2
ASAHI/AMERICA 35 Green Street P.O. Box 653 Malden, MA 02148-6834 Tel: (781)321-5409 FAX (781)388-4781 Miniplast Certification Checklist General Tool Information: Material: Thermoplastics Handling & Storage Marking of Components Quality Control (ISO 9001) Tool Set Up: Clamp Setup Planer Setup Mirror (Heating Plate) Setup Base Removal Welding Procedure: Clamping of Components Planing Alignment Initial Weld Pressure Heat Soak Time Cool Down Time/Pressure QA / QC & Inspection Tool Maintenance/Information: Care of Mirror Care of Planer Packaging/Storage Instructions Manual & Shipping Checklist Operating Concerns: Safety Poor Planning Misalignment & Adjustments Pressure During Planing Environmental Conditions The signees below are in agreement of a full and complete training on the Shop 4 Welding Tool Welding Spec: ASTM D 2657 ASTM F 2620 (PE) AWS B2.4 Other Material Trained On: PP HDPE PVDF ECTFE Miniplast Certification Checklist Rev:B 118/20/2007 Rental 1 page Model: Widos Miniplast 2 Pipe/Fitting Material: PE, PP, PVDF, ECTFE Pipe/Fitting Sizes: ½” – 4” (20 mm – 110 mm) Transport box (LxBxH): 21 x 27 x 19 inches Weight: Appr. 100 lbs. Breaker: 15 Amp Voltage Requirement: 110 V (+/- 10%)

6-20' trench machine training check - Asahi America Inc. · Web viewMiniplast Certification Checklist. General Tool Information: Model: Widos Miniplast 2 Pipe/Fitting Material: PE,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 6-20' trench machine training check - Asahi America Inc. · Web viewMiniplast Certification Checklist. General Tool Information: Model: Widos Miniplast 2 Pipe/Fitting Material: PE,

ASAHI/AMERICA 35 Green Street P.O. Box 653 Malden, MA 02148-6834 Tel: (781)321-5409 FAX (781)388-4781

Miniplast Certification Checklist

General Tool Information:

Material:

ThermoplasticsHandling & StorageMarking of ComponentsQuality Control (ISO 9001)

Tool Set Up:Clamp SetupPlaner SetupMirror (Heating Plate) SetupBase Removal

Welding Procedure:Clamping of ComponentsPlaningAlignmentInitial Weld PressureHeat Soak TimeCool Down Time/PressureQA / QC & Inspection

Tool Maintenance/Information:Care of MirrorCare of PlanerPackaging/Storage InstructionsManual & Shipping Checklist

Operating Concerns:Safety Poor PlanningMisalignment & AdjustmentsPressure During PlaningEnvironmental Conditions

The signees below are in agreement of a full and complete training on the Shop 4 Welding Tool

Welding Spec:ASTM D 2657ASTM F 2620 (PE)AWS B2.4Other

Material Trained On:PP HDPEPVDFECTFE

Product Line:Air ProProlineDuoProPolyfloPuradPolyPureChem Proline

Type of Welding:Single WallD/C SimultaneousD/C Staggered

Trainer: (Print) _____________________Signature____________ _ _ _ _________ __Date ___ ____

Welder: (Print) _____________________Signature___________ _ _ _ ___ _________Date __ _____

Company: ___________________________________________ _ _ __ _______________________

Job Name or Reference #_______________________________ _ _ __ _______________________

Miniplast Certification Checklist Rev:B 118/20/2007 Rental 1 page

Model: Widos Miniplast 2Pipe/Fitting Material: PE, PP, PVDF, ECTFEPipe/Fitting Sizes: ½” – 4” (20 mm – 110 mm)Transport box (LxBxH): 21 x 27 x 19 inchesWeight: Appr. 100 lbs.Breaker: 15 AmpVoltage Requirement: 110 V (+/- 10%)