Upload
lucine
View
40
Download
3
Embed Size (px)
DESCRIPTION
6 th RARS IG-Meeting 25 th - 26 th ,Oct/2012 (EXETER - UK). INPE/INMET Brazilian Institute for Space Research National Institute of Meteorology Sérgio de Paula Pereira (INPE). Receiving Sites in Brazil. - Cachoeira Paulista (INPE) NOAA 15, 16, 17, 18, and 19 - PowerPoint PPT Presentation
Citation preview
6th RARS IG-Meeting
25th - 26th,Oct/2012(EXETER - UK)
INPE/INMET
Brazilian Institute for Space ResearchNational Institute of Meteorology
Sérgio de Paula Pereira (INPE)
Receiving Sites in Brazil
• - Cachoeira Paulista (INPE) NOAA 15, 16, 17, 18, and 19 METOp ready
• - Cuiabá (INPE) NOAA 15, 17, 18, and 19 METOp: processing system in transit
• - Brasília (INMET) NOAA 17, 18, and 19
• - Natal (INPE) NOAA 15, 16, 17, 18, and 19) New NOAA/METOp Station packed for shipping
• - Fortaleza (Funceme) NOAA 15, 17, 18, and 19 (Station failed since end-2010) no definite date yet to resume operation
HRPT StationsOperational
since:
Expected/planned tart-up
Satellite
INPE - Cach. PaulistaINPE - CuiabáINMET - BrasíliaINPE - (Natal)FUNCEME – Fortaleza
SIVAM – Manaus…
INPE - Boa Vista ……
CHM (Navy) – Natal…
2006Sept - 2007Oct – 2007
Jan-2011 Oct-2010
early 2012
Failed since end-2010
2012/2013
suspended
suspended
NOAA-15, 16,17,18,19NOAA- 15, 17,18,19
NOAA- 17,18,19NOAA-15, 16,17,18,19
NOAA- 15, 17,18,19
Negotiation pending
Station METOP Readiness
X-RARS (IASI)
NPP Readiness
Cachoeira Paulista
METOp ready 2012 2013 (third quarter)
CuiabaMETOp ready
(station in transit)2012 /
early 2013 2013 (second
quarter)
Brasilia(planned for early
2013)-
(No plans yet)
Fortaleza (No plans yet) (No plans yet)
Natal/INPE(Station
purchased)2013 (first quarter)
(No plans yet)
Manaus ( negotiation pending)
METOp hardware in place
pending software module
(tbd)
NPP hardware in place
pending software module
Boa Vista (suspended)
SOUTH AMERICA RARS – BRAZIL (Exeter IG Meeting – Oct-2012)
TIMELINESS (Set-Oct-2012)• Level-1c BUFR files generated by INPE/Cachoeira Paulista Proc.Center
(data coming from INPE-Cuiaba, INMET-Brasilia, CPTEC-Cachoeira Paulista; and INPE-NATAL).
From Cach. Paulista:
92% within 30 min (25% within 20 min; 75% above)
8% above 30 min
From Cuiaba:
90% within 30 min (10% within 20 min; 90% above)
10 % above 30 Min
From INMET:
(Processing system being updated in Cachoeira Paulista)
From NATAL:
90% within 30 min (10% within 20 min; 90% above)
10 % above 30 Min
AAPP VERSION
• Cuiaba - INPE: 7.3 (latest)
• Cachoeira Paulista - INPE: 7.3 (latest)
• Brasilia-INMET: 7.3 (latest) - processing computer being shipped from INPE
• NATAL – INPE : 7.3 (latest)
• FUNCEME: 6.8
Present efforts (7.3):
OPS-LRS; XERCES, IFFTW libraries being installed for subsequent testing
RARS data on GTS Washington Node
• GTS FOCAL Point: INMET - Brasília
• Responsible person: Mr. Jose Mauro Rezende
• Since Oct,10th, 2008 standard RARS files being sent to final destination node in Washington (RTH KWBC)
THANK YOU
Extension of the South American RARS to Central America
• Venezuela thought as a possible alternative:
• Image Processing Center (CPDI) of the “Instituto de Ingenieria in Caracas
• Mr. Freddy Flores, Chief of CPDI
• INPE would like to count on help from the WMO Space Program in contacting data provider in Venezuela
RARS EXTENSION TO ADVANCED SOUNDING
MISSIONS
• INPE Preliminary Tests with AIRS High-spectral sounding data:
(version 1.1 downloaded; not tested yet)
RT-STPS: version 4.1
IMAPP- AIRS: version 5.2.1
AIRS_TO_BUFR: version 1.0 (installed and tested in jul-2009)
(version 1.1 downloaded; not tested yet)
CADU Files>>RT-STPS package>> pds Level 0 Files >>>>>
IMAPP-AIRS package>>> Level 1b Files>>> AIRS_To_BUFR package