640
** WARNING ** WARNING ** WARNING ** WARNING ** This document is intended for informational purposes only. Users are cautioned that Caltrans does not assume any liability or responsibility based on these electronic files or for any defective or incomplete copying, exerpting, scanning, faxing or downloading of the contract documents. As always, for the official paper versions of the bidders and non-bidder packages, write to the California Department of Transportation, Plans and Bid Documents, Room 0200, P.O. Box 942874, Sacramento, CA 94272-0001, telephone (916) 654-4490 or fax (916) 654- 7028. Office hours are 7:30 a.m. to 4:15 p.m. When ordering bidder or non-bidder packages it is important that you include a telephone and fax number, P.O. Box and street address so that you can receive addenda. Note: Addenda information is NOT included with the electronic documents available via electronic file transfer. Only bidder or non-bidder package holders listed with the Caltrans Plans and Bid Documents section as described above will receive addenda information. etric Caltrans

99SSP_Template - Caltrans - California Department of ... · Web view10 1.43 SUBSTATION ARCHITECTURAL EASTBOUND, AND SUBSTATION ARCHITECTURAL WESTBOUND 209 10 1.44 STEEL STRUCTURES

Embed Size (px)

Citation preview

99SSP_Template

** WARNING ** WARNING ** WARNING ** WARNING **

This document is intended for informational purposes only.

Users are cautioned that Caltrans does not assume any liability or responsibility based on these electronic files or for any defective or incomplete copying, exerpting, scanning, faxing or downloading of the contract documents. As always, for the official paper versions of the bidders and non-bidder packages, write to the California Department of Transportation, Plans and Bid Documents, Room 0200, P.O. Box 942874, Sacramento, CA 94272-0001, telephone (916) 654-4490 or fax (916) 654-7028. Office hours are 7:30 a.m. to 4:15 p.m. When ordering bidder or non-bidder packages it is important that you include a telephone and fax number, P.O. Box and street address so that you can receive addenda.

Note: Addenda information is NOT included with the electronic documents available via electronic file transfer. Only bidder or non-bidder package holders listed with the Caltrans Plans and Bid Documents section as described above will receive addenda information.

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION

__________________________________________________________

NOTICE TO CONTRACTORS

AND

SPECIAL PROVISIONS

FOR CONSTRUCTION ON STATE HIGHWAY IN

THE CITY AND COUNTY OF SAN FRANCISCO AND ALAMEDA COUNTY IN SAN FRANCISCO AND OAKLAND FROM 1.3 km EAST OF THE YERBA BUENA ISLAND TUNNEL EAST PORTAL

DISTRICT 04, ROUTE 80

__________________________________________________________

For Use in Connection with Standard Specifications Dated JULY 1999, Standard Plans Dated JULY 1999, and Labor Surcharge and Equipment Rental Rates.

__________________________________________________________

CONTRACT NO. 04-012024

04-SF,Ala-80-13.9/14.3,0.0/1.6

Federal Aid Project

*ACIM-080-1(085)8N

Bids Open: November 14, 2001

Dated: July 16, 2001

OSD

*************************************************************************************************

IMPORTANT

SPECIAL NOTICES

PROJECT FUNDING AND OPENING OF PROPOSALS

Funding available for this project is insufficient at this time to award and construct the project. Bids will not be opened and the contract will not be awarded until sufficient funds are made available. Bidders are advised that any and all costs incurred in preparing a bid for this project are at bidder's sole risk, cost and expense. If funds are subsequently made available to permit full project funding, prospective bidders who have obtained project plans, special provisions and proposal forms from the Department's Plans and Bid Documents Room will be notified by contract addendum. If this notification is within 6 weeks of the date set forth in the "Notice to Contractors" for the opening of bids, the addendum will also postpone the bid opening date to allow additional time for preparation of bids.

*************************************************************************************************

PRE-AWARD MEETING

SPECIAL NOTICE

*************************************************************************************************

The bidder's attention is directed to Section 2-1.03, "Bridge Construction Information/Questionnaire," and Section 3, "Pre-Award Meeting and Award and Execution of Contract," in the Special Provisions.

Responses to the "Bridge Construction Information/Questionnaire" included in the Proposal must be submitted with the bid.

A pre-award qualifications review meeting will be conducted with the apparent low bidder on November 16, 2001 at 10:00 a.m. in the third floor conference room, 1727 - 30th Street, Sacramento, CA 95816. The purpose of the meeting will be to determine the bidder's qualifications and ability to complete the construction work on this project. The second and third apparent low bidders may also be requested to participate in pre-award qualifications review meetings.

Establishing to the satisfaction of the Department the bidder's qualifications and ability to complete the bridge construction work in a safe and timely manner is a condition for being eligible for award of the contract.

*************************************************************************************************

(The bidder's attention is directed to Section 5, containing specifications for \"Disputes Review Board,\" of the Special Provisions, regarding establishing a Disputes Review Board (DRB) for the project.

(The Special Provisions for Federal-aid projects (with and without DBE goals) have been revised to incorporate changes made by new regulations governing the DBE Program (49 CFR Part 26).

Sections 2 and 5 incorporate the changes. Bidders should read these sections to become familiar with them. Attention is directed to the following significant changes:

Section 2, "Disadvantaged Business Enterprise (DBE)" revises the counting of participation by DBE primes, and the counting of trucking performed by DBE firms. The section also revises the information that must be submitted to the Department in order to receive credit for trucking.

Section 2, "Submission of DBE Information" revises the information required to be submitted to the Department to receive credit toward the DBE goal. It also revises the criteria to demonstrate good faith efforts.

Section 5, "Subcontractor and DBE Records" revises the information required to be reported at the end of the project, and information related to trucking that must be submitted throughout the project.

Section 5, "DBE Certification Status" adds new reporting requirements related to DBE certification.

Section 5, "Subcontracting" describes the efforts that must be made in the event a DBE subcontractor is terminated or fails to complete its work for any reason.

Section 5, "Prompt Progress Payment to Subcontractors" requires prompt payment to all subcontractors.

Section 5, "Prompt Payment of Withheld Funds to Subcontractors" requires the prompt payment of retention to all subcontractors.

(Payment Bonds

Attention is directed to Section 5 of the Special Provisions, regarding contract bonds. The payment bond shall be in a sum not less than one hundred percent of the total amount payable by the terms of the contract.

(Attention is directed to Section 112, "Portland Cement Concrete," of these Special Provisions which contains Section 90, "Portland Cement Concrete," of the Standard Specifications.

(Attention is directed to "Miscellaneous Metal," in Section8-1, "Miscellaneous," of these Special Provisions for new requirements for miscellaneous metal.

TABLE OF CONTENTS

NOTICE TO CONTRACTORS1

COPY OF ENGINEER'S ESTIMATE5

SPECIAL PROVISIONS12

SECTION 1.SPECIFICATIONS AND PLANS12

SECTION 2.PROPOSAL REQUIREMENTS AND CONDITIONS12

21.01GENERAL12

21.015FEDERAL LOBBYING RESTRICTIONS12

21.02DISADVANTAGED BUSINESS ENTERPRISE (DBE)13

21.02ADBE GOAL FOR THIS PROJECT15

21.02BSUBMISSION OF DBE INFORMATION15

2-1.03BRIDGE CONSTRUCTION INFORMATION/QUESTIONNAIRE16

2-1.04ESCROW OF BID DOCUMENTATION16

SECTION 3.PRE-AWARD MEETING AND AWARD AND EXECUTION OF CONTRACT18

31.01GENERAL18

SECTION 4.BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES18

SECTION 5.GENERAL19

SECTION 51.MISCELLANEOUS19

51.01WORKING DRAWINGS19

51.011EXAMINATION OF PLANS, SPECIFICATIONS, CONTRACT, AND SITE OF WORK20

51.012DIFFERING SITE CONDITIONS20

5-1.015LABORATORY20

51.017CONTRACT BONDS21

51.018EXCAVATION SAFETY PLANS21

51.02LABOR NONDISCRIMINATION21

51.03INTEREST ON PAYMENTS21

51.031FINAL PAYMENT AND CLAIMS22

51.04PUBLIC SAFETY22

51.05SURFACE MINING AND RECLAMATION ACT23

51.06REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCES23

51.07YEAR 2000 COMPLIANCE24

51.075BUY AMERICA REQUIREMENTS24

51.08SUBCONTRACTOR AND DBE RECORDS24

51.083DBE CERTIFICATION STATUS25

51.086PERFORMANCE OF DBE SUBCONTRACTORS AND SUPPLIERS25

51.09SUBCONTRACTING25

51.10PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS26

51.102PROMPT PAYMENT OF WITHHELD FUNDS TO SUBCONTRACTORS26

51.11PARTNERING26

51.114VALUE ANALYSIS26

51.12DISPUTE REVIEW BOARD27

DISPUTES INVOLVING SUBCONTRACTOR CLAIMS30

51.13TIDAL CONDITIONS AND ELEVATION DATUM38

51.14COST REDUCTION INCENTIVE PROPOSALS38

51.15AREAS FOR CONTRACTOR'S USE39

51.16UTILITIES39

51.17SANITARY PROVISIONS39

51.18BRIDGE TOLLS39

51.19ACCESS TO PROJECT SITE39

51.20PERMITS AND LICENSES39

51.21FORCE ACCOUNT PAYMENT40

5-1.22END USE OF DREDGED MATERIALS40

51.23PAYMENTS40

51.24SOUND CONTROL REQUIREMENTS41

5-1.25ENVIRONMENTAL WORK RESTRICTIONS41

SPECIES OF CONCERN41

5-1.26ENVIRONMENTALLY SENSITIVE AREAS (GENERAL)42

51.27RELATIONS WITH CALIFORNIA DEPARTMENT OF FISH AND GAME43

51.28RELATIONS WITH REGIONAL WATER QUALITY CONTROL BOARD43

51.29RELATIONS WITH BAY AREA AIR QUALITY MANAGEMENT DISTRICT43

(PENDING, TB SPEC BAAQMD)43

51.30RELATIONS WITH U.S. ARMY CORPS OF ENGINEERS44

51.31RELATIONS WITH SAN FRANCISCO BAY CONSERVATION DEVELOPMENT COMMISSION44

5-1.32RELATIONS WITH UNITED STATES COAST GUARD44

51.33RELATIONS WITH UNITED STATES FISH AND WILDLIFE SERVICE45

51.34RELATIONS WITH NATIONAL MARINE FISHERIES SERVICES46

SECTION 6.(BLANK)46

SECTION 7.(BLANK)46

SECTION 8.MATERIALS46

SEC