Dufferin Wind Power Project
Water Assessment Report August 2012
Page 45
Dufferin Wind Power Inc.
8.4 Seepage Areas
As indicated in Table 1, a search and analysis of applicable records and resources of the project
location did not identify any seepage areas, as defined by Ontario Regulation 359/09, in the
project location or within the surrounding 120 metres. The results of the site investigation
verified this determination.
9. SUMMARY OF AMENDMENTS TO THE RECORDS REVIEW
Based on the results of the site investigations, five previously unidentified water bodies
(crossings 48 through 52) were observed within 120 metres of the project location. Based on
the results of the site investigation, it was determined that five streams mapped within the
project location or 120 metre setback area, do not meet the definition of a water body
under Ontario Regulation 359/09 (i.e., is not a permanent or intermittent stream).
Previously unidentified water bodies and water bodies determined not to exist during field
investigations are discussed in Table 7 and are shown on Figure 6a through 6d. Classification of
water bodies are shown on Figure 7a through 7d.
10. CONCLUSIONS
This report is intended to fulfill the requirements for the Water Assessment Report under
Ontario Regulation 359/09. Based on the results of the site investigations, multiple water
bodies have been identified within the project location or within 120 metres. Based on these
findings, an Environmental Impact Study, as outlined under REA Sections 39 and 40, is required
for this project; one has been prepared. Table 8 summarizes the results of the site
investigation in the context of the proposed project.
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!( !(
!(!(
4THLINE
3RDLIN
E
COUNTYROAD21
SIDEROAD
240
COUN
TYROAD124
30THSIDEROAD
20THSIDEROAD
5THLINE
COUNTYROAD
9
SIDEROAD250
4THLINENORTHEAST
TOW
NLINEMU
LMU
RMELAN
CTHON
8THLINENORTHEAST
SOUTHLINEC
GREYROAD9
ROAD57A
6THLINENORTHEAST
8THLINE
TOWNLINEMELANCTHONOSPREY
ROAD67A
15THSIDEROAD
2NDLINENORTHEAST
TOWNLINEM
ULM
URM
ELANCHTON
10THLINE
6THLINENORTHEAST
5THLIN
E
SIDEROAD
250
30THSIDEROAD
TOWNLINEMELANCTHONOSPREY
Nottawasaga
UpperGrand
Saugeen
9
8
7
65
4
3
2
1112
1413
10
T9
T8
T7
T6
T5
T4
T3
T2
T1
T22
T49
T48
T47T45
T44
T43
T42
T41
T39
T38
T37
T36
T34
T33
T32T31
T30
T29
T28
T27
T26
T25
T24
T23
T21
T20
T19
T18
T17
T16
T15
T14
T13
T12
T11
T10
1
T46
T40
T35
DufferinWindPowerProject
Figure6aSiteInvestigationMap
CreatedBy:SLPCheckedBy:DR
DateCreated:112311DateModified:021512
FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentReport\
Map3aWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe
OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011
0 0.5 1 1.5 km
1:40,000
/
MajorRoadsLocalRoads
Legend
ProjectComponents
Woodlands
ProvinciallySignificantWetlands
120mProjectLocationSetback
Waterbody
UnevaluatedWetlands
DelineatedWetlands
Watercourse
Non-ProvinciallySignificantWetlands
WatercourseCrossing
TeritaryWatershed
Noisy River
Pine River
!( WatercourseCrossingsFoundNottoExist13
!(1
DirectionalDrilling
TurbineLocationsA
UndergroundCollectorSystemFeederLines
PowerLineOption1-69KVLine
UndergroundCollectorAlternateFeederLines
AccessRoads
230kVPrivateEasementStudyArea
PowerLineOption2-230KVLine
BuildableArea(ConstructionImpactArea)
ConstructionLaydownArea
CranePath
SubstationLocation"
OperationsandMaintenanceBuilding
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
15THSIDEROAD
2NDLINENORTHEAST
4THLINE
HIGHWAY10
3RDLIN
E
COUNTYROAD
17
5THLIN
E
COU
NTYROAD124
2NDLINESOUTHWEST
SIDEROAD
280
2NDLINENORTHEAST
15THSIDEROAD
5THSIDEROAD
4THLINESOUTHWEST
SIDEROAD
270
COUNTYROAD
21
MAINSTREET
4THLINENORTHEAST
RIVERROAD
HIGHWAY89
SIDEROAD
250
SIDEROAD
300
SIDEROAD
260
7THLINESOUTHWEST
SIDEROAD5
MILLLANE
OLDFIELDCOURTFIELDWAYCOURT
5THLIN
E
HIGH
WAY89
SIDEROAD
270
48
28
27
26
25
24
23
22
21
20
UpperGrand Nottawasaga
49
48
28
27
26
25
24
23
22
21
20
DufferinWindPowerProject
Figure6bSiteInvestigationMap
CreatedBy:SLPCheckedBy:DR
DateCreated:112311DateModified:080112
FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentRepot\
Map3bWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe
OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011
0 0.5 1 1.5 km
1:40,000
/
MajorRoadsLocalRoads
Legend
ProjectComponents
Woodlands
ProvinciallySignificantWetlands
120mProjectLocationSetback
Waterbody
UnevaluatedWetlands
DelineatedWetlands
Watercourse
Non-ProvinciallySignificantWetlands
WatercourseCrossing
TeritaryWatershed
!( NewWatercourseCrossingsObservedDuringSiteInvestigations
48
!(1
PowerLineOption2-230kVLinePowerLineOption1-69kVLine
230kVPrivateEasementStudyArea
DirectionalDrillingDirectionalDrilling/OverheadLinesUndergroundInstallation
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
4THLINE
2NDLIN
E
BLINDLIN
E
25THSIDEROAD
HIGH
WAY10
20THSIDEROAD
COUN
TYROAD11
COUN
TY ROAD12
HURONTARIOSTREET
1STLINEEHS
TOWNLINE M
ONOAM
ARANTH
15THSIDEROAD
COUNTYROAD8
30THSIDEROAD
2NDL
INE
EHS
6THLIN
E
HIGHWAY89
MAPLEWOODDRIVE
20THSIDEROAD
30THSIDEROAD
1STLINE EHS
1STLINE EHS
2NDLIN
EEHS
Nottawasaga
UpperGrand
50
40
39
38
37
36
35
34
33
3231
30
29
28
27DufferinWindPowerProject
Figure6cSiteInvestigationMap
CreatedBy:SLPCheckedBy:DR
DateCreated:112311DateModified:080112
FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentRepot\
Map3cWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe
OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011
0 0.5 1 1.5 km
1:40,000
/
MajorRoadsLocalRoads
Legend
ProjectComponents
Woodlands
ProvinciallySignificantWetlands
120mProjectLocationSetback
Waterbody
UnevaluatedWetlands
DelineatedWetlands
Watercourse
Non-ProvinciallySignificantWetlands
WatercourseCrossing!(1
TeritaryWatershed
!( WatercourseCrossingsFoundNottoExist15
!( NewWatercourseCrossingsObservedDuringSiteInvestigations
50
PowerLineOption2-230KVLinePowerLineOption1-69KVLine
DirectionalDrilling
PointofInterconnect-69kVPowerLine(Lot14,Concession1-TownofMono)
DirectionalDrilling/OverheadLinesUndergroundInstallation
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
4THLIN
E
2NDLIN
E HIGH
WAY10
COUN
TYROAD12
COUN
TY ROAD11
COUNTYROAD10
15THSIDEROAD
6THLINE
TOW
NLINE MO
NO AM
ARAN
TH
COUNTYROAD109
HURO
NTARIOSTREET
10THSIDEROAD
1STLINE EHS
5THSIDEROAD
CENTENNIALR
OAD
COUNTYROAD7
DAWSONROAD
WILLOUGHBYROAD
COUNTYROAD23
COUNTYROAD
3
1STLINEEHS
COUN
TYROAD11
1STLINEEHS
Nottawasaga
UpperGrand
Credit-16Mile
52
51
47
46
45
44
43
42
41
40
Mill Creek
Monora CreekMonora Creek
DufferinWindPowerProject
Figure6dSiteInvestigationMap
CreatedBy:SLPCheckedBy:DR
DateCreated:112311DateModified:080112
FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentRepot\
Map3dWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe
OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011
0 0.5 1 1.5 km
1:40,000
/
MajorRoadsLocalRoads
Legend
ProjectComponents
Woodlands
ProvinciallySignificantWetlands
120mProjectLocationSetback
Waterbody
UnevaluatedWetlands
DelineatedWetlands
Watercourse
Non-ProvinciallySignificantWetlands
WatercourseCrossing
TeritaryWatershed
!( WatercourseCrossingsFoundNottoExist46NewWatercourseCrossingsObservedDuringSiteInvestigations!(50
!(1
PowerLineOption2-230KVLine
DirectionalDrillingDirectionalDrilling/OverheadLines
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A"
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!( !(
!(!(
4THLINE
3RDLIN
E
COUNTYROAD21
SIDEROAD
240
COUN
TYROAD124
30THSIDEROAD
20THSIDEROAD
5THLINE
COUNTYROAD
9
SIDEROAD250
4THLINENORTHEAST
TOW
NLINEMU
LMU
RMELAN
CTHON
8THLINENORTHEAST
SOUTHLINEC
GREYROAD9
ROAD57A
6THLINENORTHEAST
8THLINE
TOWNLINEMELANCTHONOSPREY
ROAD67A
15THSIDEROAD
2NDLINENORTHEAST
TOWNLINEM
ULM
URM
ELANCHTON
10THLINE
6THLINENORTHEAST
5THLIN
E
SIDEROAD
250
30THSIDEROAD
TOWNLINEMELANCTHONOSPREY
Nottawasaga
UpperGrand
Saugeen
9
8
7
65
4
3
2
1112
1413
10
Stinso
n Drain
Westicott Drain
Orvis B
ranch
T9
T8
T7
T6
T5
T4
T3
T2
T1
T22
T49
T48
T47T45
T44
T43
T42
T41
T39
T38
T37
T36
T34
T33
T32T31
T30
T29
T28
T27
T26
T25
T24
T23
T21
T20
T18
T17
T16
T15
T14
T13
T12
T11
T10
1
T46
T40
T35 T19
DufferinWindPowerProject
Figure7aClassificationofWaterbodies
CreatedBy:SLPCheckedBy:DR
DateCreated:112311DateModified:020312
FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentReport\
Map3aWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe
OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011
0 0.5 1 1.5 km
1:40,000
/
MajorRoadsLocalRoads
TurbineLocationsProjectComponents
Legend
ProjectComponents
Woodlands
ProvinciallySignificantWetlands
120mProjectLocationSetback
Waterbody
UnevaluatedWetlands
Non-ProvinciallySignificantWetlands
WatercourseCrossing
TeritaryWatershed
Noisy River
Pine River
DrainClassificationsA
CD
F
B
E
A
!(1
230KVPrivateEasementStudyArea
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
4THLINE
HIGHWAY10
3RDL IN
E
COUNTYROAD
17
5THLIN
E
COUN
TYROAD124
2NDLINESOUTHWEST
SIDEROAD
280
2NDLINENORTHEAST
15THSIDEROAD
5THSIDEROAD
SIDEROAD
270
4THLINESOUTHWEST
COUNTYROAD
21
4THLINENORTHEAST
MAINSTREET
SIDEROAD
250
RIVERROAD
SIDEROAD
260
1STAVENUE
SIM
ONS
TREE
T
7THLINESOUTHWEST
MILLLANE
SIDEROAD5
SIDEROAD
300
HIGH
WAY89
BERRYSTREET
OLDFIELDCOURTFIELDWAYCOURT
SIDEROAD
270
5THLIN
E
SIDEROAD
250
49
48
27
26
25
24
23
22
21
20
Cague DrainCurphy Drain
Fraser Drain
McKibbon Drain
Cague Drain
McM
anam
an D
rain
Curphy Drain
Fraser Drain
McKibbon Drain
Arnold Drain
DufferinWindPowerProject
WaterAssessmentReport-Figure7bClassificationof
Waterbodies
CreatedBy:SLPCheckedBy:DR
DateCreated:112311DateModified:080112
FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentReport\
Map3aWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe
OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011
0 0.5 1 1.5 km
1:40,000
/
MajorRoadsLocalRoads
Legend
ProjectComponents
Woodlands
ProvinciallySignificantWetlands
120mProjectLocationSetback
Waterbody
UnevaluatedWetlands
Non-ProvinciallySignificantWetlands
WatercourseCrossing
TeritaryWatershed
DrainClassifications
!(1
PowerLineOption2-230kVLinePowerLineOption1-69kVLine
230kVPrivateEasementStudyArea
DirectionalDrillingDirectionalDrilling/OverheadLines
A
CD
F
B
E
UndergroundInstallation
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
4THLINE
2NDLIN
E
BLINDLIN
E
25THSIDEROAD
HIGH
WAY10
20THSIDEROAD
COUN
TYROAD11
HURO
NTARIOSTREET
1STLINEEHS
TOWNLINE M
ONOAM
ARANTH
3RDLIN
EEHS
COUNTYROAD8
15THSIDEROAD
COU
NTY ROAD12
2NDLINEEHS30THSIDEROAD
HIGHWAY89
MAD
ILLDRIVE
20THSIDEROAD
2NDLIN
EEHS
1STLINE EHS
1STLINE EHS
2NDLINEEH
S
30THSIDEROAD
Nottawasaga
UpperGrand
50
39
38
37
36
35
34
33
3231
30
29
28
27 DufferinWindPowerProject
Figure7cClassificationofWaterbodies
CreatedBy:SLPCheckedBy:DR
DateCreated:112311DateModified:080112
FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentReport\
Map3aWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe
OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011
0 0.5 1 1.5 km
1:40,000
/
MajorRoadsLocalRoads
Legend
ProjectComponents
Woodlands
ProvinciallySignificantWetlands
120mProjectLocationSetback
Waterbody
Lots/Concessions
UnevaluatedWetlands
Non-ProvinciallySignificantWetlands
WatercourseCrossing!(1
TeritaryWatershed
DrainClassifications
PowerLineOption2-230KVLinePowerLineOption1-69KVLine
DirectionalDrilling
PointofInterconnect-69kVPowerLine(Lot14,Concession1-TownofMono)
DirectionalDrilling/OverheadLines
A
CD
F
B
E
UndergroundInstallation
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
4THLIN
E
2NDLIN
E HIGH
WAY10
COUN
TYROAD11
BLINDLIN
E
COUNTYROAD10
COUN
TYROAD12
15THSIDEROAD
TOW
NLINE MO
NOAM
ARAN
TH
COUN
TYROAD16
COUNTYROAD109
HIGHWAY9H
URONTARIO
STREET
TOWNLIN
E
10THSIDEROAD
BROADWAY
COUNTY
ROAD7
1STLINE EHS
2NDLIN
EEHS
KENNEDYROAD
5THSIDEROAD
CENTENNIALR
OAD
ZINASTREET
DAWSONROAD
1ST
WILLOUGHBYROAD
COUNTYROAD23
COUNTYROAD
3
ALDERSTREET
MILLSTREET
STARRVIEWCRESCENT
FRENCH
BUENAVISTA
SHANNONCOURT
BAYBERRYROAD
FEADSTREET
GOOSE
BERR
YST
REET
JOSHUAR
OAD
PERRYROAD
4THSTREET
1STLINEEHS
HURONTARIOSTREET
5THSIDEROAD
COUN
TYROAD11
2NDLIN
E
HURONTARIOSTREET
COUNTYROAD
109
1STLINEEHS
COUNTYROAD7
52
51
46
45
44
43
42
41
40
Mill Creek
Monora Creek
Mill Creek
47
DufferinWindPowerProject
Figure7dClassificationofWaterbodies
CreatedBy:SLPCheckedBy:DR
DateCreated:112311DateModified:080112
FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentReport\
Map3aWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe
OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011
0 0.5 1 1.5 km
1:40,000
/
MajorRoadsLocalRoads
Legend
ProjectComponents
Woodlands
ProvinciallySignificantWetlands
120mProjectLocationSetback
Waterbody
UnevaluatedWetlands
Non-ProvinciallySignificantWetlands
WatercourseCrossing
TeritaryWatershed
DrainClassifications
!(1
PowerLineOption2-230KVLine
DirectionalDrillingDirectionalDrilling/OverheadLines
A
CD
F
B
E
Dufferin Wind Power Project
Water Assessment Report August 2012
Page 54
Dufferin Wind Power Inc.
Table 8: Summary of the Water Assessment Site Investigation
ID Water Body Does the Project Location
Overlap a Water Body? Is the Project Location within
120 metres of the Water Body? Distance to Nearest Project Components
Project Components within 120 metres of the Water Body EIS Required?
Lakes
None identified within the project location or adjacent lands within 120 metres
Lake Trout Lakes
None identified within the project location or adjacent lands within 120 metres
Permanent and/or Intermittent Streams
1 Upper Grand Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit
Yes
2 Nottawasaga -Noisy River No Yes 61 m Buildable Area, Underground Collector Circuit Yes
3 Nottawasaga -Noisy River Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit
Yes
4 Nottawasaga – Tributary of the Noisy River Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit
Yes
5 Nottawasaga -Noisy River Yes Yes Within project location Buildable Area, Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit
Yes
6 Nottawasaga -Noisy River No Yes 38 m Buildable Area, Access Road, Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit
Yes
7 Nottawasaga -Noisy River No Yes 84 m Buildable Area Yes
8 Nottawasaga – Tributary of the Noisy River Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit
Yes
9 Nottawasaga – Redickville Tributary (Online pond upstream)
Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit
Yes
10 Nottawasaga – Redickville Tributary Yes Yes Within project location Buildable Area, Access Road, Underground Collector Circuit, Underground Collector Alternate Path
Yes
11 Upper Grand River (wetland upstream)
Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit
Yes
12 Nottawasaga – Pine River Yes Yes Within project location Buildable Area, Access Road, Turbine 34 and 35, Crane Path, Underground Collector Circuit, Culvert Installation, Directional Drilling, Exit/Access Pits
Yes
13 No channel observed at this crossing. No No n/a n/a No
14 Nottawasaga – Pine River Yes Yes Within project location Buildable Area, Proposed Underground Collector Circuit Yes
230 kV Private Easement Study Area
Multiple Tributaries of the Upper Grand River Yes Yes Within project location 230 kV Line Yes
20 Upper Grand River Tributary No Yes Within project location 230 kV Line Yes
21 Upper Grand River Tributary Yes Yes 80 m Horizontal Directional Drilling, Exit/Access Pits, 230 kV Line Yes
22 Upper Grand River Tributary No Yes Within project location 230 kV Line Yes
23 Nottawasaga – Curphy Drain (Boyne River)
Yes Yes Within project location 230 kV Line. Exit or Access Pits Yes
24 Nottawasaga – Curphy Drain (Boyne River)
Yes Yes Within project location 230 kV Line Yes
25 Nottawasaga – Cague Drain (Boyne River) Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes
26 Nottawasaga – Cague Drain (Boyne River) Yes Yes Within project location 230 kV Line Yes
27 Nottawasaga – Boyne River Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes
28 Nottawasaga – Boyne River Yes Yes Within project location 230 kV Line – Trenching Yes
29 Nottawasaga - Boyne River Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes
30 Nottawasga - Boyne River Yes Yes Within project location 230 kV Line Yes
Dufferin Wind Power Project
Water Assessment Report August 2012
Page 55
Dufferin Wind Power Inc.
Table 8: Summary of the Water Assessment Site Investigation
ID Water Body Does the Project Location
Overlap a Water Body? Is the Project Location within
120 metres of the Water Body? Distance to Nearest Project Components
Project Components within 120 metres of the Water Body EIS Required?
31 North Branch of the Nottawasaga River Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes
32 North Branch of the Nottawasaga River (located south of where it is mapped)
Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes
33 North Branch of the Nottawasaga River Yes Yes Within project location 230 KV Line Yes
34 North Branch of the Nottawasaga River Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes
35 North Branch of the Nottawasaga River Yes Yes Within project location 230 KV Line Yes
36 North Branch of the Nottawasaga River Yes Yes Within project location 230 KV Line Yes
37 No channel observed at this crossing. No No n/a n/a No
38 Upper Grand – Willow Brook Yes Yes Within project location 230 KV Line. Exit or Access Pits Yes
39 Upper Grand – Willow Brook Yes Yes Within project location Horizontal Directional Drilling, 230 KV Line Yes
40 Upper Grand – Willow Brook Yes Yes Within project location Horizontal Directional Drilling, 230 KV Line Yes
41 Upper Grand – Willow Brook Yes Yes Within project location Horizontal Directional Drilling, 230 KV Line Yes
42 Upper Grand – Willow Brook Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes
43 Upper Grand – Willow Brook Yes Yes Within project location 230 KV Line Yes
44 South Branch of the Nottawasaga River Tributary (Marsh habitat)
Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes
45 Upper Grand – Mud Creek Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes
46 No channel observed at this crossing. No No n/a n/a No
47 No channel observed at this crossing. No No n/a n/a No
48 Upper Grand River Tributary Yes Yes Within project location 230 KV Line Yes
49 Upper Grand River Tributary Yes Yes Within project location 230 KV Line Yes
50 Upper Grand – Willow Brook Yes Yes Within project location Horizontal Directional Drilling, 230 KV Line Yes
51 Upper Grand – Willow Brook Yes Yes Within project location 230 KV Line Yes
52 Nottawasaga – South Branch of the Nottawasaga River
Yes Yes Within project location 230 KV Line Yes
Seepage Areas
None identified within the project location or adjacent lands within 120 metres