22
6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego

6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

Embed Size (px)

Citation preview

Page 1: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002

Next Generation Abilene and Advanced National & Regional InfrastructureNext Generation Abilene and Advanced National & Regional Infrastructure

CENIC 2002

San Diego

CENIC 2002

San Diego

Page 2: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 2

Key topics

Abilene Network upgrade

Quilt Project

Optical networking progress

Page 3: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 3

Abilene background & milestones

Abilene is a UCAID project in partnership with• Qwest Communications (SONET & DWDM service)• Cisco Systems (routers, switches & access)• Juniper Networks (routers)• Nortel Networks (SONET kit)• Indiana University (network operations)• ITECs in North Carolina and Ohio (test and evaluation)

Timeline• Apr 1998: Project announced at White House• Jan 1999: Production status for network• Oct 1999: IP version of HDTV (215 Mbps) over Abilene• Nov 2001: Raw HDTV/IP (1.5 Gbps) over Abilene

Page 4: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 4

Abilene – May, 2002

IP-over-SONET backbone (OC-48c, 2.5 Gbps) 53 direct connections

• 4 OC-48c connections • 1 Gigabit Ethernet trial • 23 will connect via at least OC-12c (622 Mbps) by 1Q02• Number of ATM connections decreasing

215 participants – research universities & labs• All 50 states, District of Columbia, & Puerto Rico• 15 regional GigaPoPs support ~70% of participants

Expanded access• 50 sponsored participants

– New: Smithsonian Institution, Arecibo Radio Telescope

• 23 state education networks (SEGPs)

Page 5: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 5

Page 6: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 6

Abilene international connectivity

Transoceanic R&E bandwidths growing!• GÉANT – 5 Gbps between Europe and New York City now

Key international exchange points facilitated by Internet2 membership and the U.S. scientific community

• STARTAP & STAR LIGHT – Chicago (GigE)• AMPATH – Miami (OC-3c OC-12c)• Pacific Wave – Seattle (GigE)• MAN LAN - New York City (GigE/10GigE EP soon)• CA*NET3/4: Seattle, Chicago, and New York• CUDI: CENIC and Univ. of Texas at El Paso

International transit service• Collaboration with CA*NET3 and STARTAP

Page 7: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 7

Packetized raw High Definition Television (HDTV)

Raw HDTV/IP – single UDP flow of 1.5 Gbps• Project of USC/ISIe, Tektronix, & U. of Wash (DARPA) • 6 Jan 2002: Seattle to Washington DC via Abilene

–Single flow utilized 60% of backbone bandwidth• 18 hours: no packets lost, 15 resequencing episodes• End-to-end network performance (includes P/NW & MAX

GigaPoPs)– Loss: <0.8 ppb (90% c.l.)– Reordering: 5 ppb

• Transcontinental 1-Gbps TCP requires loss of

– <30 ppb (1.5 KB frames)– <1 ppm (9KB jumbo)

Page 8: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 8

End-to-End Performance:‘High bandwidth is not enough’

Bulk TCP flows (transfers > 10 Mbytes) • Current median flow rate over Abilene: 1.9 Mbps

–95th percentile: 7.0 Mbps

Page 9: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 9

Future of Abilene

Original UCAID/Qwest agreement amended on October 1, 2001

Extension of for another 5 years – until October, 2006

• Originally expired March, 2003

Upgrade of Abilene backbone to optical transport capability - ’s (unprotected)

• x4 increase in the core backbone bandwidth–OC-48c SONET (2.5 Gbps) to 10-Gbps DWDM

Page 10: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 10

Key aspects of next generation Abilene backbone - I

Native IPv6• Motivations

– Resolving IPv4 address exhaustion issues

– Preservation of the original End-to-End Architecture model• p2p collaboration tools, reverse trend to CO-centrism

– International collaboration

– Router and host OS capabilities

• Run natively - concurrent with IPv4• Replicate multicast deployment strategy• Close collaboration with Internet2 IPv6 Working Group on

regional and campus v6 rollout– Addressing architecture

Page 11: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 11

Key aspects of next generation Abilene backbone - II

Addition of new measurement capabilities• Enhance active probing (Surveyor)

– Latency & jitter, loss, TCP throughput

• Add passive measurement• Support for computer science research – “Abilene Observatories”

– archive/measurement/experiment• Support of Internet2 End-to-End Performance Initiative

– Intermediate performance beacons

Network resiliency• Abilene ’s will not be protected like SONET• Increasing use of videoconferencing/VoIP impose tighter

restoration requirements (<100 ms)• Options:

– MPLS/TE fast reroute (initially)– IP-based IGP fast convergence (preferable)

Page 12: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego
Page 13: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 13

Next generation router selection

Extensive router specification and test plan developed

• Team effort: UCAID staff, NOC, NC and Ohio ITECs• Discussions with four router vendors

Tests focused on next gen advanced services• High performance TCP/IP throughput • High performance multicast• IPv6 functionality & throughput• Classification for QoS and measurement

3 router platforms tested & commercial ISPs referenced

New Juniper T640 platform selected

Page 14: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 14

Two leading national initiatives in the U.S.

Next Generation Abilene• Advanced Internet backbone

– connects entire campus networks of the research universities

• 10 Gbps nationally

TeraGrid• Virtual machine room for distributed computing (Grid) • Connecting 4 HPC centers initiallly

– Illinois: NCSA, Argonne– California: SDSC, Caltech

• 4x10 Gbps: Chicago Los Angeles

Ongoing collaboration between both projects

Page 15: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 15

Quilt Project

Coalition of advanced regional networks • Now includes 18 GigaPoPs with SURA and EDUCAUSE• Including CENIC and Pacific/Northwest • Led by Wendy Huntoon (Pittsburgh)

Became a project of UCAID last summer• In parallel with Internet2 & Abilene projects

Core activities• Commercial Internet Services• Regional Optical Networking ( Next Gen Abilene)• Measurement ( End-to-end Performance)• New Internet2/Quilt K-20 Joint Initiative

Page 16: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 16

Optical networking technology drivers

Aggressive period of fiber construction on the national & metro scales in U.S.

Many university campuses and regional GigaPoPs with dark fiber

Dense Wave Division Multiplexing (DWDM)

• Allows the provisioning of multiple channels (’s) over distinct wavelengths on the same fiber pair

• Fiber pair can carry 160 channels (1.6 Tbps!)

Optical transport is the current focus• Optical switching is still in the realm of experimental

networks, but is nearing practical application

Page 17: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 17

DWDM technology

DWDM fundamentally is an analog optical technology

• Combines multiple channels (2-160+) over the same fiber pair

• Employs discrete wavelengths (’s) of light • Generally supports 2.5 or 10 Gbps channels

Physical obstacles to long-distance transmission of light

• Attenuation –Solved by amplification (OO)

• Dispersion–Requires periodic signal regeneration (OEO)

Page 18: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

18

Optical network project differentiation

Distance scale (km)

Examples Equipment

Metro < 60

UW(SEA),

USC/ISI(LA)

Dark fiber & end terminals

State/

Regional

< 500

(ULH: <2500)

I-WIRE (IL),

CENIC ONI,

I-LIGHT (IN)

Add OO

amplifiers

Extended

Regional/

National

> 500

PLR,

TeraGrid

Abilene

Add OEO

regenerators

& O&M $’s

Page 19: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 19

Regional optical fanout

Next generation architecture: Regional & state based optical networking projects are critical

• Three-level hierarchy: Backbones, GigaPoPs, campuses• Leading examples

– CENIC ONI (California), I-WIRE (Illinois), I-LIGHT (Indiana)

• State-based projects can be viewed as cost sharing

Collaboration with the Quilt • Regional Optical Networking project • Interface with next generation Abilene and future projects

U.S. carrier DWDM access is not widespread• 30-60 cities for DWDM now• ~120 cities for SONET (circa 1998)• Further expansion constrained by current telecom crunch

Page 20: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 20

National optical networking options

1 – Provision incremental wavelengths• Obtain 10-Gbps ’s as with SONET• Exploit smaller incremental cost of additional ’s

– 1st cost is ~10x than subsequent ’s

2 – Build dim fiber facility• Partner with a facilities-based provider

– Acquire 2 fiber pairs on a national scale– Outsource operation of transmission equipment

• Needs lower-cost optical transmission equipment– Find ELH/ULH optical kit partner

The classic ‘buy vs. build’ decision in Information Technology

• Option 1 selected for TeraGrid and Next Gen Abilene

Page 21: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

6 May 2002 21

Conclusions – Abilene future

Backbone upgrade project underway• Partnership with Qwest extended thru 2006• Juniper T640 routers selected for backbone• 10-Gbps backbone deployment starts this fall

Advanced service foci• Native, high-performance IPv6• Enhanced, differentiated measurement• Network resiliency

Incremental, non-disruptive transition

Complementary to and collaborative with NSF’s TeraGrid

Page 22: 6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego

www.internet2.edu