7.1.1
SOUTH CENTRAL RAILWAY
Particulars Capital CF DRF. DF SF TOTAL
11 () New Lines (Construction) .. .. .. .. 700,51,00 700,51,00
14 Gauge Conversion .. .. .. .. 88,25,00 88,25,00
15 Doubling 462,81,00 .. .. .. .. 462,81,00
16 -
Traffic Facilities-Yard
Remodelling & Others
65,02,33 .. 9,15,00 8,07,52 .. 82,24,85
17 Computerisation 12,05,00 .. 8,54,10 9,51,57 .. 30,10,67
21 Rolling Stock 22,41,38 .. 11,04,64 40,47 .. 33,86,49
22 -
Leased Assets - Payment
of Capital Component
.. 605,43,00 .. .. .. 605,43,00
29 - Road Safety Works-Level Crossings.
.. .. .. .. 85,21,24 85,21,24
30 -/
Road Safety Works-Road
Over/Under Bridges.
.. .. .. .. 155,77,12 155,77,12
31 Track Renewals .. .. 375,26,61 .. .. 375,26,61
32 Bridge Works 5,00,99 .. 24,00,06 2,50,00 .. 31,51,05
33 Signalling and Telecommunication
1,31,00 .. 26,50,02 33,50,09 .. 61,31,11
36 -
Other Electrical Works
excl TRD
8,46,00 .. 4,55,88 97,11 .. 13,98,99
37 Traction Distribution Works
3,38,59 .. 18,31,20 9,65,97 .. 31,35,76
41 Machinery & Plant 1,89,00 .. 9,82,37 3,15,05 .. 14,86,42
42 - Workshops including Production Units
76,43,65 .. 13,70,00 8,59,64 .. 98,73,29
51 Staff Quarters 8,69,70 .. 8,42,49 .. .. 17,12,19
52 Amenities for Staff 1,09,85 .. 7,79,45 7,57,48 .. 16,46,78
53 Passenger Amenities .. .. 8,85,93 56,71,70 .. 65,57,63
64 Other Specified Works 3,27,18 .. 1,44,19 14,85,05 .. 19,56,42
65 / Training/HRD .. .. .. 1,20,00 .. 1,20,00
81 Metropolitan Transport Projects
45,00,00 .. .. .. .. 45,00,00
71 Stores Suspense 1228,88,28 .. .. .. .. 1228,88,28
72 Manufacture Suspense 751,26,83 .. .. .. .. 751,26,83
73 Miscellaneous Advances 7,15,00 .. .. .. .. 7,15,00
Total Gross 2704,15,78 605,43,00 527,41,94 156,71,65 1029,74,36 5023,46,73
Credits or Recoveries
() (a) For Released Materials .. .. 189,45,00 .. .. 189,45,00
() (b) Other Credits 6,00 .. .. .. .. 6,00
() (c) Stores Suspense 1232,32,13 .. .. .. .. 1232,32,13
() (d) Manufacture Suspense 741,40,09 .. .. .. .. 741,40,09
() (e) Miscellaneous
Advances
4,10,00 .. .. .. .. 4,10,00
Total - Credits or
Recoveries
1977,88,22 .. 189,45,00 .. .. 2167,33,22
() Plan Outlay (Net) 726,27,56 605,43,00 337,96,94 156,71,65 1029,74,36 2856,13,51
2016-17 ,
Assets-Acquisition, Construction and Replacement for 2016-17
(Figures in thousand of Rupees)( . )
7.2.1
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
1 -- (177.49 ) Cap. 856,23,00 719,72,74 168,83,34 ..Peddapalli-Karimnagar-Nizamabad (177.49 km) . S.Fund 70,00,00 .. .. 70,00,00
2 - (126 ) Cap. 8334,50,00 790,47,43 80,00,00 ..Nandyal-Yerraguntla (126 km) . S.Fund 50,00,00 .. .. 50,00,00
() EBR(P) 50,00,00 .. .. 50,00,00
3 - (246 ) Cap. 1633,00,00 426,57,23 118,00,00 ..Munirabad-Mahabubnagar (246 km) . S.Fund 90,00,00 .. .. 90,00,00
() EBR(P) 645,00,00 74,79,50 150,00,00 90,00,00
4 - (92 ) Cap. 458,06,00 3,58,80 10,00 ..Macherla-Nalgonda (92 km) . S.Fund 20,00 .. .. 20,00
5 - (140 ) Cap. 382,07,00 454,90,59 119,26,67 ..Gulbarga-Bidar (140 km) . S.Fund 40,00,00 .. .. 40,00,00
() EBR(P) 388,00,00 158,28,00 25,00,00 40,00,00
6 - (60 ) Cap. 223,08,97 310,25,10 7,00,00 ..Gadwal-Raichur (60 km) . S.Fund 5,00,00 .. .. 5,00,00
7 - (21.5 ) Cap. 165,06,00 .. 1 ..Kakinada-Pithapuram (21.5 km) . S.Fund 25,00,00 .. .. 25,00,00
() EBR(P) 25,00,00 .. .. 25,00,00
8 - (57.21 ) Cap. 840,20,00 1,36,30 3,50,00 ..Kotipalli-Narsapur (57.21 km) . S.Fund 150,00,00 .. .. 150,00,00
() EBR(P) 50,00,00 .. .. 50,00,00
9 - (113 ) Cap. 465,35,40 .. .. ..Obulavaripalle-Krishnapattnam (113 km) ( ) Dep (RVN) 267,46,00 267,46,00 .. ..
() EBR(P) 386,30,00 163,30,00 .. 100,00,00
EBR 66,02,31 56,00,00 .. ..
10 - (148.9 ) Cap. 86,85,93 75,62 1,00,00 ..Manoharabad-Kotapalli (148.9 km) . S.Fund 20,00,00 .. .. 20,00,00
() EBR(P) 10,00,00 .. .. 10,00,00
11 - (11 ) Cap. 72,80,34 69,17,68 7,61,00 ..Vishnupuram-Janapahar (11 km) . S.Fund 5,00,00 .. .. 5,00,00
12 - (24 ) - (19.1 );
Cap. 193,24,00 258,90,39 70,00,00 ..
Jaggayyapet-Mallacheruvu (19.1 km) with new material modification
for Mallacheruvu-Janapahar (24 km). S.Fund 110,00,00 .. .. 110,00,00
() EBR(IF) 10,00,00 .. .. ..
13 - () (255.4 ) Cap. 95,80,00 63,46,51 11,00,00 ..Cuddapah-Bangalore (Bangarapet) (255.4 km) . S.Fund 29,19,00 .. .. 29,19,00
() EBR(P) 62,50,00 109,00,00 150,00,00 29,00,00
() EBR(IF) 10,00,00 .. .. ..
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
() / NEW LINES (CONSTRUCTION) - / A - Works in Progress
7.2.2
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
14 - (56.25 ) Cap. 19,03,00 1,12,83 1 ..Bhadrachalam Road-Sattupalli (56.25 km) . S.Fund 1,00 .. .. 1,00
() EBR(P) 318,46,00 .. .. 25,00,00
15 - (309 ) Cap. 491,25,00 2,98,59 10,00,00 ..Nadikude-Srikalahasti (309 km) . S.Fund 90,00,00 .. .. 90,00,00
() EBR(IF) 10,00,00 .. .. ..
() EBR(P) 722,73,66 .. .. 90,00,00
16 # - (41.55 ) Cap. 272,74,00 50,62 1 ..Gudur-Durgarajapatnam (41.55 km) . S.Fund 5,00,00 .. .. 5,00,00
17 - (151 ) Cap. 908,23,00 1,01,00 50,00 ..Bhadrachallam-Kovvur (151 km) . S.Fund 5,00,00 .. .. 5,00,00
() EBR(IF) 10,00,00 .. .. ..
() EBR(P) .. .. .. 5,00,00
18 - (17.20 ) Cap. 48,87,50 3,12,52 5,00,00 ..Akkanapet-Medak (17.20 km) . S.Fund 5,00,00 .. .. 5,00,00
( ) EBR(Dep) 68,89,00
() EBR(P) 5,00,00 .. .. 5,00,00
19 # - (142 ) Cap. 828,00,00 6,12 45,00 ..Cumbum - Proddutur (142 km) . S.Fund 1,00,00 .. .. 1,00,00
20 # - (125 ) Cap. 615,98,00 .. 1 ..Kondapalli - Kothagudem (125 km) . S.Fund 10,00 .. .. 10,00
21 # - (200 ) Cap. 1111,99,00 19 81,96 ..Manugur - Ramagundam (200 km) . S.Fund 1,00 .. .. 1,00
- / Total-Works in Progress . S.Fund .. .. .. 700,51,00
() EBR(P) .. .. .. 519,00,00
- () / . S.Fund .. .. .. 700,51,00
Total - New Lines (Construction) () EBR(P) .. .. .. 519,00,00
22 - (76 ) - - - (478 );
Cap. -17,06,70 225,32,61 33,00 ..
Guntur-Guntakal & Guntakal-Kalluru (478 km) incl. Pendekallu-Gooty
new line with lifting of Kalluru-Dharmavaram (76 km) C.Fund 415,79,50 535,93,55 .. ..
DRF 1,58,66 1,01,00 .. ..
(4) DF(4) 1,81,52 .. .. ..
. S.Fund 87,00,00 .. .. 87,00,00
. R. 1,05,86
23 - (167 ) Cap. 198,06,00 323,94,51 4,94,80 ..Mudkhed-Adilabad (167 km) C.Fund 234,19,50 234,19,50 .. ..
DRF 4,24,06 5,11,12 .. ..
. S.Fund 1,00,00 .. .. 1,00,00
24 - (227 ) Cap. 546,24,00 588,94,78 95,00 ..Dharmavaram-Pakala (227 km) C.Fund 235,50,18 235,50,18 .. ..
. S.Fund 25,00 .. .. 25,00
- / Total-Works in Progress . S.Fund .. .. .. 88,25,00
- / . S.Fund .. .. .. 88,25,00
Total - Gauge Conversion
#
() / NEW LINES (CONSTRUCTION)
/ GAUGE CONVERSION - / A - Works in Progress
/ .Expenditure/commitment on this project will be made only after following all due processes/mandatory approvals and sanctions.
7.2.3
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
25 - (115 ) Cap. 175,27,08 82,21,12 1 1,00 Hospet-Guntakal (115 km) ( ) Dep (RVN) 244,95,09 244,95,09 .. ..
EBR 2,00,00 .. .. ..
26 - (83 ) - (9.34 ) Cap. 163,43,00 190,03,64 51,99 1,05,00 Gudur-Renigunta (83 km) & Renigunta-Tirupati (9.34 km) C.Fund 97,00 15,13,49 .. ..
DRF 20,25 41,90 .. ..
EBR 2,50,00 .. .. ..
27 - - (151.04 ) Cap. 323,91,56 42,25,00 .. 1,00 Gooty-Renigunta - Patch doubling (151.04 km) ( ) Dep (RVN) 595,79,00 595,79,00 .. ..
() EBR(IF) 15,00,00 .. 15,00,00 ..
28 - (81.1 ) Cap. -71,71,80 .. 1,00 1,00 Raichur-Guntakal (81.1 km) ( ) Dep (RVN) 293,65,00 293,65,00 .. ..
29 - (24.47 ) - : Cap. 118,22,55 135,02,85 1,00 15,00,00 Raghavapuram-Mandamari (24.47 km) - Patch tripling C.Fund 1,00 .. .. ..
() EBR(IF) 19,00,00 .. 18,00,00 ..
30 - - (224.9 ) - - (641.37 )
Cap. 829,74,00 .. .. 145,75,00
Daund-Gulbarga - Doubling (224.9 km) and Pune-Guntakal -
Electrification (641.37 km) ( ) Dep (RVN) 324,46,00 324,46,00 .. ..
() EBR(IF) 360,25,00 .. 360,25,00 150,00,00
31 - - : (4.37 ) Cap. 827,59,08 47,58,90 1,00 1,00,00 Mancheryal-Peddampet - Patch tripling (4.37 km) () EBR(IF) 30,00,00 .. 28,00,00 30,00,00
32 - - (24.38 ) Cap. 105,99,30 12,26,00 1,00 19,00,00 Guntur-Tenali - Doubling with electrification (24.38 km) () EBR(P) 50,00,00 .. 40,00,00 50,00,00
() EBR(IF) 41,00,00 .. 40,00,00 ..
33 - - (23 ) ( ) Dep (RVN) 1,00,00 .. .. ..Krishnapatnam-Venkatachalam - Doubling with electrification (23 km) () EBR(P) 86,34,00 73,75,00 5,00,00 50,00,00
34 - (81.43 ) Cap. 231,60,43 8,15,40 1,00 10,00,00 Mudkhed-Parbhani (81.43 km) () EBR(IF) 160,00,00 .. 91,00,00 160,00,00
35 --- , - - (221 ) -
Cap. 676,85,50 40,68,00 1,00 5,00,00
Vijaywada-Gudivada- Bhimavaram-Narasapur, Gudivada-
Machlipatnam and Bhimavaram-Nidadavolu(221 km) - Doubling with
electrification
( ) EBR(Dep) 751,85,50
() EBR(IF) 76,00,00 .. 75,00,00 75,00,00
36 - (219.64 ) - Cap. 95,50,00 15,83,28 1,00 114,00,00
Kazipet-Vijaywada (219.64 km) - 3rd line with electrification () EBR(IF) 69,00,00 .. 68,00,00 50,00,00
37 # - - 3 (293 ) Cap. 50,00,00 .. .. 50,00,00 Vijayawada-Gudur - 3rd line (293 km) () EBR(IF) 2373,00,00 .. .. 50,00,00
38 # - - 3 (335 ) Cap. 25,00,00 .. .. 25,00,00 Duvvada - Vijayawada - 3rd line (335 km) () EBR(IF) 3325,00,00 .. .. 25,00,00
39 # - - 3 (202 ) Cap. 20,00,00 .. .. 20,00,00 Kazipet - Balharshah - 3rd line of balance section (202 km) () EBR(IF) 2000,00,00 .. .. 30,00,00
#
/ DOUBLING - / A - Works in Progress
/ .Expenditure/commitment on this project will be made only after following all due processes/mandatory approvals and sanctions.
7.2.4
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
40 # - - (180 ) Cap. 30,00,00 .. .. 30,00,00 Gooty - Dharmavaram - Bangalore (180 km) () EBR(IF) 1770,00,00 .. .. 50,00,00
41 - (41 ) Cap. 10,00,00 .. .. 10,00,00 Kalluru - Guntakal (41 km) () EBR(IF) 400,00,00 .. .. 40,00,00
42 # - (110 ) Cap. 10,00,00 .. .. 10,00,00 Secunderabad - Mehboobnagar (110 km) () EBR(IF) 1190,00,00 .. .. 70,00,00
43 , - (21 ) Cap. 5,00,00 .. .. 5,00,00 Renigunta, Dharmavaram & Wadi - Bypass (21 km) () EBR(IF) 295,00,00 .. .. 25,00,00
44 - - (15 ) Cap. 2,00,00 .. .. 2,00,00 Vijayawada & Kazipet -Bye-pass line (15 km) () EBR(IF) 198,00,00 .. .. 15,00,00
- / Total-Works in Progress Cap. .. .. .. 462,83,00
() EBR(P) .. .. .. 100,00,00
() EBR(IF) .. .. .. 770,00,00
45 # - (443 ) Cap. 2000,00,00 .. .. 1,00 Guntakal - Guntur (443 km) () EBR(P) 2000,00,00 .. .. 1,00
- / Total-New Works Cap. .. .. .. 1,00
() EBR(P) .. .. .. 1,00
- / Cap. .. .. .. 462,84,00
Total - Doubling () EBR(P) .. .. .. 100,01,00
() EBR(IF) .. .. .. 770,00,00
46 - Cap. 5,42,03 .. 31,00 3,50,00 Vijayawada - Modification of yard to enable relinquishment of land DRF 13,10,26 20,80,01 2,44,35 8,00,00
(3) DF(3) 25,42,56 25,42,56 .. ..
47 - Cap. 9,53,00 8,03,55 1 1Maltekdi - Crossing station in lieu of sanctioned work at Pathrad
48 - - - (3) DF(3) 36,44,00 32,80,88 22,80 25,00
Renigunta - Bypass line connecting Gudur-Renigunta to Gooty-
Renigunta line
49 - - Cap. 11,39,30 10,76,79 5,00 1Nancherla-Guntakal West - Bypass line
50 , , , - -
Cap. 7,92,61 6,12,26 3,00 1,99
Navabpalem, Annavaram, Ravikampadu, Regupalem & Elemanchali -
Crossovers and common loops
51 -
Cap. 18,80,82 10,93,18 50 1
Yedlapur - Bypass line for traffic from Raichur to Raichur thermal
power station EBR 2,50,00 .. .. ..
52 - 26 (2 4 )
Cap. 16,39,33 .. 3,37,00 3,00,00
Secunderabad - Extension of washing siding with shunting neck for 26
coaches at military siding end (2 pit lines & 4 stabling lines) (3) DF(3) 3,29,97 3,29,97 .. ..
#
/ DOUBLING
/ .Expenditure/commitment on this project will be made only after following all due processes/mandatory approvals and sanctions.
- / B - New Works
- / TRAFFIC FACILITIES-YARD REMODELLING & OTHERS - / A - Works in Progress
7.2.5
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
53 , , , - Cap. 15,17,76 14,79,84 45,44 18,68 Tarur, Peragaon, Selu, Kodi & Satuna - Addl loops EBR 2,50,00 2,50,00 .. ..
54 - - Cap. 15,57,00 17,44,67 45,00 30,00 Mungalipattu - New crossing station with standard layout
55 -
Cap. 4,69,05 4,66,71 1,63,40 4,53
Ramagundam Yard - Bypass line with traction distribution for direct
entry & exit from Kazipet end
56 - Cap. 8,05,03 7,49,73 10,00 1Poodur - New crossing station
57 - Cap. 3,68,86 2,87,76 1 1Sangamjagarlamudi - New crossing station
58 - Cap. 10,36,87 6,30,13 1,34,69 10,00
Sanathnagar - Development of terminal facilities and yard remodelling EBR 1,00,00 .. .. ..
59 - Cap. 14,00,42 7,98,91 1 1Daulatabad - Addl. facilities for military siding ( ) EBR(Dep) 10,94,93
60 - Cap. 9,11,64 5,70,09 2,29,00 65,00 Ramalingampalli - New crossing station
61 - Cap. 17,40,19 5,33,00 8,09,84 3,50,00 Kukkadam & Rayanaguda - Crossing stations
62 - Cap. 11,72,00 8,34,71 15,00 15,00 Divitipalli - New crossing station
63 - - Cap. 4,69,68 5,36,72 1,50,00 30,00 Bandarupalli - Standard layout EBR 1,00,00 1,00,00 .. ..
64 - Cap. 6,43,64 3,95,23 1,75,94 7Taticherla - Addl loop line EBR 1,00,00 .. .. ..
65 . - .4 7 Cap. 17,46,48 .. 45,00 10,00,00 Gudur Jn - Addl platform between road No.4 to 7 (3) DF(3) 58,51 58,51 .. ..
66 , - 720 Cap. 2,91,23 .. 1,75,00 4,00,00
Regupalem, Elamanchali & Narasingapalli - Extension of loop lines to
720 m (3) DF(3) 14,07,77 14,07,77 .. ..
EBR 15,99,00 12,73,00 .. ..
67 - - Cap. 6,56,60 2,11,12 50,00 30,00 Bommaipalli - Crossing station with standard layout EBR 1,00,00 1,00,00 .. ..
68 - - Cap. 16,95,00 4,07,80 46,00 2,00,00 Umdanagar-Timmapur - New crossing station EBR 5,00,00 .. .. ..
69 - - (3) DF(3) 9,74,09 3,68,68 1,90,25 55,79 Cheruvumadhavaram - Standard layout
70 -
Cap. 6,16,02 .. 1,00,00 2,00,00
Machilipatnam - Extension of platform & stabling lines with provision of
a platform and signalling arrangement for new passenger line (3) DF(3) 14,56 14,56 .. ..
- / TRAFFIC FACILITIES-YARD REMODELLING & OTHERS
7.2.6
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
71 , - - Cap. 9,14,00 .. 4,24,00 10,00 Gajulapalli, Santamagaluru & Ramannapet - Standard layout
72 - - - Cap. 4,48,27 .. 2,50,00 30,00 Krishnammakona - Conversion of C-class station to A-class (3) DF(3) 3,63,31 3,63,31 .. ..
73 - .1, 2 3 -
Cap. 58,36,41 .. 10,00 2,50,00
Guntakal - Connectivity of road No.1, 2 & 3 to Gooty end and bypass
arrangements from Nandyal-Wadi line
74 - Cap. 2,56,65 .. 2,80,00 80,00 Nashkal - Up directional loop (3) DF(3) 90,35 90,35 .. ..
75 - - Cap. 6,77,36 .. .. 3,00,00 Bhadrachalam Road-Manuguru - Addl loop (3) DF(3) 31,46 31,46 .. ..
76 - - (3) DF(3) 3,26,24 2,58,31 60,00 1Edduladoddi - Standard layouts with provision of loop line
77 -
Cap. 16,75,40 38,49 1,00,00 4,00,00
Motumari - Bypass with overhead alignment towards Jaggayapet
branch line at Kazipet end
78 - Cap. 7,09,09 .. 80,00 4,72,00 Tadikalapudi - Addl. loop (3) DF(3) 3,87 3,87 .. ..
79 - - Cap. 6,96,25 3,87,79 3,00,00 30,00 Vemuru - New crossing station with standard layout
80 - - Cap. 8,90,07 .. 55,00 6,00,00 Aswapuram - Standard lay out (3) DF(3) 57,93 57,93 .. ..
81 - - Cap. 10,82,68 .. 44,00 3,40,00 Prasannayanapalle - Standard layout (3) DF(3) 10,31 10,31 .. ..
82 - Cap. 8,82,68 .. 25 2,15,00 Bommasamudram - Conversion of halt station to crossing station (3) DF(3) 82 .. ..
83 - Cap. 26,23,04 .. 68,00 3,00,00 Vijayawada - Modification to bulb and CR goods lines (3) DF(3) 21,84 21,84 .. ..
84 - - (12.9 ) Cap. 21,29,92 .. 50,00 1,00,00 Vijayawada-Mustabada - Automatic block system (12.9 km) (3) DF(3) 50,76 50,76 .. ..
85 - -I II Cap. 3,77,42 .. 1,00,00 1,00,00 Visakhapatnam - Crossovers connecting lines-I & II to Gudivada (3) DF(3) 15,67 15,67 .. ..
86 - (3) DF(3) 44,72,00 1,45 .. 5,00,00 Tirupati - Development of entry from southern side
87 - Cap. 3,19,00 .. 90 50,00
Vijayawada - Coaching fit for bulb lines between VNC-bulb cabins
88 - 6
Cap. 5,53,45 .. 90 2,00,00
Dharmavaram - Cross over connectivity from road No.6 for reception
and dispatch of trains from and to Bangalore
- / TRAFFIC FACILITIES-YARD REMODELLING & OTHERS
7.2.7
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
89 - (295 ) - () EBR(IF) 30,00,00 .. 10 3,50,00 Vijayawada - Gudur (295 km) - Longer loop
90 - (350 ) - () EBR(IF) 28,00,00 .. 10 3,50,00 Visakhapatnam - Vijayawada (350 km) - Longer loop
91 2.5 Cap. .. .. .. 5,00 Works costing below Rs.2.5 crore each DRF .. .. .. 1,10,00
(1) DF(1) .. .. .. 26,63
(3) DF(3) .. .. .. 1,84,09
- / Total-Works in Progress Cap. .. .. .. 64,87,33
DRF .. .. .. 9,10,00
(1) DF(1) .. .. .. 26,63
(3) DF(3) .. .. .. 7,64,89
() EBR(IF) .. .. .. 7,00,00
92 - - - Cap. 4,64,50 .. .. 1,00
Nalwar - Wadi & Nalwar - Thangundi - IB signal on up & down lines
93 - - -
Cap. 4,26,43 .. .. 1,00
Renigunta - Mamanduru & Mamanduru - Balapalle - IB signals on up &
down lines
94 - Cap. 80,94,00 .. .. 1,00 Charlapalli - Development of satellite terminal
95 - - ( 5 ) Cap. 9,62,00 .. .. 1,00 Vijayawada - Duvvada - IB stop signals (5 Nos)
96 -
Cap. 10,00,00 .. .. 1,00
Tiruchanur - Conversion of C class station as B class station with loop
line on Up and Dn lines with high level platform
97 2.5 Cap. .. .. .. 10,00 Works costing below Rs.2.5 crore each DRF .. .. .. 5,00
(1) DF(1) .. .. .. 5,00
(3) DF(3) .. .. .. 5,00
(4) DF(4) .. .. .. 6,00
- / Total-New Works Cap. .. .. .. 15,00
DRF .. .. .. 5,00
(1) DF(1) .. .. .. 5,00
(3) DF(3) .. .. .. 5,00
(4) DF(4) .. .. .. 6,00
- - / Cap. .. .. .. 65,02,33
Total - Traffic Facilities-Yard Remodelling & Others DRF .. .. .. 9,15,00
(1) DF(1) .. .. .. 31,63
(3) DF(3) .. .. .. 7,69,89
(4) DF(4) .. .. .. 6,00
() EBR(IF) .. .. .. 7,00,00
- / B - New Works
- / TRAFFIC FACILITIES-YARD REMODELLING & OTHERS
7.2.8
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
98 - ( ) (1) DF(1) 8,63,64 6,86,88 10,00 1South Central Railway - Unreserved ticketing system (under Railway
Board)
99 - Cap. 4,38,00 3,61,47 10,00 5,00 South Central Railway - Automatic ticket vending machines
100 - - (1) DF(1) 37,86,00 27,80,67 1,00,00 9,38,56
South Central Railway - Extension of unreserved ticketing system to E-
category stations
101 - Cap. 25,60,00 4,37,56 9,00,00 12,00,00 South Central Railway - Extension of automatic ticket vending
machines
102 - 858 -
DRF 2,68,00 1,89,22 11,96 10
South Central Railway - Repl of 858 Nos of dumb terminals & thin
clients with unreserved ticketing system thin clients with monitors and
keyboards
103 - / ,
DRF 3,14,00 .. 1,95,19 54,00
South Central Railway - Rep of routers, line drivers and LAN extender
equipment of passenger reservation system / unreserved ticketing
system
104 - / ,
DRF 3,63,48 .. 1,90,60 2,00,00
South Central Railway - Repl. of routers, LAN switches and media
converters of PRS/UTS
105 2.5 DRF .. .. .. 4,00,00 Works costing below Rs.2.5 crore each (1) DF(1) .. .. .. 10,00
(3) DF(3) .. .. .. 2,99
- / Total-Works in Progress Cap. .. .. .. 12,05,00
DRF .. .. .. 6,54,10
(1) DF(1) .. .. .. 9,48,57
(3) DF(3) .. .. .. 2,99
106 (3) DF(3) 4,20,00 .. .. 1Fuel Management System
107 2.5 DRF .. .. .. 2,00,00 Works costing below Rs.2.5 crore each
- / Total-New Works DRF .. .. .. 2,00,00
(3) DF(3) .. .. .. 1
- / Cap. .. .. .. 12,05,00
Total - Computerisation DRF .. .. .. 8,54,10
(1) DF(1) .. .. .. 9,48,57
(3) DF(3) .. .. .. 3,00
/ COMPUTERISATION - / A - Works in Progress
- / B - New Works
7.2.9
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
108 -
C.Fund 605,43,00 .. 577,81,00 605,43,00
Leased Assets - Payment of Capital component of lease charges to
Indian Railway Finance Corporation
- / Total-Works in Progress C.Fund .. .. .. 605,43,00
- - / C.Fund .. .. .. 605,43,00
Total - Leased Assets - Payment of Capital Component
109 - (190 )
. S.Fund 44,58,57 39,32,66 1,43,48 16,38
South Central Railway - Manning of unmanned level crossings (190
Nos)
110 - - (120 )
. S.Fund 7,50,00 .. 1 1
Vijayawada Division - Solar-wind hybrid power lighting system at level
crossing gates (120 Nos)
111 - (6 ) (-)
. S.Fund 3,32,36 4,08,66 15,00 1
Secunderabad Division - Interlocking of manned level crossing gates
(6 Nos) (A-route)
112 - (50 ) ( -) . S.Fund 2,93,88 3,41,84 40,00 43,69
Vijayawada Division - Electrically operated lifting barriers (50 Nos) (A
& B-routes)
113 - (110 )
. S.Fund 22,00,00 9,27,11 2,50,00 8,00,00
South Central Railway - Manning of unmanned level crossing gates
(110 Nos)
114 - - 6- (-) . S.Fund 14,05,36 15,57,64 70,00 11,23
Vijayawada-Visakhapatnam - 6-quad cable for level crossing gates (B-
route)
115 - (16) ( -)
. S.Fund 9,81,76 8,07,42 1,00,00 1,72,34
Secunderabad Division - Approach warning at special class level
crossing gates (16 gates) (A & B-routes)
116 - (26) ( -)
. S.Fund 10,90,81 13,13,16 96,00 12,65
Vijayawada Division - Approach warning at special class level crossing
gates (26 gates) (A & B-routes)
117 , , - (6, 4, 1 1 )
. S.Fund 6,59,33 6,96,95 75,00 1
Vijayawada, Guntur, Secunderabad & Nanded - Interlocking of level
crossing gates (6, 4, 1 & 1 Nos respectively)
118 - (100 )
. S.Fund 7,63,12 3,02,56 1,75,00 3,86,56
Guntakal Division - Electricaly operated lifting barriers in lieu of
mechanical ones at interlocked level crossing gates (100 Nos)
- / ROAD SAFETY WORKS-LEVEL CROSSINGS. - / A - Works in Progress
- / LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT - / A - Works in Progress
7.2.10
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
119 - 6- . S.Fund 4,32,95 4,17,90 1,08,10 1Nanded Division - Addl. 6-quad cable for gate communication
120 - (375 ) . S.Fund 18,75,00 1,02,57 1 50,00
Vijayawada Division - Pre-fabricated reinforced RCC blocks (375 level
crossings)
121 - (190 )
. S.Fund 11,20,00 38,90 40,00 1,00,00
Hyderabad Division - Upgradation & improvement to road surfaces
with precast RCC slabs (190 level crossings)
122 - (261)
. S.Fund 14,86,93 3,93,01 3,70,00 1,50,00
Guntur Division - Fibre reinforced precast RCC blocks at level
crossings (261 Nos)
123 - - (51 )
. S.Fund 3,91,41 1,88,10 20,00 50,00
Wadi-Guntakal - Improvement to approach roads at level crossings by
fibre reinforced precast RCC blocks (51 level crossings)
124 - (55)
. S.Fund 3,18,00 2,98,03 75,00 1
Vijayawada Division - Mini data loggers at mid-section interlocked
level crossings (55 gates)
125 - (24 ) . S.Fund 2,88,00 .. 50,00 2,75,00
Guntur Division - Reliability improvement work at level crossings (24
gates)
126 - - 6- (125 ) (23 )
. S.Fund 5,29,45 86,92 2,24,60 2,80,00
Kazipet-Vijayawada - Reliability improvement work at level crossing
communication by addl. 6-quad cable (125 km) (23 gates)
127 - - 6- (125 ) (22 )
. S.Fund 5,29,83 66,36 2,68,80 3,00,00
Balharshah-Kazipet - Reliability improvement work at level crossing
communication by addl. 6-quad cable (125 km) (22 gates)
128 -- - 6- (120 ) (16 )
. S.Fund 4,08,22 26,67 2,07,75 2,71,80
Kazipet-Secunderabad-Wadi - Reliability improvement work at level
crossing communication by addl. 6-quad cable (120 km) (16 gates)
129 - - ( )
. S.Fund 4,34,00 .. 1 1
Guntakal Division - Improvement to level crossing surfaces with fibre
reinfoacement precast RCC blocks (south section)
130 - (13 ) . S.Fund 6,24,01 .. 50,00 1,50,00
Guntur Division- Closure of level crossing by diversion (13 Nos)
- / ROAD SAFETY WORKS-LEVEL CROSSINGS.
7.2.11
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
131 - (50 )
. S.Fund 8,39,66 .. 1 4,00,00
Vijaywads Division - Electronically operated lifting barriers in lieu of
mechanical barrier gates (50 gates)
132 - . 98,140,107,109,110,43,10 126
. S.Fund 3,55,63 .. 1 2,00,00
Guntakal Division - Interlocking of level crossing gate Nos 98, 140,
107, 109, 110, 43, 10 & 126
133 - (22 ) . S.Fund 4,40,00 .. 1 1,00,00 South Central Railway - Interlocking of level crossings (22 Nos)
134 - (76)
. S.Fund 17,39,01 .. 25,00 3,25,00
Guntakal Division- Manning of unmanned level crossings (76 Nos)
135 - (3)
. S.Fund 4,12,56 .. 80,00 1,05,96
Hyderabad division - Closure of level crossing by diversion to nearby
level crossing (3 Nos)
136 - / (7 )
. S.Fund 6,37,14 .. 25,00 6,12,14
Secundrabad Division- Closure of level crossing by diversion to
nearby levelcrossing/subway (7 Nos)
137 - . 8, 21, 23 37, 1 29 19/ (7 )
. S.Fund 5,28,00 .. 25,00 5,03,00
Secunderabad Division- Closure of level crossing Nos. 8, 21, 23 & 37,
1MB, 29 & 19 by diversion to nearby levelcrossing/subway (7 Nos)
138 - (7 )
. S.Fund 3,59,17 .. 1,50,00 3,58,17
Vijayawada Division - Closure of level crossing by diversion to nearby
levelcrossing (7 Nos)
139 - . 473, 102, 108, 110, 112, 154, 161 (7 )
. S.Fund 3,50,00 .. 1,50,00 3,20,00
Vijayawada Division - Closure of level crossing Nos 473, 102, 108,
110, 112, 154, 161 by diversion to nearby level crossing (7 Nos)
140 - (46 ) . S.Fund 10,58,00 .. 10,00 50,00
Guntur Division- Manning of unmanned level crossings (46 Nos)
141 - (27)
. S.Fund 6,36,00 .. 1,02,01 6,73,99
Secundrabad Division- Manning of unmanned level crossings (27 Nos)
142 - (34)
. S.Fund 7,82,00 .. 2,50,00 6,06,70
Vijayawada Division- Manning of unmanned level crossings (34 Nos)
- / ROAD SAFETY WORKS-LEVEL CROSSINGS.
7.2.12
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
143 - - - (94 )
. S.Fund 3,21,28 .. 1 2,00,00
Tirupati-Renigunta-Gudur - Addl. quad cable for improving signalling
and communication reliability at level crossing gates (94 rkm)
144 - (34 ) . S.Fund 7,82,00 .. 11,00 4,22,00
Nanded Division- Manning of unmanned level crossings (34 Nos)
145 - / (11 )
. S.Fund 5,44,59 .. 5,00 65,00
Guntakal Division- Closure of level crossing by diversion to nearby
levelcrossing/bridge (11 Nos)
146 2.5 . S.Fund .. .. .. 4,09,55 Works costing below Rs.2.5 crore each
- / Total-Works in Progress . S.Fund .. .. .. 84,21,22
147 - (35 39 )
. S.Fund 20,28,00 .. .. 1
Guntakal & Hyderabad - Non blanking arrangements at level crossing
gates (35 & 39 Nos respectively)
148 - (5 ) . S.Fund 3,25,60 .. .. 1Guntakal & Secunderabad - Interlocking of level crossing gates (5 Nos)
149 2.5 . S.Fund .. .. .. 1,00,00 Works costing below Rs.2.5 crore each
- / Total-New Works . S.Fund .. .. .. 1,00,02
- - / . S.Fund .. .. .. 85,21,24
Total - Road Safety Works-Level Crossings.
150 - - .99- - - .99-
. S.Fund 18,67,22 15,31,12 60,00 2,00,00
Gudur-Oduru - Road over bridge in lieu of level crossing No 99-A and
Gudur-Kondagunta - level crossing No 99-B( ) EBR(Dep) 24,41,44
151 - .254 . S.Fund 8,80,69 .. 1,00 20,00 Safilguda - Road under bridge in lieu of level crossing No 254 ( ) EBR(Dep) 24,09,04
152 - - .49 . S.Fund 12,36,00 8,92,07 2,00,00 1,00,00 Ghanapur-Nashkal - Road over bridge in lieu of level crossing No 49 ( ) EBR(Dep) 22,00,00
153 - - .96 . S.Fund 3,59,47 4,49,07 50,00 4,00,00 Balaharshah-Manikgarh - Road over bridge in lieu of level crossing No
96( ) EBR(Dep) 14,82,22
154 - - .5 . S.Fund 10,84,00 73,69 6,12,35 1,00,00 Yakatpura-Huppuguda - Road under bridge in lieu of level crossing No
5( ) EBR(Dep) 5,99,00
155 - - .6 . S.Fund 6,23,14 5,41,82 7,65 20,00 Huppuguda-Falaknuma - Road over bridge in lieu of level crossing No
6( ) EBR(Dep) 19,52,00
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. - / A - Works in Progress
- / ROAD SAFETY WORKS-LEVEL CROSSINGS.
- / B - New Works
7.2.13
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
156 - - .483- . S.Fund 9,61,67 8,09,69 1 1,00,00 Bayyavaram-Anakapalli - Road over bridge in lieu of level crossing No
483-E( ) EBR(Dep) 12,94,72
157 - - .255 . S.Fund 7,98,40 8,62,29 1 1,00,00 Stuartapuram-Bapatla - Road over bridge in lieu of level crossing No
255( ) EBR(Dep) 14,29,59
158 - - .417 . S.Fund 7,03,83 6,79,79 1,00 1Anaparthy-Bikkavolu - Road over bridge in lieu of level crossing No
417( ) EBR(Dep) 12,16,43
159 - - - : .166 150
. S.Fund 29,98,56 10,82,51 96,00 1
Dhone-Bogolu & Dhone-Malkapuram - Road over bridge in lieu of level
crossing No 166 & 150 respectively( ) EBR(Dep) 17,99,00
160 - - .37 . S.Fund 17,48,00 4,98,11 10,00 10,00 Wangapalli-Aler - Road over bridge in lieu of level crossing No 37 ( ) EBR(Dep) 10,96,53
161 - - .138 . S.Fund 15,39,14 8,02,20 8,00 50,00 Yerragudipadu-Yerraguntla - Road over bridge in lieu of level crossing
No 138( ) EBR(Dep) 9,12,00
162 - - .161 . S.Fund 31,32,42 6,13,21 2,05,14 5,00,00 Chalavaripalli-Tadipatri - Road over bridge in lieu of level crossing No
161( ) EBR(Dep) 17,11,94
163 ( ) - . 25 . S.Fund 16,21,72 10,43,78 20,00 70,00 Lingampalli (Station Yard) - Road over bridge in lieu of level crossing
No 25( ) EBR(Dep) 31,65,82
164 - - .347 . S.Fund .. .. 1 1Vatluru-Eluru - Road over bridge in lieu of level crossing No 347 ( ) EBR(Dep) 15,49,00
165 - - .54 . S.Fund 31,18,01 4,61,20 73,00 3,00,00 Aurangabad-Chikalthana - Road over bridge in lieu of level crossing
No.54( ) EBR(Dep) 18,02,28
166 - - .62- . S.Fund 15,75,66 .. 5,00 1,00,00 Kazipet-Warangal - Road over bridge in lieu of level crossing No 62-T ( ) EBR(Dep) 12,66,00
167 - - .343 . S.Fund 7,60,60 .. 25 1,00,00 Vatlur-Powerpet - Road over bridge in lieu of level crossing No.343 ( ) EBR(Dep) 20,19,88
168 - - .410 . S.Fund 12,06,96 5,99,91 3,50 1,00,00 Dwarapudi-Anaparthi - Road over bridge in lieu of level crossing No
410( ) EBR(Dep) 19,79,80
169 - - .485 . S.Fund 16,59,00 1,99 1 2,00,00 Bayyavaram-Anakapalli - Road over bridge at level crossing No 485 ( ) EBR(Dep) 18,95,47
170 - - .286 . S.Fund 7,68,00 5,56,72 20 2,00,00 Guntur-Nandyal - Road over bridge in lieu of level crossing No 286 ( ) EBR(Dep) 14,77,42
171 - - .183 . S.Fund .. .. 1 5,00 Nandyal-Dhone - Road over bridge in lieu of level crossing No 183 ( ) EBR(Dep) 9,72,62
172 - - .475 . S.Fund 15,49,52 5,60,35 1,00,00 2,00,00 Elamanchili-Narasingapalli - Road over bridge in lieu of level crossing
No 475( ) EBR(Dep) 13,14,70
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
7.2.14
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
173 - - .20 . S.Fund 12,32,48 6,02,91 20,00 50,00 Secunderabad-Wadi - Road over bridge in lieu of level crossing No 20 ( ) EBR(Dep) 18,07,94
174 - - .21 . S.Fund 14,13,00 4,77,64 1,43,00 3,00,00 Secunderabad-Wadi - Road under bridge in lieu of level crossing No 21 ( ) EBR(Dep) 10,12,27
175 - - .197 . S.Fund 15,04,00 5,33,31 1,53,09 2,80,00 Guntakal-Wadi - Road over bridge in lieu of level crossing No 197 ( ) EBR(Dep) 17,34,00
176 - - .15- . S.Fund 11,71,00 76,83 20,00 2,00,00 Secunderabad-Kazipet - Road over bridge in lieu of level crossing No
15-T( ) EBR(Dep) 2,53,91
177 - - .128 . S.Fund 20,58,00 5,62,08 5,00 50,00 Kazipet-Vijaywada - Road over bridge in lieu of level crossing No 128 ( ) EBR(Dep) 16,86,00
178 - - .7 . S.Fund 10,88,72 3,44,56 1,50,00 50,00 Samalkot-Kakinada Port - Road over bridge in lieu of level crossing No
7( ) EBR(Dep) 38,74,66
179 - .158 . S.Fund 12,23,81 4,06,04 2,70,00 50,00 Kavali Yard - Road over bridge in lieu of level crossing No 158 ( ) EBR(Dep) 22,55,65
180 - - .103 . S.Fund 12,27,75 14,91,11 15,00 1,00,00 Gudur-Vijaywada - Road over bridge in lieu of level crossing No 103 ( ) EBR(Dep) 21,64,71
181 - - .55 . S.Fund 10,23,00 8,03,44 50,00 1,00,00 Secunderabad-Dhone - Road over bridge in lieu of level crossing No
55( ) EBR(Dep) 12,13,00
182 - - .179- . S.Fund 15,48,00 .. 1,50,00 2,00,00 Renigunta-Guntakal - Road over bridge in lieu of level crossing No 179-
A( ) EBR(Dep) 11,99,59
183 - - .334- . S.Fund 2,98,00 .. 2,67,90 1,00,00 Vijaywada-Rajamundry - Road over bridge in lieu of level crossing No
334-E( ) EBR(Dep) 16,81,18
184 - - .8 . S.Fund 9,77,43 2,86 1 1,00,00 Vijayawada-Gudivada - Road over bridge in lieu of level crossing No 8 ( ) EBR(Dep) 13,34,62
185 - .381 . S.Fund 8,07,47 .. 1 20,00 Nidadavolu Station Yard - Road over bridge in lieu of level crossing
No.381( ) EBR(Dep) 24,55,68
186 - - .28 . S.Fund 10,51,00 4,13,82 20,00 1,00,00 Pagidipalli-Bhongir - Road over bridge in lieu of level crossing No.28 ( ) EBR(Dep) 13,87,25
187 - - .22 . S.Fund 9,77,39 32,76 4,00,00 2,00,00 Ghatkesar-Bibinagar - Road over bridge in lieu of level crossing No.22 ( ) EBR(Dep) 15,85,29
188 - - .13 ( ) - .1
. S.Fund 17,90,18 .. 1 1,00,00
Samalkot-Kakinada - Road over bridge in lieu of level crossing No.13
& Kakinada (GFCL siding) - level crossing No.1( ) EBR(Dep) 36,78,33
189 - - .120 . S.Fund 15,06,30 1,17 10,00 1,00,00 Kadapa-Kamalapuram - Road over bridge in lieu of level crossing
No.120( ) EBR(Dep) 20,11,00
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
7.2.15
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
190 - - .106 . S.Fund 13,40,00 .. 1 10,00 Khammam-Pandillapalli - Road over bridge in lieu of level crossing
No.106( ) EBR(Dep) 26,71,73
191 - - .73 . S.Fund 3,81,00 64,48 3,00,00 3,00,00 Devarakadra-Kaukuntla - Road over bridge in lieu of level crossing
No.73( ) EBR(Dep) 16,03,00
192 - - .-8 . S.Fund 13,12,98 4,08 2,00 25,00 Ammuguda-Moula Ali - Road under bridge in lieu of level crossing
No.BP-8( ) EBR(Dep) 16,91,00
193 - - .-11 . S.Fund 10,71,82 14,26 4,21,00 2,00,00 Ammuguda-Moula Ali - Road under bridge in lieu of level crossing
No.BP-11( ) EBR(Dep) 12,91,00
194 - - .193 . S.Fund 4,87,00 .. 1,00 5,00 Tanguturu-Surareddypalem - Road over bridge in lieu of level crossing
No.193( ) EBR(Dep) 21,31,58
195 - - .12 . S.Fund 11,52,40 1,91,90 2,20,00 1,00,00 Cherlapally-Ghatkesar - Road over bridge in lieu of level crossing
No.12( ) EBR(Dep) 20,68,30
196 - - .51 . S.Fund 12,30,15 4,23,47 1,00,00 2,00,00 Peddampet-Ramagundam - Road over bridge in lieu of level crossing
No.51( ) EBR(Dep) 18,96,13
197 - - .2 . S.Fund 18,15,00 .. 1,00 10,00 Guntur-Mangalgiri - Road over bridge in lieu of level crossing No.2 ( ) EBR(Dep) 32,57,09
198 - - .99 2- . S.Fund 11,91,00 3,56,82 50,00 3,00,00
Sriramnagar-Gadwal - 2-lane road over bridge in lieu of level crossing
No.99( ) EBR(Dep) 19,19,64
199 - - .415 2- . S.Fund 14,62,71 .. 1 5,00
Anaparthi-Balabhadrapuram - 2-lane road over bridge in lieu of level
crossing No.415( ) EBR(Dep) 29,00,36
200 - - 419 2- . S.Fund 7,05,00 30,00 5,35,80 2,00,00
Bikkavolu-Medapadu - 2-lane road over bridge in lieu of level crossing
No.419( ) EBR(Dep) 22,99,82
201 - - .312 . S.Fund 6,29,00 .. 1,00 10,00 Guntur-Nallapadu - Road under bridge in lieu of level crossing No.312 ( ) EBR(Dep) 9,34,55
202 - - .127 . S.Fund 5,30,98 2,47 50 2,00 Ananthapur-Prasannapalli - Road over bridge in lieu of level crossing
No.127( ) EBR(Dep) 20,52,63
203 - - .33 2-
. S.Fund 13,50,00 .. 1,00 10,00
Raigir-Wangapalli - 2-lane road over bridge & limited use subway in
lieu of level crossing No.33( ) EBR(Dep) 18,51,05
204 - - .57
. S.Fund 29,88,01 19,98 3,84,43 2,00,00
Rovindrakhani-Manchiryal - Road over bridge & limited height subway
in lieu of level crossing No.57( ) EBR(Dep) 18,80,24
205 - - .193 2-
. S.Fund 15,90,00 .. 5,00 10,00
Dichpalli-Nizamabad - 2-lane road over bridge & limited use subway in
lieu of level crossing No.193( ) EBR(Dep) 28,17,42
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
7.2.16
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
206 - - .80 2-
. S.Fund 6,87,40 .. 10,00 1,00,00
Sirpur Town-Vempalli - 2-lane road over bridge & limited use subway
in lieu of level crossing No.80( ) EBR(Dep) 17,69,27
207 - - .44 2-
. S.Fund 12,83,00 .. 2,00 20,00
Raghunathpalli-Ippaguda - 2-lane road over bridge & limited use
subway in lieu of level crossing No.44( ) EBR(Dep) 18,97,69
208 - .218 . S.Fund 4,10,00 1,38,80 3,13,06 3,00,00 Raichur Yard - Road under bridge in lieu of level crossing No.218 ( ) EBR(Dep) 3,59,71
209 - .256 . S.Fund 5,79,00 .. 1 1,00,00
Lallaguda Halt Station Yard - Road under bridge in lieu of level
crossing No.256( ) EBR(Dep) 8,38,56
210 - - .3/ . S.Fund 18,20,00 8,99,80 2,67,90 1Chittapur - Malkhaid Road - Road over bridge in lieu of level crossing
No.3/A( ) EBR(Dep) 18,20,00
211 - - .364 . S.Fund 17,11,00 .. 1 10,00 Pulla-Chebrol - Road over bridge in lieu of level crossing No.364 ( ) EBR(Dep) 27,18,96
212 - - .113 . S.Fund 15,26,91 .. 1 10,00 Vedayapalem-Nellore - Road over bridge in lieu of level crossing
No.113( ) EBR(Dep) 30,99,98
213 - - .112 . S.Fund 15,41,66 .. 1 10,00 Vedayapalem-Nellore - Road over bridge in lieu of level crossing
No.112( ) EBR(Dep) 31,58,95
214 - - .135 . S.Fund 10,31,00 25,10 50,00 3,00,00 Kurnool Town-Dupadu - Road over bridge in lieu of level crossing
No.135( ) EBR(Dep) 29,76,08
215 - - .144 . S.Fund 17,65,00 .. 1 10,00 Alluru Road-Bitragunta - Road over bridge in lieu of level crossing
No.144( ) EBR(Dep) 25,27,85
216 - - .249 . S.Fund 16,31,64 .. 1 1,00,00 Vejandla-Guntur - Road over bridge in lieu of level crossing No.249 ( ) EBR(Dep) 26,28,20
217 - - .23 . S.Fund 1,96,42 1,94,15 20,00 1Chinnakuntapalle-Mudigubba - Road under bridge in lieu of level
crossing No.23
218 - - .115 . S.Fund 3,37,64 1,40,57 81,85 20,00 Dharmavaram-Chigicherla - Road under bridge in lieu of level crossing
No.115
219 - - .160 . S.Fund 3,33,26 25 12,34 1,50,00 Gooty-Turukapalli - Road under bridge in lieu of level crossing No.160
220 - - .164 . S.Fund 3,23,25 15,13 2,39,97 1Komali-Juturu - Road under bridge in lieu of level crossing No.164
221 - - .155 . S.Fund 2,77,09 1,04,76 95,00 1Ramarajupalli-Turukapalli - Road under bridge in lieu of level crossing
No.155
222 - - .127 130 . S.Fund 3,05,21 2,24,43 40,00 1Guntakal-Tugali - Road under bridges in lieu of level crossing Nos.127
& 130
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
7.2.17
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
223 - - .180 . S.Fund 3,23,69 1,12,06 85,00 1Gooty-Patakottacheruvu - Road under bridge in lieu of level crossing
No.180
224 - - .149 . S.Fund 2,02,47 1,45 51,23 1,00,00 Pamidi-Ramarajupalli - Road under bridge in lieu of level crossing
No.149
225 - - .38 . S.Fund 1,95,82 1,57 1,25,06 5,00 Kalasamudram-Kadiri - Road under bridge in lieu of level crossing
No.38
226 - - .128 . S.Fund 1,46,52 .. 11,29 1,00,00 Guntakal-Maddikera - Road under bridge in lieu of level crossing
No.128
227 - - .46 . S.Fund 3,67,63 1,83,05 43,63 1
Nalgonda-Thipparthy - Limited height subway in lieu of level crossing
No.46
228 - - .60
. S.Fund 4,65,09 1,84,66 27,56 1
Thipparthy-Miryalaguda - Limited height subway in lieu of level
crossing No.60
229 - - .111 . S.Fund 4,92,69 .. 1 1Pangaon-Ghatnandur - Road under bridge in lieu of level crossing
No.111
230 - - .162, 170 171 . S.Fund 8,16,88 2,99,34 4,71,23 1,00,00
Secunderabad-Mudkhed - Road under bridge in lieu of level crossing
No.162, 170 & 171
231 - .134
. S.Fund 2,70,00 51,85 1,00 2,00,00
Secunderabad - Road under bridge in lieu of level crossing No.134
near Kurnool Town & Dupadu
232 -- . 199 . S.Fund 25,83,00 .. 1 10,00 Gudur-Vijayawada- Road over bridge in lieu of level crossing No.199 ( ) EBR(Dep) 35,66,80
233 -- . 54 . S.Fund 18,07,00 .. 7,65 10,00 Secunderabad -Kazipet- Road over bridge in lieu of level crossing No.
54( ) EBR(Dep) 29,20,78
234 -- . 407 . S.Fund 20,77,00 .. 1 10,00 Vijayawada-Visakhapatanam- Road over bridge in lieu of level
crossing No. 407( ) EBR(Dep) 30,46,98
235 -- . 426 . S.Fund 20,51,00 .. 1 10,00 Vijayawada-Visakhapatanam- Road over bridge in lieu of level
crossing No. 426( ) EBR(Dep) 52,19,20
236 -- . 67 . S.Fund 21,57,00 .. 5,00 10,00 Kazipet-Vijayawada- Road over bridge in lieu of level crossing No. 67 ( ) EBR(Dep) 31,22,37
237 -- . 328 . S.Fund 21,88,00 .. 1 10,00
Vijayawada-Visakhapatanam- Road over bridge in lieu of level
crossing No. 328A( ) EBR(Dep) 36,47,84
238 -- . 128 . S.Fund 19,50,00 .. 1 10,00 Gudur-Vijayawada- Road over bridge in lieu of level crossing No.128 ( ) EBR(Dep) 29,24,35
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
7.2.18
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
239 -- . 80 . S.Fund 17,51,00 .. 5,00 15,00 Kazipet-Vijayawada- Road over bridge in lieu of level crossing No. 80 ( ) EBR(Dep) 40,95,18
240 -- 520-
. S.Fund 4,60,00 .. 1 20,00
Gudur-Vijayawada- Replacement of existing girders of Road over
bridge in lieu of level crossing No. 520-A
241 -- . 64 . S.Fund 20,21,00 .. 5,00 10,00 Kazipet-Vijayawada- Road over bridge in lieu of level crossing No. 64 ( ) EBR(Dep) 32,24,40
242 -- . 1 . S.Fund 18,71,00 .. 2,00 10,00 Kazipet-Balharshah- Road over bridge in lieu of level crossing No. 1 ( ) EBR(Dep) 26,22,62
243 -- . 316 . S.Fund 15,66,00 .. 1 10,00 Vijayawada-Visakhapatanam- Road over bridge in lieu of level
crossing No. 316( ) EBR(Dep) 29,74,47
244 - - .115 . S.Fund 27,67,00 .. 1 10,00 Vijayawada-Bhimavaram - Road over bridge in lieu of level crossing
No. 115( ) EBR(Dep) 57,65,82
245 -- . 90 . S.Fund 20,01,00 .. 5,00 15,00 Kazipet-Vijayawada- Road over bridge in lieu of level crossing No. 90 ( ) EBR(Dep) 37,81,22
246 -- . 60 . S.Fund 8,56,00 .. 2,00 10,00 Kazipet-Vijayawada- Road over bridge in lieu of level crossing No. 60 ( ) EBR(Dep) 36,73,50
247 -- . 431 . S.Fund 21,45,00 .. 1 10,00 Vijayawada-Visakhapatanam -Road over bridge in lieu of level
crossing No.431( ) EBR(Dep) 50,69,13
248 -- . 187 . S.Fund 31,24,00 .. 1 10,00 Gudur-Vijayawada- Road over bridge in lieu of level crossing No.187 ( ) EBR(Dep) 45,10,96
249 - - .3 . S.Fund 22,48,00 .. 5,00 10,00 Bhokar-Hadgaon Road - Road over bridge in lieu of level crossing No.3 EBR 25,86,00 .. .. ..
250 - - .24 . S.Fund 21,59,00 .. 2,00 10,00 Bisugirsharif-Jamikunta - Road over bridge in lieu of level crossing
No.24( ) EBR(Dep) 28,42,18
251 - - .14 . S.Fund 23,35,00 .. 2,00 10,00 Uppal-Jamikunta - Road over bridge in lieu of level crossing No.14 ( ) EBR(Dep) 30,29,10
252 -- . 182 . S.Fund 2,98,88 .. 1 2,00,00 Gooty-Wadi- Road under bridge in lieu of level crossing No. 182
253 -- . 2 4 . S.Fund 3,79,99 .. 1 1,00,00 Pakala -Putalapattu- Road under bridge in lieu of level crossing No. 2
& 4
254 -- . 17, 21, 32, 36, 37, 41,43 -- . 220 (8 )
. S.Fund 30,79,42 .. 5,00 3,10,00
Secunderabad-Dhone- subways in lieu of level crossing No. 17, 21,
32, 36, 37, 41,43 Secunderabad-Mudkhed- level crossing No. 220 (8
Nos)
255 -- . 119 . S.Fund 3,28,34 .. 1 2,00,00 Gooty-Dharmavaram- Road under bridge in lieu of level crossing No.
119
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
7.2.19
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
256 -, - - : . 3,10,14 & 73 12 (5 )
. S.Fund 11,35,90 .. 10,54 2,00,00
Subways on Motumari-Jaggayapeta, Bhalki-Kalgupur & Sulthanabad-
Karimnagar sections in lieu of level crossing Nos 3,10,14 & 73 & 12
respectively (5 Nos)
257 - - - . 28, 29 , 38, 86 , 91,92 , 94, 98,100 (9 )
. S.Fund 22,67,89 .. 1,00 4,00,00
Vikrabad-Parli Vaijnath- Road under bridge in lieu of level crossing
No.28, 29 , 38, 86 , 91, 92 , 94,98,100 in Kohir- Pangaon (9 Nos)
258 - .117,121, 123,125,126,131,146,157,159 161 (10 )
. S.Fund 28,82,55 .. 5,00 20,00
Hyderabad division- subways in lieu of level crossing No. 117, 121,
123, 125, 126, 131, 146, 157, 159 & 161 (10 Nos)
259 -- . 151 . S.Fund 2,98,88 .. 71 1,80,00 Gooty-Dharmavaram- Road under bridge in lieu of level crossing No.
151
260 -- . 189 . S.Fund 3,48,27 .. 1 1,25,00 Gooty-Wadi- Road under bridge in lieu of level crossing No. 189
261 - -27 . S.Fund 56,20,44 .. 11,48 3,00,00 Guntur division- subways in lieu of level crossing- 27 Nos
262 -- . 6,9 23 (3 ) . S.Fund 6,83,81 .. 1,00 2,00,00 Motumari-Jaggayapeta- subways on in lieu of level crossing Nos 6,9 &
23 (3 Nos)
263 - - . 11 245 (2 ) . S.Fund 5,01,04 .. 5,00 20,00 Secunderabad-Dhone- subways in lieu of level crossing No. 11 & 245
(2 Nos)
264 . 88,132,136 90,60 : - - (5 )
. S.Fund 16,76,59 .. 1,00 2,00,00
Subways on Gundrathimadugu-Kondapalli & Mandamari-Wirur
sections in lieu of level crossing Nos 88, 132, 136 & 90,60 respectively
(5 Nos)
265 -- .. 5,8,9, 53,96,97,98 -- .178
. S.Fund 14,00,03 .. 21 3,00,00
Dharmavaram-Pakala -subways in lieu of level crossing No. 5, 8, 9,
53, 96, 97, 98 & Gooty-Renigunta Level crossing No. 178 (8 Nos)
266 -- . 58 . S.Fund 2,79,99 .. 1 1,00,00 Dharmavaram-Pakala- Road under bridge in lieu of level crossing No.
58
267 -, - - : . 19 16,18 9 (4 )
. S.Fund 12,00,91 .. 1,00 2,00,00
Subways on Ghatkesar-Bibinagar, Tandur- Vikarabad & Sanatnagar -
Maula Ali sections in lieu of level crossing Nos 19 & 16,18 & 9
respectively (4 Nos)
268 - . 16,21,101, 104,107,109, 7,15, 133,137, 2 23 (12 )
. S.Fund 19,32,76 .. 1,00 3,00,00
Nanded division- subways in lieu of level crossings Nos 16,21,
101,104, 107,109, 7,15, 133,137, 2 & 23 on (12 Nos)
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
7.2.20
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
269 -- . 16,19,28, 29,32,43,102,103,104,106,115 -- . 7
. S.Fund 25,20,00 .. 50 3,00,00
Dharmavaram-Pakala- subways in lieu of level crossing No. 16, 19,
28, 29, 32, 43, 102, 103, 104, 106, 115 & Katpadi-Tirupati- Level
crossing No. 7 (12 Nos)
270 2.5 . S.Fund .. .. .. 30,00,00 Works costing below Rs.2.5 crore each
- / Total-Works in Progress . S.Fund .. .. .. 150,72,12
271 - - 114 . S.Fund 24,88,63 .. .. 5,00 Kata road-Washim- Road over bridge in lieu of level crossing No. 114 ( ) EBR(Dep) 39,23,59
272 - - 114, 125 134 (3)
. S.Fund 5,15,78 .. .. 5,00
Kalikiri-Damalcheruvu- Subways in lieu of level crossings No.114, 125
& 134 (3 Nos.)
273 - - 314
. S.Fund 7,80,07 .. .. 5,00
Vijayawada-Gudivada- Road under bridge in lieu of level crossing No.
314A at Madhuranagar( ) EBR(Dep) 14,08,08
274 - - 24, 31, 32, 36, 37 47 (6)
. S.Fund 10,80,32 .. .. 5,00
Guntur-Nadikude- Subways in lieu of level crossing No. 24, 31, 32, 36,
37 & 47 (6 Nos.)
275 - - 255, 258 259 (3 ) . S.Fund 5,40,16 .. .. 5,00
Tenali-Repalle- Subways in lieu of level crossing No. 255, 258 & 259
(3 Nos.)
276 Nanded Division:- MMR-MUE Section:- Proposed construction ofRoad Over Bridge in lieu of LC No. 99 at Km. 247/1-2 between Satuna- Selu Stations.
. S.Fund 24,88,63 .. .. 5,00
Satuna-Selu- Road over bridge in lieu of level crossing No. 99 ( ) EBR(Dep) 39,23,59
277 - - 20 24 . S.Fund 3,43,86 .. .. 5,00 Chinnekuntapalli -Mudigubba- Subways in lieu of level crossings No.
20 & 24
278 - () - - : 28 115 (2 )
. S.Fund 5,04,38 .. .. 5,00
Peddapalli-Jagityal(Lingampet) & Vikrabad-Parli Vaijnath - Subways in
lieu of level crossings No. 28 & 115 respectively(2 Nos.)
279 - - 32 . S.Fund 26,77,18 .. .. 5,00 Zahirabad-Matalkunta- Road over bridge in lieu of level crossing No. 32 ( ) EBR(Dep) 42,41,47
280 - 30 . S.Fund 25,14,90 .. .. 5,00
Adilabad yard- Road over bridge in lieu of level crossing No. 30 with
subway( ) EBR(Dep) 51,55,27
281 - - 92 93 . S.Fund 3,43,86 .. .. 5,00
Kurabalakota-Madanapalle Road- Subways in lieu of level crossings
No. 92 & 93
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
- / B - New Works
7.2.21
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
282 MMR-MUE Section:- Proposed construction of Road Over Bridge inlieu of LC No. 122 at Km. 291/9 - 292/0 between Parbhani - PingliStations.
. S.Fund 24,88,63 .. .. 5,00
Parbhani-Pingli- Road over bridge in lieu of level crossing No. 122 ( ) EBR(Dep) 39,23,59
283 - - 100 . S.Fund 2,96,48 .. .. 5,00 Pullampet-Razampeta- Subway in lieu of level crossings No. 100
284 - - 2 . S.Fund 13,16,25 .. .. 5,00
Dharmavaram-Chinnekuntapalli- Road over bridge in lieu of level
crossing No. 2( ) EBR(Dep) 13,16,25
285 - 92 . S.Fund 17,36,14 .. .. 5,00 Partur yard- Road over bridge in lieu of level crossing No. 92 ( ) EBR(Dep) 27,39,07
286 - - 60 . S.Fund 26,27,10 .. .. 5,00 Mahabubnagar-Manyamkonda- Road over bridge in lieu of level
crossing No. 60( ) EBR(Dep) 40,10,46
287 - - 186,190, 203, 206, 208A, 226,230 233 (8 )
. S.Fund 21,55,76 .. .. 5,00
Guntakal-Wadi- Subways in lieu of level crossing No. 186,190, 203,
206, 208A, 226, 230 & 233 (8 Nos.)
288 - - 134 -- 176
. S.Fund 17,65,81 .. .. 5,00
Purna-Chudawa - Road over bridge in lieu of level crossing No. 134A
and Purna-Marshul - Subway at level crossing No.176A( ) EBR(Dep) 25,01,46
289 - - 39 . S.Fund 30,25,38 .. .. 5,00 Kolanur-Peddapalli - Road over bridge in lieu of level crossing No. 39 ( ) EBR(Dep) 47,26,24
290 - - 103 . S.Fund 3,50,00 .. .. 5,00 Renigunta-Gooty- Subway in lieu of level crossings No. 103 in
Razampeta Yard
291 - - 146, 147, 156, 159, - - 121 - - 143, 144, 146, 147 (9)
. S.Fund 24,25,23 .. .. 5,00
Dharmavaram -Gooty -Subways in lieu of level crossings No. 146,
147, 156, 159, Guntakal-Bellary- LC No.121 and Guntakal-Kalluru-LC
Nos 143, 144, 146, 147 ( 9 Nos.)
292 - - 207 . S.Fund 13,57,86 .. .. 5,00 Ongole-Surareddipalem- Road over bridge in lieu of level crossing No.
207( ) EBR(Dep) 20,71,00
293 - - 4, 7,6, 15, 17, 39, 60, 66, 72, 73, 110 113 (12 )
. S.Fund 27,57,82 .. .. 5,00
Dharmavaram-Pakala- Subways in lieu of level crossing No. 4, 7,6, 15,
17, 39, 60, 66, 72, 73, 110 & 113 (12 Nos.)
294 - - 115 . S.Fund 24,88,63 .. .. 5,00 Kata road-Washim- Road over bridge in lieu of level crossing No. 115 ( ) EBR(Dep) 39,23,59
295 - - - : 116, 127, 137,138, 139, 144 146 3, 64, 71 81 (11 )
. S.Fund 25,28,00 .. .. 5,00
Dharmavaram-Pakala & Katpadi-Tirupati - Subways in lieu of level
crossing No. 116, 127, 137, 138,139,144, 146 and 3, 64, 71, 81
respectively (11 Nos.)
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
7.2.22
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
296 - - - : 23, 29, 35 87, 126,127, 137 (7 )
. S.Fund 18,86,29 .. .. 5,00
Renigunta-Guntakal & Gudur-Tirupati - Subways in lieu of level
crossing Nos. 23, 29, 35 & 87, 126, 127, 137 respectively (7 Nos.)
297 - 413 . S.Fund 2,77,74 .. .. 5,00
Anaparthy yard- Foot over Bridge with ramps in lieu of level crossing
No. 413
298 - - 482 . S.Fund 3,90,96 .. .. 5,00 Kazipet-Warangal- Road under bridge in lieu of level crossing No. 482 ( ) EBR(Dep) 3,90,96
299 - - 131, 135, 136, 142, 144, 147, 156 ,158 177 (9 )
. S.Fund 20,68,36 .. .. 5,00
Guntakal-Nandyal- Subways in lieu of level crossing No. 131, 135,
136, 142, 144, 147, 156 ,158 & 177 (9 Nos.)
300 - - 3 47 . S.Fund 3,43,86 .. .. 5,00 Dharmavaram-Tanakallu- Subways in lieu of level crossings No. 3 & 47
301 - - 71 130 . S.Fund 3,43,86 .. .. 5,00 Mulacalacheruvu-Mangalampeta- Subways in lieu of level crossings
No. 71 & 130
302 - - 136 . S.Fund 3,49,61 .. .. 5,00 Renigunta-Gooty- Subway in lieu of level crossings No. 136 in
Yerragudipad Yard
303 - - 142 . S.Fund 4,42,25 .. .. 5,00 Renigunta-Gooty- Subway in lieu of level crossings No. 142 in
KalamallaYard
304 - - - : 53 6-
. S.Fund 5,31,68 .. .. 5,00
Secundrabad-Dhone & Jankampet-Bodhan -Subways in lieu of level
crossing No. 53 & 6-JB respectively
305 - - 13 . S.Fund 20,42,48 .. .. 5,00 Tandur-Mantatti- Road over bridge in lieu of level crossing No.13 ( ) EBR(Dep) 31,32,85
306 - - - - 105 . S.Fund 3,36,69 .. .. 5,00
Razampeta-Hastavaramu- Subway in lieu of level crossings No. 105
307 - - 73 . S.Fund 4,11,28 .. .. 5,00 Renigunta-Mamanduru- Subway in lieu of level crossings No. 73
308 - , - - : 11,163 78 (3 )
. S.Fund 9,00,00 .. .. 5,00
Gangakhed-Pokarna Narsimha, Chondi-Basmath & Jalna yard -
Subways in lieu of level crossings No. 11, 163 and 78 respectively (3
Nos.)
309 - - 11,21,22,41 51 (5)
. S.Fund 14,57,55 .. .. 5,00
Pagidipalli-Nadikudi - Subways in lieu of level crossings No.
11,21,22,41 and 51 (5 nos)
310 - - 134 ( )
. S.Fund 14,53,00 .. .. 5,00
Renigunta-Gooty - Road over bridge in lieu of level crossing No. 134
with subway (Kamalapuram Yard)( ) EBR(Dep) 14,53,00
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
7.2.23
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
311 - 107 ()
. S.Fund 25,00,00 .. .. 5,00
Gudur-Vijayawada - Road over bridge in lieu of level crossing No. 107
(Venkatacahalam Yard)( ) EBR(Dep) 25,00,00
312 2.5 . S.Fund .. .. .. 3,00,00 Works costing below Rs.2.5 crore each
- / Total-New Works . S.Fund .. .. .. 5,05,00
- -/ / . S.Fund .. .. .. 155,77,12
Total - Road Safety Works-Road Over/Under Bridges.
313 - - (49 ) DRF 17,87,12 5,84,07 2,20,03 1,00,00
Ballharshah - Cheruvu Madhavaram - Rehabilitation of weak formation
(49 km)
314 - - (20.6 ) DRF 5,79,08 3,32,21 33,26 1,00 Tanguturu - Duggirala - Rehabilitation of weak formation (20.6 km)
315 - - - (25.97 1.9 :)
DRF 6,48,79 5,22,77 6,65 5,00
Gunadala - Pithapuram & Ventrapragada - Gudivada - Rehabilitation
of weak formation (25.97 km & 1.9 km respectively)
316 - - (9.3 ) DRF 3,66,23 1,80,94 10,00 1,00,00 Nandyal - Guntakal - Rehabilitation of weak formation (9.3 km)
317 - - () - 17 DRF 23,78,31 21,12,86 50,00 1,47,00 Nallapadu - Nandyal - CTR(P) - 17 km
318 - - - () -14.01 () - 9.91
DRF 28,21,96 23,71,84 7,08 1,22,50
Vijayawada - Visakhapatnam - Complete Track Renewal (Primary) -
14.01 km & Through Rail Renewal (Primary) - 9.91 km
319 - - 11.5 () DRF 2,36,57 2,34,93 6,30 2,64 Secunderabad Military Siding - CTR - 11.5 km (S) EBR 8,77,58 9,91,10 .. ..
320 - - () - 11.45 DRF 9,65,08 10,39,17 62,21 10Kavutaram-Machilipatnam - TRR(P) - 11.45 km
321 - - () - 15.56 () - 6.738
DRF 27,64,33 20,13,31 90,00 1,00,00
Nallapadu-Nandyal - CTR(P) - 15.56 km & TRR(P) - 6.738 km
322 -- - 13.6 DRF 5,49,02 .. 70,03 2,20,02 Mudkhed-Adilabad-Pimpalkutti - TFTR - 13.6 km
323 - - ()- 4.578 () - 8.054 DRF 14,75,01 3,67,03 3,70,00 3,43,00
Gudur-Vijayawada - CTR(P) - 4.578 km & TRR(P) - 8.054 km
324 - - (33 ), -18.45 7.69
DRF 8,56,78 5,63,53 1,68,84 93,25
Balharshah-Kazipet - TTR (33 sets), TBR - 18.45 km & TFR - 7.69 km
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
/ TRACK RENEWALS - / A - Works in Progress
7.2.24
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
325 - - () - 7.906 DRF 4,72,40 .. 70,03 1,33,48 Wadi-Secunderabad - TRR(S) - 7.906 km
326 - - (9 ) 21.1 DRF 9,68,79 9,87,03 25,00 20,00 Nallapadu-Nandyal - TTR (9 sets) & TFTR - 21.1 km
327 - - -50.39 , -13 -21.779
DRF 14,30,62 .. 1,00,00 2,45,00
Renigunta-Guntakal - TBR-50.39 km, TTR-13 sets & TFR-21.779 km
/ Complete Track Renewal
328 - - - 21.82 - 20.71 2.57 ()
DRF 49,61,66 43,50,16 3,20,00 98,00
Vijayawada-Duvvada - CTR - 21.82 km & TRR - 20.71 km & 2.57 km
(P)
329 - - - 5.3 - 50.32 () DRF 51,98,43 58,68,16 3,00,00 21,35
Warangal - Kondapalli - CTR - 5.3 km & TRR - 50.32 km (P)
330 - - -15.19 - 7.25 ()
DRF 26,15,18 27,81,69 1,00,00 10,00
Secunderabad - Yasantapur - CTR - 15.19 km & TRR - 7.25 km (P)
331 - - - 5.5 - 3.82 () DRF 11,02,31 5,38,88 6,00,00 36,43
Wadi - Secunderabad - CTR - 5.5 km & TRR - 3.82 km (P)
332 - - - 12.29 - 14.04 () DRF 29,94,01 28,25,48 65,00 18,00
Kovvur -Thadi - CTR - 12.29 km & TRR - 14.04 km (P)
333 - - - 26.85 - 7.07 () DRF 40,96,67 40,67,42 1,43,37 10
Krishna - Wadi - CTR - 26.85 km & TRR - 7.07 km (P)
334 - - - 8.5 () DRF 11,53,84 7,02,69 25,00 1,22,50 Satulur - Narasaraopet - CTR - 8.5 km (P)
335 - - () - 1 () - 51.91
DRF 47,57,34 50,00,64 -94,48 40,00
Balharshah-Gangineni - CTR(P) - 1 km & TRR(P) - 51.91 km
336 - - () - 17.75 () -28.15
DRF 48,89,88 36,81,81 7,62,61 10,00
Sulehalli-Secunderabad - CTR(P) - 17.75 km & TRR(P) - 28.15 km
337 - - () - 6.35 () - 4.48( )
DRF 7,66,81 5,53,57 1,03,38 63,24
Wadi-Secunderabad - CTR(S) - 6.35 km & TRR(S) - 4.48 km (yard
lines)
338 - - () - 0.65 () - 26.79
DRF 25,94,31 23,25,38 1,40,06 1,00
Vijayawada-Chagallu - CTR(P) - 0.65 km & TRR(P) - 26.79 km
339 - - () - 6.31 () - 2.75 DRF 10,70,58 11,05,15 10,00 3,28
Lingiri-Wadi - CTR(P) - 6.31 km & TRR(P) - 2.75 km
/ TRACK RENEWALS
7.2.25
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
340 - - () - 20.23 () - 8.35
DRF 34,41,11 37,44,57 2,00,00 2,00
Dharmavaram-Anantapur - CTR(P) - 20.23 km & TRR(P) - 8.35 km
341 -- - () - 2.44 () - 3.37 ( )
DRF 4,27,88 4,74,52 55,00 5,00
Vijayawada-Bhimavaram-Nidadavolu - CTR(S) - 2.44 km & TRR(S) -
3.37 km (yard lines)
342 - - () - 11.10 DRF 14,75,79 13,50,62 1,35,00 50Malkapuram-Dhone - CTR(P) - 11.10 km
343 -- - () - 3.608 () -3.622 ( )
DRF 5,44,51 2,80,55 1,00,00 50,00
Gudur-Renigunta-Tirupati - CTR(S) - 3.608 km & TRR(S) - 3.622 km
(yard lines)
344 - - () - 3 DRF 4,20,42 1,85,97 40,00 98,00 Guntur-Pedakakani - CTR(P) - 3 km
345 - - () - 1.07 , () - 10.03 () - 22.285
DRF 21,47,45 15,26,12 1,40,06 1,08,45
Matalakunta-Ghatnandur - CTR(P) - 1.07 km, TRR(P) - 10.03 km &
TSR(P) - 22.285 km
346 - - () - 10.5 () - 4.55 ( )
DRF 11,44,07 10,94,13 1,18,04 40,00
Gudur-Vijayawada - CTR(S) - 10.5 km & TRR(S) - 4.55 km (yard lines)
347 - - () - 8.48 DRF 11,73,02 10,09,23 14,00 13,00
Narsingapalli - Thadi - Complete Track Renewal (Primary) - 8.48 km
348 - - () - 5.32 DRF 8,60,26 4,05,29 3,00,00 2,00 Nalwar - Wadi - Complete Track Renewal (Primary) - 5.32 km
349 - - () - 4.23 () - 13.44 DRF 18,33,40 20,29,99 41,16 1,00
Isivi-Wadi - CTR(P) - 4.23 km & TRR(P) - 13.44 km
350 - - () - 48.80 DRF 30,47,13 30,71,47 1,50,00 1,02,00 Tarur-Potul - TSR(P) - 48.80 km
351 - - () -18.50 DRF 14,09,88 3,91,35 1,65,17 1,04,00 Khandwa-Akola - CTR(S) - 18.50 km
352 - - () - 15.43 () -9.03
DRF 30,28,21 14,25,39 9,97,93 1,00,00
Vijayawada-Bikkavolu - CTR(P) - 15.43 km & TRR(P) - 9.03 km
353 - - () -1.905 () -33.625
DRF 32,99,95 32,62,35 1,80,00 1,96
Peddapalli-Kothapalli - CTR(P) - 1.905 km & TRR(P) - 33.625 km
354 - - () - 2.90 , () - 0.62 () - 1.80 ( )
DRF 3,72,31 .. 20,00 1,43,23
Wadi-Secunderabad - CTR(S) - 2.90 km, TRR(S) - 0.62 km & TSR(S) -
1.80 km (yard lines)
/ TRACK RENEWALS
7.2.26
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
355 - - () - 5.53 () - 1.15 DRF 9,10,70 3,18,61 20,00 1,41,32
Dharur-Begumpet - CTR(P) - 5.53 km & TRR(P) - 1.15 km
356 - - () - 10.40 DRF 15,23,55 13,87,35 24,73 10,00 Motumari-Makkapeta - CTR(P) - 10.40 km
357 - - () - 8.87 , () - 8.67 () - 3.61 ( )
DRF 13,56,41 8,58,36 1,00,00 1,50,94
Secunderabad-Kazipet - CTR(S) - 8.87 km, TRR(S) - 8.67 km &
TSR(S) - 3.61 km (yard lines)
358 - - () - 8.90 () -21.55
DRF 31,42,37 32,08,40 -1,25,68 90,00
Secunderabad-Jangaon - CTR (P) - 8.90 km & TRR(P) - 21.55 km
359 - - () - 2.60 () - 4 DRF 5,86,97 2,64,14 6,00 1,47,00
Guntur-Bandarupalle - CTR(P) - 2.60 km & TSR(P) - 4 km
360 - - () - 0.91 , () - 5.555 - 0.83
DRF 4,38,37 2,99,86 47,50 50,00
Gudur-Vijayawada - CTR(S) - 0.91 km, TRR(S) - 5.555 km & TSR(S) -
0.83 km
361 - - () - 7.53 () - 23.39 DRF 32,04,13 35,35,77 3,00,00 12,00
Guntakal-Wadi - CTR(P) - 7.53 km & TRR(P) - 23.39 km
362 - - ()- 22.56 , ()- 25 - 1.54
DRF 56,18,79 28,85,35 5,72,75 1,07,39
Wadi - Secunderabad - CTR(P) - 22.56 km, TRR(P) - 25 km & TSR -
1.54 km
363 - - ()-5.28 DRF 7,60,32 3,99,40 54,46 88,65 Motumari-Jaggayyapet - CTR(P) - 5.28 km
364 - - () -7 () - 26 DRF 26,01,67 8,98,33 5,00,00 1,04,64
Manmad - Mudkhed - CTR(P) - 7 km & TSR(P) - 26 km
365 - - ()-1.82 () - 8.08
DRF 10,25,55 6,60,07 2,80,00 1,50,00
Pagidipalli - Nadikudi - CTR(P) - 1.82 km & TRR(P) - 8.08 km
366 - - ()- 2.80 ( ) DRF 2,50,82 1,85,77 10,00 40,00 Nadikudi-Macherla - CTR(S) - 2.80 km (yard lines)
367 - - ()- 9.99 - 16.52
DRF 31,42,02 3,86,27 5,98,76 1,02,00
Vijayawada - Vishakhapattnam - CTR(P) - 9.99 km & TRR(P) - 16.52
km
368 - - () - 4.8 DRF 4,45,08 1,33,67 30,00 98,00 Tenali-Guntur - CTR(P) - TRR(P) - 4.8 km
369 - - () - 13.2 () - 4.15 DRF 23,03,37 16,53,17 3,50,00 1,22,50
Guntur-Krishna Canal - CTR(P) - 13.2 km & TRR(P) - 4.15 km
/ TRACK RENEWALS
7.2.27
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
370 - ( ) - () - 3.8 () - 16.352
DRF 26,62,67 10,68,32 2,37,50 2,45,00
Gudur-Vijayawada (up & down) - CTR(P) - 3.8 km & TRR(P) - 16.362
km
371 - () - () - 2.4 DRF 4,52,31 97,27 2,82,69 1,50,00 Dharmavaram-Gooty (SL) - CTR(P) - 2.4 km
372 - () - () - 4 DRF 6,43,75 89 1,00,00 1,92,94 Manmad-Mudkhed (SL) - CTR(P) - 4 km
373 - ( ) - () - 4 DRF 7,24,48 45,75 4,47,66 98,00 Renigunta-Guntakal (up & down) - CTR(P) - 4 km
374 - () - () - 2.5 DRF 4,09,93 3,43,30 15,00 50,00 Nallapadu-Nandyal (SL) - CTR(P) - 2.5 km
375 - () - () - 1.28 () -0.7
DRF 2,84,38 .. 50,00 80,55
Manikgarh-Gadchandur (SL) - CTR(P) - 1.28 km & TRR(P) - 0.7 km
376 - ( ) - () - 6.59 () -38.19
DRF 52,73,25 13,99,13 12,68,60 3,35,00
Guntakal-Wadi (up & down) - CTR(P) - 6.59 km & TRR(P) - 38.19 km
377 - - () - 28.4 DRF 29,78,57 .. 1,50,00 6,31,00 Khandwa -Akola - CTR(S) - 28.4 km
378 - - () -1.81 DRF 3,19,18 .. 10,00 98,00 Guntur-Nandyal - CTR(P) -1.81 km
379 - () - 11.22 () -2.15
DRF 22,98,58 .. 10,00,00 8,05,30
Motumari-Jaggayapeta Town- CTR(P) -11.22 km & TRR(P) - 2.15 km
380 - ()- 9.67 () -3.00 DRF 19,78,81 .. 25,00 4,90,00
Tenali-Guntur - CTR(P) - 9.67 km & TRR(P) -3.00 km
381 - () - 54.158 () - 3.99
DRF 97,56,19 .. 20,96,10 14,70,00
Wadi-Secunderabad - CTR(P) - 54.158 km & TRR(P)-3.99 km
382 - - () - 0.95 () -5.71 DRF 4,99,54 .. 25,00 1,47,00
Guntur-Nandyal - CTR(S) - 0.95 km & TRR(S)-5.71 km
383 - () -1.497 () -12.838
DRF 15,60,28 .. 5,88,70 3,43,00
Gudivada - Machilipatnam - CTR(P) -1.497 km & TRR(P) -12.838 km
384 - - () - 27.877 () -5.043
DRF 53,80,18 .. 12,10,69 14,70,00
Secunderabad-Kazipet - CTR(P) - 27.877 km & TRR(P) - 5.043 km
385 - - () 6.74 DRF 7,86,08 .. 50,00 98,00 Gudur-Vijayawada -TRR(P) - 6.74 km
/ TRACK RENEWALS
7.2.28
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
386 - () - 32.241 ()-31.417
DRF 93,24,22 .. 17,89,39 19,60,00
Vijayawada-Visakhapatnam - CTR(P) - 32.241 km & TRR(P) - 31.417
km
387 - - ()-17.795 DRF 21,36,88 .. 1,00,00 2,45,00 Janakampet-Bodhan - CTR(S) -17.795 km
388 - - () -1.20 () - 2.319
DRF 3,31,78 .. 52,68 98,00
Manikgarh-Gadchandur - CTR(S) -1.20 km & TRR(S) -2.319 km
389 - - () - 1.90 () - 1.545
DRF 3,09,00 .. 20,00 1,50,00
Gudur-Vijayawada - CTR(S) -1.90 km &TRR(S) -1.545 km
390 - () 12.67 DRF 14,78,05 .. 7,00,00 3,43,00 Renigunta-Guntakal - TRR(P) -12.67 km
/ Through Rail Renewal
391 - - - 25.58 -14.53 () DRF 26,71,81 21,04,77 15,00 1,96,00
Nalgonda - Nadikude - TRR - 25.58 km & TSR - 14.53 km (P)
392 - - - 53.52 () DRF 48,47,03 47,26,98 75,00 56,15 Balharshah - Hasanparti Road - TRR - 53.52 km (P)
393 - - - 4 - 26.78 () DRF 17,36,69 22,59,31 7,87 10,00
Chitta-Udgir - TRR - 4 km & TSR - 26.78 km (P)
394 - - () - 8.94 DRF 8,07,34 8,95,86 -43,48 40,00 Ghatkesar-Wangapalli - TRR(P) - 8.94 km
395 - - - () -24.03
DRF 21,77,59 22,10,69 7,00 50,00
Hasanparti - Kazipet Town & Nekonda - Dornakal - Through Rail
Renewal (Primary) - 24.03 km
396 - - () -7 DRF 6,16,25 4,96,64 1,75,00 60,00 Gudur - Venkatachalam - Through Rail Renewal (Primary) - 7 km
397 - - () - 39.91 DRF 37,93,31 12,30,53 6,00,00 8,55,57 Kazipet-Errupalem - TRR(P) - 39.91 km
398 - - () - 38.14 DRF 36,63,19 43,74,93 3,08,52 50,00 Balharshah-Kazipet - TRR(P) - 38.14 km
399 - - () - 3.20 DRF 2,71,33 2,50,67 14,47 66Mahbubnagar Town-Maniyamkonda - TRR(P) - 3.20 km
400 - - () - 7 DRF 6,49,31 34 70,03 2,20,00 Vikarabad-Marpalli - TRR(P) - 7 km
401 - - () - 13.50 ( ) DRF 7,78,42 1,72,99 7,00 1,21,52 Secunderabad-Dhone - TRR(S) - 13.50 km (yard lines)
402 - - () - 14.387 DRF 8,41,17 60,81 76,33 2,84,38 Balharshah-Kazipet - TRR(S) - 14.387 km
/ TRACK RENEWALS
7.2.29
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
403 -- ()- 3.25 DRF 3,13,33 3,99,29 -2,62 10,00 Balharshah-Kazipet - TRR(P) - 3.25 km
404 - - ()- 44.94 DRF 43,06,51 28,82,33 1,39,96 4,90,00 Kazipet-Vijayawada - TRR(P) - 44.94 km
405 - - () - 7.52 DRF 7,53,76 7,73,72 13 9,30 Gudur-Renigunta - TRR(P) - 7.52 km
406 - - () - 3.7 DRF 3,26,09 2,41,94 21,01 57,15 Mudkhed - Secunderabad - TRR(P) - 3.7 km
407 - - () - 7.059 DRF 4,50,38 2,66,05 47,50 1,00,00 Vijayawada-Visakhapatnam - TRR(S) - 7.059 km
408 - - () -10.08 DRF 8,96,57 1,51,80 20,20 1,96,00 Tenali-Repalle - TRR(P) - 10.08 km
409 - ( ) - () - 21.46 DRF 24,28,84 2,56,27 8,27,84 84,56 Kazipet-Kondapalli (up & down) - TRR(P) - 21.46 km
410 - ( ) - () - 18.458 DRF 20,63,64 20,74,38 -3,21,72 2,45,00 Balharshah-Kazipet (up & down) - TRR(P) -18.458 km
411 - - () - 29.721 DRF 30,18,95 .. 5,00,00 3,92,00 Bhimavaram-Narasapur - TRR(P) - 29.721 km
412 - () - () - 3.10 DRF 4,11,67 .. 2,12,21 70,00 Bellary-Guntakal (UP): TRR(P) -3.10 km
413 - - () - 10.43 DRF 10,32,75 .. 7,00,00 30,00 Dhramavaram-Pakala - TRR(P) -10.43 km
414 - - () - 4.795 DRF 3,35,09 .. 2,12,72 66,61 Wadi-Secunderabad - TRR(S) - 4.795 km
415 - - () - 27.90 DRF 31,39,98 .. 20,00,00 3,92,00 Kazipet-Kondapalli : TRR(P) - 27.90 km
416 - - () -11.72 DRF 8,68,79 .. 50,00 1,22,50 Kondapalli-Vijayawada - TRR(S) -11.72 km
417 - - () - 12.04 DRF 13,85,04 .. 6,50,00 4,90,00 Balharshah-Kazipet : TRR(P) -12.04 km
/ Through Sleeper Renewal
418 - - () - 5.95 DRF 3,66,36 3,51,20 48,00 10,00 Venkatachalam-Bitragunta - TSR(P) - 5.95 km
419 - - () - 7.80 DRF 4,37,73 5,36,93 30,00 10,00 Tenali-Vejandla - TSR(P) - 7.80 km
420 - () - () - 4.00 DRF 2,78,18 .. 49,08 1,05,97 Balharshah-Kazipet(UP) - TSR(P) - 4.00 km
/ Ballast
421 - - - 61.68 DRF 7,45,06 14,15,10 1,28,65 10,00 Parli Vaijnath - Parbhani - TFR & TBR - 61.68 km
422 - - - 31.68 , - 42.35 - 42.34 (2479 )
DRF 8,11,07 7,48,80 1,00,00 17,00
Renigunta-Guntakal - TFR - 31.68 km, TBR - 42.35 km & TWR - 42.34
km (2479 joints)
/ TRACK RENEWALS
7.2.30
SOUTH CENTRAL RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
423 - - - 74.74 , - 70.85 , - 46 () (32 )
DRF 24,16,29 9,52,72 4,34,79 5,21,15
Balharshah - Vijayawada - TBR - 74.74 km, TFR - 70.85 km, TFTR -
46 km & TTR (CMS) (32 sets)
424 - - - 96.89 - 12.55 DRF 10,94,60 4,93,89 20,20 2,45,35
Secunderabad - Kazipet - TBR - 96.89 km & TFR - 12.55 km
425 - - - 72.36 - 72.46 DRF 12,07,68 7,20,43 80,12 1,48,09
Wadi - Secunderabad - TBR - 72.36 km & TFR - 72.46 km
426 - - - 56.04 , - 25.87 , - 46.74 (58 )
DRF 18,50,31 15,20,14 1,35,46 98,00
Wadi - Guntakal - TBR - 56.04 km, TWR - 25.87 km, TFR - 46.74 km
& TTR (58 sets)
427 - - -218.17 , -226.55 ,-15.48 -14
DRF 49,99,80 35,08,84 2,00,00 4,36,57
Balharshah-Vijayawada - TBR - 218.17 km, TFR - 226.55 km, TFTR -
15.48 km & TTR -14 sets
428 - - - 39.19 , - 20.25 -16
DRF 7,35,68 6,68,47 17,51 50,00
Gudur-Vijayawada - TBR - 39.19 km, TFR - 20.25 km & TTR - 16 sets
429 - - - 8.85 , - 54.78 , - 11 - 75
DRF 21,45,20 10,91,53 62,84 3,55,31
Secunderabad-Kazipet - TBR - 8.85 km, TFR - 54.78 km, TFTR - 11
km & TTR - 75 sets
430 - - - 3.2 , - 52.13 , - 29.0