15
5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11

5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

Embed Size (px)

Citation preview

Page 1: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

5G PPP From Research to Standardization

5G PPP WG Pre-Standardization

2016-05-11

Page 2: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

5G PPP overview

5G Infrastructure Association

General Assembly

Board

European Commission5G PPP

Partnership board

Steering board

Technology board

WG1

WG 5G Vision and Societal Challenges

WP Spectrum

WG SME support

Activity Community building and IPR

Activity 5G International cooperation

Other activities

WG 2

WG n

WG 5G Pre-Standardization

Pro

ject

Pro

ject

Pro

ject

Pro

ject

5G Initiative

2016-05-11

Page 3: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

5G PPP Key ambitions

32016-05-11

• Delivering:

– Technologies

– Architectures

– Solutions to future 5G communication infrastructures

• Support of 5G PPP targeted outcomes in global standards is a priority.

• Program Ambitions (High-level KPIs)• Providing 1000 times higher wireless area capacity and more varied service

capabilities compared to 2010

• Saving up to 90% of energy per service provided. The main focus will be in mobile

communication networks where the dominating energy consumption comes from the

radio access network

• Reducing the average service creation time cycle from 90 hours to 90 minutes

• Creating a secure, reliable and dependable Internet with a “zero perceived”

downtime for services provision

• Facilitating very dense deployments of wireless communication links to connect

over 7 trillion wireless devices serving over 7 billion people

• Enabling advanced user-controlled privacy

Page 4: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

5G PPP Vision and Requirements 5G new service capabilities

4

• 5G supports efficiently three different types of traffic profiles– high throughput for e.g. video services

– low energy for e.g. long–living sensors

– low latency for e.g. mission critical services

• 5G covers network needs and contributes to digitalization of vertical markets– automotive, transportation, manufacturing, banking, finance, insurance, food and agriculture

– education, media

– city management, energy, utilities, real estate, retail

– healthcare, government

• 5G scales to growing demand and different network layouts– anticipated dramatic growth in number of terminal devices and continuous growth of traffic

– heterogeneous network layouts including satellite

– power consumption less or equal to current networks and reduced network management complexity

2016-05-11

Page 5: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

5G PPP Vision and RequirementsKey Requirements

5

• 1,000 X in mobile data volume per geographical ≥ 10 Tb/s/km2

• 1,000 X in number of connected devices ≥ 1M terminals/km2

• 100 X in user data rate reaching a peak terminal data rate ≥ 10Gb/s

• Guaranteed user data rate >50Mb/s

• 1/10 X in energy consumption compared to 2010

• 1/5 X in end-to-end latency reaching 5 ms for e.g. tactile Internet and radio link latency reaching a target ≤ 1 ms for e.g. Vehicle to Vehicle communication

• 1/5 X in network management OPEX

• 1/1,000 X in service deployment time, deployment in ≤ 90 minutes

• Support user velocities up to 500km/h for ground transportation

• Accuracy of outdoor terminal location ≤ 1m

These Key Requirements are not expected to be met all at the same time

2016-05-11

Page 6: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

5G PPP and the Vertical sectorsSetting the requirements

6

• Requirements from vertical sectors for 5G are very important

• 5G PPP is have published a series of whitepapers on:Automotive, Health, Media & Entertainment, Energy, and Manufacturing requirements ( https://5g-ppp.eu/white-papers/ )

• Challenges that will be difficult, even impossible, to meet with current LTE include:

• End-to-end latency down to 5ms (e.g. for autonomous driving)

• Improved coverage (e.g. deep indoor, rural areas and roads)

• Service continuity between different access technologies (e.g. for automotive, manufacturing and media & entertainment)

• At least 50 Mbps for immersive user experience everywhere (e.g. virtual reality and 4K videos)

• High reliability / QoS control (and potentially low latency) of 99.999% is required for low throughput applications ( ~Mbps) for health, energy and manufacturing

• Localization accuracy down to 10cm (e.g. for bicycles road safety applications)

• Low cost and energy efficiency is a must for energy and manufacturing applications

• High level of security (e.g. for vertical use cases)

2016-05-11

Page 7: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

5G PPP research plan

7

• Identify societal and standardization needs

• Pre-structuring model phase 2

• Long-term research in phase 3

TA25G

Low BandAI

TA35G

mmWaveAI

TA5Novel Radio System

ArchitectureTA1

5G Wireless System Design

TA15 (ICT 7)Open “Blue” TA

TA16 (ICT 7)CSA

TA21 (ICT 8)Open “Blue” TA

TA20 (ICT 8)Open “Blue” TA

TA22Access

Convergence 1

TA23Access

Convergence 2

TA24EUJ-01 1

TA26EUK-01

Application Layers

Physical Layer

Note: The size and the orientation of the TAs boxes do not indicate the potential size or manpower of future Projects

TA

75

G f

or

Fu

ture

MT

C S

olu

tio

ns

TA

6S

ea

mle

ss I

nte

gr.

of

Sa

tell

ite

an

d A

ir P

latf

orm

s

TA

17

Ub

iq.5

G A

cce

ss

TA

9C

ost

Eff

icie

nt

Op

tica

l M

etr

o

TA

10

Hig

h C

ap

acit

y

Op

tica

l C

ore

TA

4

Su

bsy

st. fo

r5

G P

latf

orm

s

TA

8C

og

nit

ive

Ne

two

rk M

ng

t

TA18NetApps Development and Verification Platform

TA19E2E NFV and SDN Holistic Operational Model

TA13Security, Privacy, Resilience, and High

Availability

TA12Foundations for SW Networks

TA14Multi-Tenant / Domain

Plug & Play Control Plane

TA11Converged 5G

FlexHaul Network

TA25EUJ-01 2

ICT 7 RIA ICT 8 RIA EUJ and EUK RIA ICT 8 IA

2016-05-11

Page 8: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

5G Time-LineMapping to 3GPP projected schedule

8

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Rel-12 Rel-13 Rel-14

Rel-14 SI (SA1/RAN)

Rel-15

Rel-15

Rel-16

Rel-16

4G in 3GPP

5G in 3GPP

5G PPP j1

WRC’15 WRC’19

VisionITU Requirements / Method Proposals

5G PPP j2 5G PPP j35G PPP Set-upEC 5G PPP

ONF, Open Daylight, OPNFV, Open Stack…SDN/NFV

EC FP7 Pre-5G METIS, 5GNOW…EC FP7j1: Specificationj2: Developmentj3: Experimentation

Winter Olympics in South Korea

FIFA World Cup in Russia

Summer Olympics in Japan

5G Deployment and CommercializationTrialsRadio ExperimentsMobile

Networks

Wkp

IMT-2020

Specifications

Evaluation

Note: Other Regions events under elaboration

ETSI, ONF, Open Daylight, OPNFV, OpenStack,...

2016-05-11

Page 9: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

3GPP Time-line

9

• Phase 1 until H2 2018– Address a more urgent subset of the commercial needs

– Maps to 3GPP Rel-15

• Phase 2 until December 2019– IMT 2020 submission

– Address all identified use-cases and requirements

– Maps to 3GPP Rel-16

2016-05-11

Page 10: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

5G PPP approach to standardization

10

• Develop a common view on use-cases and verticals

• Develop concepts addressing the scenarios (xMBB, uMTC, mMTC)

• Research projects investigate technology component candidates

– First evaluations based on scenarios and use-cases

• Industry partners select relevant topics to drive in standardization

• Method to contribute

– Partners inputs to standardization bodies

– Understanding the verticals (interaction with relevant standardization organs to understand key requirements)

2016-05-11

Page 11: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

Relevant Standardization topics for 5G

11

• IMT-2020 Requirements– ITU-R (WP5D)

• Access, fronthaul, system architecture– 3GPP

• SDN/NFV/MEC

• Satellite communication component and satellite navigation system for 5G (ETSI/TC SES)

• New areas– IoT, Machine-Type Communication

– Softwarization, control and orchestration

– Additional verticals

2016-05-11

Page 12: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

Standardization for verticals

12

• Vertical-specific– Reason for verticals to use 5G solutions

• Ease of integration

• Economy-of-scale

– Specific requirements vs. Unified, standardized solutions

– Focus on requirements from vertical SDOs

• Interact with established vertical oriented SDOs

• Examples of SDOs for the Automotive industry– C-ITS, ETSI, CEN and ISO.

– E.g., joint work between ISO TC204 WG18 and CEN TC278 WG16

2016-05-11

Page 13: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

5G Ecosystem and business aspects

13

• 5G is more than a new cellular radio interface– Integrates multiple network technologies

– All-encompassing solution for the broad networking demands of the future

• New use cases– MTC

– Integration of verticals

• New actors– Open for SMEs and others

– Incumbents

– Infrastructure vs. “network apps”

• Regulatory aspects– Security

– Privacy (who owns the information)2016-05-11

Page 14: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

Conclusions

14

• 5G PPP driving EU research

• 5G is more than a new radio interface

• Standardization must consider an integrated network– Other sectors/functions

– Trade-off RAN/CN

– May not fit in the traditional RAN/CN functional split

• How do business aspects impact 5G standardization– Which role does telecom have

• Collaboration between ETSI and other SDOs critical to 5G success

2016-05-11

Page 15: 5G PPP From Research to Standardization - ETSI · PDF file5G PPP From Research to Standardization 5G PPP WG Pre-Standardization 2016-05-11. ... manufacturing, banking, finance, insurance,

2015-10-20 15

Thank you for your attention!

http://5g-ppp.eu