9 .0 THRAPSTON – STRATEGY AND ALLOCATIONS 61 Thrapston Regeneration Masterplan (Entec, October 2003) 9.1 Development in Thrapston will be of a scale commensurate with the town’s role as a Rural Service Centre. A range of sites, both Brownfeld and Greenfeld, will be developed in order to ensure the regeneration of the town centre, enhance job opportunities and maintain a supply of housing land. It will be necessary to phase new housing development in order to ensure that growth is accompanied by the delivery of infrastructure and jobs. The rate of development will be dependent upon ensuring that school places can be provided for in line with increased demand. 9.2 In association with development proposals afecting secondary education provision in Oundle (see Section 8 above); the increasing pressure upon Prince William School resulting from the proposed housing development throughout the Plan area means that the issue of providing a new secondary school in Thrapston is continually being raised. Furthermore, this particular issue was identifed through the earlier Preferred Options consultation for this Plan (January – March 2006). Considering the wider need to plan for sustainable communities as set out in PPS1 and the growth levels for Oundle and Thrapston set out in the Core Strategy, the Plan proposes the safeguarding of land in Thrapston in the longer term for provision of a new secondary school. 9.3 The local health services also sufer capacity problems, with the Midland Road surgery oversubscribed and seeking relocation to a larger site. The 2002 Thrapston improving the appearance and range of services in the town centre, making better use of the river and lakes, town centre car parking improvements, more facilities for young people and improvements to public transport. Developer contributions will therefore be required towards a range of social and community infrastructure, in addition to ensuring that the local transport network can deal with the new development. 61 Healthcheck and 2003 Masterplan also identifed a range of priorities for action, including Pl i i i ill i li ici i l il i l l hi l l i iti i l l wi isi ill i i i i l i Policy THR1 – INFRASTRUCTURE ann ng Perm ss on w not be granted for the development s tes out ned at pol es THR3 and THR5 of th s P an unt t can be demonstrated that the oca ghway, oca serv ces and amen es are n p ace to dea th the demands ar ng from new development. Land w be safeguarded at Spr ngfield Farm for a new secondary school, wh ch may be needed w th n the P an per od or in the longer term. i 7 4 R U R A L N O R T H, O U N D L E A N D T H R A P S T O N P L A N S u b m t t e d J a nu a r y 2 0 0 8

9.0 thrAPSton – StrAtegy And AlloCAtIonS · 9.1 Development in Thrapston will be of a scale commensurate with the town’s role ... these key pr nc ples. Indicator: ncreased vitality

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 9.0 thrAPSton – StrAtegy And AlloCAtIonS · 9.1 Development in Thrapston will be of a scale commensurate with the town’s role ... these key pr nc ples. Indicator: ncreased vitality

R u R a l N o R t h , o u N d l e a N d t h R a p s t o N p l a N

9.0 thrAPSton – StrAtegy And AlloCAtIonS

61 Thrapston Regeneration Masterplan (Entec, October 2003)

9.1 Development in Thrapston will be of a scale commensurate with the town’s role as a Rural Service Centre. A range of sites, both Brownfield and Greenfield, will be developed in order to ensure the regeneration of the town centre, enhance job opportunities and maintain a supply of housing land. It will be necessary to phase new housing development in order to ensure that growth is accompanied by the delivery of infrastructure and jobs. The rate of development will be dependent upon ensuring that school places can be provided for in line with increased demand.

9.2 In association with development proposals affecting secondary education provision in Oundle (see Section 8 above); the increasing pressure upon Prince William School resulting from the proposed housing development throughout the Plan area means that the issue of providing a new secondary school in Thrapston is continually being raised. Furthermore, this particular issue was identified through the earlier Preferred Options consultation for this Plan (January – March 2006). Considering the wider need to plan for sustainable communities as set out in PPS1 and the growth levels for Oundle and Thrapston set out in the Core Strategy, the Plan proposes the safeguarding of land in Thrapston in the longer term for provision of a new secondary school.

9.3 The local health services also suffer capacity problems, with the Midland Road surgery oversubscribed and seeking relocation to a larger site. The 2002 Thrapston

improving the appearance and range of services in the town centre, making better use of the river and lakes, town centre car parking improvements, more facilities for young people and improvements to public transport. Developer contributions will therefore be required towards a range of social and community infrastructure, in addition to ensuring that the local transport network can deal with the new development.

61Healthcheck and 2003 Masterplan also identified a range of priorities for action, including

pl i i i ill i liici i l il i l l

hi l l i iti i l l wi isi

ill i ii i l i

Policy THR1 – INFRASTRUCTURE

ann ng perm ss on w not be granted for the development s tes out ned at pol es thR3 and thR5 of th s p an unt t can be demonstrated that the oca

ghway, oca serv ces and amen es are n p ace to dea th the demands ar ng from new development.

land w be safeguarded at spr ngfield Farm for a new secondary school, wh ch may be needed w th n the p an per od or in the longer term.

i7 4 R u R a l N o R t h , o u N d l e a N d t h R a p s t o N p l a N s u b m t t e d J a nu a r y 2 0 0 8

Page 2: 9.0 thrAPSton – StrAtegy And AlloCAtIonS · 9.1 Development in Thrapston will be of a scale commensurate with the town’s role ... these key pr nc ples. Indicator: ncreased vitality

T H R A P S T O N – S T R A T E G Y A N D A L L O C A T I O N S

n I

n I

Indicator:

mprovements in infrastructure associated with the development of land identified in policy thR5

Target:

mprovements in infrastructure implemented prior to or alongside new development, as appropriate

Regeneration

9.4 Investment in Thrapston is required in order to support its role as a Rural Service Centre. The proposals for Thrapston Town Centre regeneration draw on the findings of the Healthcheck and related Masterplan outlined above.

9.5 An overall framework for change and development over the plan period is provided by Policy THR2. Development proposals, traffic management and environmental enhancement schemes should be designed to follow the principles established within this policy.

ll ildi l i i

a the

b the –

c d public –

e

f

i l l li i

n I

Policy THR2 – REGENERATION OF THRAPSTON TOWN CENTRE

town centre and edge of centre proposals for new deve opment and the re-use of and and bu ngs shou d contribute towards mprov ng:

retail offer – to increase active frontages, enhance and not threaten the viability of existing local businesses

visual appearance of public areas to create new landmarks and enhanced vistas local facilities – to enhance community infrastructure

car parking to enhance the provision of convenient and safe parking facilities linkages between the high Street and public areas – to upgrade pedestrian accessibility gateways to the centre – to provide an enhanced sense of place

env ronmenta enhancement and traffic management schemes shou d a so respect these key pr nc ples.

Indicator:

ncreased vitality and vibrancy within thrapston town centre

7 5iR u R a l N o R t h , o u N d l e a N d t h R a p s t o N p l a N s u b m t t e d J a nu a r y 2 0 0 8

Page 3: 9.0 thrAPSton – StrAtegy And AlloCAtIonS · 9.1 Development in Thrapston will be of a scale commensurate with the town’s role ... these key pr nc ples. Indicator: ncreased vitality

Target:

n 100% of approved town centre applications to adhere to the criteria set out in policy thR2

9.6 Key Sites are identified in Policy THR3 that are pivotal to the regeneration of the town centre; based on the healthcheck and master planning work referred to above. These sites need to be viewed comprehensively and developed in a complementary manner for a range of town centre uses.

i ill ilil i i

1 ( ) i i ial i l i il i iliti

i i li i l ildi i

i ; i i i ii i i

2 l l i i i i i i l

l i l i l i i i iI ial i l i i

il i

3 Bull i i iti i i

i i jli ildi l l

i l i l ill l l i i l i l i i

i i l ildil incl i

si l iali i i iiliti iali ial i l

i li i i

Policy THR3 – THRAPSTON REGENERATION SITES

the regenerat on of thrapston town Centre w be fac tated through the mixed use redevelopment of the fol ow ng s tes:

High Street 17-31 high Street, the library and fire stationth s s te has potent for a mix of uses nc ud ng reta , commun ty fac es, offices, hous ng and town centre car park ng. development shou d address the h gh street and prov de a andmark bu ng to enhance the prom nent corner s te creat ng an attract ve gateway to the h gh street shopp ng area and enhanc ng the sett ng of the adjacent Conservat on area.

Land at Cosy nook and rear of high Street properties development cou d take p ace n assoc at on w th s te 1, or ndependent y, and shou d respect the s te’s ocat on part y w th n the des gnated Conservat on area. t has potent for a mix of uses nc ud ng town centre car park ng, reta , offices and hous ng.

ring and Church Walk th s s te offers opportun es to create an mportant new c vic space for the town. the sett ng of the Conservat on area, st James’s Church and ad acent

sted Bu ngs shou d be enhanced by new deve opment that creates act ve frontages ook ng onto a new town square. Redeve opment w be arge y dependent upon find ng su tab e s tes to re ocate the ex st ng car

repa r bus ness and st John’s ambu ance bu ng. the range of uses that cou d be accommodated ude enhanced town centre car park ng, a new

te for the week y market and other spec st market act vit es, commun ty fac es, spec st resident accommodat on for e derly persons, and food and dr nk estab shments w th space for outdoor eat ng.

7 6 i R u R a l N o R t h , o u N d l e a N d t h R a p s t o N p l a N s u b m t t e d J a nu a r y 2 0 0 8

Page 4: 9.0 thrAPSton – StrAtegy And AlloCAtIonS · 9.1 Development in Thrapston will be of a scale commensurate with the town’s role ... these key pr nc ples. Indicator: ncreased vitality

T H R A P S T O N – S T R AT E G Y A N D A L L O C AT I O N S

4 is si will i

li i i l i il l i ial i l i il i

i iliti il i i i

ildi l i l ii li l i i

li i l i i itii i i

i i i l i j i iMidl ill i l l wi i i i i i

i i i i l ili ili i le al i i i i

n

n In I

Policy THR3 – Continued

Cattle market Redevelopment of th te be dependent upon relocat on of the current vestock market and related act vit es, preferab y to a s te n the oca area. the s te has potent for a mix of uses nc ud ng reta , hous ng,

offices, commun ty fac es and new town centre car park ng. development shou d respect the sett ng of the adjacent Conservat on area and l sted Bu ngs. there shou d be no veh cu ar access to the h gh street but an enhanced pedestr an nk shou d be prov ded. North-south pedestr an

nkages across the s te shou d be des gned to ncrease opportun es to access the h gh street on foot from exist ng areas n the south of the town. off s te h ghway mprovements a ong Market Road and at ts unct on w th

and Road w need to both prov de for any new deve opment and death ex st ng road user confl cts n the area around the schools. th s may

requ re some road w den ng, wh ch cou d be fac tated by relocat on of the Bow ng Green to a su tab ternat ve locat on w th n the town.

Indicator:

the redevelopment of 17-31 high street, land at Cosy Nook and rear of high street properties, the Bull Ring and Church Walk, and the Cattle Market

Targets:

mproved town centre retail offer by end of 2011 ncreased amount of town centre parking by end of 2011

7 7iR u R a l N o R t h , o u N d l e a N d t h R a p s t o N p l a N s u b m t t e d J a nu a r y 2 0 0 8

Page 5: 9.0 thrAPSton – StrAtegy And AlloCAtIonS · 9.1 Development in Thrapston will be of a scale commensurate with the town’s role ... these key pr nc ples. Indicator: ncreased vitality

Brid

ge

CB.61m

9

61

28

29

1

25

2

7

15

1

STJAMES'CRESCENT

42.7

m

CHANDLERGARDENS

16

1a

27

3a

51

41

1614

4053

113

79

46

QUEENSTREET

45.0

m

Gara

ge

MAR

KET

46a

15 13

1618

4

9

3

.2m

5

13

13

7 24

2a

11

WINDINGWAY

TAVENUE7a

25

ERW

AY

3357

18

1278

91

T

21

1

ElSu

bSt

a

12

53

3

4a6

BM45

78

32b

30.4

m

6

55

1

5

4

9

22

4 HALFORDSTREET

PO

25

9 to 1214 to 16

12

32 GROVEROAD

11

41 Bk

15

49 Ca

ttle

1to

26

Wal

k

Path ESS

6

DEVE

RERO

AD

Tenn

is C

ourts

43

2

Sub

Sta 16

12

48

68

50 17'

95

82

96

210 5

1317

8

MONT

AGUE

Presb

ytery

Paul

's

4

GVC

1 to

20 26

11 5COSYNOOK

1

12

16

LB 81823

5

16

32 28

20

HIGH

23

to

9

36

Bow

ling

46

48

53a

59PH

Man

or

1

32

16

5

43

13

16

2

37 33.5m 4

33.2m

5

1

34.4

m Hous

e

THRA

PSTO

N

4

31

78

37

102

STPA

ULSGARD

ENS

39

38

6

22

1

Esta

te

Fire

St

atio

n

1

4

17

BM31

.14m

4

5

3Fairf

ield

42

War

ehou

se

5755

Club

Gras

send

ale

38

65

King

s Ar

ms 66PH

2

7

St Ja

mes

's

2

78

1

TCB 145

8

69

7

90

Car P

ark

Thra

psto

n

86

98

11

29

1

SACKVILLE STREET

33 14

11

8

8a St

106

Hote

l

41

27

29.9

m

6

Indu

stria

l 13 Tw

r

44

23

37

4

19

27

34

Wor

ks

28

6

1 Wr T

34

13

10

The Ha

ll 58

67

14

12

32

Chicheley Cottages3

32.6

m

11

33.4

m

21

53

6El

BM34.13m

1

15

54

10 COURT

33

TCB

88

6

6 1

GROVE

11

4

7

Brid

ge

4

29.6m

9 7

2 7

1

PASHLER

21

Ward

Bdy 10

29

22

26

5 21

348 4 45

Tel

Gara

ge

3

Hous

e

Chur

ch

MANOR

Mano

r Clo

se 36

6 to 24

5 59

57-59

PC

Supe

rmar

ketRe

ctor

y93

OUNDLEROAD

35.1

m

Peac

e M

emor

ial P

ark 8 19

2

100

BEECHCT

27

11

9

C O UR

T

40

30a

Surgery

7

12a

208

51

5TCB

to

20

to

10

29.9

m

ESS

Church

3

32

STRE

ET

15b

31.1

m

51

CHANCERYLANE

2

37

64Flats

14

Hall HORTONS'LANEHa

ll

Chur

ch King

1

5Harrisons PARKVIEW

10

64

Hote

l71

NENE

BM 3

6.24

m

Polic

eOf

fice

68 16

LB

Chur

ch

4

3 3645

WAINWRIGH

TYL

2

Cour

t 30

8

2

3COTTINGHAMWAY

14

13 46

2513

6

GDNS18a Bk

20

24

1

36

43

17

Ex

23

Cour

t

CLOSE

73

1 15

77 Th

e 49

5531

61a

56

14

HomeCourt

8

HUNT

INGD

ON R

OAD

18

7

2

2

7

8

5

18

2

21 13

ESS

1 2

30

Liby

818b

33

BM31.18m28 to 3 0

Play

grou

nd

Gree

n

53

Mar

ket Bk

29

1

30

Chich

eley

Lod

ge

47

Scho

ol

MAR

KET

ROAD

John

7 31a

57a

29

1

PH

Walk

11

13

22

64 21

CORDWAINER

1

Club

6

9

2

Chur

ch

THR

3(4)

THR

3(2)

THR

3(1)

THR

3(3)

Due

to th

e O

rdna

nce

Sur

vey’

s P

ositi

onal

Acc

urac

y Im

prov

emen

t (PA

I) P

rogr

amm

e, s

ome

data

on

this

m

ap m

ay b

e m

isal

igne

d w

ith it

s re

late

d O

S fe

atur

e.

Eas

t Nor

tham

pton

shire

Cou

ncil

will

be a

ble

to a

dvis

e yo

u of

the

PAI d

ata

conv

ersi

on p

rogr

amm

e, it

s im

pact

on

this

map

and

any

furth

er in

form

atio

n yo

u m

ay re

quire

.

±

Inse

t 2A

Thra

psto

n To

wn

Cen

tre

1:2,

500

Scal

e:

Bas

ed u

pon

the

Ord

nanc

e S

urve

y m

appi

ng w

ith th

e pe

rmis

sion

of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nery

O

ffice

© C

row

n C

opyr

ight

. Una

utho

rised

repr

oduc

tion

infri

nges

cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. E

ast N

orth

ampt

onsh

ire C

ounc

il.

Lice

nce

No

1000

1907

2. (2

007)

Prop

osal

s M

ap

The

key

for t

his

Pla

n an

d al

l oth

er In

sets

ca

n be

foun

d ju

st b

efor

e th

e pl

astic

wal

let

tow

ards

the

rear

of t

he fo

lder

.

Page 6: 9.0 thrAPSton – StrAtegy And AlloCAtIonS · 9.1 Development in Thrapston will be of a scale commensurate with the town’s role ... these key pr nc ples. Indicator: ncreased vitality

T H R A P S T O N – S T R A T E G Y A N D A L L O C A T I O N S

Employment Strategy

9.7 Thrapston has several existing business areas, including Cottingham Way/ Cosy Nook (4 hectares); Halden’s Parkway (40 hectares, with 7.5 hectares still undeveloped); and Top Close (2.3 hectares, with 0.8 hectares still undeveloped). Separate to, but closely related to both Thrapston and Woodford, are the Islip Furnace and adjacent automobile storage sites (comprising about 7 hectares and 21.5 hectares respectively).

9.8 In support of the town’s role as a rural service centre, it is important that a range of employment opportunities continue to be available; through safeguarding these existing employment areas, making better use of under utilised land within them, and by planning for new employment and commercial development within town centre redevelopment sites. The potential of town centre sites is highlighted in the regeneration section above.

9.9 It is not considered necessary to identify major new Greenfield employment sites in the Thrapston area but there is a need for some local businesses to relocate from their existing cramped and problematic sites, particularly at Chancery Lane and Midland Road. The Council will continue to assist with seeking relocation sites, with a preference for sites within the business areas identified above, in order to enable the expansion of these businesses and their retention in the local area, as well as the redevelopment of their existing sites. If plots within existing business areas are not available or suitable, alternative sites will be judged against the general polices in this Plan and in the Core Strategy, as well as policy THR4.

9.10 The existing A605 roundabout junction with Huntingdon Road already deals with high volumes of traffic and there are safety issues relating to commercial heavy vehicles overturning. A redesign of the junction will need to be considered as part of any proposals to intensify or extend employment uses in this area.

9.11 Existing businesses are often longstanding employers and have a base of local employees who are able to walk to work. Relocation of these businesses should not compromise the ability of employees to access the new site, making them car dependent where they were not before. Travel Plans are a recently developed means of setting out measures by which single occupancy car journeys can be limited. Options may include improved walking and cycling links; buses provided by the employer; improvements to public transport; and car sharing.

7 9i

I

l i i i i i ili i ir i ill i l i i l l Islip

i I i l i i l i il l li i i l

a b

l i lill i i i

i

R u R a l N o R t h , o u N d l e a N d t h R a p s t o N p l a N s u b m t t e d J a nu a r y 2 0 0 8

Policy THR4 – RELOCAT NG EXISTING BUSINESSES AROUND THRAPSTON

proposals for re ocat ng ex st ng bus nesses n thrapston and fac tat ng theexpans on w be d rected to and w th n ha den’s parkway, top C ose or Furnace bus ness areas. f su tab e s tes n these ocat ons are not ava ab e or viab e, then potent al relocat on s tes elsewhere shou d be:

Adjacent to the existing built up area; and Suitable for hgV access and manoeuvring

proposa s for the further concentrat on of employment development at ha den’s parkway w be requ red to contr bute where necessary towards mprovements to the a605 roundabout junct on.

Page 7: 9.0 thrAPSton – StrAtegy And AlloCAtIonS · 9.1 Development in Thrapston will be of a scale commensurate with the town’s role ... these key pr nc ples. Indicator: ncreased vitality

n

n

Indicator:

Relocation of existing businesses to alternative sites

Target:

100% of approved schemes for business relocation meeting the locational requirements set out in policy thR4

Housing Strategy

9.12 The town has expanded considerably in recent years and the Core Strategy makes provision for a further 1,140 houses in the period from 2001 to 2021. Of this total, 411 were built by April 2007; with a further 72 under construction and 118 with planning permission but not yet started. An assessment of potential within the built up area of the town estimates that up to 400 units could be developed on ‘brownfield’ sites. Around 230 of these are however on complex mixed use redevelopment sites which will require coordination between a range of agencies and land owners in order to ensure their delivery in the Plan period. Housing development will be the preferred re-use on sites outside the town centre, but within the town centre housing will be a secondary element rather than the main use.

Housing as part of a new Neighbourhood

9.13 Work conducted on possible directions of growth in Thrapston assessed land to the south of Thrapston, bounded by the A14, as the most sustainable location for a new neighbourhood. The land has considerable potential for housing (estimated at around 685 units) but could also accommodate local facilities such as a medical centre, a relocated fire station, a family pub and high quality business uses. Greenfield housing development over the plan period will therefore be focused in this area, allocated as THR5.

9.14 The site has a diverse character, to the east there are mainly open agricultural fields; to the west, a former quarry and brownfield

land including the former Midland Road Station. Parts of the site to the east have been identified as being of archaeological importance and will need to be safeguarded in any development proposals. Noise attenuation is also a key issue, as the site lies alongside the A14 trunk road. In summary, there are various features within the site which will contribute towards achieving a distinctive character for the new neighbourhood. These elements will need to be comprehensively considered as part of a master plan for the site (as required for all sustainable urban extensions by policy 17 of the Core Strategy).

8 0 i R u R a l N o R t h , o u N d l e a N d t h R a p s t o N p l a N s u b m t t e d J a nu a r y 2 0 0 8

Page 8: 9.0 thrAPSton – StrAtegy And AlloCAtIonS · 9.1 Development in Thrapston will be of a scale commensurate with the town’s role ... these key pr nc ples. Indicator: ncreased vitality

T H R A P S T O N – S T R AT E G Y A N D A L L O C AT I O N S

i ill li l

ill i l i i l i liial i i i ill in li

wi il ili l pl

i il i il li

a b c d e f g h i

n

n

Policy THR5 – THRAPSTON SOUTH

a new ne ghbourhood w be developed on and to the south of thrapston, between hunt ngdon Road/Market Road, the a14/a605 and Mid and Road. the mix of uses w nc ude hous ng, a med ca centre, open space and h gh qua ty commerc development. the del very of hous ng on the s te w be phased ne

th the projected ava ab ty of schoo aces.

a master plan for the s te w l be prepared wh ch w l estab sh the:

overall mix of land uses; means of access and movement across the site; delivery of open space and medical facilities; delivery of high quality commercial uses; phasing of housing completions up to 2021 and beyond; protection of the area of archaeological interest; protection of geological and biodiversity interest; detailed design principles; detailed measures that will be put in place to attenuate noise from the A14 trunk road.

Indicator:

production of a master plan for the site setting out details of infrastructure delivery and phasing of housing development

Target:

Commencement of housing development on the site by 2011

8 1iR u R a l N o R t h , o u N d l e a N d t h R a p s t o N p l a N s u b m t t e d J a nu a r y 2 0 0 8