers and providing positive & negative cabling.

Page 25: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

25

ELECTRICAL & INSTRUMENTATION [E&I] JOBS Fabrication & Installation of DBs, Junction Box, Laying of underground & over Ground Cables and all instrumentation work at Well Head & Manifold.

AGEC is pleased to offer complete range of Engineering and Contracting Services in the following fields:

Providing fabrication, installation & supervision for the installation of off skid / on skid instrumentation & control equipment installation.

Carry – out calibration testing & installation of the entire on skid / off skid instrumentation & control equipment including all switches, PCVS, panels and skid instrumentation.

Laying of power control, grounding cables (underground – above ground) according to the cable schedules, including cable connecting according to the construction drawing, including cable

Page 26: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

26

terminate at both ends, joining splicing (if any) dressing, tagging (both cable & cable cores) tying at 18* interval.

Cable Tag Making Laying & interconnection of Main Power Supply Cable between Skid & FJB and Annunciation Panel. Excavation & back filling of cable trenches. Laying of Road crossing (PVC Sleeves) Making cable entry knockouts and fixing of gland / myer hub for all panels & JBS. This includes filling

of sealing compound & plugging of eye seals together with red-points seal mark. Installation of cable conduit for control room including expansion of existing and / on cutting of a new

opening for entry of new cables. Installation of grounding network for all the new installations. Installation & hook-up of annunciation panel in the existing control room. Carry-out power / control hook-up of a new installation interlocking modification based on field

routing. Installation & hook-up of the off skid – field mounted instruments together with impulse lines, signal

cabling and main power supply connection. Installation of air strip lights Installation of smoke detector Installation of firm alarm system.

Testing & Commissioning:

Carry out meggar, continuity, insulation & shield tests of all power and control cables.

Carry out testing & verification of internal wiring and termination of all prewired panels. Including MDB, compression panel, annunciation panel, SSP and FJB etc.

Carry out instrument control loop testing (both closed & opened loops)

Field setting & functional testing of all the instrumentation & control equipment including local control instruments, regulators, area lighting.

Furnishing of proper clamping for all instruments, tubing, conducting & cables ducts. Carry out verification of instrument wiring & termination of all existing DB / Panel / JB / SSP.

Page 27: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

27

PIPING WORK Engineering and Construction

Laying of 4” Dia coated pipe line from Mazari # 8 to Sonro, including Well – head piping &

instrumentation (Rs. 1.7 million)

Modification of the existing Bukhari piping, various sizes 10”, 8”, 6” and 4”

Laying of 4” Dia coated pipe line from Mazari # 2 to Mazari facility, including well – head piping &

instrumentation controls.

Laying of 4” Dia coated pipe line from south Mazari well to manifold including well – head piping &

instrumentation controls.

Laying of 4” Dia coated pipe line from Tangri well to manifold, including well head piping &

instrumentation controls.

Laying of 4” Dia coated pipe line from Lyari well to manifold including well head piping &

instrumentation controls

Laying of 4” Dia coated pipe line from Tajidi well to manifold including well – head piping &

instrumentation controls.

Page 28: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

28

DETAILS OF COMPLETED PROJECTS ENGINEERING & CONSTRUCTION SERVICES

CLIENT: SCHLUMBERGER

Sand Blasting & Painting of the followings:

Acid Tanks

Coil Tubing Units

Mobile Nitrogen Tanks

Large & small Silos Tanks

Cat Flat engine

Mobile Water Tanks.

Page 29: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

29

DETAILS OF COMPLETED PROJECTS

ENGINEERING & CONSTRUCTION SERVICES

CLIENT: LASMO OIL PAKISTAN

1. Modification in existing Platform for maintenance of Fin Motor

2. Sun – shades for Control room building, security building & main office building

3. Catering contractor rest room.

4. As built drawing of Project – office at Kadanwari Gas field

5. Eye – Clinic Chundko

6. Raw – Water supply to permanent Camp

7. Car – Parking Shed

8. Chemical Shed at warehouse

9. Structural design for electric post at wellheads

10. Structural design for incinerator foundation and pad.

11. Repairs of Aircraft Hangar at Kadanwari.

12.Engineering and design for repair work including calculations, drawing, specifications and B.O.Q.

Page 30: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

30

DETAILS OF COMPLETED PROJECTS ENGINEERING & CONSTRUCTION SERVICES

CLIENT: BHP EXPLORATION PAKISTAN

Supply of complete for well site locations for Parker Rig – 247

Engineering Consultancy,

Design Package

DETAILS OF COMPLETED PROJECTS

ENGINEERING & CONSTRUCTION SERVICES

CLIENT: PAKISTAN PETROLEUM LIMITED (PPL)

Renovation of

Exploration and Joint Operations Department at 3rd floor, PIDC House Karachi.

Various other Engineering and Civil Projects within Pakistan

DETAILS OF COMPLETED PROJECTS

ENGINEERING & CONSTRUCTION SERVICES

CLIENT: DESCON ENGINEERING (PVT) LTD. 1. Liberty – Power Point

Ghotki Phase – I Sukkur, Sindh

Earth – Work 10,000,000 cu. Ft.

2. Chakwal Cement Project Chhoi – Kallar Kahar District: Chakwal

Fabrication & Erection of Steel Storage Tanks

3. F.F.C. Jordan. E & P Equipment Parking Shed

Page 31: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

31

DETAILS OF COMPLETED PROJECTS

ENGINEERING & CONSTRUCTION SERVICES

CLIENT: PAK ARAB REFINERY LTD. (PARCO)

Sludge Cleaning, Sandblasting and Painting of 2 (two) Large Oil Farm Tanks.

Construction of Fence Wall around Block – Valve Assemblies

in Section III & Section IV between Shahwali & Mehmood Kot, Kasba Gujrat.

Power Cable Trenches – Complete RCC underground with insulated trays made and

constructed and successfully handed over.

Page 32: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

32

COMMUNICATION TOWERS

COMMUNICATION TOWER NETWORK FACILITIES

Page 33: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

33

Installing and Rigging of Communication Tower Masts and Antennas requires specialized skill & experience. It is essential that persons having such type of skills should install & no one else should attempt to install Towers or Masts without proper certification, expertise and experiences. AGEC is a fully specialized in Communication Towers Manufacturing & Installation firm and have executed numerous Projects in this field having extensive seven years’ experience. Due to our qualified Engineers, Quality consciousness has led this firm to excel in this field. We are pioneers in providing confidence to the multinationals to install Towers fabricated by us in place of American imported Towers.

AGEC is shall be completely following the Occupational Safety & Health act regulation “OSHA”.

It is AGEC’s intention to fully comply with the WILLIAM’S – STEIGER Occupational Safety & Health Act 1970 in letter and spirit. It is policy of AGEC to Design & Manufacture Towers & related equipment that are safe to use without hazards to people & / or property. On roof top structures to ensure proper transfer of stresses from foundation to the existing columns of Building. We make use of the Hilti (Swiss Bolts) of the required strength, compare to locally available Rawl Bolt as generally used.

We have been providing and installing HF / VHF Radio and Mobile phone COMMUNICATION TOWERS as specialized services to Paktel, Lasmo Oil, Mosely USA and SSGC.

Page 34: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

34

LIST OF PROJECT - COMMUNICATION COMMUNICATION TOWER CONSTRUCTING SERVICES

CLIENT: MOBILINK PAKISTAN

15 Meter High Tower 5. Supported Hyderabad, Sindh

20 Meter High Tower 5. Supported Hyderabad, Sindh

12 Meter High Tower 5. Supported Data Centre Karachi

15 Meter High Tower 5. Supported Classic Centre, Karachi

13 Meter High Tower 3. Legged 5. Supported Hammem Centre Karachi.

60 Meter High Tower 5. Supported Port Qasim Industrial Area, Karachi.

LIST OF PROJECT - COMMUNICATION

COMMUNICATION TOWER CONSTRUCTING SERVICES

CLIENT: PAKTEL

50 Meter High Tower S. S. Multan on ground.

40 Meter High Tower S. S. Sialkot on ground.

10 Meter High Tower S. S. Shah Jamal Town, Lahore.

45 Meter High Tower on Pile Foundation, DHA, Karachi.

Page 35: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

35

COMPANY’S INCOME TAX REGISTRATION AND

REGISTRATION MANDATORY CERTIFICATION

SALES TAX APPLICATION TO GOVT OF PAKISTAN

FINANCIAL STATUS

INCOME TAX DEDUCTION CERTIFICATES

Page 36: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

36

Page 37: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

37

Page 38: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

38

FINANCIAL STATUS Last Financial year

BPO’S JOB

Description Amount (Rs)

Civil :

Dhabi & Khaskheli

2,099,514

Dhabi Sports Complex

4,669,593

Tangri Upgrade

8,337,039

TOTAL 15,106,146

Description Amount (Rs)

Mechanical 2,081,613

Electrical 17,131,021

Civil 793,295

Instrumentation 510,617

Scaffolding 469,231

Schlumberger tanks 295,000

SIEMENS 202,730

TOTAL 40,212,507

Description Amount (Rs)

Mechanical Pipe Lines

South Mazari

Tangri II

Tajedi

2,596,510

Mazari # 9 1,641,448

Liari / Mazari 434,530

Fall Protection System 4,034,897

TOTAL 8,707,385

Page 39: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

39

Grand TOTAL & BPOs & POs (Rupees) 64,026,038

Page 40: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

40

Page 41: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

41

Loss Control Training by DNV

Page 42: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

42

Project Management; Planning, Scheduling and Control Training from AMA

[American Management Association, USA

Page 43: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

43

Improving Managerial Skills of the new prospective Manager by AMA

[American Management Association, USA

Page 44: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

44

Page 45: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

45

Page 46: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

46

Page 47: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

47

Page 48: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

48

Page 49: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

49

Page 50: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

50

Page 51: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

51

Page 52: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

52

Page 53: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

53

Page 54: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

54

Page 55: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

55

Page 56: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

56

Page 57: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

57

CONTROL OF THE WORK PROJECT CONTROL Five Steps Model for Project Control

1. Up-Date the Status 2. Analyze the impact 3. Act on the Variance 4. Publish the revision 5. Inform Management

STEP NO. 1

UP – DATE THE STATUS

Confirm or set up mechanism for collecting data.

Sources for collection of data 1. Project Manager 2. Person holding prime responsibility 3. Status review meeting 4. Personnel time reports, time cards or time logs.

FORMAT FOR STATUS REOPRT:

Where we are today

Where will be the next report

What is our budget position

What item jeopardizes project completion

Who deserves recognition? GRAPHICAL REPRESENTATION: Charts & Graphs:

Gantt Charts.

Gantt charts with slippage

Gantt Charts with slippage on non-critical path

Re-source loading chart

Cost line graph

Multiple base line

Page 58: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

58

Multiple baseline with slippage

Multiple baseline with slippage and under budget situation

Cost analysis curve

Schedule trend analysis.

Cost Trend

Resource Trend Analysis

Contingency Utilization.

TREND ANALYSIS It is important to look at trends and to project what will happen in terms of time, resources, and / or dollar if the trend continues. Trends analysis is the useful tool for project control since it enables you to compare the target with the destination. STEP # 2 ANALYZE THE IMPACT

Compare planned to actual results in order to reveal variances.

Determine cause that is when problem appears; look carefully to find the cause.

Prepare analysis or forecast report in which progress or the lack there of is extrapolated to the future.

STEP NO. 3

ACTION ON THE VARIANCES Three courses of action as a result of comparing the plan to actual:

1. Do nothing either because the impact is not great enough to warrant action or because the trend is not strong enough to justify action yet.

2. Look at the plan exist and make modification within the schedules, resources cost & scope baselines to accommodate the problem.

3. Start negotiating trade – offs perhaps time added to the schedule, additional resources, additional money, and / or resizing the scope of the project.

Page 59: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

59

STEP NO. 4 PUBLISH THE REVISION

Publishing a revised plan is similar to publish the original plan during the planning steps of the project management life cycle. STEP NO. 5 INFORM MANAGEMENT

During the controlling process, Management needs to be informed of problems being experience on the project so that it corresponds to inquiries concerning the project.

Page 60: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

60

PROJECT MEMBERS

ROLE IN THE CONTROLLING PROCESS A well-thought out data collection effort in an organization with adequate time reporting and cost accounting systems can reduce the number of data that have to be gathered from the members of the project team, allowing them more time to work on the project and furthering the objectives of the organization. STATUS REVIEW MEETING IN ORDER TO RESOLVE:

Why are the Mile stone not completed

What is impact

When will the work be done?

Is an alternative action plan needed

What is the date (s) required to get on scheduled. WE DO HAVE A PROJECT STATUS REVIEW MEETING ON A DAILY, WEEKLY AND FORTNIGHTLY BASIS AND RECORD THE REPORT FOR ITS DISTRIBUTION.

Page 61: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

61

QUALITY

QUALITY ASSURANCE & CONTROL Quality Plan: Quality assurance shall be in accordance with the appropriate part of BS 5750 Quality system or an approved equivalent standard and a quality plan shall be produced which shall be subject to approval prior to commencement of the job.

Preparation Panels: Before starting and activity a representative panel for appropriate activity be installed. The panels will consist of company, contractor inspector & will be witnessed for.

1. Preparation of sample for the appropriate activity, as and when required at least 2 sample per system. 2. Approval the sample, which shall provide the acceptance criteria for any test if required and stand as

reference for quality to be obtained during the work.

Pre-Start Meeting:

A pre-start meeting shall be held at least one week prior to start the work. Attendees shall be including representative of company, contractor and manufacture if required. Contractor shall co-ordinate this meeting.

Technical Service: The contractor shall co-ordinate the manufacturer technical services. As and when required depending on the nature of job like painting.

Inspection hold points: Upon completion of one activity the work shall be suspended for the purpose of inspection and company’s witness.

Acceptance by Company: Final acceptance certificate will be issued by the company after completion of appropriate job.

HSE, QA/QC and Environmental Policies – Please refer to our detailed approved

manual available on request.

Page 62: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

62

Page 63: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

63

For every Project we create a set of SMART goals

• S - Specific, significant, stretching

• M - Measurable, meaningful, motivational

• A - Attainable, agreed upon, achievable, acceptable, action-oriented

• R - Relevant, realistic, reasonable, rewarding, results-oriented.

• T - Time-based, timely, tangible, trackable

Page 64: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

64

ADMINISTRATIVE & TECHNICAL STAFF LIST OF TECHNICAL STAFF CIVIL ENGINEERING

1. Engr. G.R. Abbasi B.Sc BE (CIVIL)

2. Mr. Habib Khan DAE (Civil)

3. Mr. Muhammad Amir. DAE (Civil)

4. Mr. Kashif Madni DAE (Civil)

5. Mr. Hymayoon Khokhar Surveyor

6. Mr. Ajazuddin Ahmed Material Engineer / Quality Controller

LIST OF TECHNICAL STAFF MECHANICAL ENGINEERING

1. Engr. S.A.R. Sultan BE (Mechanical)

2. Engr. Syed Raghib Hashmi BE (Mechanical)

3. Engrr. Humayun Akhtar BE (Mechanical) M.S.E. (Structure), USA

4. Mr. Shakeel Ahmed DAE (Mechanical)

LIST OF TECHNICAL STAFF - ELECTRICAL & INSTRUMENTATION ENGINEERING

1. Engr. Suhail Ahmed BE (Electrical)

2. Mr. John - DAE (Electrical)

3. Mr. Javed - DAE (Electrical)

4. Mr. Mehmood - Instrumentation Technician

LIST OF TECHNICAL STAFF - TELECOMMUNICATION

1. Mr. Moin Saeed SITE Engineer

2. Mr. Qamar Alam Senior Site Supervisor

3. Mr. Muhammad Ishfaq Site Supervisor

4. Mr. Muhammad Sharif Site Supervisor

5. Mr. Mustafa Site Supervisor

6. Mr. Muhammad Ali Foreman

7. Mr. Israb Khan Rigger

8. Mr. Rahmat Rigger

9. Mr. Dinar Shah Mast Fitter

10. Mr. Shahzad Khan Mast Fitter

LIST OF ADMINISTRATIVE STAFF

1. Shabbeer Ahmed Manager Accounts

2. Qadir Mehmood Project Coordinator

3. Muhammad Younus Accountant 4. Zeeshan Ahmed Office Manager

Page 65: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

65

CURRICULUM VITAE

Name : Syed Abdul Rasheed Sultan Father’s Name : Syed Sultan Shah Nationality : Pakistani Permanent Address : Block – 2, 33 – C, 1st Floor PECHS Karachi – 75400, Pakistan Academic Qualification : 1. AMI Mar. E. (London) 2. Chartered Engineer (London) 3. Certificate of Competency as First Class Engineer (London) 4. Personnel Management Course from Pakistan Institute of Management (PIM) Field of Specialization : Mechanical, Electrical, Civil & Marine Engineering Ship Building, Ship Management & Operation Management 1985 to date 1 : Chief Executive – TEAMS International Covering Technical Services to Oil & Gas Industry Shipping repairs & other industrial Units 2 : Director – Tri-marine International Giving services to wards in shipping in a way of Ship Management, Marine Services, Shipping Agency Services for part at Karachi & Bin Qasim, Chartering Brokerage etc. EXPERIENCE Senior Manager : Responsible for Management & Operational Control

For Fleet of about 98 oceans giving vessel for Management Company based in Hong Kong. This involved direct control / supervision of about 2500 executive & staff. Complete budgeting (Revenue & capital) and follow up of projected budgeted amount ranging more than US $ 150 million.

1968 – 1974 : As career Executive with Sui Gas Transmission Co. Responsible to board of director / managing director For:

(a) Analytical preparation of control of capital budgets / yearly revenue budgets for all departments listed under “B”.

Page 66: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

66

(b) Management control of following departments:

Mechanical Department, headed by mechanical engineers (executive level) & their staff related to compressor station.

Electrical & instrument control department, headed by electrical & instrument engineers (executive level) & their staff related to remote control system.

Civil department, headed by civil engineers (executive level) & their staff related to maintenance of residential areas & new projects.

Gas pipeline maintenance & sales station, department headed by gas pipeline engineers (executive level) & their staff.

Administration & cash department, headed by administration officer.

(c) Liaison with government authorities. (d)

Constant Liaison w/local govt authorities for effective control of all situations.

1965 – 1967 : Worked as chief engineer with Pakistan mercantile marine. 1955 – 1964 : Joined Pakistan Mercantile Marine in 1955 as a Cadet Engineer & Promoted to

the rank of 2nd Engineer by 1958 thus securing four promotions in 3 years. Left for United Kingdom to appear in Certificate of Competency (Engineer) Examination which was cleared in September 1959 and was also granted Graduation from the Institute of Marine Engineer London. On return from United Kingdom rejoined Pakistan Mercantile Marine as 2nd Engineer in 1959 & completed service period for the eligibility of 1st Class Examination. Left for United Kingdom in 1963 to Clear 1st class engineer’s examination. On completion continued my training in United Kingdom for Diesel & Motor high power plants leading me to 1st class certificate of competency as Marine Engineer also was granted associate membership of the institute of marine engineers. An accepted as chartered engineer.

1951 – 1955 : Four years Apprenticeship in Marine Engineering from Karachi Port Trust.

Page 67: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

67

RESUME

Engr. G.R. ABBASI Project Consultant

1. Graduate in Science from Karachi University.

2. Graduate in Civil Engineering, from NED University of Engineering & Technology, Karachi.

3. Certificate in Improving Managerial Skills of the New or the prospective Manager from American Management

Association, Chicago, USA.

4. Certificate in Basic Project Management Planning, Scheduling & Control from American Management Association, New York, USA.

5. Certificate in Loss Control Management, Modern Safety Management from DNV, USA.

6. Registered in Specialized Consulting Engineer in OIL & GAS Development, Pakistan Engineering Council and Government of Pakistan Islamabad.

7. Special Training in Drilling SITE Environment, with Clive and Lloyds, Australia.

8. 17 Years Civil Construction experience including 8 years exclusively in Oil & Gas Exploration Facilities with Union Texas Pakistan, Badin Concession Block.

PROJECT DESIGNED, EXECUTED & PERSONALLY SUPERVISED DURING 8 – YEARS OF STAY WITH UNION TEXAS PAKISTAN. DRILLING FACILITIES:

A. Construction of 120 exploratory & development of well site locations. This includes site surveys, selection of suitable access road, preparation of scope of work, specifications, bid package, supervision, Liaison with WAPDA and telephone department for safe rig moves.

B. Construction of 25 single span bridge ranging from 15 ft. to 35 ft. with the use of steel girder and pre-cast desk slabs over irrigation & drain canals.

PRODUCTION FACILITIES: Construction of equipment foundations, pipe supports, skim pits, flame pits, burn pits, fire water ponds, oil storage tank’s foundations, protection dykes services roads, control room buildings, chain link fencing. Security guards rooms for the following production facilities.

1. Golrachi Gas Facility 2. Truck Gas Facility 3. Laghari Oil Field

Page 68: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

68

4. Dhabi Oil Field 5. Mazari Oil Field 6. Matli Remote Facility 7. Nori Remote Facility 8. Ghungroo Epf 9. North Akri Epf 10. Tajidi Epf 11. Rind Facility 12. Key Hole G Facility 13. Tangri Facility 14. Bukhari Facility 15. South Buzdar

RESIDENTIAL FACILITIES: Construction of foundations for Porta – Cabins, installation of water purification plant (Aqua – Water plant) Placing of water supply & sewerage treatment plant (Red fox Unit) at the following comps:

Khaskheli Base Camp

Dhabi Camp

Turk Camp.

Bukhari Camp

Experience: GAMMON PAK LTD – Pakistan Steel Mills Repair Shop Complex. 1978 -1980 - Construction of:

Storage Bins

Storm Water Pump House

Transformer Rooms

Switch Gear Rooms

Trolley Channel up to 50 tons capacity

Underground communications.

Railway tracks McDonald LYTTON UNICON (MLC), ABU DHABI, UAE 1980 – 1981 - Construction of:

UAE Armed Forces G.H.Q. Abu Dhabi, Khalid Bin Waleed Air Defence Camp, Swaihan, UAE.

Page 69: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

69

ZAPIA MIDDLE EAST CONSTRUCTION CO / BOVIS ENGLAND U.A.E. ARMED FORCES, G.H.Q. ABU DHABI U.A.E. 1980 – 1981 - Construction of:

Jundy’s Accommodation

Work shop & Vehicle shed

Mosque – 400 Persons. M/S. RASHID CONSTRUCTIO CO. RIYADH WATER SUPPLY DEPARTMENT. 1985 -1986 - Construction Of:

Swimming Pools (Olympic Standard)

Cinema – 300 seats.

Water Reservoir

Precast Overhead Tank M/S. SAIPEN – CAT / MOTHER CAT SAUDI ARABIA

1986 – 1987 - Construction of:

East – West Crude Oil Pipeline Expansion Projects. M/S. UNION TEXAS PAKISTAN

1987 – 1995 - 1987 – 1995 Project Engineering and Construction at site.

Page 70: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

70

Page 71: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

71

Page 72: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

72

Page 73: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

73

SUHAIL A. KHAN

STATUS : PRINCIPAL ENGINEER (ELECTRICAL)

Diploma in Associate Engineering in Electrical from Sindh Board of Technical Education, Karachi in 1972.

EXPERIENCE:

1973 – 1974 Customer Engineer in Home & Foreign Traders for Klockner Mover.

1974 – 1975 Electrical Engineer with Micas Ltd.

(ROTI Corporation of Pakistan) for installation of 3 Nos. ROTI Plants in Karachi under

supervision of German Engineers.

1975 – 1980 In Karachi Steel Mills project with different contractors as SITE

Engineer. The main assignment included installation of M.C.C.s H.T.

17, Lt Cables Tunnels Lighting & External Lighting.

1980 – 1981 Electrical Engineer with VISE KV, Iraq for construction on the

projects of Agriculture Institute in Mosal & Karkuk for Ministry of

Housing & Construction.

1981 – 1982 Electrical Engineer on project of Riyadh Electrical Company (RESC)

for underground HT & LT Distribution System, Substation along –

with service connection to customers.

1982 – 1986 Electrical Engineer with Abdullah Fawad Construction,

Saudi Arabia, worked on the following main projects:

Housing Scheme of Royal Commissioning for Jubail.

Industrial City under the consultancy of BECHTAL.

The work included internal & External

Electrification, CCTV System, Security/Fire Alarm system & Installation of Substation.

Electrification of squash court complex Dhahran which includes fire alarm system associated

with Halon Fire Extinguishing & HAVC Controls.

Runway & apron lighting along with Electrical Installation, Terminal building for Tarajeeb

Airport, Aramco.

Installation of HT / LT switch gears 7 laying of cables for upgrading of the Distribution system

in Abqaiq, Hafoof & Tarajeeb Oil Fields for Aramco.

Air – Conditioning control system of 6 Nos. of 600 tons chillers for Dammam

Municipality Building.

Page 74: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

74

HUMAYUN AKHTAR MECHANICAL ENGINEER

1. Graduate in Mechanical Engineering, from NED University of Engineering & Technology, Karachi.

2. MSE (Structure) from USA

3. M.S.E. (CAD) from USA

4. Associate Member of Society of Mechanical Engineering, USA.

5. 8 years comprehensive experience in Designing & Supervision of Mechanical Jobs.

Area of Experience:

Engineering Design & Analysis

Designing and detailing of material handling systems e.g.

Belt conveyors, screw conveyors, bucket elevators, air slides, bucket conveyors etc (for sugar, cement &

asphalt plants)

Design and analysis of general purpose steel structure for sugar, cement & asphalt plants & miscellaneous

structure.

Preparation of bill of materials for different equipment & items.

Bulk storage tank design & analysis (software level)

Dedusting duct designing & layout.

Management

Project coordination of 2000 capacity cement plant.

Implementation of ISO 9000 in design department

One of the pioneer member of 26 million rupees HMC CAD canter project.

Management of the sales & marketing department

Negotiation of contracts.

Cost estimation & bid preparation.

Information Technology

Sales & marketing of thermal power plants & related equipments

Scanning & archiving system development

CAD procedures & standards manual development

Engineering software development

Local area network (LAN) of 120 computers & peripherals

Teaching / instructions

Development & execution of engineering software, training courses for engineers and draftsman of HMC

design centre (e.g. Auto CAD, Pro Plant, Pro Steel, Pro Vessel, Tri Tanks, HVAC, SAP 386 and ANSVS etc.)

Course on Word processor, spread sheets & desktop publishing.

Computer Languages:

FORTRAN, BASIC AUTOLISP and developed different programs in these languages.

Developed a program in BASIC for Belt Conveyor Design and now working with Auto Cad interface.

Page 75: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

75

Software packages:

1. Extensively used Finite Element Analysis packages like IDEAS, NASTRAN, NISA 11, on work stations like Apollo

ON 3000, ON 3500, ON 4000 and IBM mainframe for Two years and completed different components &

structural Design Analysis Projects.

2. User & Instructor of ANSVS and SAP 861386 for structural Analysis.

3. Instructor of Drafting Software’s i.e.

Pro – Pipe : for piping layout

Pro – Steel : For Drafting of Steel Structure

Pro – Plant : For Drafting of plant layout

CAD Pipe HVAC : For piping layout

4. User & Instructor of Design Packages i.e. PRO – VESSEL, TRI – VESEL (for pressure vessel design) and TRI –

TANK 620 & TRI – TANK 650 (Bulk Storage Tank Design)

5. Also used word star, word perfect, lotus, Dbase III, Ms. Excel, Ms. Project Manager etc and different DTP

Packages.

Details of Experience:

Worked as senior design engineer (CAD) 1990 – 1995

In heavy mechanical complex ltd. Taxila

Responsibilities:

Design project coordinator for 2000 TID Galadari Cement Extension project.

Incharge material Handling section, which includes designing and standardization of belt conveyors, screw

conveyors, bucket elevators, clinker conveyors for sugar plants, cement plants etc.

Designing / detailing of de-dusting ducts for industrial plants i.e. cement plant asphalt plants.

Designing & Standardization of Asphalt mixing plant.

Heading a team of three engineers for designing & development of belt conveyor program based on Auto

CAD.

Design & analysis of different types of steel structure using ANSVS and SAP 386 packages.

Jobs Carried out:

Smooth operation & maintenance of about 120 computers, peripherals and approximate 15 software.

Training of engineers / draftsman to software like pressure vessel design.

(PRO – VESSEL, TRI – VESEL), bulk storage tank design (TRI TANK 620 & 650)

Piping analysis / layout and duct design (HVAC)

Selection, procurement & Testing of all Engineering (Design, Analysis Drafting) software and development of

training courses for engineering & Draftsman.

Updating of HMCs * CAD standards & procedures Manual.

System Design, Procurement & Commissioning of complete computer network HMC design (canter 2 floors,

30 Rooms) based on Novell NetWare. System consists of more than 100 computers and 20 peripheral.

Page 76: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

76

Designing, detailing, cost estimations, BO (I and purchase of vendor items of 15 Belt Conveyors of different

capacities. (10 – 300 Tons/hr) and Belt – width (300 – 2200 mm) for Sugar & Cement plants and related

structure.

Modeling & FE Analysis of a very large steel structure.

Design & Analysis of Bulk Storage Tanks using TRI TANK 620 & 650.

Design & Analysis of General Purpose Structure.

In Charge of Training in SAP 386 (Finite Element Analysis Software), Auto CAD, Lotus 123. Word Star & Word

Perfect (1990 – 1992)

Organized & Instructed 11 courses of Auto CAD in HMC (1990 – 1992)

Have experience of installation / maintenance of Hard Disk, Disk Drives, Key Board, controller Cards etc of

PCs.

Scanning, Archiving & Cataloging of Old Drawing & Documents.

Worked as Assistant Manager (Sales & Marketing) Feb, 1989 – April 1990. In heaving Mechanical Complex

Ltd. Taxila.

Responsibilities:

Pricing & Cost estimation of equipment.

Preparation & Submission of Quotations.

Computerization of Sales & Marketing Department.

Worked as Assistant Manager (Design) Oct, 1984 – Dec 1986

In heavy foundry & Forge Ltd. Taxila.

Responsibilities:

Designing, Material, Cost estimation of Screw Conveyors and allied Steel Structure of 50 tons / day white

cement.

Preparation of bill of Material for different equipment of 50 tons / day white cement plant.

Designing & material cost estimation of general purpose containers.

Worked as Trainee Sales / Services Engineer Feb, 1984 – Sep, 1984

in an indenting firm J.L. Wei and Company, Karachi.

Responsibilities:

Sales & Service of Chemical Equipment like Water Treatment Equipment etc.

Page 77: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

77

SYED RAGHIB HASHIMI PRINCIPAL ENGINEER (MECHANICAL)

1. Graduate in Science from Karachi University

2. Graduate in Mechanical Engineering, from NED University of Engineering & Technology, Karachi.

3. Certificate in CAD/CAM from Kilbride Training Center Scotland, UK and City and Guilds, London.

4. Instructional Technique Course from Leach Worth College, London.

5. Industrial Training with Karachi Shipyard.

6. 17 – Years comprehensive experience in Mechanical Engineering, particularly in machine design, steel pipes

fabrication, templates & sketches as per site requirement using hot & cold bending process, welding &

pressure testing of different steel pipes.

EXPERIENCE:

KARACHI SHIPYARD:

1979 – 1985 Design Office Machinery

1. Preparation of technical specifications of different projects.

2. Preparation of enquiry specification for machineries, pipes, pipe fittings.

3. Technical scrutiny of purchase file.

4. Procurement of material.

5. Ensuring availability of drawing and related materials for construction work.

6. Preparation of working drawing for different piping system / machinery foundations.

7. Designing of different piping systems.

1986 – 1993 SUI SOUTHERN GAS Co, KARACHI.

1. Installation of different Valves and other fitting for fuel oil, lubricating oil, etc. Fabrication of different pipes as

per site requirement.

2. Commissioning of different machineries.

3. Planning, organizing and dealing with labor effectively to obtain optimum production.

SHAMSI ASSOCIATES:

1. KESC Sixth Unit Pipe Fabrication Drawing for Turbines.

2. Faran Sugar Mill Piping Work.

Page 78: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

78

Dr. SALEEM SIDDIQI CICCM, CIPM, (UA) MBA, PhD http://qa.linkedin.com/in/saleemsiddiqi

Summary Total Experience: Over 30 years.

Extensive Upstream & Downstream Contracts / Purchasing Oil-Gas Industry experience :

* Drilling and Exploration

* E&P, Production

* EPC

* LTSA (Long Term Service Agreements)

* OEM (Original Equipment Manufacturers) Service Agreements. Etc.

SASOL PETROLEUM INTERNATIONAL – Johannesburg – South Africa

Worked as a DRILLING CONTRACTS ENGINEER October 2010 till Oct 2011.

QATARGAS Co. Doha [State of Qatar]

CONTRACTS SPECIALIST July 2009 till April 30, 2010 Fully

responsible to handle all Contract Engineering activities of Drilling and Exploration including complete pre-Tender, Pre-Award, Contract and Post-Award

Contractual stage activities till Execution / Administration and Contract closeouts.

DOLPHIN ENERGEY LIMITED – Doha [State of Qatar]

CONTRACTS / PROCUREMENT ENGINEER March 2004 till May, 2009 5 Years Dolphin Energy a Joint Venture (OXY, TOTAL and Mubaadla) E&P Company engaged in offshore Drilling, Development, Production, Treatment and Transmission of

Hydrocarbons in the North Field of Qatar.

Dolphin Gas Plant is one of the largest state-of-art and latest plant in the world in terms of compressed gas volume and largest Energy Project worth $6.0 Billion

in the Middle East which has a daily Gas treating capacity of 2.1 bln stcf/ day for Export to UAE.

Two underwater Sea Pipelines: 36 inchx80km - to transport raw Natural Gas from two offshore Production Platforms to onshore Gas Treatment Plant in Qatar

(having two process streams each having two trains), utilities, compression trains, off-site condensate storage and sulphur units) and 48 inch x 364km - deep

water subsea umbilical, riser and flow line from Qatar to UAE to transport 2.1 Bln. Stcf./ day of Compressed and Refined Gas.

* Performed all processes from pre-qualification, pre-award, award up to finalization / execution stages of typical Oil / Gas Industry Contracts / Purchasing. Post

award activities were also performed on selective Contracts for closing them out.

RAS GAS LNG CO. LTD QATAR June 2001 to Jan 2004 & May 2010 till Oct, 2010

CONTRACTS ENGINEER > 3 Years An E&P and LNG Gas Company.

RASGAS's Liquefied natural gas (LNG) production is in excess of 54mn tonnes per year from 11 trains. It is world's largest Exporter and trans-shipper of LNG.

* As Contracts Engineer processed numerous Drilling, EPC, Shutdown, Maintenance, Construction Technical Engineering Contracts and LTSAs from pre-Award,

Award and Post Award / Administration stages.

BRITISH PETROLEUM (employed by Union Texas Petroleum) 1985 to 1998

CONTRACT ADMINISTRATOR Pakistan > 13 Years

An E&P and Gas producing Company.

ARAMCO (Saudi Arabian American Oil Company), 1973 to 1979

SUPERVISING Saudi Arabia. > 6 Years

Page 79: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

79

Major E&P Company with over 10 Million bpd production

Responsible for Supervising a team for Receiving, Shipping (Logistics), Materials - Inventory Control & Purchasing.

ESSO EASTERN INC. (Exxon-Mobil) 1980 to 1985

ADMINISTRATION OFFICER / WAREHOUSE SUPERVISOR 5 Years

E&P Company producing >900 mmcfd Gas in Pakistan.

I was responsible for Oil Industry Local and Overseas Sourcing / Purchasing, Materials Control, Logistics, etc.

MARUBENI CORPORATION – (JGC) Pakistan. 1998 to 2000 CHIEF PURCHASER

A leading Japanese EPC Company which completed Oil Refinery (100,000 bpd capacity) project in Pakistan.

I was fully responsible to support construction and engineering of this Oil Refinery Project relating to Materials

Purchases / Control and producing work / services Contracts, Imports, Logistics etc.

PAKISTAN PETROLEUM LIMITED (PPL), KARACHI 2000 to 2001 MATERIALS COORDINATOR

E&P Company with largest Natural Gas reserves in Pakistan. I was responsible for the processing Equipment

/Services Contracts for the Construction & Installation of Gas Compression Trains and sourcing / procurement of

specialized Materials. I was also responsible for Logistics, Customs and Inventory Control for the Project.

Education and Professional Qualification.

* CICCM (Certified International Commercial Contracts Manager) from IPSCMI

(International Purchasing and Supply chain Management Institute), Delaware, USA

* CIPM (Certified International Purchasing Manager) from IPSCMI

(International Purchasing and Supply chain Management Institute), Delaware, USA

* DBA – (Doctorate in Business Administration (PhD)

* MBA - (Masters in Business Administration).

Professional & Career Development Courses

Advanced Management Program

Microsoft Advance EXCEL

Advanced Microsoft WORD

Microsoft WINDOWS 7

Computer Operating System Techniques

Modern Safety Management

Page 80: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

80

LIST OF MACHINERIES, EQUIPMENTS, TOOLS AND VEHICLES

CIVIL

Sr. # Description Quantity Remarks

1 Concrete Mixer Machine 10 Cft 2

2 Diesel Driven Roller 1

3 Concrete Vibrator 2

4 Plate Compactor 1

5 Generator 3.5 KVA 1

6 Deep Well Pump 1

7 Water Bowser 1

8 Generator 2.5 KVA 1

9 Level Instrument 1

10 Theodolite 1

11 Steel shuttering 3000 cft

12 Complete Scaffolding 3000 cft

13 Plywood Shuttering 2000 cft

14 Tools For Steel Cutting As Per

Requirements

15 Tools For Concreting Work As Per

Requirement

16 Pick Up 1

Page 81: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

81

MECHANICAL

Sr. # Description Quantity Remarks

1 Welding Machine 350 / 400 AMP 2

2 Generator 5 KVA 2

3 Hydro Testing Pump O – 10,000 Psi

Hydro Testing Pump O – 3,000 Psi

1

4 D/Watering Pump 2” Dia 1

5 Air Compressor 250 CFM 1

6 Sand Blasting Equipment 2

7 Drill Machine 13 mm 1

8 Bevel Machine 2

9 Grinder Heavy Duty 7” Dia 2

10 Grinder 4 Dia 2

11 Grinder Pencil 2

12 Heating Oven 400 oC 2

13 Desiccator 120 oC 1

14 Full body safety harness belt 1

15 Cold cutters 2”, 3”, 4”, 6”, 8” 4

16 Electric connection board 6

17 Exhaust fan 18” with frame 1

18 Scaffolding complete 4000 cft

19 Crane 10 tons 1 Rental

20 Side booms 2 Rental

21 Trailer 40 ft. flat bed 1 Rental

22 Excavator 1 Rental

23 Tractor with blades 1 Rental

24 Van 12 – seats 1

25 Pick-up 1

Page 82: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

82

ELECTRICAL

Sr. # Description Quantity Remarks

1 Tool Boxes 4

2 Drill Machines 4

3 Grinder 7” 1

4 Grinder 4” 1

5 Bender 1

6 Vices 2

7 Threading Die 2

8 Pipe Cutters 2

9 Fire Extinguishers 2

10 Cable Cutters 2

11 Lugs Punch 2

12 First Aid Boxes 2

13 Complete Scaffolding 3000 cft

14 Air Blower 1

15 Heat Guns 2

16 Meggar 2

17 Multi-meter 1

18 Generator 5 KVA 1

19 Full Body Safety Harness Belt 2

20 Face Shields 1

21 Pick Up 3

22 Van 1

INSTRUMENTATION

Sr. # Description Quantity Remarks

1 Hydraulic pump 1

2 Master gauge 0 to 3000 psi 1

3 Master gauge 0 to 300 psi 1

4 Test gauge 0 to 400 psi 1

5 Dead weight test 1 Rental

6 Manu meter 1

7 Volt meter 1

8 Tube cutter 1

9 Tubing bender 3/8” 1

10 Tubing bender 1/4” 1

11 Tubing bender 1/2” 1

12 Lugs punch 1

13 Pipe die 1

14 Pipe vice 1

15 Table vice 1

16 Diesel generator 5 KW 1

17 Grinder HD 1

18 Table Drill Machine 1

19 Manual drill machine 1

20 Temperature bath 1 Rental

Page 83: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

83

21 General / common tool box 2

22 Nitrogen cylinder with regulator 1

23 Pick up 1

24 Car 1

TELECOMMUNICATION

Sr. # Description Quantity Remarks

1 Derricks (Gin Poles) 4

2 Hilti Drill Machines 4

3 Hilti Bolts 2

4 Manila Rope 4000 ft

5 Winch machines 4

6 Water pump 2

7 Pulley 30

8 Trolley 12

9 Mixer machine 1

10 Vibrator (concrete) 2

11 Wire rope 4

12 Cutter machine 3

13 Grinding machines 3

14 Punch machines 4

15 Welding units 3

16 Heavy drill machines 5

Page 84: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

84

ENLISTMENTS

Page 85: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

85

ENLSITMENTS

As approved Contractors and Suppliers

1. B.P. Pakistan exploration & Production Inc.

2. Lasmo Oil Pakistan.

3. Pakistan Petroleum

4. OGDCL Pakistan

5. Sui Southern Gas Co.

6. BHP Pakistan

7. Descon Pakistan

8. Schlumberger.

9. SIEMENS Pakistan

10. Moody International

11. OPI

12. Paktel

13. Mobilink Pakistan

14. Moseley USA

15. Marubeni Corporation, Pakistan

16. Pak Arab Refinery Co – Mid Country Project

Page 86: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

86

EPC AGEC’s capability to provide one-window EPC services has evolved over the years by combining our knowledge and experience in specialized fields. Our organization structure especially lends itself to offering competitive EPC solutions for projects in the energy and infrastructure sectors. Engineering

Basic and detailed engineering is performed by a state-of-art design facility equipped with prevalent engineering applications. An extensive communication network is in place for data transmittal, document control and project management to ensure smooth interaction between all stake-holders. We have successfully handled:

Basic Engineering

Detailed Engineering

Piping Design

Mechanical Design

Civil & Structural Design

Electrical Design

Instrumentation Design

Equipment design

Infrastructure design

Electronic Safety and Security Management

Page 87: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

87

Page 88: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

88

Civil Construction

Complete general contracting services integrating civil, mechanical, electrical and instrumentation disciplines, are core strength. Over the years, we have invested in acquiring a large asset base of construction equipment. Our vast construction experience is recognized as one of the leading construction firms operating in Pakistan. The breadth of our involvement ranges from modest facility expansions to large grassroots projects. Our construction capabilities include erection of new plants, relocation of plants and upgrades of operating facilities. Our electrical, civil/structural, mechanical and instrumentation groups are capable of undertaking a wide variety of installation, testing, and commissioning projects for all industry sectors that we serve. The scope of construction includes: We are adept at handling heavy civil works for industrial and infrastructure projects. This expertise extends from earthworks to finishes. The civil team has a proven track record in completing 'fast track' projects consisting of industrial plants and infrastructure development.

Page 89: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

89

Pipeline Crossing:

Pipeline Crossing, Over Bridge / Barrage, On Piles, Suspended and Thrust Bored under Canal, Road and Railways. Include all Civil, Mechanical works and also Expansion Loops etc. Tie-in, Testing and Commissioning.

Construction of Oil / Gas / Water / Waste Water / Chemical Pipelines & Utilities:

Route Surveying, R.O.W. Marking, Grading and Trenching, Pipe Transportation, Stringing, Welding, Cleaning, Priming, Coating and Wrapping, Air Testing, Laying, Backfilling, Tie-in, Pipe Bending, Pigging, Hydrostatic Testing and Commissioning, Installing R.D. Marker and Cathodic Posts, Fabrication, Erection, Valve Assemblies, Piping, Manifold, Pipeline Crossings and all Civil work. Cement Mortar Lining Water Pipeline Internally. Also uniting Cement Mortar Externally, On Pipe, Wall Surface and Structure. Our continuous investment in upgrading and expanding our systems is the key to our enhanced control and productivity. Foundation and Other Civil Works:

Heavy foundations for Vessels, equipment, Machinery, Water Retaining and Oil Tanks, Supports / Anchors etc. Earth works, Embankment, Dykes, Bund Wall, Stone / Brick Pitching etc. RCC / Combined Steel Structure Shed / Store Buildings, Residential Colony, Workshops & Roads, Lighting, Sewerage etc. Camp construction by Portable Cabins (Container) office, Messing & Residential units arrangements. Construction of Irrigation Projects:

Small Irrigation System, Main Canal- Hydraulic structure, Falls Cross and Head Regulator. Aqueduct and Bridges. Canal brick / Concrete Lining. Tile drainage, Surface Drainage and Agricultural Development work. Construction of Dam Weir, Sluice, Vertical / Redial gates with hosting arrangements. Earthen Embankment, Spur Coffer Dam, Earth work & Steel Sheet Piling. Rehabilitation of Canal / Regulators, Dredging etc. Sand Blasting all Steel work / Oil Farm Tanks, Priming & Coating Paints. Residential Colony, Work Shop, Compound wall, Water Supply, Road, Lighting, Drainage System.

Insulation / Painting:

Blast cleaning to SA 2½ and then Paint-Airless Spray System with all types of Paint materials. Also Thermal Insulation System installation along with special Machinery / Workshop for metal working.

Water Supply Pipeline and Pump Station:

Construction of Rising Main, Penstock, Trunk Main, Conduit, Syphon, Pump House & Pumping Station, Clarifier Tank & Treatment Plants, Manhole Chambers, Thrust Blocks with Civil and Mechanical work. Cleaning, Coating and Wrapping external surface Encasement with cement concrete. Internal Cement Mortar Lining 4" to 84" Ø Steel Pipeline and externally Gunited with Cement Mortar – up to 4" thickness. Installation of Turbine / Centrifugal / Plunger / Submersible Pumps, Associated Piping, Manifold / Interconnections and all Civil and Mechanical work. Fire Water Alarm System:

Laying, Water Lines, Main and Distribution. Installation of Hydrants, Monitor, Valves, Specials and Fitting etc. Pump Station and all Civil work. Providing Fire Extinguisher, Hose, Nozzle etc.

Page 90: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

90

Mechanical Construction

AGEC provides mechanical construction services for 'grass-root' projects as well as for expansion / revamping of existing facilities comprising of erection of equipment (including heavy lifts), piping / pipe racks, steel structures, tanks, painting, insulation, testing and pre-commissioning / commissioning. Gas Gathering System:

Gas Gathering Pipelines / Header / Transmission Pipeline, Survey, Planning, Soil, Investigation, Developing Well-Head area, Connections and installation of Dehydration/Separator units & other Process / Purification Plants, Instrument, Inter-connections, Piping, Mechanical and Electrical work with Solar Electrical System, Instrumentation, Hydro Testing and Commissioning. All Foundations, Supports, Crossings and other civil works.

Page 91: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

91

Oil and Gas Field Facilities/Refinery/Petro Chemical Plant:

Fabrication, Erection of Oil and Gas Process /Purification / Dehydration /Condensate Plant, and all Piping, Mechanical, Electrical, Civil, RCC & Steel Structural works. Installation of Compressor / Separator units, Cooler, Scrubber, Slug Catcher etc. Piping, Supports, Skids and Inter-connection of complete system, Electrical and Instrumentation, Testing and Commissioning. Construction and Installation HRSG Units with Stack & Foundations. Hydrolyser / Stripper Column and associated Equipment. Construction & Erection of Water and Sewerage Treatment Plant complete with Foundations and Disposal System. Fabrication and Erection of Tanks:

Fabrication, Erection of Oil / Water Steel Storage Tanks, Ladders, Structural Work, Heat Exchanger etc. Installation of Pumps, Piping and other Mechanical works including Foundation, Instrument and Electrical work. Earthen Dykes with Brick Pitching and other Civil work. Machinery / Equipment Erection:

Transportation and Erection of heavy Equipment / Machinery Skids, Turbines, Compressors, Generators, Pumps, Vessel Heat Exchanger, Boilers maximum lift 200 tons and height 150 ft. Extensive Rigging experience and heavy Lifts, including Alignment, Leveling etc. complete with associated facilities and heavy foundations. Steel Structure and associated works:

Pre-fabrication and Installation Steel Structure Bridges, Gantry, Beams, Trusses, Buildings, Skids, Boiler components (non-pressure parts), Supports and associated works. Supporting workshop facilities. Pre-fabrication of Spools (as per developed isometrics), Erection and welding of piping, Valves, Bends & other Specials. Inter-connections of Pipeline networks, Cyclone, Dykes, Vessels, Stacks, Trusses and Walkway etc.

Page 92: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

92

Electrical and Instrumentation

AGEC’s Electrical and Instrumentation group is capable of undertaking a wide variety of on and off shore installation, testing, and commissioning projects for a wide variety of clients. The scope of our E&I services includes:

· Distributed Control Systems (DCS)

· Cathodic Protection Systems

· SCADA and PLC configurations

· Power Distribution networks

· Telecommunications

· Grounding and Lighting

· Substations

Electrical and Instrumentation works: Installation of panels / MCC and Motors / Generators. Also Laying and Testing of Cable, Terminations and Energizing, Lighting System and Control Cabling. N.D.T. systems – X-ray Machine, Ultrasonic inspection available in house. Installation of Electronic / Solid State Systems, Pneumatic and Hydraulic Control Systems. Instrument Calibration, Installation and Testing.

Page 93: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

93

SERVICES

EPCC

· Basic and Detailed Engineering

· Procurement

· Manufacturing

· Construction

o Civil / Structural

o Mechanical

§ Piping

§ Equipment

§ Painting

§ Insulation

§ Heavy Lifts / Rigging

o Electrical

o Instrumentation & Control

o Tanks

o Buildings

Page 94: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

94

·

Testing

· Pre-Commissioning

· Commissioning

· Maintenance

- Provision of Shut-down technical manpower.

· Retrofits & Upgrades

Page 95: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

95

PROCUREMENT

This important function is driven by the objective of procuring materials and equipment from the best possible local and overseas sources according to the technical specifications, competitive prices and meeting delivery schedule. The enablers are:

• A team of Oil and Gas industry procurement and expediting experts.

• A comprehensive available data bank of suppliers and vendors.

• We integrate various stores, procurement and finance activities to provide direct links from project sites /

offices to central procurement.

The Procurement team performs the following:

• Pre-qualification of vendors and review evaluations.

• All import, export and customs clearance activities and guidance to customers.

• Documentation for opening L/C's (Letter of Credit) and remittances to overseas suppliers and vendors.

• Logistics Management

• Contracts Engineering

Page 96: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

96

INDUSTRIAL SAFETY AND SECURITY MANAGEMENT

Page 97: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

97

We are a turnkey provider of integrated Industrial Security and Fire Safety Systems in the industry. We are one of the leading privately held Security System Integrators [SSI]; in operation for almost 5 years. As SSI we are devoted to our Customers. Our commitment is to provide the most effective solution for your business complemented by incredible service.

SOLUTIONS & SERVICES 1. INDUSTRIAL SECURITY & SAFETY SYSTEMS • Closed Circuit Television System [CCTV] • Access Control System • Fire Detection and Suppression System • Time & Attendance System [Biometric] • Intruder Alarm System • Under Vehicle Inspection System • Road Blocker System • Walk-Through Metal/Explosive Detector Gates • Parking Barriers • Speed Gates and Turnstiles • Parking Guidance System • Visitors Management System • Public Address System • Emergency Evacuation

Car Gear Lock System and Immobilizers to protect Car snatching 2. BUILDING MANAGEMENT SYSTEM • Lighting Controls • Energy Management and Metering • People Counting System 3. CONNECTIVITY SOLUTIONS • Structured Cabling 4. HEALTH-CARE SECTOR • Nurse Call System CLOSED CIRCUIT TELEVISION (CCTV) CCTV technology has evolved. The use of VCR has faded and gave the way to digital and network technology. Camera systems have developed into true network appliances with peripheral components that require integration. At AGEC, we have stayed “ahead of the curve”. Our technical staff has significant network experience and the ability to design, install and maintain systems that will meet or exceed your physical security requirements.

Page 98: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

98

AGEC provides both digital IP and analog CCTV solutions integrated with Network and/or Digital Video Recorders. IP solutions have the ability to provide our customers with an effective medium for camera recall from any network connection. As CCTV technology takes the voyage over to IP, our technical team at AGEC will be leading the way with the best in class video solutions. FIRE AND LIFE SAFETY AGEC has an in-house engineering department which designs fire safety systems. Our installation department works with our client’s engineering department to make sure that your system is installed as specified and meets all requirements. We perform tests & inspections as required by local laws and ordinances. Additionally AGEC Fire has a wide range of contract options to keep your Fire and Life Safety Systems in top physical condition. All of our service and installation is backed by our commitment to superior customer service. FIRE SUPPRESSION SYSTEM AGEC Fire suppression is state of the art self-firefighting system; it is fully automatic system which is capable of the detecting and suppressing the fire within described SOP. As an advantage all the Clean Agents used are human friendly and also FIRE AND SAFETY STANDARDS approved. Available solutions are:

FM200

NOVEC

ECARO

AEROSOL

ACCESS CONTROL The backbone for the majority of integrated security systems is the access control system. Safeguarding employees, protecting assets and reducing liabilities are the keys to an effective access control system. AGEC is an ‘enterprise’ dealer for only major access control lines with established industry acceptance. These access control systems allow our clients to control movement to buildings, parking lots, elevators, storage and materials areas, or to limit employee and visitor entrances to sensitive areas such as hospital wards, manufacturing areas, and computer rooms and data storage facilities. At AGEC we recognize the criticality of these systems to the operation. Our installers and service technicians maintain certifications in most major manufacturers systems. In addition, our Engineers are experts in the integration of these systems. We are experienced in the planning, implementation and post-installation support.

Page 99: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

99

INSTALLATION & PROJECT MANAGEMENT

Based upon our client’s unique needs, we will work to identify the best technology solutions, install your system and perform the integration and test activities necessary to meet your security requirements. Security system integration usually combines Access Control, Alarm Monitoring, CCTV and other electronic systems into a homogeneous package to reduce replication, confusion and training while significantly increasing efficiency. With vast field experience, the AGEC project management team and installation group can be relied upon to deliver projects on time and on budget. The program management team ensures that specially developed components and system integration activities conform to the client's expectations and to the project schedule. A project manager is assigned to each project regardless of its size, and given full authority over all aspects to ensure timely completion. Our installers work hand in hand with the project manager, ensuring that the utmost attention is paid to every system detail. MAINTENANCE & SUPPORT Training, on-site repair and in-field service are all provided by our team of highly trained and experienced professionals. It is imperative that you receive the necessary up-front training and ongoing technical support. We design and provide long term maintenance contracts that guarantee that your system will continually operate to its effective potential beyond the standard warranty period. Given the vital role that security and CCTV play in corporate and public life, you naturally spend a great deal of time and effort in specifying and installing the best possible system. But if you have a problem – you want it resolved fast - first time – and guaranteed.

Page 100: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

100

At AGEC we recognize the need for fast and efficient service. That is why we offer a choice of highly customizable service contracts to meet the various support needs of our customers. With prompt, reliable, and knowledgeable personnel providing same day service, our average response time is 3-4 hours between dispatchers / service technicians to on site. At AGEC we are diligent at keeping your systems at peak performance. OTHER PRODUCTS INTEGRATED TECHNOLOGY AGEC forte is providing innovative and intelligent systems through seamless integration of building, security and life safety management systems. PRINCIPALS To provide cutting-edge technology, superior performance and quality, AGEC selectively chooses the products from best manufacturers of the world.

Page 101: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

101

Product List - - - contd.

Client’s List

Page 102: A Group of Engineers & Contractors - · PDF fileA Group of Engineers & Contractors 2 ... The very basis of our present success is due meeting Clients foremost ... separators, manifold

A Group of Engineers & Contractors

102

Core Values Safety Each of us has the SHE (Safety, Health and Environmental)

responsibility to ourselves, our families, our coworkers, our customers and the public to ensure that an accident free environment and safety is our way of life regardless of cost.

Integrity We uphold the practices that are the foundation of our organization, respecting individuals, treating people fairly, conducting business in professional manner and honoring our commitments.

Pride We take pride in our employees, our organization, the quality of our work and our accomplishments.

Innovation

We encourage adaptability and the implementation of creative ideas to meet the dynamic challenges facing our industry.

HSE, QA/QC and Environmental Policies – Please refer to our detailed

approved manual available on request.

http://LaoJee.com/AGEC/ [email protected]