Appendix 8 Final Report Voltage Drop Study Details of Each Distribution Line
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 8
VOLTAGE DROP STUDY DETAILS OF EACH DISTRIBUTION LINE
Voltage drop calculation of B1
Sendingvoltage(V) 22,000 Load (kW) 10,000
Voltagedrop (V) -912
Sendingcurrent(A) 262.4
Voltagedrop rate -4.1%
Chrak MtesSS~a
a~LBS 1LBS 1~bManhattan
SEZ 4th section 5th section 6th section 7th section 8th section 9th section 10th section
Transmission methodThree-phase
Three-phase
Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire
Line type 4 PC-3x300sq 2 AAC-1x240sq 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sqDistance(km) 0.25 8.61 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0Load spread(Refer to loadcharacteristic table) 1 1 1 1 1 1 1 1 1 1Section power factor cosθ 0.95 0.95 0.95 1 1 1 1 1 1 1Section load (kW) 10,000Section voltage drop (V) 17.7 891.1 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,982 21,091 21,088 21,088 21,088 21,088 21,088 21,088 21,088 21,088
R X
Loadcharacteri
sticnumber
FLoad
spread
1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.5
5 0.333
Center maximum spread load(+End centralized load)
Sending end maximum spread load(+End centralized load)
Impedance(Ω /km) Load characteristic table
Load state
End centralized loadEquality spread load(+End centralized load)
End maximum spread load(+End centralized load)
Voltage drop calculation of B2
Sendingvoltage(V) 22,000 Load (kW) 13,627
Voltagedrop (V) -866
Sendingcurrent(A) 357.6
Voltagedrop rate -3.9%
Chrak MtesSS~a
a~LBS1LBS1~LBS2 4th section 5th section 6th section 7th section 8th section 9th section 10th section
Transmission methodThree-phase
Three-phase
Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire
Line type 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.25 1.45 7.15 0.00 0.00 0.1 1.0 1.0 1.0 1.0Load spread(Refer to loadcharacteristic table) 1 2 3 1 1 1 1 1 1 1Section power factor cosθ 0.9 0.9 0.9 0.95 0.9 1 1 1 1 1Section load (kW) 96 13,531Section voltage drop (V) 25.2 111.7 729.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,975 21,863 21,134 21,134 21,134 21,134 21,134 21,134 21,134 21,134
R X
Loadcharacteri
sticnumber
FLoad
spread
1 AAC-1x150sq 0.2060 0.2507 0.3245 1 12 AAC-1x240sq 0.1620 0.2364 0.2865 2 0.53 PC-3x240sq 0.1620 0.1100 0.1958 3 0.6674 PC-3x300sq 0.1290 0.1070 0.1676 4 0.5
5 0.333
Center maximum spread load(+End centralized load)
Sending end maximum spread load(+End centralized load)
Impedance(Ω /km) Load characteristic table
Load state
End centralized loadEquality spread load(+End centralized load)
End maximum spread load(+End centralized load)
Voltage drop calculation of B3
Sendingvoltage(V) 22,000 Load (kW) 2,989
Voltagedrop (V) -307
Sendingcurrent(A) 78.4
Voltagedrop rate -1.4%
Chrak MtesSS~a
a~LBS1LBS1~LBS2
LBS2~LBS3
LBS3~bb~EDC
Svay Rieng 7th section 8th section 9th section 10th section
Transmission methodThree-phase
Three-phase
Three-phase
Three-phase
Three-phase
Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire
Line type 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.26 12.56 8.34 4.58 0.64 1.82 1.0 1.0 1.0 1.0Load spread(Refer to loadcharacteristic table) 1 2 2 2 2 2 1 1 1 1Section power factor cosθ 0.95 0.95 0.95 0.95 1 1 1 1 1 1Section load (kW) 1,079 958 674 278Section voltage drop (V) 5.5 194.3 82.4 22.6 0.7 1.5 0.0 0.0 0.0 0.0Section end voltage (V) 21,994 21,800 21,718 21,695 21,695 21,693 21,693 21,693 21,693 21,693
R X
Loadcharacteri
sticnumber
FLoad
spread
1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.5
5 0.333
Impedance(Ω /km)
Equality spread load(+End centralized load)
End maximum spread load(+End centralized load)
Center maximum spread load(+End centralized load)
Sending end maximum spread load(+End centralized load)
Load state
End centralized load
Load characteristic table
Voltage drop calculation of B4
Sendingvoltage(V) 22,000 Load (kW) 7,500
Voltage drop(V) -1,550
Sendingcurrent(A) 196.8
Voltage droprate -7.0%
1st section 2nd section 3rd section 4th section 5th section 6th section 7th section 8th section 9th section 10th section
Transmission methodThree-phase
Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire
Line type 4 PC-3x300sq 5 AAC-1x185sq 2 AAC-240sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.3 27.0Load spread(Refer to loadcharacteristic table) 1 3 1 1 1 1 1 1 1 1Section power factor cosθ 0.95 0.95 1 1 1 1 1 1 1 1Section load (kW) 7,500
Section voltage drop (V) 16.0 1,534.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,984 20,450 20,450 20,450 20,450 20,450 20,450 20,450 20,450 20,450
R X
Loadcharacteri
sticnumber
FLoad
spread
1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.55 AAC-1x185sq 0.1840 0.2409 5 0.333
Center maximum spread load(+End centralized load)
Sending end maximum spread load(+End centralized load)
Impedance(Ω /km) Load characteristic table
Load state
End centralized loadEquality spread load(+End centralized load)
End maximum spread load(+End centralized load)
Voltage drop calculation of B5
Sendingvoltage(V) 22,000 Load (kW) 2,500
Voltage drop(V) -176
Sendingcurrent(A) 65.6
Voltage droprate -0.8%
1st section 2nd section 3rd section 4th section 5th section 6th section 7th section 8th section 9th section 10th section
Transmission methodThree-phase
Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire
Line type 4 PC-3x300sq 5 AAC-1x185sq 2 AAC-240sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.3 9.0Load spread(Refer to loadcharacteristic table) 1 3 1 1 1 1 1 1 1 1Section power factor cosθ 0.95 0.95 1 1 1 1 1 1 1 1Section load (kW) 2,500
Section voltage drop (V) 5.3 170.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,995 21,824 21,824 21,824 21,824 21,824 21,824 21,824 21,824 21,824
R X
Loadcharacteri
sticnumber
FLoad
spread
1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.55 AAC-1x185sq 0.1840 0.2409 5 0.333
Center maximum spread load(+End centralized load)
Sending end maximum spread load(+End centralized load)
Impedance(Ω /km) Load characteristic table
Load state
End centralized loadEquality spread load(+End centralized load)
End maximum spread load(+End centralized load)
Voltage drop calculation of P1
Sendingvoltage(V) 22,000 Load (kW) 6,000
Voltage drop(V) -1,984
Sendingcurrent(A) 157.5
Voltage droprate -9.0%
IE SS~a a~LBS1 LBS1~ LBS2~ 5th section 6th section 7th section 8th section 9th section 10th sectionTransmission method Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wireLine type 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 2 AAC-1x240sq 4 PC-3x300sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.35 13.30 18.02 0.57 0.6 1.8 1.0 1.0 1.0 1.0Load spread(Refer to loadcharacteristic table) 1 1 1 1 1 1 1 1 1 1Section power factor cosθ 0.95 0.95 0.95 0.95 1 1 1 1 1 1Section load (kW) 6,000
Section voltage drop (V) 14.9 825.9 1,119.0 24.2 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,985 21,159 20,040 20,016 20,016 20,016 20,016 20,016 20,016 20,016
R X
Loadcharacteri
sticnumber
FLoad
spread
1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.5
5 0.333
Center maximum spread load(+End centralized load)
Sending end maximum spread load(+End centralized load)
Impedance(Ω /km) Load characteristic table
Load state
End centralized loadEquality spread load(+End centralized load)
End maximum spread load(+End centralized load)
Voltage drop calculation of P2
Sendingvoltage(V) 22,000 Load (kW) 6,000
Voltage drop(V) -533
Sendingcurrent(A) 157.5
Voltage droprate -2.4%
IE SS~a a~LBS×3 3rd section 4th section 5th section 6th section 7th section 8th section 9th section 10th sectionTransmission method Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wireLine type 3 PC-3x240sq 1 AAC-1x150sq 2 AAC-1x240sq 4 PC-3x300sq 2 AAC-1x240sq 4 PC-3x300sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.44 6.83 18.0 0.6 0.6 1.8 1.0 1.0 1.0 1.0Load spread(Refer to loadcharacteristic table) 1 1 1 1 1 1 1 1 1 1Section power factor cosθ 0.95 0.95 0.95 0.95 1 1 1 1 1 1Section load (kW) 6,000
Section voltage drop (V) 22.6 510.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,977 21,467 21,467 21,467 21,467 21,467 21,467 21,467 21,467 21,467
R X
Loadcharacteri
sticnumber
FLoad
spread
1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.5
5 0.333
Center maximum spread load(+End centralized load)
Sending end maximum spread load(+End centralized load)
Impedance(Ω /km) Load characteristic table
Load state
End centralized loadEquality spread load(+End centralized load)
End maximum spread load(+End centralized load)
Voltage drop calculation of K1
Sendingvoltage(V) 23,600 Load (kW) 7,000
Voltagedrop (V) -1,532
Sendingcurrent(A) 171.2
Voltagedrop rate -7.0%
Tatay PS~LBS1
LBS1~LBS2
LBS2~LBS3
LBS3~LBS4
LBS4~aa~Koh
Kong SEZ 7th section 8th section 9th section 10th section
Transmission methodThree-phase
Three-phase
Three-phase
Three-phase
Three-phase
Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire
Line type 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 37.0 5.28 2.60 1.84 4.58 0.13Load spread(Refer to loadcharacteristic table) 1 1 1 1 1 1 1 1 1 1Section power factor cosθ 0.9 0.95 0.95 0.95 0.95 0.95 1 1 1 1Section load (kW) 4,000 3,000Section voltage drop (V) 2,730.7 152.8 75.3 36.5 132.6 3.8 0.0 0.0 0.0 0.0Section end voltage (V) 20,869 20,716 20,641 20,605 20,472 20,468 20,468 20,468 20,468 20,468
R X
Loadcharacteri
sticnumber
FLoad
spread
1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.5
5 0.333
Center maximum spread load(+End centralized load)
Sending end maximum spread load(+End centralized load)
Impedance(Ω /km) Load characteristic table
Load state
End centralized loadEquality spread load(+End centralized load)
End maximum spread load(+End centralized load)
Appendix 9 Final Report List of Collected Data and Documents
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 9
LIST OF COLLECTED DATA AND DOCUMENTS
A9 - 1
APPENDIX 9 : List of Collected Data and Documents
No. Title Author / Publisher Type
1 Economy, Trade, Investment Climate and Japanese Company in Cambodia JETRO Hardcopy
2 SEZ map in Cambodia JETRO Brochure
3 Master Land-Use Planning of PPSEZ Project-357.3179Ha Phnom Penh SEZ Hard Copy
4 Welcome to SANCO POI PET SANKO SEZ Brochure
5 Master Plan of SANKO SEZ SANKO SEZ Brochure
6 Cambodia Industrial Development Policy 2015-2025 RGC PDF
7 Statistical Yearbook 2011 MOP CD
8 Labor Force Report 2012 MOP Booklet
9 Labor Force and Child labor survey Report 2012 MOP Booklet
10 Cambodia inter-censual Population survey 2013 MOP Booklet
11 Cambodia Factsheet June2014 MOP Brochure
12 Demand, Number and Type of Customer Data (REE areas) EAC Excel
13 List of Location and Transformer Capacity for JICA's Project in Svay Rieng Province EDC PDF
14 License Area Map (Bavet, Poipet, Koh Kong) EDC PDF
15 Transmission Lines Development Plan EDC PDF
16 GIS Data EDC GIS data
17 Demand, Number and Type of Customer Data (EDC areas) EDC Excel
18 Meteorological Data (Bavet, Poipet, Koh Kong) MOWRAM Excel
19 Distribution System 22kV in Svay Rieng EDC PDF
20 Annual Report 2012-2014 EDC PDF
21 Distribution System Diagram in Svay Rieng EDC PDF
22 Organization Chart (EDC HQ, Head of EDC Svay Rieng, Electricity of Banteay Meanchey) EDC PDF
23 Record of power failure in YORKS factory YORKS CO., LTD PDF
A9 - 2
No. Title Author / Publisher Type
24 Pole concrete of Koh Kong RYP Group Co., LTD Hardcopy
25 IEE Report Rural Energy Pilot Project 2012.2 ADB PDF
26 Updated Resettlement Plan Rural Energy Pilot Project _2014.12 ADB PDF
27 IEE Report Medium-Voltage Sub-Transmission Expansion Sector Project (Package 2)_2014.11 ADB PDF
28 Resettlement Plan Medium-Voltage Sub-Transmission Expansion Sector Project (Package 2) 2014.12 ADB PDF
29 Resettlement Plan_Medium-Voltage Sub-Transmission Expansion Sector Project (Pacage 1)_2014.11 ADB PDF
30 Report on Power Sector of the Kingdom of Cambodia 2015 Edition EAC PDF
31 General Requirements of Electric Power Technical Standards 2004 EAC PDF
32 General Requirements of Electric Power Technical Standards 2004 EAC PDF
33 Overall Performance Standards for Electricity Suppliers EAC PDF
34 Specific Requirements For Transmission and Distribution Facilities EAC PDF
35 Design standard distribution networks EDC PDF
36 Drawings of Chrak Mtes substation EDC PDF
37 Drawings of EDC Bavet switching station EDC PDF
38 Drawings of IE substation EDC PDF
39 Drawings of Banteay Meanchey substation EDC PDF
Appendix 10 Final Report Route Map of Bavet
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 10
ROUTE MAP OF BAVET
#
#
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
##
#
#
#
##
#
#
##
#
#
#
#
#
#
#
#
#
#
#
#
# #
#
#
# #
#
#
#
#
##
#
#
#
#
#
#
#
#
##
#
#
#
#
##
#
#
#
#
#
##
#
#
#
#
#
#
##
#
#
#
#
####
#
#
#
#
# #
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
##
##
#
#
#
#
#
#
#
#
#
#
#
##
#
#
#
#
#
#
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
###
#
#
#
# #
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
# ## #
#
#
#
#
ÚÚ
Ú
Ú Ú
Ú
Ú
Ú
Ú
Ú
ÚÚ
Ú
ÚÚ
Ú
Ú
Ú
Ú
ÚÚ
Ú
Ú
ÚÚ
Ú
Ú Ú
Ú
Ú
Ú
Ú
%
%
%
%"T
"T
Bati
Nhor
Bavet
Basak
Chres
Ksetr
Samlei
Popeaek
Sambuor
Prasout
Monourom
Samyaong
Samraong
SangkhoarSvay Toea
Prey Thum
Prey Ta Ei
Svay RiengPou Ta Hao
Chrak Mtes
Prey Kokir
Svay Rumpea
Prey Chhlak
Koy Trabaek
Prey Angkunh
Svay Ta YeanPreah Ponlea
Me Sa Thngak
Reach Montir
Kandieng Reay
Banteay Krang
Romeang Thkaol
Chantrea
Svay Teab
Svay Rieng
Kampong Rou
588000
588000
590000
590000
592000
592000
594000
594000
596000
596000
598000
598000
600000
600000
602000
602000
604000
604000
606000
606000
608000
608000
610000
610000
612000
612000
614000
614000
616000
616000
618000
618000
620000
620000
622000
622000
624000
624000
1208
000
1208
000
1210
000
1210
000
1212
000
1212
000
1214
000
1214
000
1216
000
1216
000
1218
000
1218
000
1220
000
1220
000
1222
000
1222
000
1224
000
1224
000
1226
000
1226
000
1228
000
1228
000
1230
000
1230
000
1232
000
1232
000±
0 1.5 30.75
Kilometers
SPHEROID........................... EVERESTGRID..................................... 2 KILOMETERUTM...................................... ZONE 48NDATUM................................. WGS84PROJECTION....................... UTM
1:100,000Scale
Legend22kV Overhead Line
22kV Underground Line
National road
Provincial road
Cart track
Footpath
"T Substation% District centerÚ Commune center# Phum center
Manhattan SEZ
Svay Rieng
District boundary
Commune boundary
Population
River or stream
DRAWING TITLE:
DWG No.DATE SHEETSCALE
BV-0104-01-2016 011/100,000
BAVET (Svay Rieng Province)ROUTE MAP
*Original drawing has A3 size
EDC Svay Rieng
Control Room400kVA
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
BAVET (Svay Rieng Province)PLANE DRAWING
H:1/3000 04-01-2016
01
BV-0201
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Transformer (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
N
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SECTIONSHEET 02, DWG No. BV-03
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SECTIONSHEET 07, DWG No. BV-03SHEET 08, DWG No. BV-03
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SECTIONSHEET 08, DWG No. BV03
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
N0+
000
0+02
0
0+04
01 1
PLANSCALE: 1/150
Existing Pole 22kVExisting LV Pole
Control Room
Mainhole Pipe D=600mm
0+0000+0200+040 CROSS SECTION 1-1Scale: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-030204-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
0+280
0+300
PLANSCALE: 1/150
N
2 2
WAI KOR River
3
ROAD LEVEL:-2.578mSLOPESLOPE
WATER LEVEL:-3.728m
0+280
Existing Lighting Pole
CROSS SECTION 2-2Scale: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-030704-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
N
0+280
0+300
0+320
0+340
2
3 3
PLANSCALE: 1/150
SLOPE
ROAD LEVEL:-2.578mSLOPE
Existing Lighting Pole
SLOPE SLOPE
Mainhole Mainhole
0+300 0+320 0+340CROSS SECTION 3-3Scale: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-030804-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
0+660
0+680
0+700
N
33
PLANSCALE: 1/150
ROAD LEVEL:-2.586m
SLOPE
Mainhole Mainhole
Box Culvert
0+660 0+680 0+700
Existing Lighting Pole
CROSS SECTION 3-3Scale: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-031404-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
BAVET (Svay Rieng Province)PLANE DRAWING
H:1/3000
02
BV-0202
N
04-01-2016
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Transformer (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 21, DWG No. BV-03
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SECTIONSHEET 26, DWG No. BV-03SHEET 37, DWG No. BV-03
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SECTIONSHEET 28, DWG No. BV-03
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
1+020
1+040
1+060
PLANSCALE: 1/150
N
SLOPE
ROAD LEVEL:-1.695mSLOPE
WATER LEVEL:-3.732m
National Road N-1 LEVEL:-1.463m
WATER TANK TOWER
3350 3350
1+040 1+060
CROSS SECTION 4-4Scale: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-032104-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
N
1+320
1+340
1+360
N
PLANSCALE: 1/150
4 4
WATER LEVEL:-3.732m
Barrier
National Road N-1 LEVEL:-1.103m
20315
WATER LEVEL:-3.732m
1+320 1+340 1+360
CROSS SECTION 4-4Scale: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-032604-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
N
1+400
9 9
ColumnPier Cap
Sidewalk
Barrier
Beam
SLOPE SLOPE
National Road N-1 LEVEL:-1.103m
WATER LEVEL:-3.732m WATER LEVEL:-3.732m
Existing Lighting Pole
CROSS SECTION 9-9Scale: 1/200
Water pipe
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-033704-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
N
1+420
1+440
1+460
44
PLANSCALE: 1/150
Tonle Vai Kor Bridge
20300 20300 20300
WATER LEVEL:-3.732m WATER LEVEL:-3.732m WATER LEVEL:-3.732m
Ground LEVEL:-5.103mGround LEVEL:-5.163m
Ground LEVEL:-5.903m
SECTION:D-8
1+420 1+440 1+460CROSS SECTION 4-4Scale: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-032804-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Petrol StationPetrol Station
250kVALBS
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
BAVET (Svay Rieng Province)PLANE DRAWING
H:1/3000
03
BV-0203
N
04-01-2016
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Transformer (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 29, DWG No. BV-03
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
N
55
PLANSCALE:1/200
SLOPENational Road N-1 LEVEL:-1.430m
SLOPE
Existing Pole 22kV
Existing Pole 22kVCross Road
Existing Telecommunication PoleExisting Pole 22kV
Existing Lighting Pole Existing Lighting Pole
POSTER
54625462
CROSS SECTION 5-5Scale: 1/200
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-032904-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
115 KV Grid Substatio
n C
hra
k M
tes
ControlBuilding
100kVA
LBS
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
BAVET (Svay Rieng Province)PLANE DRAWING
H:1/3000 BV-0226
N
26
04-01-2016
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Transformer (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 30, DWG No. BV-03SHEET 31, DWG No. BV-03SHEET 34, DWG No. BV-03
ishiirsタイプライターテキスト
N
PLANSCALE: 1/550
Existing Pole 22kVExisting Pole 22kV
Existing LV Pole
MainholeBlocking Curb
35503550
Road to Sub-ST Level: -0.232m
Bamboo
Barbed FencingBrickwall Fence
Mango Tree
CROSS SECTION 6-6Scale: 1/200
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-0330
66
04-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
N
PLANSCALE: 1/550
SLOPE
National Road N-1 LEVEL:-0.123m
SLOPE
50005000
Existing Pole 22kV
Existing LV Pole
Mango Tree Mango Tree
Curb-blockBarbed Fencing
To Sub-Station
CROSS SECTION 7-7Scale: 1/200
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-0331
7 7
04-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
N
PLANSCALE: 1/550
SLOPE
National Road N-1 LEVEL:-0.123m
SLOPE
5000 5000
Existing Pole 22kV
Existing LV Pole
Curb-block Barbed Fencing
To Sub-Station
CROSS SECTION 8-8Scale: 1/200
Bamboo
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN BV-0334
8 8
04-01-2016
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
MANHATTAN SPECIAL ECONOMIC ZONE
Flooding Area
Flooding Area
Flooding Area
Flooding Area
Flooding Area
Flooding Area
Flooding Area
Flooding Area
Petroluem Station
Filling Soil
Flooding Area
Filling Soil
Flooding Area
160kVA
LBS
LBS
LBS
LBS
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
BAVET (Svay Rieng Province)PLANE DRAWING
H:1/3000 BV-0233
N
33
04-01-2016
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Transformer (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 38, DWG No. BV-03
ishiirsタイプライターテキスト
MANHATTAN SPECIAL EC
ONOMIC ZONE
National Road No.1
(LEVEL:-0.44m)
N
PLANSCALE:1/500
10
10
Existing undergroundtelecommunication cable
Existing undergroundtelecommunication cable
National Road No.1 (LEVEL:-0.44m)
Existing Pole 22kV
Existing Lighting PoleFlooding Area(Level: -1.870m)
1000017390 27595 5405
Existing Pole 22kV
Entrance toMANHATTANSPECIAL ECONOMIC ZONE
30.60m
CROSS SECTION 10-10Scale: 1/200
Existing undergroundtelecommunication cable
Telecommunication manhole
Telecommunication manhole
SCALE
DRAWING TITLE:
DATE SHEET DWG No
BAVET (Svay Rieng Province)CROSS SECTION DRAWING
AS SHOWN 04-01-2016 BV-0338
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Appendix 11 Final Report Route Map of Poipet (1)
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 11
ROUTE MAP OF POIPET (1)
#
##
#
# #
#
#
#
#
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
Ú
Ú
Ú
"T
RunTnaot
Kandal
Pongro
Chambak
Souriya
Prey Kob
Thma Sen
Ou Chrov
Khai DanMak Heun
Kouk Chak
Nimit Bei
Nimit Pir
Koun Trei
Koub Lech
Kouk Prich
Dong Aranh
Nimit Buon
Nimit Muoy
Naka ChhayKoub Kaeut
Tuol Pongro
Tomnob Dach
Nimit Thmei
Veang Muong
Yeang thmei
Andoung Thma
Souphi TboungSouphi Kandal
Souphi
Nimitt
Ou Bei Choan
240000
240000
242000
242000
244000
244000
246000
246000
248000
248000
250000
250000
252000
252000
254000
254000
256000
256000
258000
258000
260000
260000
262000
262000
264000
264000
266000
266000
1506
000
1506
000
1508
000
1508
000
1510
000
1510
000
1512
000
1512
000
1514
000
1514
000
1516
000
1516
000
1518
000
1518
000
1520
000
1520
000
1522
000
1522
000
1524
000
1524
000
±0 1 20.5
Kilometers
SPHEROID........................... EVERESTGRID..................................... 2 KILOMETERUTM...................................... ZONE 48NDATUM................................. WGS84PROJECTION....................... UTM
1:75,000Scale
DRAWING TITLE:
DWG No.DATE SHEETSCALE
PP-0104-01-2016 011/75,000
POI PET (Banteay Mean Chey Province)ROUTE MAP
Legend22kV Overhead Line
22kV Underground Line
Rail road
"T 115kV Substation% District centerÚ Commune center# Phum center
National road
Provincial road
Cart track
Footpath
Banteay Mean Chey
District boundary
Commune boundary
Population
*Original drawing has A3 size
Cassava Field
CambodiaPower Transmission Line
Sugar C
ane
Cassava
Field
Tree 3m up
Tree 3m up Tree 3m up
Cassava
Field
Cassava
Field
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
POI PET (Banteay Meanchey Province)PLANE DRAWING
H:1/3000 04-01-2016
1
PP-0201
N
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 02, DWG No. PP-02
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SECTIONSHEET 03, DWG No. PP-02
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SECTIONSHEET 04, DWG No. PP-02
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SETCITONSHEET 07, DWG No. PP-02
ishiirsタイプライターテキスト
Existing UG LineExisting House
N
Existing UG Line
Existing House
Ground LevelExisting UG Line
Existing pole 115kV
Existing UG Line From Control Building cross access roadCROSS SECTION 1-1SCALE: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
AS SHOWN 04-01-2016 PP-0302
11
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Cassava Field
Cam
bodi
aPo
wer
Tran
smis
sion
Line
Exis
ting
Hou
se
Provincial Road(Under construction)
N
PLANSCALE: 1/750
CPTL
ExistingPole 115kV
Control Building
CROSS SECTION 2-2SCALE: 1/150
Cable trench
SCALE
DRAWING TITLE:
DATE SHEET DWG No
AS SHOWN 04-01-2016 PP-0303
2 2
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Cassava Field
Cam
bodi
aPo
wer
Tran
smis
sion
Line
Exis
ting
Hou
se
Provincial Road(Under construction)
N
PLANSCALE: 1/750
Existing Pole 22kV
ExistingPole 115kV
ExistingPole 115kV
ExistingPole 115kV(Dead End)
ExistingPole 115kV(Dead End)
Cassava Field
CROSS SECTION 2-2SCALE: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
AS SHOWN 04-01-2016 PP-0304
2 2
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Cassava Field
Cam
bodi
aPo
wer
Tran
smis
sion
Line
Exis
ting
Hou
se
Provincial Road(Under construction)
N
PLANSCALE: 1/750
Provincial Road(Under construction, Level: 27m)
Existing Pole 22kV
Existing Telecom Pole
Ditch Cassava Field Cassava Field
CROSS SECTION 2-2SCALE: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
AS SHOWN 04-01-2016 PP-0307
2 2
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Cassava Field
Cassava Fie
ld
Rice Fiel
d
Rice F
ield
Rice
Fiel
d
Rice
Fiel
d
Rice
Fiel
d
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
POI PET (Banteay Meanchey Province)PLANE DRAWING
H:1/3000 04-01-2016
3
PP-0203
N
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキスト115 kVTransmission Line
Rice Field
Roa
d 25
8D
Roa
d 25
8D
LBS
LBS
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
POI PET (Banteay Meanchey Province)PLANE DRAWING
H:1/3000 04-01-2016
32
PP-0232
N LEGEND:22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 10, DWG No. PP-03SHEET 11, DWG No. PP-03
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SECTIONSHEET 13, DWG No. PP-03SHEET 14, DWG No. PP-03
ishiirsタイプライターテキスト
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SECTIONSHEET 17, DWG No. PP-03
ishiirsタイプライターテキスト
N
PLANSCALE: 1/175
SLOPE
Road 258D LEVEL: -1.731m
3000
SLOPE
3000
Existing Pole 22kVExisting Pole 22kV
Water LEVEL: -2.993m
Brick Wall
Existing Pole 22kV
CROSS SECTION 5-5Scale: 1/175
SCALE
DRAWING TITLE:
DATE SHEET DWG No
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
AS SHOWN 04-01-2016 PP-0310
5 5
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Road 258D
115k
V
N
PLANSCALE: 1/500
Laterite Road LV: -1.727m
Existing Pole 22kV
Existing LV Pole
Wood Fence
U-Dranaige
SLOPESLOPE
CROSS SECTION 6-6Scale: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
AS SHOWN 04-01-2016 PP-0311
6 6
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Road 258D
115k
V
N
PLANSCALE: 1/500
SLOPE
National Road N-5 LEVEL:-1.407m5650
SLOPE
5650U-Dranaige
SLOPE
Existing LV Pole Existing Pole 115kV
CROSS SECTION 6-6Scale: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
AS SHOWN 04-01-2016 PP-0313
6 6
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Roa
d 25
8D
115kV
115kV
115kV115kV
115kV
115kV
115kV
N
N
N
PLANSCALE:1/175
PLANSCALE: 1/1000
MainholePIPE INVERT LV: -3.152m
National Road LV: -1.482m
Existing LV PoleExisting LV Pole
Existing Pole 115kV
SLOPE SLOPE SLOPE SLOPE
Existing Pole 115kVCROSS SECTION 7-7Scale: 1/250
MainholeMainholeMainhole
HouseHouseHouseHouseHouseHouseHouseHouse HouseHouse House House
House
SCALE
DRAWING TITLE:
DATE SHEET DWG No
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
AS SHOWN 04-01-2016 PP-0314
7 7
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Roa
d 25
8D
115kV
115kV
115kV115kV
115kV
115kV
115kV
N
N
N
PLANSCALE:1/175
PLANSCALE: 1/1000
PIPE LV: -2.652m
PIPE INVERT LV: -3.752m SLOPE SLOPE SLOPE SLOPE
UG
Opt
ic
Existing Underground Optic Pole
Existing Pole 115kV
Existing LV PoleExisting LV PoleExisting LV Pole
CROSS SECTION 7-7Scale: 1/250
Existing Pole 115kV
MainholeMainholeMainholeMainhole
HouseHouseHouseHouseHouseHouseHouse
SCALE
DRAWING TITLE:
DATE SHEET DWG No
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
AS SHOWN 04-01-2016 PP-0317
77
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Appendix 12 Final Report Route Map of Poipet (2)
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 12
ROUTE MAP OF POIPET (2)
#
#
#
"T
Phniet
Kantuot
Sala Krau
282000
282000
283000
283000
284000
284000
285000
285000
286000
286000
287000
287000
288000
288000
289000
1504000
1504000
1505000
1505000
1506000
1506000
1507000
1507000
1508000
1508000
DRAWING TITLE:
DWG No.DATE SHEETSCALE
PP-0104-01-2016 021/20,000
Legend22kV Overhead Line
22kV Underground Line
Rail road
"T 115kV Substation% District centerÚ Commune center# Phum center
National road
Provincial road
Cart track
Footpath
Banteay Mean Chey
District boundary
Commune boundary
Population
±0 0.3 0.60.15
Kilometers
SPHEROID........................... EVERESTGRID..................................... 1 KILOMETERUTM...................................... ZONE 48NDATUM................................. WGS84PROJECTION....................... UTM
1:20,000Scale
POI PET (Banteay Mean Chey Province)ROUTE MAP
289000
*Original drawing has A3 size
115kV
115kV
115kV
Telecom UG
115kV
115kV
115kV
115kV
115kV
115kV Telecom UG
115kV
115kV
Substation
ControlBuilding
Rice Field
Rice Field
Rice Field
Farm
Rice Field
Rice Field
Rice Field
115kV
115kV
115kV
Telecom UG
115kV
115kV
115kV
115kV
115kV
115kV Telecom UG
115kV
115kV
Substation
ControlBuilding
Rice Field
Rice Field
Rice Field
Farm
Rice Field
Rice Field
Rice Field
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
POI PET (Banteay Meanchey Province)PLANE DRAWING
H:1/3000 04-01-2016
33
N
PP-0233
8
See Section dwg. No. PP-03, Sheet 18 to 24
8
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 24, DWG No. PP-03
ishiirsタイプライターテキストCROSS SECTIONSHEET 23, DWG No. PP-03
ishiirsタイプライターテキストCROSS SECTIONSHEET 22, DWG No. PP-03SHEET 18, DWG No. PP-03
ishiirsタイプライターテキスト
115k
V115k
V
115k
V
115k
V
115k
V
115k
V115k
V
115k
V
115k
V
115k
V
115k
V
Tele
com
U
G
CAMBODIA POWER TRANSMISSION LINES CO.,LTD
Control Building
Rice FieldRice FieldRice Field
CAMBODIA POWER TRANSMISSION LINES CO.,LTD
UG_22kV LINE
Existing Pole 22kV
Existing pole 115kVExisting Pole 22kV
Wire mesh fence
CONTROL BUILDING
GENERATORROOM
SCALE
DRAWING TITLE:
DATE
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
PLANSCALE: 1/1200
SECTION G-GSCALE: 1/150
As Shown 04-01-2016SHEET DWG No
PP-0324
8 8
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
115k
V115k
V
115k
V
115k
V
115k
V
115k
V115k
V
115k
V
115k
V
115k
V
115k
V
Tele
com
U
G
CAMBODIA POWER TRANSMISSION LINES CO.,LTD
Control Building
Rice FieldRice FieldRice Field
UG_22kV LINE
FRESH WATER SUPPLY PIPE
UG_22kV LINE
Existing Pole 22kV Existing Pole 22kV
Existing pole 115kV
Barbeded wire fence
SCALE
DRAWING TITLE:
DATE
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
PLANSCALE: 1/1200
SECTION E-ESCALE: 1/150
04-01-2016As ShownSHEET DWG No
PP-0323
8 8
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
115k
V115k
V
115k
V
115k
V
115k
V
115k
V115k
V
115k
V
115k
V
115k
V
115k
VTe
leco
m
UG
CAMBODIA POWER TRANSMISSION LINES CO.,LTD
Control Building
Farm
Rice FieldRice FieldRice Field
Existing Pole 22kV
UG_22kV LINE
FRESH WATER SUPPLY PIPE
GATE
Existing Pole 22kVExisting pole 22kV
Existing pole 115kV
Existing HouseExisting House
SCALE
DRAWING TITLE:
DATE
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
PLANSCALE: 1/1200
SECTION B-BSCALE: 1/150
04-01-2016As ShownSHEET DWG No
PP-0319
8 8
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
115k
V115k
V
115k
V
115k
V
115k
V
115k
V115k
V
115k
V
115k
V
115k
V
115k
V
Tele
com
U
G
CAMBODIA POWER TRANSMISSION LINES CO.,LTD
Control Building
Rice FieldRice FieldRice Field
5.00m5.00m
Canal Lavel: -14.10 m
ROAD LEVEL: -10.74m
CROSS SECTION 8-8SCALE: 1/150
NATIONAL ROAD No.6LEVEL: -10.65m
GATE
30.00m
Existing Telecommunication Pole
Existing pole 115kV
Existing pole 22kV
Existing Telecommunication Pole
SCALE
DRAWING TITLE:
DATE SHEET DWG No
POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING
04-01-2016
PLANSCALE: 1/1200
As Shown PP-0318
8 8
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Rice Field
Rice Field
Rice Field
LBS
LBS LBS
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
POI PET (Banteay Meanchey Province)PLANE DRAWING
H:1/3000 04-01-2016
39
N
PP-0239
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
Appendix 13 Final Report Route Map of Koh Kong
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 13
ROUTE MAP OF KOH KONG
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
Ú
Ú
Ú
Ú
Ú
%
%
#
Koh KongKoh Kong
Kaoh Chak
Cham Yeam
Neang Kok
Preaek Svay
Phum Ti BeiPhum Ti Pir
Phum Ti Pir
Phum Ti Buon
Phum Ti Muoy
Phum Ti Muoy
Stueng Veaeng
Tuol Kokir Leu
Boeng Kachhang
Bak Khlang Bei
Bak Khlang Pir
Bak Khlang Muoy
Smach Mean Chey
Tuol Kokir Kraom
Boeng Khun Chhang
Dang Tong
Bak Khlang
Stueng Veaeng
Tuol Kokir Leu
Smach Mean Chey
Smach Mean Chey
274000
274000
276000
276000
278000
278000
280000
280000
282000
282000
284000
284000
286000
286000
288000
288000
290000
290000
292000
292000
294000
294000
1276
000
1276
000
1278
000
1278
000
1280
000
1280
000
1282
000
1282
000
1284
000
1284
000
1286
000
1286
000
1288
000
1288
000
1290
000
1290
000
±0 0.9 1.80.45
Kilometers
SPHEROID........................... EVERESTGRID..................................... 2 KILOMETERUTM...................................... ZONE 48NDATUM................................. WGS84PROJECTION....................... UTM
1:60,000Scale
DRAWING TITLE:
DWG No.DATE SHEETSCALE
KK-0104-01-2016 011/60,000
KOH KONG ROUTE MAP
Legend22kV Overhead Line22kV Underground Line
# Provincial center% District centerÚ Commune center# Phum center
National roadProvincial roadCart trackFootpathDistrict boundaryCommune boundaryPopulationStream systemRiver or stream
*Original drawing has A3 size
KOH KONG SPECIAL ECONOMIC ZONEKOH KONG SPECIAL ECONOMIC ZONE
LBS
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
KOH KONG PLANE DRAWING
H:1/3000 04-01-2016
1
KK-0201
N LEGEND:22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
TOLL STATION
WAT MONDULSEIMARAM
Sea
TOLL STATION
WAT MONDULSEIMARAM
Sea
LBS
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
KOH KONG PLANE DRAWING
H:1/3000 04-01-2016
5
KK-0205
NLEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 33, DWG No. KK-03SHEET 34, DWG No. KK-03
Water level -17.0728
-12.00
-11.00
-10.00
-13.00
-14.00
-15.00
-16.00
19.98 19.79
Water level -17.0728
-9.00
-8.00
-7.001+710 1+720 1+730 1+740 1+750
MV Pole
Cable 3x185, 3 wires
SCALE
DRAWING TITLE:
DATE SHEET DWG No
KOH KONG SECTIONAL DRAWING
1/150 04-01-2016 KK-0333
Suspended Fresh water pipe Ø300
Plane
Longitudinal section
To Southeast To Northwest
Suspended 22kV cable
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Suspended22kV cable
SuspendedFresh water pipe
Telecommunication wire support
1.20
1.00
7.80
Water level -17.0728
0.95
0.50
3.10
1.90 4.00 1.90
CROSS SECTION AT CHAINAGE 0+144
Suspended22kV cable
SuspendedFresh water pipe
Telecommunication wire support
1.20
1.00
7.80
Water level -17.0728
0.95
0.50
1.79 1.90 4.00 1.90
CROSS SECTION AT CHAINAGE 0+464
Suspended22kV cable
SuspendedFresh water pipe
Telecommunication wire support
1.20
1.00
7.80
0.95
0.50
1.20 1.90 4.00 1.90
CROSS SECTION AT CHAINAGE 1+524
SCALE
DRAWING TITLE:
DATE SHEET DWG No
KOH KONG SECTIONAL DRAWING
1/150 04-01-2016 KK-0334
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Tamab Guest house &Restaurant
Garage 3595‘ ‘
3594
Adve
rtisi
ng P
ole
Bun MouyMaterial Constructon Supply
SEK CHHOUNGarage 3620
Flat Houses
Raksmey RatanakGuest House
KOH KONG NEW MAKETACLEDABank. PlcKoh KongBrance
Prasak Microfinance PlcKoh Kong Brance
KOH KONG COURT
POST ANDTELECOMUNICATIONSKOH KONG PROVINCE
KOH KONGPROVINCIAL HALL
DEPARTMENT OF PLANNING
DEPARTMENT OFCULT AND RELIGION
OFFICE OFLAWS MAKER
Adve
rtisi
ng P
ole
Adve
rtisi
ng P
ole
Adve
rtisi
ng P
ole
Adve
rtisi
ng P
ole
Raksmey Ratanak Guest House
Flat Houses
Sea
Tamab Guest house &Restaurant
Garage 3595‘ ‘
3594
Adve
rtisi
ng P
ole
Bun MouyMaterial Constructon Supply
SEK CHHOUNGarage 3620
Flat Houses
Raksmey RatanakGuest House
KOH KONG NEW MAKETACLEDABank. PlcKoh KongBrance
Prasak Microfinance PlcKoh Kong Brance
KOH KONG COURT
POST ANDTELECOMUNICATIONSKOH KONG PROVINCE
KOH KONGPROVINCIAL HALL
DEPARTMENT OF PLANNING
DEPARTMENT OFCULT AND RELIGION
OFFICE OFLAWS MAKER
CINEMA / GUALARIESBUILDING
Adve
rtisi
ng P
ole
Adve
rtisi
ng P
ole
Adve
rtisi
ng P
ole
Adve
rtisi
ng P
ole
Raksmey Ratanak Guest House
Flat Houses
SeaLBS
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
KOH KONG PLANE DRAWING
H:1/3000 04-01-2016
7
KK-0207
N
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 02, DWG No. KK-03
ishiirsタイプライターテキスト
ishiirsタイプライターテキストCROSS SECTIONSHEET 35, DWG No. KK-35
ishiirsタイプライターテキストCROSS SECTIONSHEET 36, DWG No. KK-03
ishiirsタイプライターテキスト
LV Pole
Poster Pole
MV Pole
Existing 22kV Underground cable
12.89 1.47 20.61 20.02
Water level -17.0728 Water level -17.0728
±0.00CHAINAGE:
-12.00
-11.00
-10.00
-13.00
-14.00
-15.00
-16.00
-9.00
-8.00
-7.00
0+10 0+20 0+30 0+40 0+50
SCALE
DRAWING TITLE:
DATE SHEET DWG No
KOH KONG SECTIONAL DRAWING
1/150 04-01-2016 KK-0302
Suspended Fresh water pipe Ø300
Suspended 22kV cable
Plane
Longitudinal section
To Southeast To Northwest
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
2
National Road No.48National Road No.48
2
PLANSCALE: 1/250
N
12.60mROAD LEVEL: -14.85m
12.60m
CROSS SECTION 2-2
SLOPERoad curb Road curb
SLOPE
Existing Pole 22kVExisting Pole 22kVExisting Lighting Pole
Existing LV Pole
Brick wall fence
Tree
SCALE: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
KOH KONG CROSS SECTION DRAWING
AS SHOWN 04-01-2016 KK-0335
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Adve
rtisi
ng P
ole
ACLEDA Bank. Plc
Koh Kong Brance
3 3
PLANSCALE: 1/400
N
8.70mROAD LEVEL: -14.22m
8.70m
SLOPERoad curb
SLOPE
Existing LV Pole
ACLEDA Bank. PlcKoh Kong Brance
Existing Pole 22kV
CROSS SECTION 3-3SCALE: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
AS SHOWN 04-01-2016 KK-0336
KOH KONG CROSS SECTION DRAWINGJICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Stream
Flooding Area
Flooding Area
Flooding Area
Flooding Area
Flooding Area
Stream
Flooding Area
Flooding Area
Flooding Area
Flooding Area
LBS
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
KOH KONG PLANE DRAWING
H:1/3000 04-01-2016
9
KK-0209
N
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 37, DWG No. KK-03
Flooding Area
National Road No.48
44
PLANSCALE: 1/400
N
Existing Pole 22kVCrossing Road No.48
Existing Pole 22kVCrossing Road No.48
ROAD LEVEL: -13.35m
4.84m 4.84m
CROSS SECTION 4-4SCALE: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
AS SHOWN 04-01-2016 KK-0337
KOH KONG CROSS SECTION DRAWINGJICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Swampland
Swampland
Swampland
Swampland
Stream
Stream
Stream
Stream
Swampland
Swampland
Swampland
Swampland
Stream
Stream
Stream
Stream
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
KOH KONG PLANE DRAWING
H:1/3000 04-01-2016
10
KK-0210
N
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 38, DWG No. KK-03
ishiirsタイプライターテキスト
Swam
pland
Swam
pland
Natio
nal R
oad N
o.48
Prov
inci
al R
oad
Nation
al Road
No.48
5 5
PLANSCALE: 1/400
N
4.25mROAD LEVEL: -13.13m4.25m
Existing Telecommunication Pole Existing Telecommunication Pole
Existing Telecommunication Cable
National Road No.48National Road No.48Provincial Road
SwamplandSwampland
LEVEL: -16.20m LEVEL: -16.20m
CROSS SECTION 5-5SCALE: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
AS SHOWN 04-01-2016 KK-0338
KOH KONG CROSS SECTION DRAWINGJICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Tree H>6m Rubber H>6mRubber H>6m
Tree H>6m
Rubber H>6mSugar Farm
Rubber H>6m Tree H>6mTree H>6m
Tree H>6m Rubber H>6mRubber H>6m
Tree H>6m
Rubber H>6mSugar Farm
Rubber H>6m Tree H>6mTree H>6m
LBS
Connect to existing Line
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
KOH KONG PLANE DRAWING
H:1/3000 04-01-2016
14
KK-0214
N
LEGEND:
22kV Overhead Line (New)
22kV Underground Line (New)
Load Breaking Switch (New)
22kV Overhead Line (Exist.)
22kV Underground Line (Exist.)
22kV Pole (Exist.)
LV Pole (Exist.)
Telecommunication Pole (Exist.)
Road
Road Center
Pond
House, Cottage
Bridge
Ditch
Pipe Culvert
Wiremesh Fence
Brickwall Fence
JICA PROJECT NAME:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.
CONTRACTOR:
*Original drawing has A3 size
ishiirsタイプライターテキストCROSS SECTIONSHEET 39, DWG No. KK-03
ishiirsタイプライターテキスト
Nat
iona
l Roa
d N
o.48
6 6
N
PLANSCALE: 1/150
5.00mROAD LEVEL: -15m
5.00m
Existing Pole 22kV
Existing Telecommunication Pole Existing Telecommunication Pole
18.14m5.10m 6.32mCROSS SECTION 6-6
SCALE: 1/150
SCALE
DRAWING TITLE:
DATE SHEET DWG No
AS SHOWN 04-01-2016 KK-0339
KOH KONG CROSS SECTION DRAWINGJICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
*Original drawing has A3 size
Appendix 14 Final Report Chrak Mtes Substation
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 14
CHRAK MTES SUBSTATION
2xLGJ-240/30 2xLGJ-240/30
SA .,
os
CT
SA ..
LGJ-300/40
SA
CT' P2~~~ Pl
CB
OS
CT
j
·,rt!ff.. ~} os:--1
I BUS \",!;.,;,yy:; I " "
2x(NRLH58GJ-630/80)
CVT r'H··
C B A C B A C S A ~ TO #1 TRANSFORMER
CHINA EXrM BANK
Loan No. pac No. 2014(11) TOTAL No. (311)
Contract No. EDC-2MV EXT. 2
o -"PPROVED CY APPROVED with CONDITIONS
RETURNED for CORRECTIONS
DRAWINGS for WORKS
~ ~~cP .~
ELECTRICITE D
~~ LEGEND OF 115kV EQUIPMENT
115kVit.i-m ~
MARK(IfJ5j;)
.• H::3 Surge Arrester itilli
SF6 Three Phose Circuit Breaker SF6.::;ffi~;u$f"
Switch
Y10W-102/266 lOkA
TYD J 11 O.2/0.5(3P)/3P
115/J3/0.11/J3/0.11 lkV
GW4A-l 126kV 2000A 31
GW4A-126D(GW) 126kV 31.5kA
LVB-115W3 600~1200/1 O.5s/5P30/5P30/5P30/0.2s PI
. LVB-115W3 200N400/1A
P2
! O.5s/5P30/5P30/5P30/5P30/0.2s Pl---- P2
LW36-126F 126kV 2000A 31.5kA
LW36-126 126kV 2000A 31.5kA
SYMBlE{U)
SA
CVT
DS
DS'
CT
CB
CS'
REVlSION I REVD I CHKD I fMlfJ: APPRD PROJECT: TRANSMISSION UNES AND SUBSTAnONS FROt.! PHNOt.! PENH TO BAVEr
EDC-TSPB
ElECTRICITE DU CAMBODGE (EDC)
ELECTRIC SINGLE UNE OF I15kV SWrrCHYARD 115kVIU.Ht"i:itli
2015-04-20 I[I1)!ING 00. I 605381 $-D0301-02 IREV I A
Appendix 15 Final Report EDC Svay Rieng Switching Station
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 15
EDC SVAY RIENG SWITCHING STATION
22 kV METALCLAD SWITCHGEAR ROOM(OUTLINED DIMENSION)
EDC SVAY RIENG
EHV-J0122kV
IncomingNo. 1
VN1
EHV-J0322kVVT-1
Panel
EHV-J0522kV
OutgoingF1
ToMarket
EHV-J0722kV
Capacitor1
(Blank)
EHV-J0922kV
Outgoing
ToP05 &VN2
EHV-J1122kVBus
Section
EHV-J1022kV
Bus Riser& VT-2Panel
EHV-J0822kV
OutgoingF2
ToIce
Factories
EHV-J0622kV
Capacitor2
(Not used)
EHV-J0422kV
OutgoingF4
ToOld District
Hall
FromPhnomPenh
EHV-J0222kV
IncomingNo. 2
VN2
SpareSpace
SpareSpace
BatteryCharger &
BankAC Distribution Panel
Front Front
12780
5800
850 800 800 800 800 800 800 800 800 800 850 800850
1330
1130 1100
1150
380
1380
1460
100
450 800 900 2000 4480 2000 2150
300
800
2370
1800
1800
Note:(1) All dimensions are in millimeter.(2) 22kV Cubicles are of LG.
SCALE
DRAWING TITLE:
DATE KEY PAGE DWG No
BAVET (Svay Rieng Province)EDC 22kV Switchgear Room
1/50 08/12/2015 PP-03
JICA PROJECT NAME:
SUB CONTRACTOR:
Preparatory Survey for Southern Economic CorridorDistribution Expansion Project
NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.
CONTRACTOR:
Appendix 16 Final Report IE Substation
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 16
IE SUBSTATION
Dell 3nd JIB CWNNew Stamp
Appendix 17 Final Report Banteay Meanchey Substation
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 17
BANTEAY MEANCHEY SUBSTATION
Appendix 18 Final Report MV Pole Arrangement
1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor
APPENDIX 18
MV POLE ARRANGEMENT
GLGL
Arm Tie
Pin Type Insulators
2000
String Insulators1000 1000
250
12000
2000
250
12000
900 400
700
Arm Tie
Foundation Foundation
1300
7001300
1000 1000
*
*
*
*
*: Size of concrete foundation depends
on soil condition.
CHAPTER B3 / 25 to 160 kVA pole mounted substation
Version 1.2 7,1
II - 25 to 160 kVA pole mounted substation
1) Presentation : - For three phase transformer, whose capacity from 50 KVA to 160 KVA
- For single phase transformer, whose capacity from 25 KVA to 50 KVA
Figure : pole mounted substation on single pole
MV Fuse
LV Fuse
MV fuse switch
MV / LV transformer
MV lightning arrester
LV network
Grounding
2m height of protective cover
LV Meter Box
Not less than 5.0 m
MV fuse switch
MV / LV transformer
MV lightning arrester
LV network
LV circuit breaker
Grounding
2m height of protective cover
LV Meter Box
Not less than 5.0 m
CHAPTER B3 / 200 to 400 kVA pole mounted substation
Version 1.2 9,1
III - 200 to 400 kVA pole mounted substation
1) Presentation :
Figure III-1: pole mounted substation on double poles
LV network
CT
Meter cabinet
LV board cabinets
MV lightning arresters
LV network
LV network Grounding
2m high of Protective device
MV fuse switch
Main switch
4 protected feeders by HPC fuses 2 m
Not
less
than
5.0
m
3 m
APPENDICESAppendix 8 : Voltage Drop Study Details of EachDistribution LineAppendix 9 : List of Collected Data and DocumentsAppendix 10 : Route Map of BavetAppendix 11 : Route Map of Poipet (1)Appendix 12 : Route Map of Poipet (2)Appendix 13 : Route Map of Koh KongAppendix 14 : Chrak Mtes SubstationAppendix 15 : EDC Svay Rieng Switching StationAppendix 16 : IE SubstationAppendix 17 : Banteay Meanchey SubstationAppendix 18 : MV Pole Arrangement