WP 5 Strategic focus and WP 5 Strategic focus and resultsresults
Focus:Focus:Develop advanced simulation tools and Develop advanced simulation tools and visualization of results to support the decision visualization of results to support the decision processprocess
Planned results:Planned results:- description of best practice;- description of best practice;- improvement of understanding how multimodal - improvement of understanding how multimodal
transport system works;transport system works;- understanding how the performance of corridor - understanding how the performance of corridor
transport system responds to system changes transport system responds to system changes (e.g. improvements in infrastructure (e.g. improvements in infrastructure information exchanges, synchronized information exchanges, synchronized planning).planning).
WP 5 shall improve academic WP 5 shall improve academic cooperation and the business cooperation and the business development with high quality development with high quality
recommendations for improvement recommendations for improvement of intermodal transport concepts in of intermodal transport concepts in the corridor in line with the overall the corridor in line with the overall
objective of East-West projectobjective of East-West project
WP5 relations with other WP5 relations with other WP’sWP’s
WP
5 –
kno
wle
dge
deve
lopm
ent
WP 4 – business and logistics development
WP1 – Intermodal transport corridor development strategy
Input to sustainable development strategy
Scenario and concepts for simulation
Results fromsimulation andbenchmarking
Telematic application
Requirementson applications
Goals
WP
2–
ITS
Input to WP1
Involved partnersInvolved partners VGTU;VGTU; Klaipeda University;Klaipeda University; Municipality of Karlshamn;Municipality of Karlshamn; Blekinge County Administration;Blekinge County Administration; Swedish Road Administration;Swedish Road Administration; Blekinge Institute of Technology;Blekinge Institute of Technology; Port of Esbjerg;Port of Esbjerg; University of Southern Denmark;University of Southern Denmark; Vinnova;Vinnova; Kaliningrad State University;Kaliningrad State University; Baltic State Fishing Fleet AcademyBaltic State Fishing Fleet Academy
Key tasks of WP5Key tasks of WP5
Task A - Corridor development Task A - Corridor development analysis (Macro level analysis);analysis (Macro level analysis);
Task B - Micro level simulation of Task B - Micro level simulation of transport corridor;transport corridor;
Task A - Corridor development Task A - Corridor development
analysisanalysis Task A 1. Identification of the main hubs, LC’s as well as Task A 1. Identification of the main hubs, LC’s as well as the main actors along East-West corridor:the main actors along East-West corridor:
Task A.1.1.Task A.1.1. Analysis of infrastructure (networks, terminals, Analysis of infrastructure (networks, terminals, transshipment technologies);transshipment technologies);
Task A.1.2.Task A.1.2. Analysis of communication networks; Analysis of communication networks;Task A.1.3.Task A.1.3. Identification of the regulative legal framework Identification of the regulative legal framework
for development of transport sector along E-W corridor;for development of transport sector along E-W corridor;Task A.1.4.Task A.1.4. Review of studies on development of existing Review of studies on development of existing
transport network along the E-W corridor (Others + BTH);transport network along the E-W corridor (Others + BTH);Task A.1.5.Task A.1.5. Analysis and generalization of regional profiles Analysis and generalization of regional profiles
along the corridor;along the corridor;Task A.1.6.Task A.1.6. Identification and assessment of current technical Identification and assessment of current technical
capacity and administrative and legal bottlenecks along E-capacity and administrative and legal bottlenecks along E-W corridor.W corridor.
Task A - Corridor development Task A - Corridor development
analysisanalysis Task A.2. Overview of different transport modelling Task A.2. Overview of different transport modelling
tools:tools:
Task A.2.1.Task A.2.1. Provide overview on status of transport Provide overview on status of transport modelling in southern part of BSR (others+BTH);modelling in southern part of BSR (others+BTH);
Task A.2.2.Task A.2.2. Selection of best practice for different Selection of best practice for different types of transport modelling (others+BTH);types of transport modelling (others+BTH);
Task A.2.3.Task A.2.3. Clarification of the main obstacles in Clarification of the main obstacles in developing and applying transport modelling developing and applying transport modelling along the corridor (others + BTH) ;along the corridor (others + BTH) ;
Task A.2.4.Task A.2.4. Elaboration of the outputs that could be Elaboration of the outputs that could be helpful for transport companies (stakeholders) on helpful for transport companies (stakeholders) on transport modelling (others+BTH);transport modelling (others+BTH);
Task B - Micro level simulation of Task B - Micro level simulation of transport corridortransport corridor
B.1) Identifying the crucial stakeholders and their objectives; and defining B.1) Identifying the crucial stakeholders and their objectives; and defining performance metrics relevant for the corridor. performance metrics relevant for the corridor. Task B.1.1 identification of the crucial stakeholders and their objectives (BTH + others):Task B.1.1 identification of the crucial stakeholders and their objectives (BTH + others):Task B.1.2 defining performance metrics at operational level relevant for the corridor Task B.1.2 defining performance metrics at operational level relevant for the corridor
(BTH+others).(BTH+others).
Task B.2. Development of micro-level corridor simulator model and scenarios;Task B.2. Development of micro-level corridor simulator model and scenarios;
Task B.2.1 Define architecture of simulator model (BTH+others)Task B.2.1 Define architecture of simulator model (BTH+others)Task B.2.2. Define level of detail including characteristics of objects simulated Task B.2.2. Define level of detail including characteristics of objects simulated (BTH+others)(BTH+others)Task B.2.3. Refine simulation scenarios for micro based simulation Task B.2.3. Refine simulation scenarios for micro based simulation (BTH+others)(BTH+others)
Task B.3 Development of micro-level simulator and verification (BTH+others)Task B.3 Development of micro-level simulator and verification (BTH+others)
Task B.4 Simulation experiments and validationTask B.4 Simulation experiments and validationB.4.1 Simulation of scenarios (BTH+others)B.4.1 Simulation of scenarios (BTH+others)B4.2. Result visualisaation (BTH+others)B4.2. Result visualisaation (BTH+others)B4.3 Result and simulation validations (BTH+others)B4.3 Result and simulation validations (BTH+others)