ADVANCE PRODUCT QUALITY PLANNING
by : Wahyu Epifanto
APQP| WHAT IS IT?
A structured methodology for the design and development of new and modified products from concept through to production
It provides a set of detailed requirements to be undertaken at each stage in the APQP system
It involves the utilization of various techniques to be employed to identify and resolve problems before going into full production
The goal is to facilitate communication with everyone involved to assure that all required steps are completed on time.
Effective planning depends on a company’s top management commitment to achieving customer satisfaction.
APQP| WHAT IS IT?
Process Design & Development
Product Design & Dev.
APQP Timing ChartConcept Program
Initiation/Approval Approval Prototype Pilot Launch
Planning
Product & Process Validation
Planning
Production
Feedback Assessment and Corrective Action
Plan & Define Program
Product Design & Development Verification
Process Design & Development Verification
Product & Process Validation
Feedback Assessment & Corrective action
TIDAK LENGKAP
BAKWAN TIDAK AKAN LAKU,
KARENA TIDAK SESUAI DENGAN KEBUTUHAN KONSUMEN
LENGKAP
BAKWAN AKAN LAKU,
KARENA SESUAI DENGAN KEBUTUHAN KONSUMEN
HASIL SURVEY :
1. Harga tidak mahal
2. Rasa Gurih
3. Lembut / Tidak Alot
4. Minyak tidak banyak
5. Ukuran besar (Diameter + 5cm)
6. Warna, tidak gosong
7. Bentuknya rapih
Bahan – bahan :
1. Tepung
2. Air
3. Kol
4. Wortel
5. Toge
6. Daun Bawang
7. Garam
8. Minyak
9. Cabe
Alat-Alat :
Talenan
Pisau
Sendok
Mangkok/Baskom
Wajan
Kompor
Gas
Piring
Cara Membuatnya :
Dipotong :
1. Kol
2. Wortel
3. Toge
4. Daun Bawang
Buat Adonan :
5. Tepung
6. Air
7. Garam
Digoreng :
8. Minyak
Sajikan
9. Cabe
Alat :
1. Pisau
2. Talenan
3. Mangkok/Baskom
Alat :
4. Mangkok /Baskom
5. Sendok
Alat :
6. Wajan
7. Kompor
8. Gas
9. Wajan
Alat:
10. Piring
1.MEMBELI BAHAN YG FRESH
2. MURAH
1.MERAWAT ALAT-ALAT - TIDAK RUSAK
MENGONTROLPEMAKAIAN DANPENGELUARAN
MEMBAYARGAJI KARYAWAN
MENCARIORANG
MENGONTROLABSENSI
MENGEMBANGKAN ORANG
1.MENSORTIR BAHAN 2. MENYIMPAN BAHAN
1.MEMOTONG BAHAN - 1CM
2. BERSIHKAN 3.MEMBUAT ADONAN - TDK ENCER - TAKARAN 4. MENGORENG BAKWAN - SUHU - MINYAK
5.KEMASAN - TDK PENYOK - KUAT
1.MEMASTIKAN BAKWAN BERKUALITAS - WARNA - RASA - UKURAN - BENTUK
1.MEMASARKAN BAKWAN - CARI CUSTOMER - PROMOSI
1.MENGANTAR KAN BAKWAN - TEPAT WAKTU
PURCHASING WAREHOUSE PRODUKSI QUALITY CONTROL MAINTENANCE PEMASARAN DELIVERY KEUANGAN HRD
BOD
PHASE 2
PHASE 3
PHASE 4
PHASE 1
PHASE 5
APQP
PLANNINGPHASE 1
Process Design & Development
Product Design & Dev.
Concept ProgramInitiation/Approval Approval Prototype Pilot Launch
Planning
Product & Process Validation
Planning
Production
Feedback Assessment and Corrective Action
Plan & Define Program
Product Design & Development Verification
Process Design & Development Verification
Product & Process Validation
Feedback Assessment & Corrective action
PHASE 1 |PLANNING
Phase 1 Inputs Phase 1 Outputs
PLANNING
• Voice of the costumer
• Market Research
• Historical Warranty and Quality Information
• Team Experience
• Business Plan/MKT Strategy
• Product/process Assumptions
• Product Reliability Studies
• Cuctomer Inputs
•Design Goals
•Reliability & Quality Goals
•Preliminary Process Flow Chart
•Preliminary Listing of special Product & Process Characteristics
•Product Assurance Plan
•Management Support
PHASE 3
PHASE 4
PHASE 1
PHASE 5
APQP
PHASE 2
Process Design & Development
Product Design & Dev.
APQP Phase 2: Product Design & Dev.Concept Program
Initiation/Approval Approval Prototype Pilot Launch
Planning
Product & Process Validation
Planning
Production
Feedback Assessment and Corrective Action
Plan & Define Program
Product Design & Development Verification
Process Design & Development Verification
Product & Process Validation
Feedback Assessment & Corrective action
PHASE 2 |PRODUCT DESIGN & DEVELOPMENT
Phase 2 Inputs Phase 2 Outputs
PRODUCT & DESIGN
DEVELOPMENT
•Design Goals
•Reliability & Quality Goals
•Preliminary Bill of Material
•Preliminary Listing of Special Product & Process Characteristic
•Product Assurance Plan
•Management Support
•Design FMEA
•Design for Manufactturability and assembly
•Design Verification
•Design Reviews
•Prototype CP
•Engineering Drawings
•Engineering Spesifications
•Material Spesifications
•Drawing & Spec. Changes
PHASE 2 |PROCESS DESIGN & DEVELOPMENT
Phase 2 Inputs Phase 2 Outputs
PROCESS DESIGN &
DEVELOPMENT
•Design Goals
•Reliability & Quality Goals
•Preliminary Bill of Material
•Preliminary Listing of Special Product & Process Characteristic
•Product Assurance Plan
•Management Support
•New equipment, Tooling and Facilities Requirement
•Special Product and Process Characterictics
•Gages/Testing Equipment Requirements
•Team Feasibility Commitment and Management Support
PHASE 2
PHASE 3
PHASE 4
PHASE 1
PHASE 5
APQP
PHASE 3Process Design & Development
Product Design & Dev.
Concept ProgramInitiation/Approval Approval Prototype Pilot Launch
Planning
Product & Process Validation
Planning
Production
Feedback Assessment and Corrective Action
Plan & Define Program
Product Design & Development Verification
Process Design & Development Verification
Product & Process Validation
Feedback Assessment & Corrective action
APQP Phase 3: Process Design & Validation
PHASE 3 |PROCESS DESIGN & DEVELOPMENT
•Packaging Standards & Specs.
•Prod/Proc. Quality System Review
•Process Flow Chart
•Floor Plan Layout
•Characteristics Matrix
•PFMEA
•Pre-launch CP
•Process Instructions
•MSA Plan
•Preliminary Process Capability Study Plan
•Management Support (including operator staffing & training plan)
Phase 3 Outputs
Phase 2 Design Outputs
Phase 2 APQP Outputs
Process Design & Development
Phase 3 Inputs
PHASE 2
PHASE 3
PHASE 4
PHASE 1
PHASE 5
APQP
PHASE 4
Process Design & Development
Product Design & Dev.
APQP Phase 4: Product & Process ValidationConcept ProgramInitiation/Approval Approval Prototype Pilot Launch
Planning
Product & Process Validation
Planning
Production
Feedback Assessment and Corrective Action
Plan & Define Program
Product Design & Development Verification
Process Design & Development Verification
Product & Process Validation
Feedback Assessment & Corrective action
PHASE 4 |Product & Process Validation
Phase 4 Inputs Phase 4 Outputs
Product and Process
Validation
•Significant production Run
•Measurement Systems Evaluations
•Preliminary Process Capability Study
•PPAP
•Production Validation
•Testing
•Packaging Evaluation
•Production CP
•Quality Planning Sign off and management Support
•Packaging Standards & Specs.
•Prod/Proc. Quality System Review
•Process Flow Chart
•Floor Plan Layout
•Characterictics Matrix
•PFMeA
•Pre –Launch CP
•Process Instructions
•MSA Plan
•Preliminary process Capability Study Plan
•Management support (including operator staffing & training plan)
s
PHASE 2
PHASE 3
PHASE 4
PHASE 1
PHASE 5
APQP
PHASE 5
Process Design & Development
Product Design & Dev.
Feedback Assessment & Corrective ActionConcept ProgramInitiation/Approval Approval Prototype Pilot Launch
Planning
Product & Process Validation
Planning
Production
Feedback Assessment and Corrective Action
Plan & Define Program
Product Design & Development Verification
Process Design & Development Verification
Product & Process Validation
Feedback Assessment & Corrective action
Phase 5 Inputs Phase 5 Outputs
Feedback Assessment & Corrective
Action
•Reduced Variation
•Improved Customer Satisfication
•Improved Delivery and Service
•Effective Use of Lessons Learned/Best Practices
•Significant Production Run
•Measurement Systems Evaluation
•Preliminary Process Capability Study
•PPAP
•Production Validation Testing
•Packaging Evaluation
•Production CP
•Quality Planning Sign-off and ManagementnSuport
PHASE 5|Feedback Assessment & Corrective Action
QUALITY MANAGEMENT SYSTEM
Continual improvement of the quality management system
Continual improvement of the quality management system
Requirements
Satisfaction
Customers
Resourcemanagement
Resourcemanagement
Measurement,analysis andimprovement
Measurement,analysis andimprovement
ProductRealisation
ProductRealisation
ManagementResponsibility
ManagementResponsibility
Input OutputProductProduct
Customers
5
6
7
8