Overview of substation installation process

Transcript

  • Dr. Asawin RajakromConstruction Departmentasawin.raja@mea.or.th

    Substation Design:Station Installation

  • Discussion Topics Request for connection Planning Transportation Installation Testing & Commissioning

    2

  • Installation Planning Equipment Acceptance

    Approve Approve

    Installation Start

    Installation of Equipment Power/Control CablingGrounding

    Test/Commissioning

    ResultsOK?

    Substation Energization

    ResultsOK?

    ProjectStart

    Project End

    Work Flowchart

    3

  • Planning Activities Duration Relation Resources, e.g. man power, material, vehicle, lifting

    facilities etc. Concurrence to other related works, e.g. cable coming in

    and going out substation, SCADA etc.

    4

  • 5

  • Equipment acceptance Transportation Checking Storage Stocktaking Checklist of each activities

    6

  • Transportation

    7

  • Transportation

    8

  • Transportation

    9

  • Transportation

    10

  • Installation of Equipment Circuit breaker Disconnecting and earthing switch Instrument transformer Lightning arrester Gas insulated switchgear (GIS) Power transformer Capacitor Cable and accessories Station supply

    11

  • Installation of Equipment

    12

  • Installation of Equipment

    13

  • Installation of Equipment

    14

  • Installation of Equipment

    15

  • Installation of Equipment

    16

  • Installation of Equipment

    17

  • Installation of Equipment

    18

  • Installation of Equipment

    19

  • Installation of Equipment

    20

  • Installation of Equipment

    21

  • Installation of Equipment

    22

  • Installation of Equipment

    23

  • Test and commissioning Insulation test SF6 gas, insulating oil and vacuum test Contact resistance Operating sequences Operational control Interlock Monitoring Metering Protection Individual test Combined test

    24

  • Test and commissioning

    25

  • Test and commissioning

    26

  • Test and commissioning

    27

  • Test and commissioning

    28

  • Test and commissioning

    29

  • Test and commissioning

    30

  • Energization/Operation Voltage Withstand and Phase Sequences Protection and Metering Confirmation Operation/Maintenance Tools Documentation

    31

  • Thank youasawin.raja@mea.or.th