04/19/23 104/19/23 1
CPU Scheduling• ICS 240: Operating Systems
– William Albritton• Information and Computer Sciences
Department at Leeward Community College– Original slides by Silberschatz, Galvin, and Gagne
from Operating System Concepts with Java, 7th Edition with some modifications
– Also includes material by Dr. Susan Vrbsky from the Computer Science Department at the University of Alabama
04/19/23 2
Class Feedback• On an anonymous (don’t write your name)
sheet of paper, answer the following questions1. Average time working on each assignment
2. Total time studying for the exam
3. List several things that help you learn
4. List several things that make learning difficult
5. List several suggestions for improving the class
04/19/23 3
Basic Concepts
• Maximum CPU utilization obtained with multiprogramming
• CPU–I/O Burst Cycle– Process execution consists of a cycle of CPU
execution and I/O wait• CPU burst: a time interval when a process uses the
CPU only (few long CPU bursts)
• I/O burst: a time interval when a process uses I/O devices only (more short CPU bursts)
• CPU burst distribution (next two slides)
04/19/23 4
Alternating Sequence of CPU And I/O Bursts
04/19/23 5
Histogram of CPU-burst Times•This histogram (a graphical display of a frequency distribution) shows many, short CPU bursts and a few, long CPU bursts.
04/19/23 6
CPU Scheduler• Short-term scheduler
– Selects from among the processes in memory (in the ready queue) that are ready to execute, and allocates the CPU to one of them
• Note that the ready queue is not necessarily a first-in first-out (FIFO) queue, as different algorithms other than first-in first-out (FIFO) might be used to manage the queue
– For example, a queue at a club is not necessarily first-in first-out (FIFO), as VIPs usually jump to the front of the queue
– A queue is a fancy word for line
04/19/23 7
Preemptive vs. Non-preemptive• Non-preemptive scheduling scheme
– The short-term scheduler cannot forcibly take the CPU back from a process
• Once the CPU has been allocated to a process, the process keeps the CUP until the process releases the CPU either by terminating or by switching to the waiting state
– Also called cooperative scheduling scheme
04/19/23 8
Preemptive vs. Non-preemptive• Preemptive scheduling scheme
– The short-term scheduler takes the CPU from the process
– Can take the CPU back due to• Time slice
• Higher priority process arrived
• Interrupts
04/19/23 9
Process State• As a process executes, it changes state
1. new: The process is being created2. running: Instructions are being executed3. waiting: The process is waiting for some event
to occur• For example, I/O completion or reception of a signal
4. ready: The process is waiting to be assigned to a processor
5. terminated: The process has finished execution
04/19/23 10
Diagram of Process State
04/19/23 11
CPU Scheduler• CPU scheduling decisions (by the short-
term scheduler) may take place when a process
1. Switches from running to waiting state• For example, when the process has an IO request
• This is non-preemptive
2. Switches from running to ready state• For example, when an interrupt occurs
• This is preemptive
04/19/23 12
CPU Scheduler• CPU scheduling decisions (by the short-
term scheduler) may take place when a process
3. Switches from waiting to ready state• For example, at the completion of I/O
• This is preemptive
4. Terminates– For example, the process (running program) is done
– This is non-preemptive
04/19/23 13
Dispatcher
• Dispatcher module gives control of the CPU to the process selected by the short-term scheduler
– This function involves the following steps1. switching context
2. switching to user mode
3. jumping to the proper location in the user program to restart that program
04/19/23 14
Dispatcher
• Because the dispatcher is used during every process switch, the dispatcher should be as fast as possible
– Dispatch latency• time it takes for the dispatcher to stop one process and
start another running
04/19/23 15
Scheduling Criteria• The following 5 factors are used as Scheduling
Criteria (Performance Evaluation), which are used to compare CPU scheduling algorithms1. CPU utilization
• Fraction of time CPU busy (through multiprogramming)• Range from 40% (light load) to 90% (heavily used)
– goal: maximize
2. Throughput• Number of processes that complete their execution per
time unit (measure of work)• Range from one process per hour to ten processes per
second– goal: maximize
04/19/23 16
Scheduling Criteria• The following 5 factors are used as Scheduling
Criteria (Performance Evaluation), which are used to compare CPU scheduling algorithms3. Turnaround time
• Amount of time to execute a particular process• In other word, the delay between job submission and job
completion• The sum of the time waiting to get into memory, waiting
in the ready queue, executing on the CPU, and doing I/O
– goal: minimize
04/19/23 17
Scheduling Criteria• The following 5 factors are used as Scheduling
Criteria (Performance Evaluation), which are used to compare CPU scheduling algorithms4. Waiting time
• Amount of time a process has been waiting in the ready queue
• Note that a CPU scheduling algorithm cannot change the execution time or I/O– goal: minimize
5. Response time• Amount of time it takes from when a request was
submitted until the first response is produced• In other words, the amount of time from request until the
process starts to respond– goal: minimize
04/19/23 18
Optimization Criteria• Max CPU utilization
• Max throughput
• Min turnaround time
• Min waiting time
• Min response time
04/19/23 19
FCFS Scheduling• FCFS - First Come First Serve
– The process that requests the CPU first is allocated to the CPU first
– Simple and non-preemptive– Better to schedule shorter processes before longer
ones• Convoy effect happens when short process get stuck
behind long process
– Unfair to processes with short bursts– Not usually used alone, but as a part of a more
complex algorithm
04/19/23 20
Process Burst Time
P1 24
P2 3
P3 3
• Suppose that the processes arrive in the order: P1 , P2 , P3 all at time 0. The Gantt Chart for the schedule is:
– Throughput: 3 processes/30 milliseconds = 1/10 – Turnaround time for P1 = 24; P2 = 27; P3 = 30– Average turnaround time: (24 + 27 + 30)/3 = 81/3 = 27– Waiting time for P1 = 0; P2 = 24; P3 = 27– Average waiting time: (0 + 24 + 27)/3 = 51/3 = 17
P1 P2 P3
24 27 300
FCFS Scheduling
04/19/23 21
FCFS SchedulingSuppose that the processes arrive in the order
P2 , P3 , P1 all at time 0
• The Gantt chart for the schedule is:
– Throughput: 3 processes/30 milliseconds = 1/10– Turnaround time for P1 = 30; P2 = 3; P3 = 6– Average turnaround time: (30 + 3 + 6)/3 = 39/3 = 13
– Waiting time for P1 = 6; P2 = 0; P3 = 3
– Average waiting time: (6 + 0 + 3)/3 = 9/3 = 3
• Much better than previous case!
P1P3P2
63 300
04/19/23 22
Shortest-Job-First (SJF) Scheduling
• Associate with each process the length of its next CPU burst. – Use these lengths to schedule the process with
the shortest time first
• Non-preemptive– once CPU given to the process it cannot be
preempted until completes its CPU burst
• SJF is optimal non-preemptive algorithm– Gives minimum average waiting time for a
given set of processes
04/19/23 23
Process Arrival Time Burst Time
P1 0.0 7
P2 0.0 4
P3 0.0 1
P4 0.0 4
• Suppose that the processes arrive in the order: P1 , P2 , P3 , P4 all at time 0. The Gantt Chart for the schedule is
| P3 | P2 | P4 | P1 |
0 1 5 9 16
– Throughput: 4 processes/16 milliseconds = 1/4– Turnaround time for P1 = 16; P2 = 5; P3 = 1; P4 = 9– Average turnaround time: (16 + 5 + 1 + 9)/4 = 31/4 = 7.75
– Waiting time for P1 = 9; P2 = 1; P3 = 0 ; P4 = 5
– Average waiting time: (9 + 1 + 0 + 5)/4 = 15/4 = 3.75
Example of SJF
Process Arrival Time Burst Time
P1 0.0 7
P2 2.0 4
P3 4.0 1
P4 5.0 4
– Throughput: 4 processes/16 milliseconds = 1/4– Turnaround time for P1 = 7-0 = 7; P2 = 12-2 = 10;
P3 = 8-4 = 4; P4 = 16-5 = 11– Average turnaround time: (7 + 10 + 4 + 11)/4 = 32/4 = 8
– Waiting time for P1 = 0-0 = 0; P2 = 8-2 = 6;
P3 = 7-4 = 3; P4 = 12-5 = 7
– Average waiting time: (0 + 6 + 3 + 7)/4 =16/4 = 4
Another Example of SJF
P1 P3 P2
73 160
P4
8 12
04/19/23 25
SRTF - Shortest Remaining Time First
• Preemptive version of Shortest-Job-First (SJF) Scheduling
• Preemptive– If new process arrives with CPU burst less than
time left of process currently executing, then new process gets the CPU
• SRTF is optimal preemptive algorithm– Gives minimum average waiting time for a
given set of processes
04/19/23 26
Example of SRTF Process Arrival Time Burst Time
P1 0.0 7 P2 2.0 4 P3 4.0 1 P4 5.0 4
– Throughput: 4 processes/16 milliseconds = 1/4– Turnaround time for P1 = 16-0 = 16; P2 = 7-2 = 5;
P3 = 5-4 = 1; P4 = 11-5 = 6– Average turnaround time: (16 + 5 + 1 + 6)/4 = 28/4 = 7– Waiting time for P1 = 11-2 = 9; P2 = 5-4 = 1;
P3 = 4-4 = 0; P4 = 7-5 = 2– Average waiting time: (9 + 1 + 0 +2)/4 = 12/4 = 3
P1 P3P2
42 110
P4
5 7
P2 P1
16
04/19/23 27
Determining Length of Next CPU Burst
• For the SJF and SRTF scheduling algorithms, knowing the exact length of the next CPU burst is difficult– For long-term scheduling, the user-defined
process time limit can be used• The user has the responsibility for estimating the
process time limit accurately
– The short-term scheduler does not know the exact length of the next CPU burst
• Instead, the next CPU burst is estimated
04/19/23 28
Determining Length of Next CPU Burst
• For short-term scheduling, the length of next CPU burst is estimated by using the length of previous CPU bursts, using exponential averaging
:Define 4.
10 , 3.
burst CPU next the for value predicted 2.
burst CPU of length actual 1.
1n
thn nt
.1 1 nnn t
04/19/23 29
Determining Length of Next CPU Burst
04/19/23 30
Examples of Exponential Averaging =0
n+1 = n
– Recent history does not count =1
– n+1 = tn
– Only the actual last CPU burst counts• If we expand the formula, we get:
n+1 = tn+(1 - ) tn -1 + …
+(1 - )j tn -j + …
+(1 - )n +1 0
• Since both and (1 - ) are less than or equal to 1, each successive term has less weight than its predecessor
04/19/23 31
Priority Scheduling• A priority number (integer) is associated with
each process
• The CPU is allocated to the process with the highest priority – In this class, assume that the smallest integer has
the highest priority• Can be either way, so we will stick with the smallest
number for the highest priority to try to avoid confusion
• Can be preemptive or non-preemptive
04/19/23 32
Priority Scheduling• Problem of Starvation
– Low priority processes may never execute
• Solution is Aging– As time progresses, increase the priority of the
process
• By the way, SJF and SRTF are also a type of priority scheduling algorithm– Priority is the predicted next CPU burst time
04/19/23 33
Process Priority Burst Time
P1 3 10
P2 1 1
P3 4 2
P4 5 1
P5 2 5• Suppose that the processes arrive in the order: P1 , P2 , P3 , P4 , P5 all at
time 0. The Gantt Chart for the schedule is
| P2 | P5 | P1 | P3 | P4 | 0 1 6 16 18 19 – Throughput: 5 processes/19 milliseconds = 5/19– Turnaround time for P1 = 16; P2 = 1; P3 = 18; P4 = 19; P5 = 6– Average turnaround time: (16 + 1 + 18 + 19 + 6)/4 = 60/5 = 12– Waiting time for P1 = 6; P2 = 0; P3 = 16; P4 = 18; P5 = 1– Average waiting time: (6 + 0 + 16 + 18 + 1)/4 = 41/5 = 8.2
Priority Scheduling (Non-preemptive)
04/19/23 34
Round Robin (RR)• Each process gets a small unit of CPU time
(time quantum or time slice), usually 10-100 milliseconds (ms)– After this time has elapsed, the process is preempted and
added to the end of the ready queue
• If there are n processes in the ready queue and the time quantum is q– Then each process gets 1/n of the CPU time in
chunks of at most q time units at once
04/19/23 35
Example of RRProcess Burst Time Arrival Time
P1 53 0
P2 17 0
P3 68 0
P4 24 0
• Time Quantum = 20 ms– Throughput: 4 processes/162 milliseconds = 2/81– Turnaround time for P1 = 134; P2 = 37; P3 = 162; P4 = 121– Average turnaround time: (134 + 37 + 162 + 121)/4 = 454/4 = 113.5– Waiting time for P1 = (77-20)+(121-97) = 81; P2 = (20-0)=20;
P3 = (37-0)+(97-57)+(134-117)=94; P4 = (57-0)+(117-77) = 97– Average waiting time: (81 + 20 + 94 +97)/4 = 292/4 = 73.0
P1 P2 P3 P4 P1 P3 P4 P1 P3 P3
0 20 37 57 77 97 117 121 134 154 162
04/19/23 36
RR with Different Arrival TimesProcess Burst Time Arrival Time
P1 53 0
P2 17 30
P3 68 50
P4 24 60
• Time Quantum = 20 ms– Throughput: 4 processes/162 milliseconds = 2/81– Turnaround time for P1 = 70-0 = 70; P2 = 57-30 = 27;
P3 = 162-50 = 112; P4 = 134-60 = 74– Average turnaround time: (70 + 27 + 112 + 74)/4 = 283/4 = 70.75– Waiting time for P1 = (57-40) = 37; P2 = (40-30) = 10;
P3 = (162-68-50)=44; P4 = (134-24-60) = 50– Average waiting time: (37 + 10+ 44 + 50)/4 = 141/4 = 35.25
P1 P1 P2 P1 P3 P4 P3 P4 P3 P3
0 20 40 57 70 90 110 130 134 154 162
04/19/23 37
Time Quantum• How to choose value for time quantum (time
slice)?– If time quantum (time slice) is 20 milliseconds
and context switch is 5 milliseconds • then 20% wasted on overhead to improve
– If time quantum is 500 milliseconds and context switch is 5 milliseconds
• then only 4% overhead
04/19/23 38
Time Quantum• If time quantum (slice) is too small
– Overhead of context switch becomes dominant
• If time quantum (slice) too large– RR degenerates to FCFS (First Come First Serve)– Typical to have 80% of CPU bursts shorter than
time slice
• If processes finish CPU burst in single time quantum– The turnaround time will be shorter
04/19/23 39
Time Quantum & Context Switches
•This figure shows how decreasing the time quantum increases the number of context switches
04/19/23 40
Turnaround Time Varies With The Time Quantum
•The average turnaround time does not necessarily improve as the time quantum size increases
04/19/23 41
Round Robin (RR)• Tradeoffs
– RR typically has a higher average turnaround time than SRTF (Shortest Remaining Time First)
– However, RR typically has better response time than SRTF
• For RR, the implicit assumption is that all processes are equally important
• According to Dr. Tanenbaum, RR is the "oldest, simplest, fairest, and most widely used" of the scheduling algorithms
04/19/23 42
Multilevel Queue Scheduling• For a multilevel queue scheduling algorithm,
the ready queue is partitioned into several separate queues– For example, two queues
1. Interactive/foreground processes at high priorities
2. Background/batch processes at low priorities
• With a multilevel queue scheduling algorithm, each queue has its own scheduling algorithm– Continuing from the above example
1. foreground – RR (Round Robin)
2. background – FCFS (First Come First Serve)
04/19/23 43
Multilevel Queue Scheduling• Scheduling must be done between the queues
– Here are some example choices1. Use fixed priority scheduling (serve all processes from
the foreground, and then from the background) – Possibility of starvation
2. Use time slicing (each queue gets a certain amount of CPU time which it can schedule amongst its processes)– 80% to foreground in RR
– 20% to background in FCFS
• A Multilevel Queue is good for time-sharing systems and favors short jobs
04/19/23 44
Multilevel Queue Scheduling
•In this figure, the ready queue is divided into five (5) separate queues
04/19/23 45
Multilevel Feedback Queue• In a multilevel queue scheduling algorithm, a
process is permanently assigned to a specific queue– A multilevel queue scheduling algorithm has low
overhead, but is inflexible
• In contrast, in a Multilevel Feedback Queue Scheduling Algorithm, a process moves between the various queues– Processes that wait for too long in a particular
queue can be moved to another queue• This kind of aging prevent starvation
04/19/23 46
Multilevel Feedback Queue• Dynamic priorities (priorities change) for each
process– Aging, which prevent starvation, can be
implemented in this manner
• Design decisions– Scheduling algorithm for each queue– Rule for upgrading/degrading process to
higher/lower queue– To which queue do new processes go?
04/19/23 47
Multilevel Feedback Queue• Typical behavior
– Higher priority queues have smaller time slices– If a process uses up its time slice, it moves down a
priority– If a process blocks before using time slice, it stays
at that priority– New processes go to the highest priority
04/19/23 48
Example of Multilevel Feedback Queue
• Three queues
1. Q0 – RR time quantum 8 milliseconds
2. Q1 – RR time quantum 16 milliseconds
3. Q2 – FCFS
04/19/23 49
Example of Multilevel Feedback Queue
• Scheduling
– A new job enters queue Q0 which is served FCFS
• When it gains CPU, job receives 8 milliseconds.
• If it does not finish in 8 milliseconds, job is moved to queue Q1
– At Q1 job is again served FCFS and receives 16 additional milliseconds
• If it still does not complete, it is preempted and moved to queue Q2
04/19/23 50
Multilevel Feedback Queues
Multiple-Processor Scheduling• CPU scheduling is more complex when
multiple CPUs are available
• N processors under control on one operating system– All homogeneous processors
• Use any processor for any job type
– Versus heterogeneous processors• Schedule according to which processor the job was
compiled on
04/19/23 51
Multiple-Processor Example• Assume homogeneous processors
– Any processor can handle any process
• Assume a common ready queue– Want to prevent the case of having one full
queue and all other queues empty
04/19/23 52
Multiple-Processor ExampleProcess Arrival Burst Time
P1 0 2 P2 0 2 P3 0 4
• If use FCFS, assign to the processors as follows – CPU1: P1 P3 (6 ms)
– CPU2: P2 (2 ms)
• Alternative (better) way to assign to the processors– CPU1: P1 P2 (4 ms)
– CPU2: P3 (4 ms)
04/19/23 53
Multiple-Processor Example• Which scheduling strategy is better?
– COMPLEX problem
• Optimal Schedule– Enumerate all possible schedules
• Choose the one with the least amount of processor idle times
• This problem is NP complete (non-polynomial), which means that the only solution is one that takes the longest time possible (check all combinations)
• In practice, use exponential averaging to estimate the optimal solution
04/19/23 54
04/19/23 55
Operating System Examples1. Solaris scheduling
2. Windows XP scheduling
3. Linux scheduling
Solaris Scheduling• Priority-based, preemptive scheduling
• Time slicing (RR) & multilevel feedback queues
• Four classes of scheduling (each class has different priorities and scheduling algorithms)1. Real time
2. System
3. Time sharing (default)
4. Interactive
04/19/23 56
04/19/23 57
Solaris Scheduling
Solaris Scheduling• Time Sharing & Interactive classes have 60
priority levels– Contain several different fields
1. Priority – higher number is higher priority
2. Time quantum – lowest priority has highest time quantum (inversely proportional to priority)
3. Time quantum expired – decrease in priority of a thread if its entire time quantum has been used up
4. Return from sleep – boost in priority if finished waiting for I/O
04/19/23 58
Solaris Dispatch Table
04/19/23 59
Windows XP Scheduling• Priority-based, preemptive scheduling
• Time slicing (RR)
• The dispatcher ensures that highest-priority process will always run– Has 32 priority levels, with higher number for
higher priority– Has two main priority classes
1. Real-time class – priorities 16 to 31
2. Variable class – priorities 1 to 15
3. Memory management – priority 0
04/19/23 60
Windows XP Scheduling• The dispatcher has a queue for each
scheduling priority
• The dispatcher traverses through all the queues from highest to lowest until it finds a thread that is ready to run
04/19/23 61
Windows XP Scheduling• After a process uses up its time quantum
– The priority is lowered
• After a process finishes a wait– The priority is boosted, depending on what the
process has been waiting for• Threads waiting for the mouse & keyboard get large
increases
• Threads waiting for a disk operation get smaller increases
04/19/23 62
Windows XP Priorities
04/19/23 63
•The far-left column is the relative priority (within each class), the 2nd column is the real-time class, and the next 5 columns are the variable class
04/19/23 64
Linux Scheduling• Priority-based, preemptive scheduling• Two separate priority ranges (lower
numbers have a higher priority)1. Real-time values: 0 to 99
• Once assigned, values never change
2. Nice values: 100 to 140 • If much I/O, up to -5 change; if CPU-bound, +5
• RR (Round Robin)– Unlike most other OS scheduling algorithms,
higher-priority processes are assigned a longer time quantum and vice-versa
04/19/23 65
Relationship Between Priorities & Time-slice
• A higher priority process is assigned a longer time quantum (and vice-versa)– Lower integers signify higher priorities
04/19/23 66
Linux Scheduling• Each processor has two kinds of queues,
which are implemented as priority arrays1. Active priority array
• Contains all processes which still have time remaining in their time slices
• Short-term scheduler chooses the process with the highest priority to run on CPU first
2. Expired priority array• Contains all processes which have used up their
time slice
• Once the active priority array is empty, then the two priority arrays are switched
04/19/23 67
List of Tasks Indexed According to Priorities
• This shows the two priority arrays
04/19/23 68
Algorithm Evaluation• In order to evaluate the CPU scheduling
algorithms, we need to determine the evaluation criteria (what will be measured)
1. CPU utilization
2. throughput
3. turnaround time
4. waiting time
5. response time
04/19/23 69
Algorithm Evaluation• Analytic Techniques
1. Deterministic Scheduling Theory
2. Queuing theory
3. Simulations
4. Implementation
04/19/23 70
Deterministic Scheduling Theory
• Because processes characteristics are all known ahead of time, we can:– Evaluate each algorithm based on the
characteristics of the processes– Choose algorithm based on performance
criteria
• Deterministic modeling is simple & fast, but results only apply to specific cases– On the other hand, may indicate certain trends
04/19/23 71
Deterministic Scheduling Theory
• Processes characteristics Process Burst time Arrival time
P1 10 0
P2 29 0
P3 3 0
P4 7 0
P5 12 0
04/19/23 72
Deterministic Scheduling Theory
• FCFS: 28 ms average waiting time
• SJF: 13 ms average waiting time
• RR: 23 ms average waiting time
04/19/23 73
Queuing Theory• Models systems with arriving customers,
wait for service, get service, depart
• Operating system characteristics such as1. number of servers
2. capacity of queues
3. arrival time distribution
4. service time distribution
• Huge body of work to analyze these systems
04/19/23 74
Simulations• Write software to fake operation
– Feed simulation a bunch of jobs– Check performance of each scheduling
algorithm
• Two possible workload characteristics1.Randomly generated from probability
distributions
2.Or compiled from real samples (called a trace tape)
04/19/23 75
Simulations• Evaluation of CPU schedulers by
simulation
04/19/23 76
Implementation• Two steps for implementation
1. Implement a scheduling algorithm in an actual operating system
2. Monitor the performance of the operating system