Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 1 of 96
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 2 of 96
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 3 of 96
CONTENTS
LIST OF ON-GOING AND COMPLETED PROJECTS
IN CENTRAL LUZON As of 4th Quarter 2012
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
ON-GOING
I. AGRI-INDUSTRIAL STRATEGY
A. Agriculture and Agrarian Reform
Agriculture
1. Balagtas and
North Food
Exchange
(NFEX)
Interchange Project Cost:
PhP 406.15 M Funding Source:
DPWH National Funded Project
Construction of bridge, embankment, ramps and interchange along NLEX for better access to NFEx in Bulacan
DPWH 16 CL Priority Project
Phases I and II completed. Phase III was bidded out by DPWH Central Office on Feb. 14, 2012 and started implementation on 13 April 2012. The Approved contract cost for the completion of the interchange (alignment) and ramps was PhP160.185 million. Construction has been suspended since June because of the need to wait for the signing of the MOU between DPWH and Northrail Corporation.
1
Agrarian Reform
2. Agrarian Reform Infrastructure Support Project (ARISP) Phase III Project Cost:
PhP 795.65 M Funding Source:
JICA
Construction of communal irrigation system, FMRs, bridges, post harvest facilities, potable water supply, and conduct of institutional development in agrarian reform communities
DAR ODA Agriculture & Agribusiness Devt (AAD) Component: 13 projects were implemented of which six (6) reached the third cycle while two (2) second cycle, and five (5) first cycle of implementation. Additional four (4) subprojects are for implementation.
Infrastructure Component: Of the
51 subprojects, 18 were completed, nine (9) ongoing, and 24 under pre-construction stage. Six (6) of the nine (9) ongoing projects were behind schedule due to
3
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 4 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
ROW problem and some works suspended because of flood. These include Maladipay CIS, Dilasag, Aurora by two (2) percentage points; Additional Works of Paleg CIP, Dinalungan Aurora, three (3) percentage points; Reviganza-Balante-Paleg-Bulawan FMR, Dinalungan, Aurora, 30 percentage points; Tuyo PCIP, Balanga, Bataan, 23.42 percentage points; Masagana and Masuso Shallow tube Well (STW), Pandi, Bulacan, 71 percentage points, and Casiligan-E/W Canaan-General Luna FMR, Rizal, Nueva Ecija, six (6) percentage points.
3. Tulay ng Pangulo Para sa Kaunlarang Pang-Agraryo
Project Cost: PhP 4,100 M
Funding Source: France
Construction of bridges in priority ARCs and CARP areas.
DAR ODA Of the 164 proposed bridges, 94 were validated, while 70, for validation. Two (2) of the validated bridges were ongoing, and one (1) under pre-construction; 13 were endorsed by DAR Central Office to DPWH for geotechnical study.
14
B. Environment and Natural Resources
4. Integrated Coastal Resources Management Project
Project Cost: PhP 35.73 M for CY 2012
Funding Source: ADB
Policy & institutional devt, biodiversity conservation, enterprise devt, social and environmental services and facilities, support to project management in Zambales
DENR ODA Some of the major activities undertaken were:
Nine (9) marine protected areas (MPAs) management plan endorsed by the MPA Management Body for LGU adoption;
Procurement for the seven (7) livelihood
17
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 5 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
projects is ongoing;
Five livelihood proposals were reviewed by the Regional Technical Review Committee of BFAR 3 on 12 Nov. 2012
II. HUMAN DEVELOPMENT
5. Pantawid Pamilyang Pilipino Program (4P’s) -- Conditional Cash Transfer Program
Project Cost: PhP1,301.36 M for CY 2012
Funding Source: GOP
4Ps is a poverty reduction strategy that provides cash grants to poor households with pregnant women and children 0-14 years old on condition that they comply with the conditions of the program.
DSWD Local/ Priority Project
Total of 90,355 or 95.83 percent of the 94,287 households benefitted from the program and have received a total of PhP 1,510.38 million since the start of the program
20
III. INFRASTRUCTURE SUPPORT
A. Transportation
Airport and Air Navigation
6. New Communications, Navigation & Surveillance / Air Traffic Management (CNS/ATM) System Development
Project Cost: PhP 10,869.31 M Funding Source:
JICA
Procurement , construction of air traffic management automation, communication navigation, surveillance, ATM center (allocated in Plaridel, Clark and Subic airports)
DOTC ODA Accomplishment rate of 29.85 percent. Behind schedule by 58.96 percentage points due to Contractor’ s suspension of work since 2009 because of alleged delayed payment by DOTC. No physical activities undertaken except for the design reviews of the projects to be implemented for the three airports in Region 3.
28
Roads and Bridges
7. Arterial Road By Pass Project Phase I (Bulacan)
Project Cost: PhP 2,651.74 M Funding Source:
JICA
Construction of bypass, starting at NLEX on a new interchange in Burol, Balagtas. This is part of the upgrading of the Inter-Urban Highway to ease traffic along the four municipalities in Bulacan, namely: Balagtas,
DPWH 16 Priority Proj/ODA
CPs 1 & 2 combined was completed. NLEX Burol Interchange which is part of CP1 opened to traffic in March 2012. Travel time reduced from 26 minutes to 10 minutes
30
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 6 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
Guiguinto, Plaridel, and Bustos.
or a savings of 16 minutes
8. MacArthur Highway Redevelopment Project
Project Cost: PhP 6,665 M Funding Source:
GOP
Widening, improvement, rehabilitation and upgrading of the highway from Bulacan, Pampanga and Tarlac.
DPWH Additional Priority Infra
Project / Local
Phases I-VI completed; Phase VII-2011 funds (Tarlac section) 97.80 percent accomplished (work suspension still in effect at Tarlac City-Gerona Section); Phase VIII – 2012 funds, 67.23 percent accomplished and covers the following: 1. Bocaue-Balagtas
Section;
2. Angeles-
Mabalacat
Section;
3. Paniqui-Moncada
Section; and
4. Tarlac 2nd District
(Tarlac City-
Gerona Section)
33
9. Mega Bridges for Urban and Rural Development Project Project Cost:
PhP 842.65 M Funding Source:
FRENCH
Construction of permanent flyovers and bridges/ unibridges nationwide. Region 3 component includes: 1. Alikabok-Bayan-
Imelda-Samal
Unibridge in Orani
Bataan(45.6 l.m.);
2. Pinagrealan
Unibridge in
Candelaria, Zambales
(28.8 l.m.)
3. San Fernando Sur
Unibridge in Cabiao, Nueva Ecija (45.6 l.m.)
4. Tagumpay Bridge in
San Leonardo, Nueva
DPWH ODA Completed Completed 97 percent actual accomplishment (partially suspended due to revision of approaches plan) 94.35 percent actual accomplishment. Catch up plan is on-going. Piling, two
36
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 7 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
Ecija 5. Lazatin Blvd. Gapan
Olongapo Intersection Flyover , City of San Fernando (P) (195.51 l.m.);
6. Mawakat Bridge in
Floridablanca, Pampanga
abutments, launching of superstructure and backfilling works completed. Completed 90.25 percent actual accomplishment. Suspended in last quarter of 2012. Catch up plan/remedial works on approaches damaged by the Habagat is on-going. Piling works, Abutments A & B; Mid-pier and installation of superstructure completed
10.
Urgent Bridge Construction Project for Rural Development Project Cost:
PhP 376.04 M Funding Source:
JICA
Construction of bridges along national roads: 1. Natividad Bridge,
Guagua, Pampanga 2. San Antonio Bridge,
Lubao, Pampanga 3. Remedios Bridge,
Lubao, Pampanga 4. San Matias Bridge,
Concepcion, Lubao, Pampanga
5. Bancal Bridge, Palanginan, Iba, Zambales
6. Alasas Bridge, Magalang, Pampanga
DPWH ODA
36.0 percent accomplishment
48.66 percent accomplishment.
33.08 percent accomplishment.
35.57 percent accomplishment.
3.0 percent accomplishment.
40.0 percent accomplishment.
38
11.
Tarlac-Pangasinan-La Union Toll Expressway Project Cost:
PhP 12,728 M (Phase I)
Construction in 2 phases of a four-lane expressway from La Paz Tarlac to Rosario, La Union . Phase 1 Section 1 is a two-lane expressway starting from the end of SCTEX in La Paz to
DPWH BOT Based on the revised construction schedule of Phase 1 Section 1 the project was 75.76 percent accomplished. Behind schedule by 4.50 percentage points due to: lack of major
40
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 8 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
Funding Source: BOT
Gerona both inTarlac.
contractors’ resources, (e.g. equipment and materials); adverse weather condition; lack of available area for slope protection works; non-conformance of some contractors; and right-of-way issues.
12 Widening of Gapan-San Fernando-Olongapo Road &Emergency Dredging Project, Phase I (GSO I)
Project Cost: PhP 1,650.22M (includes Additional works to be funded by GOP)
Funding Source:
PhP 1,566.86 M (Original) by
KEDCF
Widening of 20 km section of Gapan - San Fdo -Olongapo Road; Reconstruction of Sta. Cruz Bridge 1; and, Dredging of Porac-Gumain River with the following additional works: 1. Pedestrian Overpass
(58 lm)
2. Asphalt overlay of 3.5
km road along GSO
Road
3. Three traffic signal
lights
DPWH 16 Priority Projects/O
DA
Original scope of works, completed. Travel time reduced by 30 minutes. The project was 98.50% accomplished which should have been completed on September 29, 2012. All construction operations have been temporarily suspended since September 20, 2012 due to non relocation and non-removal of power lines and utility cables affected by the pedestrian overpass. Completed
46
13.
Gapan-San Fernando-Olongapo (GSO) Road Project, Phase II (GSO II) Project Cost:
PhP 2,222.03 M Funding Source:
KEDCF
Widening of existing 2 lanes to 4 lanes road from Sta. Cruz, Lubao to Hermosa, Bataan; ; Improvement of the existing 6-lane to 14-lane road of 1.72 km from NLEX Rotonda to San Fernando Flyover; Asphalt overlay and improvement of shoulders of 3.02 km from Layac junction to Dinalupihan including the widening of two bridges (Diladila and Tabacan) from two to four lanes
DPWH ODA The project was 17.64 percent accomplished and about 19.22 percent of the total cost was utilized.
The Lubao Bypass is 100 percent completed using purely GOP funds implemented by DPWH Region III.
52
14. Road Construction of remaining DPWH ODA Construction Plans 52
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 9 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
Upgrading and Preservation Project (RUPP) (Remaining Bongabon-Baler Road Sections)
Project Cost:
PhP 459.70 M Funding Source: JICA
two Contract Pacakges (CP) of the Bongabon-Baler Road Project CP 1 – Bongabon-Rizal-
Pantabangan (14.76 km)
CP2 – Canili-Basal (26.52 km)
were approved on 13 December 2012 by DPWH-Bureau of Design. The project was already advertized for bidding and project site visit was conducted on 15 January 2013. Issuance of PQ and Bidding Documents is 0n-going. Bidding is scheduled on 11 April 2013.
15. Spanish-Assisted DPWH Bridge Construction and Replacement Project
Project Cost:
PhP 222.47 M Funding Source: Spain
Construction of six bridges : four (4) in Aurora, one (1) in Nueva Ecija and one (1) in Zambales.: 1. Dicaloyungan Bridge,
Baler, Aurora (45 lm) 2. Montay Bridge,
Casiguran, Aurora (50
lm) 3. Minanga Bridge,
Casiguran, Aurora (45
lm) 4. Simbahan Bridge,
Casiguran, Aurora (25
lm) 5. Vega 2 Bridge,
Bongabon, Nueva
Ecija (35 lm) 6. Bangan-Talinga
Bridge, Iba, Zambales
(20 lm
DPWH ODA Overall weighted accomplishment is 48.48 percent (catch up plan- work on site/overtime, construction resources intensified to overcome negative slippage of Dicaloyungan, Montay and Minanga bridges); 59.0 percent actual
accomplishment 60.51 percent actual
accomplishment 47.22 percent actual
accomplishment 58.55 percent actual
accomplishment 5.50 percent actual
accomplishment 81.68 percent actual
accomplishment
55
Railways
16.
NorthRail Project (Bulacan and Pampanga)
Construction of 76.07 km double track standard gauge railway running along old PNR Right of
NorthRail 16 Priority Projects/
ODA
The project was suspended in 2011 to allow Northrail and Sinomach resolve the
57
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 10 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
Project Cost: PhP 28,916 M Funding Source: China Exim
Bank
Way to start from Caloocan City to Malolos City (Section 1); from Malolos City to Clark, Pampanga (Section 2)
issues affecting the project. For a significant time, it remained unresolved and eventually terminated. It is now under negotiation. A JICA Study Team is currently conducting a feasibility study for an Airport Express Rail between Metro Manila and Clark International Airport, to be completed by March 2013. The project remained 22.94 percent accomplished as of June 2012 and about 36.48 percent of the total project cost was utilized.
B. Water Resources
Flood Control and Mitigation
17.
Pinatubo Hazard Urgent Mitigation Project (PHUMP) Phase III (Pampanga) Project Cost: PhP 5,285.67 M Funding Source: JICA
Construction of flood/mudflow control works for Porac-Gumain River Basin in Pasac Delta and City of San Fernando: CP1.
Excavation/Dredging of Local Drainage Channels;
CP2: Lower Porac-Gumain River Diversion Channel;
CP3: City of San Fernando Flood Control Works 3A. San Fernando
River 3B. Outlet Channels
and Bridges
CP4. Excavation / Dredging of Major Rivers;
CP5. Raising of Roads and Construction of New
DPWH ODA The project was 86.23 percent accomplished and about 90.61percent of the total cost was utilized. Notice of Award issued to the Winning Bidder (Tokwing Construction Corporation) Completed Completed Completed 99.86 percent actual accomplishment on-going
61
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 11 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
Bridges; CP6. Flood Mitigation
Works in Guagua, Pampanga
CP7. Excavation/Dredging of Local Drainage Channels, Road Raising and Construction of Bridges
Completed Pre-qualification of contractors completed Issuance of Bid documents to pre-qualified contractors is scheduled in January 2013.
18.
Post Ondoy and Pepeng Short Term Infrastructure Rehabilitation Project Project Cost: PhP 669.56 M Funding Source: JICA
Rehabilitation of flood control facilities and national roads and bridges damaged by typhoons Ondoy and Pepeng Flood Control
Component: CP21: Repair/Restoration
of Seawall Protection and Flood Control Structures along Pudoc River in Baler, Aurora
CP22: Repair/Restoration of Flood Control Structures along Calumpit River in Bulusan and Sta. Lucia Section in Calumpit, Bulacan
CP 23: Repair/Restoration of Flood Control Structures along Bagbag & Pampanga Rivers in Iba Este, Meysulao and Sto. Niño Section, Calumpit, Bulacan
CP 24: Repair/Restoration of Damaged River Bank Protection along Angat River and Creekbank, towerbill, Minoyan Proper in Plaridel,
DPWH ODA Flood control component: Overall weighted accomplishment is 91.14 percent Completed Completed Completed Completed Completed
65
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 12 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
Pulilan, and San Jose Del Monte
CP 25: Rehabilitation of Paite-Maculcul Dike and Slope Protection at Kiling Section in San Narcisio and Cabangan, Zambales
CP 26: Rehabilitation of Slope Protection, Maculcol, Maloma Dike, and Tambak dike in San Felipe and Iba in the Province of Zambales
CP 27: Repair/Rehabilitation and heigthening of dike slope protection in Consuelo Norte Sa Marcelino, Zambales
CP 28: Restoration /Rehabilitation of Damaged dike at Apalit-Arayat Setback Levee in Arayat, Pampanga
CP 29: Repair of Checkgates along Bebe Anak, Pampanga Delta and Sapang Iba in Masantol, Pampanga
CP 30: Rehabilitation of collapsed dike/riverbank in Candaba, Pampaga
CP 31: Repair/Restoration of damaged slope protection along Sta. Fe River in the Province of Zambales
CP 32: Restoration breached dike with
Completed Completed Completed Completed 66.52 percent actual accomplishment Completed Completed Completed Completed
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 13 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
slope protection and protection wall inGuagua and Lubao, Pampanga
CP 33: Restoration/ Rehabilitation of Existing dike with slope protection and RC revetment in Moncada, Bamban and Tarlac City
CP 34: Restoration of damanged slope protection, breached dike and eroded banks along Pampanga River, Digmala River and Nanduran Creek in Bongabon and San Leonardo, Nueva Ecija
CP 35: Restoration of damaged slope protection and eroded banks along Pampanga River, Peñaranda River and Inasan Creek in San Isidro, Cabiao, Jaen and Gabaldon, Nueva Ecija
CP 48: Improvement of Pamatawan River Flood Control, Subic, Zambales
Additional Works CP 54
Repair/Rehabilation of Flood Control Facilities in Baler San Luis & Dingalan
CP 55 Restoration of Flood Control Facilities in Candaba & San Luis, Pampanga
Roads and Bridges
Cancelled due to total change in site condition Completed 71.96 percent actual accomplishment Detailed Design on going Completed in June 2012
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 14 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
Component: A. RB 17
1. Nueva Ecija-Aurora
Road Km. 174+000-
Km 214+800
2. Baler Casiguran Road
Ditawini, Mapalad and
Dinalungan Section
(Km. 198+000-Km.
298+600; Km.
317+900-Km.
317+950; Km.
322+760_Km.
322+830)
3. San Luis-Ma. Aurora
Castañeda Road
(Wenceslao-
Dianawan Section)
Km. 241+500-Km.
248+000
B. RB 10
1. Daang Maharlika,
Putlan, Carranglan
Nueva, Ecija
(Km196+400 to Km
196+500)
2. Daang Maharlika,
Putlan, Carranglan
Nueva, Ecija
(Km194+943 to Km
195+050)
3. Daang Maharlika,
Capintalan, Nueva,
Ecija (Km205+175 to
Km 205+267)
4. Daang Maharlika,
Putlan, Carranglan
Nueva, Ecija (Km
193+500)
5. Bongabon Rizal
Aurora Road,
Calaocan Bridge (Km
153+460)
6. Nueva Ecija
Completed in May 2012
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 15 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
Pangasinan Road,
Ilog Baliwag Bridge
(Km 142+335)
C. RB 8
1. Norzagaray-Bigte
Road (Km 70+040 to
km 76+000)
2. Daang Maharlika
Road (km 52+800 to
km 84+055 w/
exception)
3. Sta. Maria-
Norzagaray Road (km
38+100)
4. Marilao Bridge (km
22+084)
5. Sta. Maria Bridge # 3
(km32+538)
6. Concepcion-La Paz
Road, Lucung Bridge
Concepcion, Tarlac
Completed in January 2012
D. RB 9
1. Baluag Candaba Sta.
Ana Road in
Pampanga (km
63+050 to Km
64+459)
2. Bahay-Pare San Luis-
Sto. Domingo Road
Pampanga
(Km65+000 to Km
69+000 w/ exception
3. Mt. Arayat National
Road
Terminated Completed Completed
E. RB 41
1. Daang Maharlika
Road, Putlan,
Carranglan, Km
195+817 to Km
195+992, Nueva Ecija
I
2. Daang Maharlika
Road, km 196+280 to
Suspended due to DED revision Completed Suspended due to DED revision
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 16 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
km 196+680, Nueva
Ecija I
3. San Juan
Pantabangan,
KO160+506 to
KO160+680 Nueva
Ecija
4. Rizal Pantabangan
Road KO159+447.50
to KO159+853
w/exception, Nueva
Ecija I
5. Repair of Mancatian
Br., Angeles Porac
Road,KO079+040,
Pampanga II
Suspended due to DED revision Completed
Irrigation
19. Balog-Balog Multipurpose Project (Tarlac) Project Cost: PhP 2,363 M Funding Source: Local
Phase 1 – Rehabilitation of existing irrigation and drainage canals in the Tarlac River Irrigation System (TARRIS) and San Miguel-O’Donnell River Irrigation System (SMORIS) areas; construction of new irrigation and drainage facilities and strengthening of irrigators’ associations .
NIA Additional Priority Infra
Project
100 percent completed as of December 2012. Irrigation Service Area Covered , 12, 260 ha. Irrigators ‘Associations (IAs) Strengthened, 74 IAs.
70
C. Power, Energy and Electrification
Power Generation and Transmission
20.
Luzon Substation Expansion Project I (Bantay, Bauang, Cabanatuan, Cruz na Daan, Laong S/Ss) (Contract No. Sp09-LSEP.Lt-0028) Project Cost: PhP 111,16 M Funding Source: Local
Additional installation of capacities on each substation to avoid overloading of existing transformers (Labor, transformers, accessories)
NGCP Local Substantially completed with fund utilization rate of 98.32 percent. Remaining works for completion by the contractor (Transmission line and revamping works at the substation)
74
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 17 of 96
PROJECT TITLE BRIEF DESCRIPTION AGENCY
PROJECT CATEGO
RY
STATUS
PAGE NO.
21.
Mariveles Coal Transmission Reinforcement Project (Transmission Line Connection Asset-Mariveles-Limay B) (Contract No. Sp10-MLTP.Lt-0058) Project Cost: PhP 433.19 M Funding Source: Local
The project will reinforce Hermosa_Limay B Line to maintain N-1 during simultaneous maximum dispatch of Mariveles Coal and Limay Plants. It will have a designed capacity of 2x1200 MW to facilitate expansion of GNPOWER Mariveles Plant
NGCP Local 64.78 percent accomplishment and behind schedule by 2.0 percent due to right of way issues and non-payment of business tax by the Contractor
76
COMPLETED
22. Angat Water Utilities and Aqueduct Improvement Project, Phase IIi 78
DPWH GENERAL APPRORIATION ACT (GAA) PROJECTS 79
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 18 of 96
Balagtas and North Food Exchange Interchange
Province : San Juan, Balagtas, Bulacan Sector/Sub-Sector : Infrastructure Support /Transportation/Roads and Bridges Executing Agency : Department of Public Works and Highways, Region III (always provide specific office) PROJECT CONTRACT DETAILS:
Funding Source : DPWH National Funded Project (FY 2011 GAA) Implementation Schedule Date Started : April 3, 2012 Target Completion : December 28, 2012 Total Project Cost (PhP Million) : 406.15 (2009 - 106.15; 2010 – 70.00; 2011 to 2012 –
160.00) Beneficiaries : Producers, wholesalers, retailers, entrepreneurs,
consumers, users of agriculture/aquaculture, enterprise based product and by products, and cooperatives
Objective(s) : The project aims to provide access to North Food
Exchange (NFEX) which intends to achieve the following: 1. Increase farmers’, entrepreneurs’ and fishermen’s
income; 2. Provide consumers with low price fresh agricultural
products; 3. Reduce wastage of spoils of agricultural commodities
transiting through Bulacan to Metro Manila with modern handling and storage facilities;
4. Improve competitiveness of food and agricultural supplies and products, the quality of which is assured by appropriate and affordable technology and services;
5. Develop and promote export industry for Philippine food products;
6. Improve food supply, rationalize regional industrialization, and contribute to Metro Manila decongestion;
7. Create strategic advantage for the North Luzon Agri-business Quadrangle and the Luzon Urban Beltway;
Description : The construction of Balagtas Interchange in North Luzon Expressway (NLEX) - San Juan, Balagtas, Bulacan is a support facility to provide better access to the North Food Exchange.
The project will be implemented into three phases, namely:
I. Construction of 62 linear meters Bridge (sta. 0+060 to sta. 0+855.92) with an estimated cost of Php 106.15 million;
II. Embankment of 460 meters road with an estimated cost of Php 70 million; and
III. Ramps and the completion of interchange (alignment) with an estimated cost of Php 230 million.
The completion of the project will facilitate the access to the North Food Exchange (NFEx).
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 19 of 96
STATUS OF IMPLEMENTATION [As of 25 December 2012]
Overall Assessment Phases I and II were 100 percent completed on August 2010 and June 2011 respectively. Phase III was bidded out by DPWH Central Office on February 14, 2012 and started implementation on 13 April 2012. As of June, physical accomplishment was 23.90 percent with fund utilization rate of about 17 percent. Project construction has been suspended (Suspension Order No. 1) since 27 June 2012, pending approval of the Memorandum of Understanding (MOU) between DPWH and Northrail for the utilization of the NorthRail track that will be affected by the project.
Employment Generated:
For the whole Project Duration (man-days): 369,227
As of June 2011 (man-days): 160,136
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 20 of 96
REGION III COMPONENT DETAILS: Funding Source : JICA
Loan Code : PH-P242 Loan Effectivity : April 2008 Closing Date : April 2014
Implementation Schedule
Date Started : April 2008 Target Completion : April 2014 Total Project Cost (PhP Million) : 795.65 Beneficiaries : 16 ARCs consisting of 291,452 ARBs Objective(s) : The project aims to:
Improve the quality of life in the ARCs;
Increase the annual average household income of ARBs in ARCs by 20 percent, from the baseline of Php 97,094; and
Generate 665,116 jobs during the implementation and operation of completed projects.
Description : The project components include: 1. Infrastructure Development
a. Irrigation Development b. FMR and Bridge Development c. Potable Water Supply d. ARC Information and Marketing Center
2. Institutional Development e. Strengthening of Irrigator Associations f. Development of Primary Cooperative
3. Agriculture and Agribusiness Development (AAD) g. Upgrading of the technological know-how of the
farmers to optimize productivity h. Exposing farmer beneficiaries (FBs) to other
possible income generating activities.
Agrarian Reform Infrastructure Support Project (ARISP) Phase III
Location : Nationwide/Regionwide Sector/Sub-Sector : Agri-Industrial Strategy/Agrarian Reform Executing Agency : Department of Agrarian Reform PROJECT CONTRACT DETAILS:
STATUS OF IMPLEMENTATION [As of December 2012]
Overall Assessment Under the Infrastructure Development Component, there were 17 ARCs identified, from which one was deleted (Santiago ARC, Lubao, Pampanga) due to the non-interest of the LGU to participate in the project. There were 54 subprojects identified in the 16 ARCs of which 51 were implemented while three (3), Pulo Potable Water Supply (PWS) and Post Harvest Facility of SaTaMaPu ARC, San Isidro, Nueva Ecija were waived by the LGU/Cooperative due to its inability to provide the equity requirement and Sta. Ines Lipit PCIP of Golden Grain ARC, Sta. Ignacia was found not viable after the ARISP III Regional Year end Assessment. Of the 51 subprojects, 18 were completed, nine (9) ongoing, and 24 under pre-construction stage. Six of the nine ongoing projects were behind schedule, these include Maladipay CIS, Dilasag, Aurora by two (2) percentage points; Additional Works of Paleg CIP, Dinalungan Aurora, three (3) percentage points; Reviganza-Balante-Paleg-Bulawan FMR, Dinalungan, Aurora, 30 percentage points; Tuyo
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 21 of 96
PCIP, Balanga, Bataan, 23.42 percentage points; Masagana and Masuso Shallow tube Well (STW), Pandi, Bulacan, 71 percentage points, and Casiligan-E/W Canaan-General Luna FMR, Rizal, Nueva Ecija, six (6) percentage points.
For the Agriculture and Agribusiness Development (AAD) Component, 13 projects were implemented of which six (6) reached the third cycle while two (2) second cycle, and five (5) first cycle of implementation. Additional four (4) subprojects are for implementation. Details of the projects implemented under the two components are shown below:
Component Description Project
Cost (PhP’Million)
Status/Remarks
Infrastructure Development Component
AURORA
1.Coastal ARC in Dilasag a. JPR-Esperanza-Sitio
Amurawen Farm-to- Market Road (FMR
2.1 km road with 90 ARBs
12.63
Completed. Implementation Schedule: 01
Jan. 2012 to 31 May 2012 Final inspection conducted on
11 September 2012
b. Maladipay Communal Irrigation Sytem (CIS)
Service area is 70 has. with 67 ARBs
7.40 Implementation Schedule: 02 Jan. 2012 to 01 Dec. 2012
Ongoing with 98 percent accomplishment with negative slippage of two percentage points.
2. Riverside ARC in Ma. Aurora a. Detailen Debucao
FMR
3.1 km road with 3,879 ARBs
16.10
Completed Implementation Schedule: 01
Apr. 2012 to 15 September 2012
Preparation of Project Completion Report (PCR) ongoing.
b. Detailen CIP Service area is 60 has. with 65 ARBs
Program of Work is under review by CPMO
No updates
c. Diaman CIP Service area is 30 has. with 34 ARBs
Detailed Design approved by CPMO
No updates
d. Quirino-San Leonardo Potable Water System (PWS)
330 HH beneficiaries
Feasibility Study (FS) is under review by CPMO.
No updates
3. Paleg-Dibaraybay ARC in Dinalungan a. Paleg CIP
b. Additional Works
Construction of diversion works, canals, laterals, etc.; Service area is 102 has. with 86 beneficiaries.
12.20
Completed. During the 4th quarter 2011
the project was damaged by typhoons Pedring and Quiel. As such, repair and additional works was proposed.
97 percent accomplishment
with negative slippage of 3 percentage points.
Implementation Schedule: 16 Feb. 2012 to 15 Apr. 2012
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 22 of 96
Component Description Project
Cost (PhP’Million)
Status/Remarks
c. Reviganza-Balante-Paleg-Bulawan FMR
Phase 1: Road Component
Phase 2: Rivercrossing
4.9 km road with 1,090 beneficiaries
13.78 Implementation Schedule: 16 Apr. 2012 to 15 Aug. 2012
Phase1: 70 percent accomplishment with negative slippage of 30 percentage points.
Phase2: Bidding conducted on 22 October 2012
d. Paleg/Dibaraybay PWS
330 HH beneficiaries
6.68 Completed Preparation of PCR is ongoing. Implementation Schedule: 01
Aug. 2012 to Oct. 2012
BATAAN
4. Tuyo ARC in Balanga City a. Montilla San Rafael
Road
1.1 km road with 6.8 lms Bridge (flat slab)
8.19
Completed. Implementation period: 02
Feb. 2010 to 31 Jan. 2011. Project turn-over to Balanga
LGU on 17 March 2011.
b. Montilla San Rafael Road, Phase II
As of 4th quarter 2011:
DD was already approved. POW on hold due to right-of-
way (ROW) problem.
c. Tuyo PCIP Service area 137.5 has. with 26 wells
5.81 Implementation period: 16 Nov. 2011 to 31 July 2012.
72.58 percent accomplishment with negative slippage of 27.42 percentage points.
Implementation stops due to NIA’s PamBat commitment for the completion of the project.
Patial works resumed in December 2012.
26 wells were already drilled and installation of wells is targeted in January 2013.
d. San Rafael PWS
200 HH 2.40 Approval of FS and DD on hold pending the conduct of Geo-Resistivity Test and cash equity allocation of LGU.
Geo-Resistivity Test conducted by Balanga CLGU has completed on 30 Oct. 2012
e. Tuyo Post-Harvest Facility (PHF)
1 unit 4.00 Revised DD/POW submitted in Sept. 2012
5. Malasimbu ARC in Dinalupihan a. Cabunayan Road
2.7 km. with 2 km exemption
6.21
Revised POW and DD of FMR
and proposed overflow spillway structure submitted on 10 Oct. 2012 and 28 Dec. 2012, respectively.
b. Pentor CIP 242.54 has. 48.00 DD completed and endorsed to NIA RIMO 3 on 18 June 2012.
c. Malasimbu PHF 1 unit 4.00 DD/POW submitted to CPMO on 18 May 2012
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 23 of 96
Component Description Project
Cost (PhP’Million)
Status/Remarks
BULACAN
6. 3M3BC ARC, Pandi, Bulacan a. Improvement/
Rehabilitation of Bgy. Bunsuran II (Kalye Andres M. Bata) FMR
1.6 km road
10.00
Completed. Implementation period: 13 Feb
2010 to 24 May 2010. Project Turn-Over to LGU - 15
December 2010.
b. Construction of Manatal PHF
10,000 cavans capacity (240 sq.m.) with office space (84 sq.m.) & solar dryer (450 sq.m.)
4.95
Completed. Implementation period: 03
January 2011 to 06 May 2011 Project turn-over to LGU – 21
July 2011.
c. Masagana and Masuso Shallow tube Well (STW)
59.25 ha. service area/18 pumps/ 21 STW
4.72 29 percent accomplishment with 71 percentage points negative slippage (6 pumps and engines were already installed)
Implementation period: 11 June 2012 to Dec 2012
NUEVA ECIJA, NORTH
7. Green Valley ARC, Llanera a. Road Improvement of
Gomez A. Bonifacio Norte via Sur
4.9 km road with box culvert (3765.58 m. Exemption: 1127.58 m. and RCBC: 6.84)
16.02
Completed. Implementation period: 02 Aug
2010 to 29 Nov. 2010. Project turn-over to LGU: 15
Sept. 2011 PCR submitted to CPMO on
09 Nov. 2011
b. Green Valley Pump communal Irrigation Project (PCIP)
56.23 has. (17 STW & 15 pump set)
3.25 Revised schedule: 07 Dec. 2012 to 30 Mar. 2013
Project cost was reduced from PhP3.69M to PhP3.25M due to revision of POW which was submitted on 15 Oct 2012
6 wells were drilled
c. Construction of Caridad PHF
3500 Cavans Cap. Warehouse w/ 450 sq. m. Solar Dryer
8.94 For bidding on 03 January 2013
d. Caridad Norte and Caridad Sur Potable Water Supply (Level II)
246 HH 5.48 Implementation period: 05 Dec. 2012 to 30 Mar. 2013.
7.9 percent accomplishment.
8. Across the River ARC, Rizal a. Labrador and Paraiso
STW
Service area is 80 has.
5.68
DD and POW stage
b. Casilagan-E/W-Canaan-General Luna FMR
5.37 km (PCCP=4.276; Exemption: 1.093 km)
18.04 Implementation period: 03 Sept. 2012 to 03 Jan 2013
92 percent accomplishment with negative 6 percentage
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 24 of 96
Component Description Project
Cost (PhP’Million)
Status/Remarks
points.
c. Canaan West Potable Water Supply (PWS) Level II
130 HH 4.6 DD and POW stage
9. Tres Maria ARC, Zaragoza
a. Sta. Lucia Old CIS 400 has. 11.29 Ongoing preparation of DD and POW
b. Concreting of Sta. Lucia (Y&O) Road
2.60 km 18.54 Procurement Stage
c. Sta. Lucia (O) PWS Level II
216 HH 5.01 Submitted DD and POW
d. Sta. Lucia (Y) PWS Level I
3 new units of wells and 10 for rehab
The subproject was waived by the MLGU due to the expansion of local water district in the area.
10. Pantabangan ARC
a. Construction/Installation Sampaloc PCIP
137 has. FS stage.
b. Cadaclan-Sitio Mainit Road
2.12 km (1.7 km PCCP; 0.42 km gravel based on CPMO Validation
10.18 Submitted the revised DD and POW
c. Napon-Napon PWS (Level II)
200 HH FS stage.
NUEVA ECIJA, SOUTH
11. SaTaMaPu ARC, San Isidro a. Improvement of Pulo-
Mangga-Tabon FMR
3.567 km road
22.42
Completed Implementation Period: 25
Sept. 2011 to 11 April 2012 Project turn-over to LGU: 27
Jul 2012
b. Pulo Potable Water Supply (PWS)
With MLGU resolution waiving the proposed project due to inability to provide the needed equity
c. Post Harvest Facility Solar Dryer With Coop resolution, waiving the proposed project due to inability to provide the needed equity
PAMPANGA
12. San Luis ARC, San Luis, Pampanga a. Sta. Lucia San Carlos
FMR
2.4 km (PCCP) with 762.8 lms with an exemption of 1.637 m
3.66
Completed. Implementation period: 05 May
2010 to 08 June 2010. Project turned over to LGU: 15
October 2010.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 25 of 96
Component Description Project
Cost (PhP’Million)
Status/Remarks
b. San Juan Pambilog Communal Irrigation System (CIS)
250 hectares 8.50 Completed. Implementation period: 18 Oct.
2010 to 14 February 2011. Project turned over to LGU: 15
June 2011. PCR submitted to CPMO on
04 Aug. 2011
c. San Juan Pambilog PHF
Warehouse = 200 sqm; Solar Dryer = 200 sqm.
5.63 Completed. Implementation Schedule: 30
June 2012 to 30 Oct. 2012 Turned over on 28 Nov. 2012
d. Additional/Prop. Irrigation Project
San Nicolas – 130 has; Matique IA = 95 has; Pamuntan IA 1&2-90&42 has; Katabusan IA-25 has.
No update As of 3
rd quarter 2011,
preparation of Integrated Development Plan (IDP) for the additional Irrigation Project per ARC submitted to CPMO for evaluation. Site validation conducted on 14 July 2011
e. San Nicolas Pump Irrigation System (PIS)
160 has. service area
15.79 Completed Final Inspection on 17 Dec.
2012 Turned over on 17 Jan.2013 Implementation period: 07 Jun.
2012 to 30 Nov. 2012
f. Sitio Matique PIS 90 has. service area
FS submitted on 02 April 2012
13. Concepcion Cluster ARC, San Simon a. Construction of Sitio
Cortez FMR
1.567 kms (PCCP 1563 m; RCBC 3.6m)
11.75
Completed. Implementation Period: 23
Dec. 2011 to 20 March 2012 Project turned over to LGU on
25 July 2012
b. San Nicolas PIS 160 Has. 15.79 Completed Implementation period: 7 Jun.
2012 to 30 Nov. 2012 Turnover will be on 7 Jan 2013
14. San Ildefonso Expanded ARC, Magalang
a. San Ildefonso (Sitio Mapina to Escaler) FMR with Bridge
6.7kms (PCCP 4.4 kms w/ exemption of 2.3 kms.; Bridge: 222.6 sqm.
41.08 Ongoing DD and POW preparation.
b. San Ildefonso CIP 193 has. 20 FS submitted on 06 June 2012
TARLAC
15. Golden Grain ARC, Sta. Ignacia a. Sta. Ines Lipit PCIP
680 has. service area
Based on the ARISP III
Regional Year end Assessment the proposed project is technically and
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 26 of 96
Component Description Project
Cost (PhP’Million)
Status/Remarks
financially not viable.
b. Sta. Ines Centro-Baldios Road
2.998 kms. 13.48 Completed. Implementation period: 09
Dec. 2010 to 08 Mar. 2011.
c. Sta. Ines Centro-Baldios Road
Repair 1.83 Repair started on 28 Nov. 2012 with 70 percent accomplishment
ZAMBALES
16. San Marcelino ARC, San Marcelino a. Palopyas-
Nagkabitinianan-Batuag FMR
3.819 km road
13.84
superintendence Completed. Implementation period: 18
March 2011 to 22 June 2011. Project turn over to LGU: 15
March 2012
b. San Marcelino PCIP
67 units – well 61 units – pump (198.8 has. service area)
11.01 Completed. Implementation period: May
2011 to August 2011. Project turn over to LGU: 15
March 2012
c. AROS Post Harvest Facility
Capacity: 1500 cavans; Solar Dryer: 360 sq.m.
Revised POW and DD was approved on 07 Dec. 2012
Agriculture and Agribusiness Development (AAD)
Project/Desription Project Cost Status
1. Hybrid Corn Production Project of Paleg Dibaraybay ARC, Dinalungan Aurora
Demo farm is 30 has. with 30 cooperators;
Target production from 80 cavans/ha. to 130 cavans/ha
Potential area for production is 98 has
250,000
Phase I: Completed Crop cycle: Nov. 2010 to March 2011 Demo farm used: 32 has. with 31
cooperators participated. Average production: 122 cavans/ha. Net Income: Php 653,414 Repayment is 100% Phase II: Completed Crop cycle: May. 2011 to Nov. 2011 Affected by typhoons Juaning, Pedring and
Quiel
Phase III: Completed (Dec 2011 to April 2012) Savings generated = PhP 6,974 Ave Income = 18,699 Ave. Yield = 4.1
tons/ha
2. Rice Production using Certified Seed of Coastal ARC, Dilasag, Aurora
Demo farm is 25 has. with 25 cooperators.
Target production from 70 cavs/ha to 100 cavs/ha.
Potential area for production is 500
250,000 Phase I: Completed Rice Production 24 has. with 24 cooperators Period of harvest – May 2012 Net Income = PhP 18,000 Repayment = 100% Savings generated = 7,906 Ave. Prod = 4
MT/ha
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 27 of 96
Project/Desription Project Cost Status
has.
3. Rice Production using Certified Seed of Riverside ARC, Maria, Aurora
Demo farm is 33 has. with 33 cooperators.
Target production from 60 cavs/ha to 100 cavs/ha.
250,000 Proposed project was approved and submitted to RPMO on 30 May 2012
4. Off-Season Vegetable Production using EWSC Technology of Tuyo ARC, Balanga, Bataan
Initial 10 cooperators to be rolled over after each production cycle.
Potential area for production is 50 has.
200,000
Phase I: completed (Oct. 2010 to Dec 2010) Ave. Income per cooperator is PhP15,000. Repayment period is 100%
Phase II: Completed (Feb 2011 to April 2011) Ave. Income per cooperators PhP33,790 Repayment period is 100% Phase III: Completed (July 2011 to Oct 2011) Affected by typhoons Pedring and Quiel
5. Rice Production using UNLADSAKA Tech. of Malasimbu ARC, Dinalupihan, Bataan
20 cooperators to be rolled over after each cycle
214,000 Phase I: Completed (Nov 2011 to April 2012) 12 cooperators with 20 has Ave. Income = PhP 71,940 Ave. Yield = 81 cavans/ha
6. Tomato Production Project of Green Valley ARC, Llanera, Nueva Ecija
Demo farm is 4.6 has. with 16 cooperators
Total production is 16,800 kg
Ave. production is 3,500 kg/ha
222,624
Phase I: Completed Cropping period: June 2010 to 31 Jan. 2011 Total production lower by 68% from the 16,
800 kgs. target to 11,496 kgs. due to Typhoon Juan.
10 cooperators participated with total production area of 4.8 has.
Phase II: Completed Requested onion production of 10
cooperators in 1.8 ha. Harvested: 9 onion cooperators with an ave.
prod/ha. of 346.66 Total onion production is 3,120 kgs. One tomato cooperator total prod. Of 10,118
kgs for 2,000 sqm. End of Phase for Onion submitted in June
2012
7. Off Season Tomato Production of Pantabangan ARC, Nueva Ecija
243,825 Project Technical Support submitted on 18 July 2012 for concurrence
8. Onion Production of Across the River ARC, Rizal, Nueva Ecija
250,000 Project approved by RPMO on 31 July 2012 for CPMO concurrence
9. Rice Sufficiency Program Thru Hybrid Rice Production of Tres Maria ARC, North NE
250,000 Project approved by RPMO on 31 July 2012 for CPMO concurrence
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 28 of 96
Project/Desription Project Cost Status
10. Rice Production using Unladsaka Technology of SaTaMaPu ARC, San Isidro, Nueva Ecija
Demo farm is 27 has.
Target Production from 100 cavs/ha to 130 cavs/ha.
Total production area of 250 has.
202,500
Phase I: Completed (June 2010 to Oct 2010) The project was affected by Typhoon Juan Total production is 81,000 kgs. vs target of
135,000 kgs Total sales, PhP972,000 compared to target
sales of PhP1.8M lower by PhP567,000 Total Fund utilized: Php 262,500 End of Project Report submitted on 04 April
2011
Phase II: Completed (Dec. 2010 to April 2011) End of project Report submitted Ave. production/ha.: 120 cavs Total Sales: PhP 2,520,750.00 Repayment 100% Phase III: Completed (July 2011 to Dec 2011) Total of 27 has. with 27 cooperators Severely affected by Typhoons Pedring and
Quiel Ave. production is 35 cavs/ha Total Loans is 222,750 Repayment is 81,700, balance of 141,050 PCR submitted in Dec. 2012
11. Papaya and Palay Seed Production of Golden Grain ARC, Sta. Ignacia, Tarlac
Demo farm: o 1 ha. (papaya) o 14 has. (palay
seed)
200,000
Phase I: Palay: Completed (Oct 2010 to Feb 2011) Ave. production/ha.: 85.3 cavans Repayment 100% Papaya: Completed (Sep 2010 to Nov 2011 Total Harvest as of August 2011: 2,121 kilos Net Loss = 12,961 Severely affected by Typhoons Pedring and
Quiel EOP Submitted on 13 July 2012 Phase II: Palay: Completed (Oct 2011 to Feb 2012) 10 cooperators with 9.75 has. Gross Prod. = 978 cavans Ave. Prod. = 100 Cavs/ha EOP for Phases 1 and 2 submitted on 31
July 2012 Papaya: For Implementation
12. Rice Production Using Check Technology of Concepcion ARC, Concepcion Tarlac
32 cooperators with 59.6525 has.
300,000 Phase I: Completed Implemented for monitoring of the end of
cycle and replication report for submission
13. Off Season Vegetable Production of San Marcelino ARC, San Marcelino, Zambales
Demo farm is 1 ha.
Potential area for production is 50 has.
196,995
Phase I: Completed (June 2010 to Sept. 2010) Total harvest for the ff are:
Eggplant: 10,810 kgs Tomato: 1,915 kgs Ampalaya: 2,808 kgs Pepper: 2,105 kgs Cucumber: 1,255 kgs
Total Sales: PhP 366,790 Total Net Income: PhP 49,125.00 End of Phase I Report submitted on 28
March 2011 Phase II: Completed (Nov. 2011 to Mar 2012)
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 29 of 96
Project/Desription Project Cost Status
Total production of the ff: Tomato = 2,412 kgs Squash = 834 kgs Pepper = 1,089 kgs Eggplant = 2,266 kgs
Total Sales: 83,100 End of Report for submission
Phase III: Implementation Schedule: Nov. 2012 to April
2013
14. Hybrid Rice Production Project of 3M3BC ARC, Pandi, Bulacan
Demo farm is 27 has. with 27 cooperators
Target production from 90 cavans/ha. to 150 cavans/ha.
Total production area is 989 has. with proposed irrigation component
202,500
Phase I: Completed (Jan 2011 to May 2011) Nine out of 27 target cooperators accessed
the loan. The rest did not meet the criteria. Ave. Production/ha: 137 cavans Total Sale: PhP 3.98 million Repayment 100%
Phase II: Completed (Aug 2011 to Dec 2011) 21 cooperators with 43.5 has. participated Severely damaged by Typhoons Pedring and
Quiel
Phase III: Completed (Dec 2011 - Apr. 2012) 21 cooperators with 43.5 has. participated Total Prod: 5,655 cavans (282,750 kgs) End of Report submitted in Dec. 2012 PCR for submission
15. Capability Trainings cum Practicum on Farm Input Business of San Luis ARC, San Luis, Pampanga
268,500
Phase I: Completed (Dec. 2010 to Apr. 2011) Trainings on Bus. Planning Mgt. & Mktg.
(TBPM) conducted with 15 participants. TBPM Operation started on 20 Jan. 2011 Total Sales: PhP219,073 Net Income: PhP12,593 Total Fund utilized: PhP 256,960 End of Project Report submitted on 05 April
2011 Phase II: Completed (Nov.2011 to Apr. 2012) Procurement of farm inputs to be sold this
cropping season Net Income: 9,430 Phase III: For Implementation (July 2012 to Nov. 2012)
16. Rice Production using Combined Organic Farming Technology and Chemical Fertilizer of Concepcion ARC, San Simon, Pampanga
247,500 Phase I: Completed (July 2012 to Nov. 2012) End of Project Report for submission
17. Capability Trainings cum Practicum on Palay Trading Operations of Expanded San Ildefonso ARC, Magalang, Pampanga
250,000 Phase I: Ongoing Proposal approved on 8 November 2012
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 30 of 96
Out of the PhP 795.65 million (JICA share) total project cost for Region 3, PhP 452.23 million representing 56.84 percent of project cost has already been allocated: PhP 448.83 million for Infrastructure Development; and PhP 3.40 million for Agriculture and Agribusiness Development.
Project Implementation Concerns Right of way problems during actual project implementation and some works suspended due to floods. Immediate Results:
Increase in production volume Decrease in travel time New areas cultivated due to timproved access Increase in land value Decrease in transport cost Decrease in hauling cost of products
Employment Generated:
Expected Employment Generated for the whole project duration (man days): 665,116
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 31 of 96
Tulay ng Pangulo Para sa Kaunlarang Pang-Agraryo
Location : Regionwide/Nationwide Sector/Sub-Sector : Agri-Industrial Strategy/Infrastructure Support to Agrarian Reform Executing Agency : Department of Agrarian Reform DPWH-President Bridge Program Office
PROJECT DETAILS:
REGION III COMPONENT Funding Source : France Loan Code : France-2 Loan Effectivity : March 2009 Closing Date : March 2013 Implementation Schedule Date Started : March 2009 Target Completion : March 2013 Total Project Cost (PhP Million) : 4,100 Foreign : 3,700 (89%) GOP : 435.78 (11%) Beneficiaries : Agrarian Reform Communities (ARCs) Objective(s) : The project objective is to increase productivity and
income of Agrarian Reform Beneficiaries (ARBs) through the construction and erection of bridges in Agrarian Reform Communities. Specifically, it aims:
1. To provide the necessary link or road network access
from ARC to key growth areas of the country that would create new economic opportunities to ARBs;
2. To empower ARCs in construction and erection of 86 bridges (2,689.20 lineal meters) single-lane, prefabricated steel bridges with 80 tons loading capacity; and
3. To assist in the provision of local materials (e.g. materials for the construction of substructure, approaches, embankment, abutments, etc.) for the carrying out of the project.
Description : The project is a nationwide project with total project costs
of PhP16.165 Billion. It involves the construction, installation, and establishment of 418 universal bridges (unibridges) or 10,602 lineal meters in priority ARCs and CARP covered areas.
For Region III, the project will cover a total of 86 project sites distributed as follows:
Province No. of Project Sites Length (lm)
TOTAL 86 2,689.2
Aurora 8 158.5
Bataan 4 110.0
Bulacan 14 432.5
Nueva Ecija 26 981.0
Pampanga 16 614.0
Tarlac 9 130.0
Zambales 9 263.2
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 32 of 96
STATUS OF IMPLEMENTATION [As of December 2012]
Overall Assessment Of the 164 proposed bridges, 94 have already been validated while 70 are still for validation by the team composed of DAR-FAPs, DPWH-PBPO, Matiere. The total number of bridges is broken down as follows:
Province No. of proposed bridges
Validated For Validation
TOTAL 94 70
Aurora 28 4
Bataan 3 8
Bulacan 9 10
Nueva Ecija 22 21
Pampanga 19 6
Tarlac 5 9
Zambales 8 12
Of the 94 bridges which were validated, one (1) under pre-construction stage, two (2) ongoing, and 13 were endorsed by DAR Central Office to DPWH for geotechnical study or design preparation. Details of these projects are indicated in the table below.
Name of Bridge Location Description Cost
(PhP Million) Status
1. Construction of Tabon Bato Uni Bridge
Tuyo ARC, Balanga, Bataan
Single lane with 22.8 lm.
13.40 MOA signing among DAR, DPWH-PBP and LGU conducted on 02 December 2011
2. Construction of Ayhip Uni Bridge
Sta. Rita, Cabangan, Zambales
Single lane with 17.4 lm
length
10.23 Erection of prefabricated steel bridge completed on 21 Oct. 2012.
Concreting wingwalls and parapets completed
Ongoing riprap on both abutments
Ongoing construction of bridge approach
3. Construction of Rosaban Bridge
Botolan, Zambales
Double lane with 45.6 lm
length
41.89 Erection of prefabricated steel bridge completed
Approach construction suspended since 15 July 2012 because of the following: missing and cutting of
installed rebars the natural ground on
the southern approach was eroded due to heavy rains brought by typhoon Helen
no remedial measures were done as of this quarter.
The project shall utilize permanent prefabricated modular steel technology which will be imported from France. All the ARC unibridges shall be designed to carry an equivalent 80 tons loading capacity.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 33 of 96
13 Bridges endorsed by DAR-CO
Name of Bridge Location Length (lm)
1. Diap-Diapan Bridge Ma. Aurora, Aurora 28.8
2. Bacong Bridge Hermosa, Bataan 22.8
3. Pala-Pala Bata San Ildefonso, Bulacan 22.8
4. Bonsobre Guimba, Nueva Ecija 28.8
5. Old Sta. Lucia Zaragosa, Nueva Ecija 17.4
6. Primitivo-Sevilla Llanera, Nueva Ecija 17.4
7. San Juan-Antipolo San Jose City, Nueva Ecija 34.2
8. San Vicente Laur, Nueva Ecija 34.2
9. Diwalaan Peñaranda, Nueva Ecija 17.4
10. Quitangil Mabalacat, Pampanga 40.2
11. Saplad David Macabebe, Pampanga 28.8
12. Malisik Candaba, Pampanga 40.2
13. San Isidro San Luis, Pampanga 34.2
Employment Generated: Employment to be generated for the whole project duration (man days): 12 males
PROGRESS PHOTOGRAPHS
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 34 of 96
Integrated Coastal Resource Management Project
Location : Selected Provinces Nationwide (In Region III: Zambales) Sector/Sub-Sector : Agri-Industrial Strategy/ Environment and Natural Resources Executing Agency : Department of Environment and Natural Resources Bureau of Fisheries and Aquatic Resources (lead agency in the
Implementation of Component C) PROJECT CONTRACT DETAILS:
Funding Source : Asian Development Bank (ADB) Global Environment Facility (GEF) Government of the Philippines (GOP) Loan Code : 2311–PHI/0071-PHI Loan Effectivity : 29 June 2007 Closing Date : 30 June 2013 Implementation Schedule Date Started : June 2007 Target Completion : June 2013 Total Project Cost (PhPMillion) : 3,022.52 Beneficiaries : 68 participating municipalities from Regions II, III, V, VII
and XI. Objective(s) : The project aims to enhance coastal resources and
reduce poverty among municipal fisherfolk. It intends to sustain mangement of participatory approach to coastal resources management and biodiversity conservation. Also, it intends to introduce enterprise development to increase income of the coastal communities.
Description : The project has the following components:
Component A – Policy and Institutional Strengthening and Development .
Component B – ICRM and Biodiversity Conservation.
Component C – Enterprise Development and Income Diversification. Activities under this component include (1) undertaking social preparation including community organization, needs and resource assessment, and savings mobilization; (2) establishing an enterprise development unit (EDU) in the province; (3) establishing about 45 enterprises in 9 municipalities, and training 900 fisherfolk on technical and managerial aspects of enterprises; (4) assisting community groups in preparing bankable business plans and accessing credit facilities of formal banking systems; (5) helping develop partnerships between coastal communities and private entrepreneurs in enterprise operation, management, and marketing; and (6) promoting and developing ICRM-related ecotourism.
Component D – Social and Environmental Services and Facilities.
Component E – Support to Project Management
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 35 of 96
STATUS OF IMPLEMENTATION [As of December 2012] Overall Assessment Components A, B, D and E are implemented by DENR while Component C by BFAR. The total project cost of PhP 36.10 million allotted for Region 3 Component is for CY 2012 only. This is based on the approved 2012 work and financial plan of each implementing agency.
In Region III, the project has utilized around PhP 98.06 million since 2009. For the quarter, the project utilized around PhP 15.93 million.
Some major activities undertaken during the quarter were as follows: 1. Survey, mapping and planning (SMP) for the proposed watershed rehabilitation and reforestation; 2. Nine (9) conservation projects accomplished i.e. habitat rehabilitation, restoration and stocks
enhancement; 3. Nine (9) marine protected areas (MPAs) management plan endorsed by the MPA Management
Body for LGU adoption; 4. Three (3) MPAs was reassessed 5. Conducted Capability Building and Workshop on SWOT analysis and Gender and Development
Training for the municipalities of Botolan, Cabangan, San Felipe, San Antonio & Subic, Zambales. 6. Materials for the following livelihood projects were partially delivered. Procurement of other
materials is still ongoing. a. Tilapia Culture in Pond of Camiing Fisherfolks Association ,Cabangan, Zambales. b. Material Recovery Facility with Compost of Duhok Bani Fisherfolk Association, Masinloc,
Zambales. c. Organic Fertilizer Production (Vermiculture) of Small Fisherfolks of Municipality of Palauig
Palauig, Zambales d. Mudcrab culture in Pond of Burador Fisherman’s Association, Inc., Sta. Cruz, Zambales. e. Tilapia Pond Culture of Malimanga Fisherfolk Association, Candelaria, Zambales f. Hog Fattening of Calabungan Multipurpose Cooperative, Sta. Cruz, Zambales
REGION III COMPONENT DETAILS: Location : Province of Zambales Implementation Schedule Date Started : October 2007 Target Completion : December 2013 Total Project Cost (PhP’Million) : 13.65 (DENR for CY 2012 budget) 22.45 (BFAR for CY 2012 component C) 36.10 Beneficiaries : Local communities in nine muncipalities in Zambales,
namely: Sta Cruz, Palauig, Masinloc, Candelaria, Cabangan, Botolan, San Felipe, San Antonio and Subic
Objective(s) : Specifically, the project aims:
To develop an institutional framework for ICRMP
To assess resources in the coastal zone of participating Municipalities in Zambales
To implement biodiversity conservation
To develop sustainable enterprises and livelihoods to local fisherfolks reducing their reliance on fishing
To improve water quality sanitation and solid waste management
To provide facilities for the communities
To support an information, education and communication (IEC) program.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 36 of 96
g. Rice Retailing Fish & Meat Processing of Calapandayan Fishermen Multipurpose Cooperative, Subic, Zambales.
7. The Regional Technical Review Committee of BFAR 3 reviewed six livelihood proposals last November 12, 2012. a. Quail Egg Production of Felmida Diaz Fisherfolks Association, Cabangan, Zambales. b. Quail Egg Production of Sin-Tek Fisherfolks Association, San Felipe, Zambales. c. Quail Egg Production of Pundakit Fisherfolk’s Association, Inc. San Antonio, Zambales. d. Samaral Culture of Lucapon North Fishermen’s Association, Sta. Cruz, Zambales. e. Tilapia Culture of Macampao Fisherfolks Association, Cabangan, Zambales.
Project Implementation Concerns The slow downloading of funds for loan and grant proceeds affected the implementation of the enterprise development projects.
Immediate Results
The People’s Organizations in Botolan and San Felipe generated additional income from their livelihood projects: Natural Salt Production in Botolan, Tilapia Culture in San Felipe, Hog Fattening in Sta. Cruz, and Iodized Salt in Palauig. The Iodized Salt Making project in Palauig, Zambales is operational. The first cycle for Hog Fattening in Sta. Cruz has ended and 2
nd cycle for Natural Salt Production in Botolan, Iodized Salt Production in
Palauig and Tilapia Culture in San Felipe will commence in January 2013.
Employment Generated: Employment generated for the whole project duration (man days): 76
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 37 of 96
Pantawid Pamilyang Pilipino Program (4P’s) (Conditional Cash Transfer (CCT) Program)
Location : Nationwide Sector/Sub-Sector : Social Development Executing Agency : Department of Social Welfare & Development
PROJECT DETAILS:
STATUS OF IMPLEMENTATION [As of June 2011]
Overall Assessment
REGION 3 COMPONENT DETAILS Funding Source : GOP Implementation Schedule : Date Started: Target Completion:
Set I August 2008 2013 Set III November 2009 2014 Set IV January 2011 2015 Set V January 2012 2016
Based on the Philippine Development Plan, the program is expected to be completed by the year 2016 for the current set of beneficiaries. However, the agency aims to expand the program up to Set VII, with Set VI to be implemented in 2013 to cover all the municipalities not yet covered by the program and Set VII to be implemented by 2014 to cover the street families. With this, the target completion of the program will be by end of 2018.
Total Project Cost (PhP Million) : Planned (for 2012 only) Actual Total : 1,301.36 261.62
Cash Grant : 1,195.93 847.14 (Jan-Dec.12) Operational Cost: 105.43 75.74 (Jan-Dec.12)
Beneficiaries : Households (HH) with pregnant women and children 0-14
years old below the poverty threshold in poor municipalities/cities/provinces. Selection of household beneficiaries is based on the National Household Targeting System.
Objective(s) : Provide cash assistance to the poor to alleviate their
needs (short term) and to break the intergenerational poverty cycle through investment in human capital. Specifically, the program seeks to:
Improve preventive health care among pregnant women and young children;
Increase the enrolment and attendance rate of children in school;
Reduce the incidence of child labor;
Raise the average consumption rate in food expenditure of poor households; and
Encourage parents to invest in their children’s human capital through investments in their health, nutrition, education, and participation in community activities.
Description: Pantawid Pamilyang Pilipino is a poverty reduction strategy that provides cash grants to poor households with pregnant women and children 0-14 years old as long as they comply with the following specific conditions on health, nutrition and education:
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 38 of 96
Health & Nutrition:
Pregnant women avail pre-and post-natal care and childbirth supervised by health professional
Children 0-5 years old avail complete immunization, weight monitoring, nutrition counseling and preventive health services
Children 6-14 years old avail de-worming pills twice a year
Education:
Children 3 to 5 years old enrolled in Day Care 6 to 14 years old enrolled in elementary and high school with 85 percent class attendance per month
Parenting Education:
Attend family development session once a month
Program Benefits*:
Health & Nutrition Grant – PhP6,000/year or PhP500/month/household
Education – PhP3,000/year or PhP300/month/child for 10 months a year, to a maximum of 3 children/household ___________________________ *Households with three qualified children receive a maximum subsidy of PhP15,000 per year
(Education: PhP300 x 3 x 10 mos. = PhP9,000 + H & N: PhP500 x 12 mos.= PhP6,000) as long as they comply with the conditionalities.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 39 of 96
Target
(Regis tere
d as of
Sept. 25,
2012
Actual
(Adjusted as
of Dec. 20,
2012)
Number
Pa id with
Al lowance
% of Actual
Beneficiaries
As
Planned2
Actual Cash
Releases 3(Jan-Dec.
2012)
TOTAL 114 1,419 93,087 94,287 90,355 95.83 1,195.93 847.140 70.84
Set I 4 72 6,979 6,980 6,798 97.39 114.680 70.38 61.37
1 Nueva Eci ja 4 72 6,979 6,980 6,798 97.39 114.680 70.38 61.37
Set III 37 225 19,466 19,498 19,126 98.09 307.350 218.220 71.00
1 Aurora 2 13 1,057 1,057 1,035 97.92 16.340 11.960 73.19
2 Bataan 2 15 844 841 822 97.74 13.550 9.430 69.59
3 Bulacan 10 36 4,626 4,633 4,553 98.27 73.380 54.300 74.00
4 Nueva Eci ja 8 48 3,659 3,680 3,575 97.15 57.750 38.570 66.79
5 Pampanga 4 48 3,039 3,048 3,011 98.79 47.900 34.440 71.90
6 Tarlac 8 45 4,264 4,264 4,246 99.58 67.140 49.280 73.40
7 Zambales 3 20 1,977 1,975 1,884 95.39 31.290 20.240 64.69
Set IV* 35 226 10,051 10,062 9,907 98.46 152.500 98.600 64.66
1 Aurora 2 8 72 72 67 93.06 1.100 0.580 52.73
2 Bataan 2 8 26 26 24 92.31 0.390 0.220 56.41
3 Bulacan 7 20 898 904 891 98.56 13.830 9.780 70.72
4 Nueva Eci ja 9 83 5,800 5,804 5,713 98.43 87.420 53.190 60.84
5 Pampanga 4 58 2,157 2,158 2,143 99.30 32.69 23.09 70.63
6 Tarlac 8 30 967 967 951 98.35 14.97 10.71 71.54
7 Zambales 3 19 131 131 118 90.08 2.10 1.03 49.05
Set V* 38 896 56,591 57,747 54,524 94.42 621.4 459.94 74.02
1 Aurora 7 124 5,723 5,726 5,660 98.85 80.48 61.64 76.59
2 Bataan 4 48 2,250 2,248 2,224 98.93 31.91 22.9 71.76
3 Bulacan 4 143 13,729 14,793 12,815 86.63 65.15 62.62 96.12
4 Nueva Eci ja 11 262 15,444 15,483 15,104 97.55 210.8 142.06 67.39
5 Pampanga 5 133 5,718 5,773 5,502 95.31 58.83 46.94 79.79
6 Tarlac 3 100 8,031 8,030 7,885 98.19 102.48 75.97 74.13
7 Zambales 4 86 5,696 5,694 5,334 93.68 71.75 47.81 66.631
2
3
4Ps Beneficiaries and Cash Assistance, By Set, By Province
January to December 2012
Province%
Released
No. of
Mun.
Covere
d
Cash Assistance (in million PHP)No. of
Brgys .
Covere
d
Number of Beneficiaries 1
Registered Households
Annual P lanned Cash Grant for a maximum of 3 children and compliance of HH with the conditionalities of the program
Actual cash released based on the number of qualified children beneficiaries and compliance to the
conditionalities of the program
*Increased in number of beneficiaries due to late registration of Set III potential beneficiaries
STATUS OF IMPLEMENTATION (As of December 2012)
Overall Accomplishment As of December 2012, a total of 1,419 barangays in 114 municipalities in Region 3 were covered under Sets I, III, IV and V of the Pantawid Pamilyang Pilipino Program (4Ps) benefitting 94,287 households. However only 90,355 households or 95.83 percent were qualified to receive the corresponding cash assistance. For the period January to December 2012, an amount of PhP847.140 million or 70.84 percent of the estimated cash assistance of PhP1,195.93 million programmed for 2012 was released. Payment was based on the following result of Compliance Verification/Monitoring System
2 per household:
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 40 of 96
a) Education, school attendance of: 3-5 years old = 88.13 percent 6-14 years old = 94.39 percent
b) Health Center Visits, pregnant women and 0-5 years old = 85.14 percent c) Family Development Sessions grantees = 96.23 percent
Cash assistance amounting to PhP 1,510.38 million has been provided to qualified beneficiaries of the project since the start of the program.
Total 1,510.38
Set I 241.55 2008 to December 2012
Set III 708.39 2009 to December 2012
Set IV 130.88 2011 to December 2012
Set V 429.56 Jan- December 2012
TotalCash Assistance
(Million PhP)Period Covered
The implementation of 4Ps started with Set I in 2008 covering the four poorest municipalities of Nueva Ecija; followed by Set III in 2009 comprising 37 municipalities from the seven provinces; Set IV in 2011 covering 35 municipalities and Set V in 2012, 38 municipalities/cities. Set VI will be implemented in January 2013. As of December 2012, a total of 141,987 households were determined/validated through Community Assembly and were due for registration in the data base of the Pantawid Pamilyang Pilipino Program beneficiaries.
Reasons for achieving more than the physical targets: The increase in the number of household beneficiaries was due to the inclusion of potential beneficiaries who registered late, adjustments and validation done by NPMO. The decrease in actual beneficiaries was due to the dropping of grantees with no more 0-14 years old children after the last compliance verification/monitoring period. Reasons for achieving less than the financial targets: The estimated annual cash grant was based on the provision of cash grant to a maximum of three children among registered households while the provision of cash grants was based on the actual/validated number of children among registered households and their compliance with the conditions of the program.
Project Implementation Concerns Issues/Concerns Action Taken Recommendations
High cost of transportation in claiming cash grants of the beneficiaries living in remote, upland and coastal barangays
Identified alternative mode of payments were:
Cash cards
Global Remit (Gcash)
Rural Banks (OTC)
LBP (OTC)
Continuous monitoring of effectiveness of identified mode, and explore other alternatives
Immediate Results
Indicator Before Project During/After Project
Attendance of children in school.
Parents neglect to send children to school due to distance/accessibility problem.
Many parents were enticed to send children to school because of encouragement and values learned in attending Family Development Sessions.
Awareness on proper health practices
Low immunization rate among children 0-5 yrs old due to wrong health beliefs and unawareness of parents on health services/programs
Parents were given proper education on the importance of health practices and immunization. Through Family Development Sessions, parents bringing children to health centers for regular check up/immunization increased.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 41 of 96
Sanitation and Housing Condition
Most of the beneficiaries do not have sanitary latrine
Improved housing condition with sanitary latrines in many households as a result of health education during FDS. Families learned to save and use portion of cash grants in improving their houses.
Family and Community Relations
Prevalence of home and community conflicts (child/marital abuses, vices, etc.)
Family and community conflicts lessened. Family cohesiveness and camaraderie in the community was established and hastened. Active participation in community activities such as Clean Drive for Dengue Prevention; Backyard Gardening; Tree planting, etc..
Personal Hygiene Poor/improper grooming of beneficiaries when claiming grants in servicing banks
Well groomed/neatly dressed when claiming cash in banks as observed/appreciated by servicing banks
Personality Development
Low self-esteem of mother grantees; stereo-type attitude of “women for household chores and child rearing only”
Improved self-confidence and recognized their potentials and contributions to the community. Parents learned to be leaders and active partners in facilitating program, helped in the updating of beneficiary profile.
Commitment of partner NGAs and LGUs on supply side
With the implementation of 4Ps, an increase in school age children attending school and 0-5 children seeking health services like immunization, vitamin A supplementation, deworming, etc. were observed.
For DepED: construction of 87 new classrooms and repairs of 48 school buildings in 2011. For DOH: deployment of 630 nurses and 163 midwives For LGUs: giving priority to the Pantawid barangays in conducting immunization, Vit. A supplement, weight monitoring and check up.
Convergence with partners
With the implementation of Pantawid Pamilyang Pilipino Program, there was an expectation and challenge of improving the lives of HH beneficiaries
Partners committed to converge with the Department in uplifiting the lives of beneficiaries: DPWH: Employment of 123 HH heads to the Trabahong Lansangan CHED: Allotment of 144 scholars from the siblings of Pantawid children beneficiaries for the Students Grant in Aid for Poverty Alleviation (SGPPA). PHIC: Enrolment of Pantawid Pamilya beneficiaries as PHIC members City Government of Olongapo: Initiated the Health Plus Program as augmentation to PhilHealth benefits for the indigent families within and adjacent areas of Olongapo City.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 42 of 96
PROGRESS PHOTOGRAPHS
The Regional Advisory Committee (RAC) and Regional Project Monitoring Committee (RPMC)
conducted field visit to the province of Nueva Ecija
Street Family pre-screening activity for the Modified Conditional Cash Transfer (MCCT) Program
Validation of IP Migrant (Badjaos) households in Angeles City as target beneficiaries for MCCT Program
Conducted Community Assembly for Set VI beneficiaries in Talavera, Nueva Ecija
PWD father in San Luis, Aurora signing the MCCT
Validation Form MCCT Launching and first pay-out to the Badjao and families with street children beneficiaries in Angeles
City
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 43 of 96
PROJECT VISIT REPORT PROJECT VISITED : Pantawid Pamilyang Pilipino Program (4Ps) LOCATION : Nueva Ecija (Talavera, Guimba, Talugtog) IMPLEMENTING AGENCY : DSWD DATE : 23 October 2012
1. The monitoring visit was a joint activity of the RPMC and Regional Advisory Committee
(RAC) of 4Ps. It was participated by the following:
RPMC III -
1.1 RD Severino C. Santos , NEDA 3
1.2 Mr. Rodante D. Pascual, RDC-PSR for Crops
1.3 Bro. Jose R. Rozaldo Jr., RDC-PSR for Environment
1.4 Ms. Evelyn Villacorte, OP-PMS
1.5 OIC-RD William Beltran, PIA 3
1.6 Mr. Renan Francis K. Gonzales, DBM 3
1.7 Mr. Marc Josefh C. Abenoja, DBM 3
1.8 Mr. Marty Moral, DILG 3
1.9 Mr. Ernest Kyle Agay, DILG 3
1.10 Ms. Aurora M. Joson, NEDA 3
1.11 Ms. Anita D. Timbol, NEDA 3
1.12 Ms. Ma. Theresa Viola, NEDA 3
1.13 Ms. Evelyn S. Galang, NEDA 3
1.14 Ms. Daisy D. Sarmiento, NEDA 3
RAC III –
1.1 RD Adelina Apostol, DSWD 3
1.2 ARD Maura dela Rosa, DSWD 3
1.3 RD Aurora Quiray, POPCOM 3
1.4 ARD Edna Abcede, DOH 3
1.5 Ms. Irene Crespo, DSWD 3
1.6 RNPC Victoria Mañez, NNC 3
1.7 ARD Paz L. Mones, DA 3
1.8 Mr. Michael Maglanque, PHIC
1.9 Mr. Dexter Magbuan, PHIC
1.10 Ms. Aida S. Gomez, CHED 3
1.11 Ms. Juliette T. Feliciano, TESDA 3
1.12 Ms. Erlinda Vegarinsaga, DENR 3
1.13 Ms. Elma Maranes, DA 3
1.14 Ms. Maravia de Guzman, DepEd 3
Others/LGUs - 1.15 MSWDOs
1.16 LGU Links of Talugtog and Guimba
Project Visit Objectives
2. The joint monitoring activity of RPMC and RAC is aimed at observing the conduct of the
Community Assembly, Cash card pay-out, and Family Development Session of 4Ps.
Itinerary and Project Visit Results
3. First stop of the team was at Barangay Lomboy in Talavera, Nueva Ecija to observe the
conduct of the Community Assembly (ComAss). Mayor Nerito Santos of Talavera and his
barangay officials welcomed the group. Potential household beneficiaries mainly mothers
gathered and waited for the validation and registration to be administered by the 4Ps
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 44 of 96
4. program. It is attended mostly by mothers being the most responsible person in the
household (HH). As a pre-requisite, basic information about the household members is
disclosed and validated to ensure identity of grantee/s.
The validation team used the masterlist based from the National Household Targeting System (NHTS) brought down to the Regional Project Management Office by the National Project Management Office (NPMO) of 4Ps. After validation of documents, they will be registered as qualified grantees and be issued PHIC card and LBP cash card. RD Apostol of DSWD announced the possible expansion of Conditional Cash Transfer (CCT) Program that will include street children, Badjaos, exploited/abused children and women. The proposed expanded 4Ps will likewise allow the current school children beneficiaries finish their secondary education. Another is the provision of livelihood training.
5. Second stop was at Guimba Municipal Hall to pay courtesy call to Mayor Jose Francis
Estevens Dizon and observe cash card pay out of Nampicuan and Guimba beneficiaries at
LBP branch in Guimba. Beneficiaries, mostly mothers lined infront of LBP to withdraw
education and health allowances of their children/family. They were accompanied by the
Municipal Link and Roving Bookeeper of concerned LGUs. Members of RPMC and RAC did
a quick interview to some beneficiaries waiting for their turn to withdraw while others
observed how they used ATM machines. Following were some of the concerns/responses
made:
a. Awareness on the conditionalities and objectives of Pantawid Program. Majority of the
grantee/s interviewed were aware of the conditionalities of the program. They were
likewise oriented on the objectives of 4Ps. Cash pay out is every other month, and the
amount of cash in bank to be withdrawn depends on the compliance of the beneficiaries
to the conditions of the program as indicated in the compliance verification system
(number of qualified children with at least 85 percent school attendance) and participation
in FDS and health care services.
b. Readiness and responsiveness of LGU Links to respond to problems. Respondents
said the presence of LGU Links and Grievance Officers eased problem solving at the local
levels. On the problem of cash card pay out, the HH grantee goes to the municipal
roving officer for assistance and clarification. Grantees who don’t know how to use ATM
cash card usually request the assistance of LGU Links.
c. Transport cost and accessibility of grantees to nearest LBP ATMs- This is a common
problem of most beneficiaries of 4Ps. They have to spend a minimum of PhP100-150
(round trip) to reach LBP. To save time and money, some beneficiaries group
themselves, set a date for withdrawal, hires a tricycle/pedicab costing PhP30-50 each.
6. Third and final stop was at Pag-Asa Gym, Barangay Tandoc, Talugtog, Nueva Ecija. The
team attended the Family Development Session (FDS) participated by parents, mostly
mothers. Barangay Tandoc was included under Set I (pilot areas) of 4Ps in 2008. About
25-30 parents mostly mothers attended the session. DepEd served as resource person
on stress management. Parents were required to attend FDS to monitor and ensure their
compliance to health care and education conditionalities of 4Ps. Attendance checklist, health
and school monitoring chart were required to be brought by parent/attendee to validate
compliance and used as basis for the granting of monthly allowance. Modular sessions are
conducted monthly by the Municipal Link or a resource person.
7. Due to time constraint, the exit conference scheduled after the FDS observation was
agreed to be conducted in next meeting of RAC.
8. For information/file.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 45 of 96
Communications, Navigation & Surveillance/Air Traffic Management (CNS/ATM) System Development Project
Province/City/Mun. : Bulacan, Pampanga and Zambales /Plaridel, Angeles and Olongapo City Sector/Sub-Sector : Infrastructure Support/Transportation/Airport and Air Navigation Executing Agency : Department of Transportation and Communication (DOTC)- Civil Aviation Authority of Philippines (CAAP) PROJECT CONTRACT DETAILS:
ORIGINAL REVISED Funding Source : JICA/JBIC
Loan Code : PH-P228 Loan Effectivity : 21 February 2003
Closing Date : 21 February 2010 : 21 May 2013
Implementation Schedule Date Started : 21 February 2003 : February 2008 Target Completion : 11 February 2010 : May 21, 2013 Total Project Cost (PhP Million) : 10,869.31 Beneficiaries : Air Transport Sector Objective(s) : To develop a dynamic and integrated CNS/ATM System
using satellite technology to enhance safety, reliability and efficiency of air traffic and air space in the Philippines.
Description : The project involves the procurement / construction of the
following facilities:
Air Traffic Management Automation;
Communication, Navigation, Surveillance and Meteorological System; and,
Construction of ATM Center Building A total of PhP 134.21* million is allocated for the following airports in Region III: 1) Plaridel Airport : PhP 22.21 million 2) Clark Airport : 89.78 million 3) Subic Airport : 22.21 million
Note: * Based on actual contract cost pro-rated per component (equipment) in Region 3 Airports as of June 2012
REGION III COMPONENTS
AIRPORT SUB-COMPONENTS
Plaridel Airport Aeronautical Information Service (AIS) Workstation;
AIS Message Handling System (MHS) Workstation; and,
Very Small Aperture Terminal (VSAT) Equipment;
Diosdado Macapagal International Airport (DMIA)
Aeronautical Information Service (AIS) Workstation;
AIS Message Handling System (MHS) Workstation;
Terminal- Very High Frequency (VHF) Radio;
Very Small Aperture Terminal (VSAT) Equipment;
Automated Weather Observing System (AWOS);
Tower Workstation; and,
Airport Terminal Information Service (ATIS) VHF Radio
Subic Bay International Airport
Aeronautical Information Service (AIS) Workstation;
AIS Message Handling System (MHS) Workstation; and,
Very Small Aperture Terminal (VSAT) Equipment.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 46 of 96
STATUS OF IMPLEMENTATION [As of December 2012]
Overall Assessment
The overall accomplishment was 29.85 percent with fund utilization rate of 13.41 percent. It was behind schedule by 58.96 percentage points. As of reporting period, no physical activities yet were undertaken except for the design reviews conducted for the projects that will be implemented in the three airports in Region 3. Project cost per component includes project consultancy, building and civil works/equipment systems for Package 1 of the three airports. Contractor’s suspension of works due to delayed payment by the DOTC resulted to none achievement of physical and financial targets. A. Overall Performance (Cumulative)
134.20 1.00 88.81 29.85 (58.96)
I Clark Airport 89.78 0.67 88.81 29.85 (58.96) 59.41 19.97 (39.44) 33.61
II Subic Airport 22.21 0.17 88.81 29.85 (58.96) 14.70 4.94 (9.76) 33.61
III Plaridel Airport 22.21 0.17 88.81 29.85 (58.96) 14.70 4.94 (9.76) 33.61
Note: Cost indicated based on actual Contract Amount pro-rated to weight of component in Region 3 Airports.
A.1 Physical Accomplishment
(8)=(5)x(3 (9)=(6)x(3 (10)=(9)-(8) (11)=(9/8)x100(1) (2) (3)= (4) (5) (6) (7)=(6)-(5)
Performance Target Actual Target
TOTAL
ComponentCost
(PhPMillion)Weight
Output
IndicatorActual
Accomp
Accomplishment Weighted Indicator
Slippage/
Variance
Slippage/
Variance
134.20 17.92 0.07 17.99 13.41
I Clark Airport 89.78 12.02 0.02 12.04 13.41
II Subic Airport 22.21 2.95 0.01 2.96 13.33
III Plaridel Airport 22.21 2.95 0.04 2.99 13.46
A.2 Financial Performance
TOTAL
(5)=(3)+(4) (6)=5/2 x 100
Component Cost (PhP
Million)
Expenditure Expenditure
Rate/Absorptive
CapacityDisbursement*
Unpaid
ObligationsTotal
(1) (2) (3) (4)
Estimated Employment to be generated for the whole project duration (man days): 124,545
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 47 of 96
Arterial Road By-Pass Project (Phase I) Contract Packages I & II, Plaridel ByPass
Province/Municipality : Bulacan / Balagtas, Guiguinto and Plaridel Sector/Sub-Sector : Infrastructure Support /Transportation/Roads and Bridges Executing Agency : Department of Public Works and Highways (DPWH) Philippine-
Japan Friendship Highway Loan - Project Management Office (PJHL-PMO)
PROJECT CONTRACT DETAILS:
STATUS OF IMPLEMENTATION [As of 25 December 2012] Overall Assessment The project (CPs 1 & 2) was 100 percent accomplished and about 100 percent of total project cost was utilized. CP 1 (Burol, Balagtas Interchange) was opened to traffic in March 2012. Travel time was reduced from 26 minutes to 10 minutes or a savings of 16 minutes.
Funding Source : Japan International Cooperation Agency (JICA) Loan Code : PH-P236 Loan Effectivity : 29 July 2004 Closing Date : 29 July 2012 Implementation Schedule Contract Package I
Date Started : 31 January 2009 Target Completion : 20 May 2011 Revised: 25 November 2011 Contract Package II Date Started : 4 May 2011 Target Completion : 21 February 2013 (Target completion date beyond loan closing
date.)
Total Project Cost (PhP Million) : 2,651.739 (updated)
Beneficiaries : Farmers, businessmen, fishermen, tourists and local
travelers in the project area.
Objective(s) : The construction of Plaridel Bypass Road in Bulacan is part of the envisioned upgrading of Inter-Urban Highway System along the Philippine-Japan Friendship Highway (PJFH) that will ease the serious traffic congestion along the vicinity core urban areas of PJFH. Expected average travel time savings for Packages I and II is 23 minutes.
Description : Under the modified scope of Loan Agreement No. PH-
P236, only Contract Packages I and II, Plaridel Bypass Section (Sta. 32+970.33 to Sta. 47+400) in Bulacan Province will be constructed. The project starts at the North Luzon Expressway (NLEX) on a new Interchange and Ramps. It traverses on Northeastern direction passing through four (4) municipalities in Bulacan namely Balagtas, Guiguinto, Plaridel and Bustos with the total length of 14.65 km. plus 2.40 km. Access Road to the town proper of Plaridel. Major Items of works are PCC Pavement (width=7.00m., thickness=300mm.), Built-up Embankment (maximum height=11.45m), 1 - Interchange with PCDG Bridge, 6 – PCDG Bridges, 1 – RCDG Bridge, 3 - Farm Crossing (R.C. Box), 15 - At-Grade Intersections and Relocation of Existing Structures (Power lines, Meralco Lines, Telephone Lines, etc.)
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 48 of 96
Reasons for achieving more than the physical targets: The project was physically completed ahead of schedule due to close monitoring/supervision of DPWH Implementing Office together with Project Consultant.
A. Overall Performance (Cumulative)
A.1 Physical Accomplishment
TARGET ACTUALSLIPPAGE/
VARIANCETARGET
ACTUAL
ACCOMP.
SLIPPAGE/
VARIANCE
(2) (3)=(2)/ TOTAL (4) (5) (6) (7)=(6)-(5) (8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8) (11) = (9) / (8) X 100
2,153.212 16.85 kms
Civil Works CP I 1,559.602 100 9.07 kms 100 100 0.00 100 100 - 100.00
Civil Works CP II 593.610 100 7.78 kms 100 100 0.00 100 100 - 100.00
COMPONENT
TOTAL
(1)
PERFORMANCE
ACCOMPLISHMENT WEIGHTED INDICATOR
COST (in M PhP) WEIGHTOUTPUT
INDICATOR*
A.2 Financial Performance
TOTAL 2,778.367 2,539.424 2,539.42 91.40
1 Civil Works CP I 1,559.602 1,559.602 1,559.602 100.00
II Civil Works CP II 593.610 527.615 527.615 88.88
III Consultancy Services 295.075 295.075 295.075 100.00
IV RROW 330.080 157.132 157.132 47.60
(6)=5/2 x 100
COMPONENT COST*
EXPENDITUREEXPENDITURE RATE /
ABSORPTIVE CAPACITYDISBURSEMENTUNPAID
OBLIGATIONSTOTAL
(1) (2) (3) (4) (5)=(3)+(4)
B. Project Implementation Concerns
ISSUES/CONCERNS
ACTION TAKEN
RECOMMENDATION
Road Right of Way (RROW) –
Full payment of RROW acquisitions for lot owners
Follow up status of payment in the region, still for validation.
C. Immediate Results
INDICATOR BEFORE PROJECT DURING / AFTER
PROJECT
Travel time saving (min.)
- Along existing (CP I) 26 min
- Along new bypass (CP I) 10 min.
- Along existing (CP II) 23 min.
- Along new bypass (CP II) 6 min + 10 min. = 16 min.
TOTAL 49 min. 26 min.
TOTAL TIME SAVINGS 23 min.
D. Estimated Employment to be Generated (Man-days):
For the whole project duration : 2,645,337
As of reporting period : 1,645,135
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 49 of 96
Location Map
PROGRESS PHOTOGRAPHS PLARIDEL BYPASS NLEX CONNECTION PLARIDEL BYPASS ENTRY POINT
TOLL SUPERVISION BUILDING
TOLL PLAZA
INTERCHANGE BRIDGE
PLARIDEL BYPASS EXIT POINT
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 50 of 96
MacArthur Highway Redevelopment Project
Province : Bulacan, Pampanga and Tarlac Sector/Sub-Sector : Infrastructure Support /Transportation/ Roads and Bridges Executing Agency : Department of Public Works and Highways (DPWH)
PROJECT CONTRACT DETAILS:
STATUS OF IMPLEMENTATION [As of December 2012]
Overall Assessment
All works under Phases I-VI with total allocation of PhP4,938.495 million from 2005 to 2012 were 100 percent completed. Phase VII costing PhP 703.204* million remained 97.80 percent accomplished due to suspension of works. Those funded in 2012 (Phase VIII) were 67.23 percent accomplished. The details of each phase are as follows:
Phase/ Package
Location/Section Cost
(in PhP’000) Status
Total Phase I 474,102 Completed 2006
I 1. Meycauyan-Marilao-Bocaue
Section 88,097
2. Balagtas-Guiguinto Section 87,097
3. Malolos-Calumpit Section 89,467
4. Apalit-San Simon-Minalin-Sto.
Tomas-SFernando-Mabalacat Section
159,441
5. Tarlac Section 50,000
Total Phases II A & B 372,000 Completed 2007
II-A
1. Widening and Upgrading in Meycauayan and Canal Rehabilitation/Reconstruction in Mabalacat, Pampanga
62,500
Funding Source : DPWH Regular Infrastructure Program Implementation Schedule Date Started : 2005 Target Completion : - Total Project Cost (PhP Million) : 4,020 (Cost Estimate in 2005) 4,938 (Updated Cost,2005 to 2010) 5,938 (Updated Cost 2005 to 2011) 6,665 (Updated Cost 2005 to 2012) Beneficiaries : Transport Sector of Central and Northeastern Luzon Objective(s) : To serve as a reliable alternate route to the North Luzon
Expressway (NLEx). Description : This covers the improvement/ rehabilitation/ upgrading of
the highway from Bulacan to Tarlac in the following order of priority:
Widening of roadway into 4 – lane thoroughfare including drainage component;
Ugrading of flooded sections with drainage;
Overlaying/rehabilitation of dilapidated sections;
Improvement/ Widening of 12 existing bridges; and,
Total replacement of 12 Deteriorated Bridges
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 51 of 96
Phase/ Package
Location/Section Cost
(in PhP’000) Status
2. Detailed Engineering Design (DED)
for the replacement of two bridges 15,200
II-B 1. Widening and Upgrading of Lined
Canal in Bulacan 118,600
2. Widening and Upgrading of Canal
in Bulacan 38,700
3. Upgrading of Meycauyan Bridge 87,000
4. Widening and Upgrading of Canal
in Tarlac 50,000
Total Phase III 256,000
III 1. Widening and Upgrading of Canal
in Bulacan 48,000 Completed/2007
2. Widening and Upgrading of Canal
in Apalit and Mabalacat 48,000 Completed/2007
3. Upgrading of Bridge (Labangan
Bridge No. 7) 120,000 Completed/2008
4. Upgrading of Bridge (Tiaong
Bridge) 40,000 Completed/2007
Total Phase IV 974,000
IV 1. Meycauyan-Marilao-Bocaue
Section 195,000 Completed/25 July 2009
2. Balagtas-Guiguinto Section 73,000 Completed/April 2009
3. Malolos-Calumpit Section 56,000 Completed/06 Aug. 2009
4. Apalit-San Simon-Minalin-Sto.
Tomas Section 66,500 Completed/April 2009
5. City of San Fernando and
Mabalacat Section 97,000 Completed/April 2009
6. Replacement of Dalaquitan Bridge 85,000 Completed/March 2009
7. Replacement of Tinajero Bridge
and Approaches 53,000 Completed/March 2009
8. Replacement of Tulaoc and Sto.
Domingo Bridge 48,500 Completed/10 Sept. 2009
9. Bamban-Capas Section
Approaches 77,000 Completed/March 2009
10. Tarlac City Approaches 123,000 Completed/April 2009
11. San Manuel Approaches 100,000 Completed/March 2009
Total Phase V 778,886
V 1. Malolos-Calumpit Section 115,000 Completed/15 Nov. 2009
2. Bocaue-Balagtas-Guiguinto
Section 92,000 Completed/29 Sept. 2009
3. Meycauyan-Marilao Section 49,000 Completed/29 Aug. 2009
4. Angeles-Mabalacat Section 89,000 Completed/29 Aug. 2009
5. City of San Fernando Section 50,000 Completed/29 Oct. 2009
6. Completion of Tinajero Bridge and
approaches 20,000 Completed/30 June 2009
7. Replacement of Del Pilar Bridge
and approaches 85,000 Completed/15 Nov. 2009
8. Completion of Tiaong Bridge and
approaches 15,000 Completed/25 June 2009
9. Completion of Tulaoc and Sto.
Domingo Bridges 39,000 Completed/10 Sept. 2009
10. Completion of Dalaquitan Bridge
and Approaches 49,000 Completed/10 Sept. 2009
11. Moncada-San Manuel Section 62,200 Completed/18 Aug. 2009
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 52 of 96
Phase/ Package
Location/Section Cost
(in PhP’000) Status
12. Tarlac City-Gerona Section 61,870 Completed/06 July 2009
13. Bamban-Capas Section 51,816 Completed/25 Jul 2009
Total Phase VI 2,083,508
VI 1. Malolos-Calumpit Section 110,823 Completed/29 Oct. 2010
2. Angeles-Mabalacat Section 82,007 Completed/29 Oct. 2009
3. Paniqui & San Manuel Section 164,060 Completed/29 Oct. 2010
4. City of San Fernando Section 441,769 Completed/28 Dec.2010
5. Tarlac City-Gerona Section 123,010 Completed/28 Dec. 2010
6. Bocaue-Balagtas-Guiguinto
Section 143,602 Completed/28 Dec. 2010
7. Meycauyan- Marilao Section 107,219 Completed/ 29 Oct. 2010
8. Apalit-San Simon-Minalin-Sto.
Tomas Section 313,576 Completed/27 Jan. 2011
9. Bamban- Capas Section 123,025 Completed/29 Oct. 2010
10. **Installation of Traffic Signal Lights
(Meycauyan-Mabalacat Section) 221,268 Completed/28 Dec. 2010
11. **Installation of Traffic Signal Lights
(Tarlac Province) 253,149 Completed/28 Dec. 2010
Total Project Cost (Phase I-VI) 4,938,496
PHASE VII- 2011
TARGET ACTUALSLIPPAGE/
VARIANCETARGET
ACTUAL
ACCOMP.
SLIPPAGE/
VARIANCE
(2) (3)=(2)/ TOTAL (4) (5) (6) (7)=(6)-(5) (8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8) (11) = (9) / (8) X 100
703,204 1.00 100.00 97.80 (2.20) 97.80
1 Paniqui-Moncada Section 147,170 0.209 100 100 0 20.93 20.93 - 100.00
2 Tarlac City-Gerona Section** 324,793 0.462 100 95.6 -4.4 46.19 44.16 (2.03) 95.60
3 Bamban-Capaz Section*** 231,241 0.329 100 99.5 -0.5 32.88 32.72 (0.16) 99.50
*UPDATED COSTS AS OF March 25, 2012, DPWH Region 3
**suspended as of June 1, 2012, awaiting approval of VO #1
*** implemented by DPWH Traffic Engineering and Mangament-PMO
COMPONENT ROAD SECTION
TOTAL
(1)
PERFORMANCE
ACCOMPLISHMENT WEIGHTED INDICATOR
COST (in M PhP) WEIGHT
OUTPUT
INDICATOR
*
PHASE VIII- 2012*
TARGET ACTUALSLIPPAGE/
VARIANCETARGET
ACTUAL
ACCOMP.
SLIPPAGE/
VARIANCE
(2) (3)=(2)/TOTAL (4) (5) (6) (7)=(6)-(5) (8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8) (11) = (9) / (8) X 100
727,800 1.00 49.53 67.23 17.69 135.72
1 Bocaue-Balagtas
Section (Bulacan) 109,000 0.150 100 100 0 14.98 14.98 -
2 Angeles-Mabalacat
Section (Pampanga) 125,000 0.172 51.36 55.2 3.84 8.82 9.48 0.66
3 Paniqui-Moncada
Section (Tarlac) 350,000 0.481 53.5 51.8 -1.8 25.73 24.89 (0.85)
4Tarlac City-Gerona
Section1 143,800 0.20 91.8 90.5 -1.3 17.88 17.88 -
*updated as of December 25, 20121Resumed on August 31, 2012, with revised Expiry Date on Feb. 24, 2013 due to VO #1
COMPONENT ROAD
SECTION
TOTAL
(1)
PERFORMANCE
ACCOMPLISHMENT WEIGHTED INDICATOR
COST (in M
PhP)WEIGHT
OUTPUT
INDICATO
R
PHASE VIII: Widening of McArthur Higway (MNR) including improvement and rehabilitation of existing pavement
Estimated employment generation for the whole project duration (man-days): 705,000
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 53 of 96
Mega-Bridges for Urban and Rural Development Project
Province : Bataan, Bulacan, Pampanga and Zambales Sector/Sub-Sector : Infrastructure Support /Transportation/ Roads and Bridges Executing Agency : Department of Public Works and Highways (DPWH) – President’s Bridge
Program Office PROJECT CONTRACT DETAILS: REGION III COMPONENTS:
FLYOVER/ BRIDGE
COST (PhP) OBJECTIVE DESCRIPTION
Pinagreallan Bridge in Candelaria, Zambales
31,707,926.00 To improve the socio-economic condition in the area, as accessibility is enhanced not only in the barangay itself but between the barangay and communities of Candelaria.
Construction of permanent universal bridge modular superstructure with length of 28.80 ln. m. supplied by the Matiere S.A.S.
San Fernando Sur Bridge in Cabiao, Nueva Ecija
284,796,631.00 To facilitate the transport of farmers’ products to the market and will facilitate the movement of residents and students of the Province of Nueva Ecija especially during floods and emergency cases.
Construction of universal bridge modular superstructure with eight spans and length of 273.6 ln. m. supplied by Matiere S.A.S.
Lazatin Flyover in City of San Fernando, Pampanga
373,113,700.00 To contribute in increasing the existing road capacity to mitigate traffic congestion in San Fernando City, anticipating population increase, improving business opportunity, productivity and job generation.
Construction of permanent flyover modular superstructure with length of 195 ln. m. supplied by the Matiere S.A.S.
ORIGINAL REVISED Funding Source : French Government’s Export Credit Loan Loan Code : 85702
Loan Effectivity : 29 October 2008 Closing Date : 29 September 2012 November 12, 2013 Implementation Schedule Date Started : 2008 Target Completion : 2013 Total Project Cost (PhP Million) : 9,452 842.653 (Region 3 component,
updated cost as of September 2012)
Beneficiaries : Transport sector nationwide Objective(s) : The project intends to provide vital linkage or road
network access to spur productivity and enhance the country’s growing economy.
Specifically, it aims to construct and/or install structurally
sound permanent flyovers and universal bridges (unibridges) nationwide.
Description : The project consists of ten (10) pemanent flyovers and 72
universal bridges with modular superstructure supplied by the Matierre S.A.S.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 54 of 96
FLYOVER/ BRIDGE
COST (PhP) OBJECTIVE DESCRIPTION
Alikabok-Bayan-Orani-Imelda-Samal Bridge
44,517,429.00
This project will improve access not only within the barangay but between the different barangays of Orani.
Construction of permanent universal bridge modular superstructure with one span and length of 45.60 lm. supplied by Matierre S.A.S
Tagumpay Bridge, San Leonardo, Nueva Ecija
41,841,348.00 This project will improve the socio-economic condition, accessibility between the barangay and the communities of San Leonardo N.E.
Construction of permanent universal bridge modular superstructure with single span and a total length of 45.60 lm. supplied by Matierre S.A.S.
Mawakat Bridge, Floridablanca , Pampanga
66,683,733.00 This project will improve the socio-economic condition, accessibility between the barangay and the communities of Floridablanca, Pamp.
Construction of permanent universal bridge modular superstructure with double span single lane and a total length of 68.40 lm. supplied by the Matierrre S.A.S.
STATUS OF IMPLEMENTATION [As of December 2012]
Name of Bridge
Location Implementation
Schedule
Cost (PhP
Million) Status
Start Completion
TOTAL Region 3
842.653
1. Pinagreallan Bridge
Candelaria, Zambales
Feb. 2010
April 30, 2010
31.70
Completed
2. San Fernando Sur Bridge
Cabiao, Nueva Ecija
Mar. 17, 2010
284.797
97 percent accomplished. (partially suspended due to revision of approaches plan)
3. GSO- Lazatin Flyover
City of San Fernando
Mar. 23, 2012
Oct. 18, 2012
373.114 Completed
4. Alikabok-Bayan-Orani-Imelda- Samal Unibridge
Orani, Bataan
Mar. 1, 2011
May 6, 2011
44.517 Completed
5. Tagumpay
Bridge1
San Leonardo,
Nueva Ecija
Oct. 20, 2011
Nov. 30, 2012
41.841
94.35 percent accomplished. Catch up plan is on-going (preparation of concrete pouring on slab and slope protection). Piling, two abutments and launching of superstructure/backfilling works of approaches completed.
6. Mawakat
Bridge2
Floridablanca, Pampanga
Oct. 26, 2011
November 30, 2012 (Revised date is 30
August 2013)
66.684
90.25 percent accomplished. Suspended in last quarter 2012. Catch up plan/remedial works on approaches damaged by the Habagat prepared by the Project Engineer. Piling works, Abutments A & B; Mid-pier and installation of superstructure completed.
1 Included in 2nd Quarter under the same Loan package.
2Included in 3
rd Quarter under the same Loan package.
*updated cost as of September 2012 including the two new bridges
Estimated Employment Generated: For the whole project duration (mandays): 768,480
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 55 of 96
Urgent Bridges Construction Project for Rural Development
Province : Pampanga and Zambales Sector/Sub-Sector : Infrastructure Support /Transportation/ Roads and Bridges Executing Agency : Department of Public Works and Highways (DPWH) – President’s Bridge
Program Office PROJECT CONTRACT DETAILS:
STATUS OF IMPLEMENTATION [As of December 2012]
Name of Bridge/Location
CP II Component/
Section
Cost (PhP M)
Implementation
Period Status/Remarks
TOTAL 376.074
1. Natividad Bridge, Guagua, Pampanga
Gapan-San Fernando-Olongapo (GSO) Road
77.252 May 2012-April 2014
36 percent accomplished. (Installation of DPWH Info Sign; Construction of detour road/bridge/removal of existing bridge; Concrete pile cast in drilled holes Ø1000mm; Pile integrity test/lean concrete at both abutments; High strain dynamic load test; Fabrication/casting of pre-stressed girders; 1
st Lift at both abutments and
launching of girders/structure concrete class A completed. On-going embankment formation at road approaches and installation of formworks/falseworks for superstructure.
ORIGINAL REVISED Location : Pampanga and Zambales Funding Source : JICA (ABM:BMB, A-2011-0296, March 16, 2011) Implementation Schedule Date Started : January 19, 2012 September 2012 Target Completion : January 07, 2014 April 23, 2014 Total Project Cost (PhP Million): 440.263 Beneficiaries : Communities within the bridges’ influence areas. Objective(s) : To provide structurally sound permanent bridges along
national roads and contribute to the development of the local economy by securing safe, smooth, and reliable traffic network in the rural areas.
Description : The project involves the construction of the following four
(4) bridges along Gapan-San Fernando-Olongapo (GSO), one (1) bridge along Magalang-Arayat Road, and one (1) bridge along Olongapo-Bugallon Road under CP II-C project:
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 56 of 96
EMPLOYMENT GENERATED:
Estimated Employment to be generated (mandays) for the whole project duration: 341,890
2. San Antonio Bridge, Lubao, Pampanga
Gapan-San Fernando-Olongapo (GSO) Road
57.577 September 2012-March 2014
48.66 percent accomplished (Installation of DPWH Project Information Sign; Construction of detour road/bridge/removal of existing bridge; Concrete pile cast in drilled holes (1000 mm), driving steel sheet piles at bridge slope protection, lean concrete at both abutments, structural concrete class A, 1
st lift at both abutments and launching
of girders completed. On-going installation of formworks/falseworks for superstructure.
3. Remedios Bridge, Lubao, Pampanga
Gapan-San Fernando-Olongapo (GSO) Road
41.083 August 2012-
January 2014
33.08 percent accomplished (Installation of detour road/bridge/ removal of existing bridge; Concrete Pile Cast in Drilled Holes Ø1000mm; High strain dynamic load test; Pile integrity test; Lean concrete at both abutments; Fabrication/casting of pre-stressed girders; Structural concrete class A” substructure-1
st lift at both
abutments and stressing of pre-stressed girders completed.
4. San Matias Bridge, Concepcion, Lubao, Pampanga
Gapan-San Fernando-Olongapo (GSO) Road
84.251 July 2012-March 2014
35.57 percent accomplished (Installation of DPWH Project Info sign; Concrete Pile cast in drilled holes Ø1200mm; Removal of existing bridge; Pile integrity test/high strain dynamic load test; Lean concrete at both abutments; Structural concrete class A”(Substructure)-1
st lift at both
abutments and fabrication/casting of pre-stressed girders completed. On-going stressing of prestressed girders.
5. Bancal Bridge, Palanginan, Iba, Zambales
Olongapo-Bugallon
Road
81.279 December 2012-
February 2014
3.00 percent accomplished (Preparation for crane way is on-going)
6. Alasas Bridge, Magalang, Pampanga
Magalang-Arayat Road
34.632 July 2012-November
2013
40.00 Percent accomplished (Installation of DPWH project information sign; Construction of footbridge; Fabrication/casting of pre-stressed girders; Concrete pile cast in drilled holes Ø1200mm; High strain dynamic load test/pile integrity test; Construction of detour bridge/removal of existing bridge; Lean concrete at both abutments; Structural concrete class A” (Substructure)-1
st lift at both
abutments
On-going fabrication/casting of prestressed girders
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 57 of 96
Tarlac-Pangasinan-La Union Toll Expressway (TPLEx) (BOT1-Funded Project)
Section 1: Tarlac-Carmen Section, Sta. 0+712.17 to Sta. 49+300
Province/Municipality : Tarlac /Pangasinan Sector/Sub-Sector : Infrastructure Support /Transportation/Roads and Bridges Executing Agency : Department of Public Works and Highways, Build-Operate-
Transfer - Project Management Office (DPWH-BOT-PMO) BOT Proponent : Private Infrastructure Development Corporation (PIDC) PROJECT CONTRACT DETAILS:
1BOT Contractual Agreement: TPLEx will be implemented through Public-Private Partnership (PPP) using the Built-Transfer-Operate (BTO) variant of the BOT Law.
The private proponent is responsible for the design, financing and construction of the expressway, after which, the expressway will be turned over to the government. The government will grant the private proponent the franchise to operate and maintain the toll road under a long-term concession agreement. Returns to the private proponent shall come from income derived from operating the toll road. The private proponent shall turn over the facility to the government at the end of the concession period. The government through DPWH will provide funding support in the form of: (i) PhP793 million for the right of-way (ROW) acquisition; and, (ii) cash subsidy of PhP2.907 billion starting 2011.
Funding Source : BOT Funded through Private Infrastructure Development Corporation, a consortium made up of the following: 1. D.M. Consunji, Inc.; 2. C.M. Pancho Construction; 3. R.D. Policarpio & Co., Inc.; 4. D.M. Wenceslao & Associates; 5. J.E. Manalo & Co., Inc.; 6. New Kanlaon Construction, Inc.;
Implementation Schedule : REVISED Date Started : 15 July 2010
Target Completion : 30 Nov. 2012 31 May 2013 (completion date for approval)
Total Project Cost (PhP Million): 12,728 Phase 1 (Sections 1A & 1B) 7,257 (Section 1) 7,348.05 Beneficiaries : Transport Sector in Central and Northeastern Luzon
Regions
Objective(s) : The project aims to achieve the following: 1. Provide a safe high-speed north to south access; 2. Reduce travel time from Manila to Baguio from six hours to
3-4 hours; 3. Decongest McArthur Highway; 4. Provide reliable food supply route in Regions I, III and
NCR; and, 5. Contribute to the North Luzon Agri-Business Quadrangle’s
objective of improving food production. Description: Design, financing, construction, operation and maintenance of the Tarlac-Pangasinan-La Union Toll Expressway from La Paz, Tarlac (terminus of the Subic-Clark –Tarlac Expressway) to Rosario, La Union (88.58 km). The alignment runs parallel to MacArthur Highway passing through the municipalities of Victoria, Gerona, Paniqui, Moncada and San Manuel in Tarlac (Section 1A-48.588km); Carmen, Urdaneta, Binalonan, Pozzorubio and Sison in Pangasinan; and, Rosario in La Union (Section 1B-39.88 km). Phase I Section 1A is a 48.588 km 2-lane, 3.65 m carriageway with three meters shoulder while Phase 2 will be an additional two lanes to be undertaken when AADT reaches 25,000 vehicles.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 58 of 96
STATUS OF IMPLEMENTATION [As of December 2012] Overall Assessment The project was 75.76 percent accomplished as against the revised target of 80.25 percent. It was behind schedule by 4.50 percent due to lack of major contractors’ resources, e.g. equipment, materials, adverse weather condition, lack of available area for slope protection works, non-conformance of some contractors, and right-of-way issues. The details of accomplishment on major scope of works by the six contractors were as follows:
Contractor
Length/Location Site Works Contract Duration
% Accomplishment
Target Actual Slippage
OVERALL ACCOMPLISHMENT: SCHEDULED
80.25
ACTUAL SLIPPAGE
75.76
-4.50
RD Policarpio & Co. Inc.
Sta 0+712.17-Sta 7+260; (Tarlac Parcio Interchange; Tarlac Toll Plaza; 4 Underpass)
Embankment; reinforced concrete pipe culverts; structural concreting, pre-cast concrete pile; concrete girder; toll plaza bldg.
518 calendar days (1 .5 yr/mo) starting on 26 July 2010
100
94.59
-5.41
CM Pancho Construction Inc.
Sta 7+260 to Sta 8+920; (Sto, Niño Underpass and PNR Underpass) SCTEX interconnection
Embankment; sub-base course; crushed aggregate course; structural concrete class A/AA; precast concrete pile; gabions
343 calendar days (1 yr)
100
95.21
New Kanlaon Construction Inc.
Sta 8+920 to Sta 16+500;(Baculong-San Francisco-Poroc & Estipona Underpass)
Embankment; reinforced concrete pipe culverts; grouted riprap; precast concrete pipe stone masonry
510 calendar days (1.5 yr/mo) starting on 26 July 2010
100
95.57
-4.43
DM Wenceslao & Associates Inc.
Sta 16+500 to Sta 23+920;
Embankment; structural concrete class; Bored Pile; Concrete pipe culvert;
488 calendar days (1.4 yr/mo) starting on 20 July 2010
92.32
85.63
-6.69
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 59 of 96
Contractor
Length/Location Site Works Contract Duration
% Accomplishment
Target Actual Slippage
JE Manalo & Co.
Sta.23+920 to Sta 26+320;(4 Bridges, 1 Underpass, 1 Access Road)
Embankment; reinforced concrete pipe culvert; structural concrete class A/AA; pre stressed concrete girder; bored pile; grouted riprap
500 calendar days (1.5 yr/mo)
89.86
74.39
-15.47
DM Consunji Inc.
Sta 26+320 to Sta 49+360;Victoria-(Paniqui-Moncada and Carmen Interchange)
Embankment;Structural concrete class AA;Bored pile; Concrete pipe culvert; Pre stressed concrete girder
859 calendar days (2.4 yrs/mo) Starting on 24 March 2010
85.51
95.69
10.18
Miscellaneous Works Contractors
Slope Protection Works / Guardrail Works/ Road Signs
60.00
25.82
-34.18
Toll Facilities Contractor
Victoria Toll Plaza/ Facilities
75.00
19.45
-55.55
Toll Collection System Contractor
Toll Collection System
70.00
30.75
-39.25
Owned Supplied Materials
OSM 81.89 100.00 18.11
Other PDIC Cost
Facilities to the Engineer
70.00 75.00 5.00
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 60 of 96
(2) (2) Revised(3)=
(2)/Total(4) (5) (6)
(7)=(6)-
(5)(8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8)
(11)=(9/8)
x100
7,257 7,348.05 1.00 84.19 80.25 75.76 (4.50) 94.40
I
CM PANCHO
(SCTEX
Interconnection)
40.72 0.006 95.21 -
0.53
II R D POLICARPIO626 643.08 0.088
100.00 94.59 (5.41) 8.75
8.28 (0.47) 94.59
II C M PANCHO 138 136.64 0.019 100.00 100.00 - 1.86 1.86 - 100.00
IV NEW KANLAON 513 518.91 0.071 100.00 95.57 (4.43) 7.06 6.75 (0.31) 95.57
V
D M
WENCESLAO 842 751.56 0.102 92.32 85.63 (6.69) 9.44 8.76 (0.68) 92.75
VI J E MANALO 377 433.16 0.059 89.86 74.39 (15.47) 5.30 4.39 (0.91) 82.78
VII D M CONSUNJI 2,141 2,024.19 0.275 85.51 95.69 10.18 23.56 26.36 2.80 111.91
VIII
PIDC Direct
Contractors 381 363.36 0.049
60.00 25.82 (34.18) 2.97 1.28 (1.69) 43.03
IX
Other Works
Contractors 338 391.27 0.053
3.89 1.26 5.05 32.39
X
Ow ners
Supplied
Materials
786 1,017.34 0.138
81.89 100.00 18.11 11.34 13.85 2.51 122.13
XI
Other Ow ners
Supplied
Materials
1,107 1,020.58 0.139
61.71 36.36 (25.35) 6.02 2.38 (3.52) 39.53
XII Other PIDC Cost 7 7.23 0.001
70.00 75.00 5.00 0.07 0.07 0.00 107.14
TOTAL
Component
Cost
(PhP
Million)
Weight
Outpu
t
Indicat
or
Revised
Cost
(PhPMillion)
A.1 Physical Accomplishment
(1)
Performa
nce Target Actual TargetActual
Accomp
Accomplishment Weighted Indicator
Slippage
/Varianc
e
Slippage/V
ariance
12,728.00 5,194.26 5,216.26 40.98
Construction,
Engineering, Project
Management etc.
11,935.00 5,175.26 5,175.26 43.36
Right-Of Way
Acquisition 793.00 19.00 22.00 41.00 05.17
Financial Performance
(5)=(3)+(4) (6)=5/2 x 100
COMPONENTCost (PhP
Million)
Expenditure Expenditure
Rate/Absorptive
Capacity
Disbursement
*
Unpaid
ObligationsTotal
(2) (3) (4)
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 61 of 96
D. Project Implementation Concerns
CONTRACTOR ISSUES/CONCERNS ACTION TAKEN
R.D. Policarpio & Co.
Delay in the implementation of earthworks and other works due to ROW issues.
DPWH-BOT, PIDC and Contractor continue coordinating with DPWH-IROW for the resolution of the problem. Contractor was told to increase their resources and work extended hours to catch up with the delay.
C.M. Pancho Construction Inc. (Scope of work for assigned section completed)
.
New Kanlaon Construction Inc.
Delay in the implementation of earthworks and other works due to ROW issues.
DPWH-BOT, PIDC and Contractor continue coordinating with DPWH-IROW for the resolution of the problem. Contractor was told to increase their resources and work extended hours to catch up with the delay.
D.M. Wenceslao & Associates Inc.
Delay in the implementation of earthworks and other works due to ROW issues. Huge slippage due to delay in the implementation of earthworks, construction of Toll Facilities, and other works due to the delayed delivery of Owners Supplied Materials, adverse weather condition.
DPWH-BOT, PIDC and contractor continue coordinating with DPWH for the resolution of ROW problems. Contractor was told to increase resources and work extended to catch up with the schedule.
J.E. Manalo & Company
Huge slippage due to delay in the implementation of earthworks and other works due to delayed delivery of Owners Supplied Materials and ROW issues.
DPWH-BOT, PIDC and Contractor continue coordinating with DPWH-BOT for the resolution of ROW problem. Contractor was told to increase their resources and work on extended hours to catch-up with the schedule.
D.M. Consunji Inc.
ROW problem at Victoria interchange. Payment for the remaining undemolished house. Relocation of TARELCO power line at Anao Trunckline and San Raymundo at Paniqui Interchange. Design of Carmen Diversion Road including Parcellary plans for approval by DPWH-BOD. The design of Carmen Diversion Road, including the Parcellary Plans are still not yet approved by DPWH-
Continue coordinating with DPWH-IROW. PIDC continue coordinating with TARELCO DPWH continue coordinating with BOD.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 62 of 96
CONTRACTOR ISSUES/CONCERNS ACTION TAKEN
BOD.
Pilipinas Coconut Derivatives Inc.
Delay in the turn over of available area for slope protection by the Contractors.
Contractor to coordinate for the immediate turn over of area for slope protection.
Coco Technologies Corporation
Delay in the turn over of available area for slope protection by the Contractors
Contractors to coordinate to the Contractors for the immediate turn over of area for slope protection
Beta-Micrologic Joint Venture
Delay due to interfacing with civil works contractors. The wiring at Tarlac Central Plaza is delayed due to hand hole not yet ready. The back rack installation and electrical cable are still not completed. LAN cabling is likewise delayed due to cabinet is not yet installed.
Contractor to follow up regularly the status of work to Civil Works Contractor.
Hexafour Philippines
Delay in installation of guard rail due to hold order by PDIC.
Contractor to request PDIC to proceed with the installation.
Estimated Employment To Be Generated:
For the whole project duration (man days): 10,540
As of reporting period (man-days) : 965 positions?
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 63 of 96
Widening of Gapan-San Fernando-Olongapo (GSO) Road and Emergency Dredging Project , Phase I - Additional Works
(Asphalt Overlay of City of San Fernando-GSO Road; Construction of Pedestrian Overpass and Installation of Three Traffic Lights)
Province : Pampanga/Bataan/City of San Fernando Sectors /Sub-Sectors : Infrastructure Support /Transportation/ Roads and Bridges Executing Agency : Department of Public Works and Highways PROJECT CONTRACT DETAILS:
Funding Source : Original Scope : Economic Development Cooperation Fund (Korea)
Loan Code : PHL-8 Loan Effectivity : 27 March 2006 Closing Date : 27 March 2012
Additional Works : GOP Implementation Schedule : REVISED
Original project Date Started : 16 October 2008
Target Completion : 15 October 2010 December 2011
Additional Works : Date Started : January 4, 2012 Target Completion : July 31, 2012 Total Project Cost (PhP Million): 1,566.86 (Original) 1,650.22 (Includes cost
of additional works of PhP83.365 million to be taken from GOP)
(PhP 62.518* M from 2011 GAA-DPWH Regular Infra Projects)
*contract cost
Beneficiaries : Transport Sector in Region III (City of San Fernando,
Bacolor, Guagua, Sta. Rita, Lubao, Sasmuan and Olongapo)
Objective(s) : The project aims to achieve the following:
Address the inundation problem being experienced in the Municipalities of Lubao, Guagua and Sasmuan;
Ensure that transportation routes can be maintained during flooding; and,
Ease traffic congestion in the GSO Road (now Jose Abad Santos Avenue [JASA]) from Dolores, San Fernando City to Sta. Cruz ,Lubao.
Additional works upon completion will lessen vehicular accidents along GSO-City of San Fernando area
Description : The project has the following major components:
Component 1. Widening of Gapan-San Fernando-Olongapo (GSO) Road. This includes the widening of 20 km existing 2-lanes road to 4-lanes road composing of alternate Portland Cement Concrete Pavement (PCCP) and Asphalt Concrete Pavement (ACP). It also includes construction and improvement of drainage and Slope Protection Structures; and construction of miscellaneous structures.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 64 of 96
STATUS OF IMPLEMENTATION [As of 25 December 2012]
A. Overall Assessment
All components (1, 2, and 3) under the original scope of works of the project were completed and about 100 percent of the total project cost was utilized. Additional works of the project was 98.50 percent accomplished. These should have been completed on September 29, 2012. All construction operations were temporary suspended since September 20, 2012 due to the need to relocate the power lines and utility cables affected by the pedestrian overpass. Overall Performance (Cumulative)
A.1 Physical Accomplishment (Original scope of works)
I Civil Works 1,198.64 0.85 15.80 km. 15.80 15.80 - 13.46 13.46 - 100.00
Widening/Reconstruction of GSO
Road 634.30 0.53 15.80 15.80 - 8.36 8.36 - 100.00
Construction of Sta. Cruz Bridge458.13 0.38
2 units2.00 2.00 - 0.76 0.76 - 100.00
Dredging of Porac-Gumain Riv er106.21 0.09
800.79 cu.m800.79 800.79 - 70.96 70.96 - 100.00
II Consultancy Services 111.01 0.08 486.410 486.41 486.41 - 38.39 38.39 100.00
III Right of Way 97.00 0.07 100.00 100.00 - 6.90 6.90 100.00
1,406.65 1.00 51.85 51.85 - 100.00
COMPONENTCOST (PhP
million)WEIGHT INDICATOR
Note: *Excludes Adm. Cost, Contingencies, Service charge amounting to PhP 158.07M
PERFORMANCETARGET ACTUAL TARGET ACTUAL
ACCOMPLISHMENT (%) WEIGHTED INDICATOR
SLIPPAGE/
VARIANCE
SLIPPAGE/
VARIANCE
(8)=(5)x (3) (9)=(6)x (3) (10)=(9)-(8) (11)=(9/8)x100
TOTAL*
(1) (2) (3)= (2)/Total (4) (5) (6) (7)=(6)-(5)
Component 2. Reconstruction of Sta. Cruz Bridge 1. Demolition of existing 2-lanes, 8-span PC Bridge and Construction of new 4-lane PC Girder Bridges, L=280 m. Component 3. Dredging of Porac-Gumain River. Dredging and channel improvement of 8 km in length, 100 m in width and 2 m maximum in depth; construction and improvement of embankment protection; and construction of miscellaneous structures. Additional Works – Asphalt overlay of 3.5 km. GSO Road; Construction of a 58 lm. Pedestrian Overpass and Installation of Three (3) Traffic Signal Lights
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 65 of 96
A.2 Financial Performance
TOTAL 1,465.07 1,308.93 154.86 1,463.79 99.91
I Civil Works* 1,198.64 1,134.20 64.44 1,198.64 100.00
Widening/Reconstruction of GSO
Road 693.13 631.92 61.21 693.13 100.00
Raising of Sta. Cruz Bridge 405.08 401.85 3.23 405.08 100.00
Dredging of Porac-Gumain River 100.43 100.43 100.43 100.00
II Consultancy Services* 111.01 109.61 1.40 111.01 100.00
III Right-Of-Way Acquisition* 97.00 13.60 83.40 97.00 100.00
III Admininistrative Cost 58.42 51.52 5.62 57.14 97.81
(5)=(3)+(4) (6)=5/2 x 100
COMPONENTCOST
(PhPmillion)
EXPENDITURE EXPENDITURE
RATE /
ABSORPTIVE
CAPACITYDISBURSEMENT
UNPAID
OBLIGATIONTOTAL
(1) (2) (3) (4)
*ROWA – land owners have not yet submitted documentary requirements needed for their claims.
E. Immediate/Expected Results
INDICATOR BEFORE PROJECT DURING/AFTER PROJECT
Travel time saving 45 minutes 15 minutes (PhP35.82M/year)
Road capacity 10,000 vehicles/day 35,000 vehicles/day
Road widening/Old bridge reconstruction
Narrow road/bridge in Sta. Cruz, Lubao (P)
Bridge widened by 19 meters in width and 263 linear meters in length; 4 lanes/18 km. road widened
Dredging of river Silted Porac-Gumain river causing destructive floods
800,785.54 cu.meter of lahar sediments dredged
B. Project Implementation Concerns
ISSUES/CONCERNS ACTION TAKEN RECOMMENDATION
Suspended due to
unrelocated power line
Issued suspension order Suspend activities until site
is workable
D. Employment Generated
For the whole project duration (man-days) : 1,424,418
For additional works : 56,834.54
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 66 of 96
Gapan-San Fernando-Olongapo Road Project, Phase II (a.k.a. GSO II)
Location : Pampanga and Bataan Sectors /Sub-Sectors : Infrastructure Support /Transportation/ Roads and Bridges Executing Agency : Department of Public Works and Highways PROJECT CONTRACT DETAILS:
Funding Source : Economic Development Cooperation Fund (Korea) Loan Code : PHL-10 Loan Effectivity : 20 October 2009 Closing Date : 20 April 2014 Implementation Schedule Target Start : 14 February 2012 Target Completion : 13 October 2014 Total Project Cost (PhP Million): Original : 2,057.960 With Lubao Bypass 2,222.031
Additional Works Date Started : February 14, 2012 Target Completion : October 30, 2014
Contract Cost : 691.42
Beneficiaries : Transport Sector in Region III and population of Pampanga Objective(s) : The project aims the following:
To reduce transportation constraints on the existing road, include economic development in the area and promote the achievement of the development objectives being pursued in the Central Luzon Region; and,
To provide safer, convenient and faster travel for motorists coming from the south and north of the project area to various tourist and business destinations in Olongapo, Zambales and Bataan.
Description : The project covers the following components :
a) widening of the existing 11.30 km road from 2-lane to 4-lane and from Sta. Cruz to Hermosa, including the new construction of eight (8) new bridges: (Pampanga Section 1) Palcarangan Bridge; 2) Manapu Bridge; 3) San Isidro Bridge; 4) Prado Bridge; Bataan Section 5) Balsik Bridge; 6) Layac 1 Bridge; 7) Layac 2 Bridge; and 8) Layac 3 Bridge).
b) Improvement of existing 6-lane – 14-lane road of 1.72km from NLEX Rotonda to Dolores Fly-Over in the City of San Fernando, Pampanga; and
c) Asphalt concrete overlay and improvement of shoulders on the existing 2-lane road of 3.02km from Layac Junction to Dinalupihan, Bataan including the replacement and widening of two (2) bridges (DilaDila and Tabacan) from two to four lanes.
(Target completion is six (6) months beyond loan closing date. This needs
ICC notation)
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 67 of 96
STATUS OF IMPLEMENTATION [As of 25 December 2012]
Overall Assessment The project was 17.64 percent accomplished and about 19.22 percent of the total cost was utilized. The Lubao Bypass is 100 percent completed using purely GOP funds implemented by DPWH Region III.
A. Physical Accomplishment
TARGET ACTUALS LI P P AGE/
VARI ANCETARGET
ACTUAL
ACCOM P .
S LI P P AGE/
VARI ANCE
(2) (3)=(2)/ TOTAL (4) (5) (6) (7)=(6)-(5) (8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8) (11) = (9) / (8) X 100
TOTAL* 1,758.04 1.00 17.15 17.64 - 102.82
Civil Works 691.42 - - -
Roads 569.06 0.32 16.04km 44.20 45.70 -1.50 14.31 14.79 0.48 103.39
Bridges 122.36 0.07 228.5lm
Lubao Bypass (Completed
Usinfg local funds) 408.44
RROW 200.63 0.11 lots &
Improvements
Consultancy 123.28 0.07 53 months 40.57 40.57 0.00 2.84 2.84 100.00
742.71 0.42
*Excludes Lubao Bypass
Others
PERFORMANCE
ACCOMPLISHMENT WEIGHTED INDICATOR
COMPONENT COST (in M PhP) WEIGHTOUTPUT
INDICATOR*
A. 2 Financial Performance
DISBURSEMENTUNPAID
OBLIGATIONSTOTAL
EXPENDITURES RATE/
ABSORPTIVE CAPACITY (%)
(1) (2) (3) (4) (5) = (3) + (4) (6) = (5) / (2) * 100
TOTAL*1,813.635 327.006 21.600 348.606 19.22
1. Civil Works (CW) 691.420 185.318 19.600 204.918 29.64
2. RROW 200.628 64.153 0.000 64.153 31.98
3. Consultancy Services 123.280 50.616 2.000 52.616 42.68
4. M anagement Cost 55.600 26.919 0.000 26.919 48.42
5. Others (PA/PE, VO, SA, SAA) 742.707 - - -
6. Lubao Bypass (Completed
Using local funds) 408.438 408.438 0.000 408.438 100.00
*Excludes Lubao Bypass Construction
COMPONENT COST (PM)
EXPENDITURE
B. Project Implementation Concerns
ISSUES/CONCERNS ACTION TAKEN RECOMMENDATION
Unpaid RROW acquisition due to claimant’s lack of requirements and disagreements by some opposing individuals, such as, Environmentalists that were opposing the cutting of trees and businessman that believed their business’ interest could be affected in the implementation of the project.
Coordinates with the concerned parties (e.g. ESSO, Family affected Persons, RDO, DEO etc.)
KEDCF-PMO sent letters regarding ROW acquisition and conducted meetings with affected utility companies.
Employment Generated (Estimated)
For the whole project duration (man-days) : 2,019,211 As of reporting period (man-days) : 396,750
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 68 of 96
PROGRESS PHOTOGRAPHS
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 69 of 96
Road Upgrading and Preservation Project (RUPP) (Remaining Sections of Bongabon-Baler Road-JICA Loan Agreement No. PH-P247)
Province/s : Aurora and Nueva Ecija Sector/Sub-Sector : Infrastructure Support /Transportation Executing Agency : Department of Public Works and Highways (DPWH), Philippine
Japan Highway Loan – Project Management Office (DPWH, PJHL-PMO)
PROJECT CONTRACT DETAILS:
Brief Background on Bongabon-Baler Road Improvement Project: Bongabon-Baler Road Improvement Project in Central Luzon traverses the provinces of Nueva Ecija, Nueva Viscaya and Aurora Provinces. It was originally under the Arterial Road Links Dev’t. Project III, under JBIC Yen Loan Agreement No. PH- P188. It consists of four (4) packages, namely:
CP SECTION SCOPE OF WORKS
I Bongabon-Rizal-Pantabangan PCCP length = 14.76 kms (includes Rizal town bypass=4.0 kms) No. of bridges= 5 (3 new, 2 repair)
II Pantabangan-Canili (Completed in June 2011 except the 6.5 km Bypass)
PCCP length =31.36 kms. (includes Canili Dam bypass=6.5 kms) No. of bridges =5 (4 new, 1 repair)
III Canili-Bazal PCCP length = 26.52 kms. (includes Ma. Aurora bypass = 4.0kms
IV Bazal-Ma. Aurora-San Luis (completed in 2006)
PCCP length = 10.95 kms., No. of bridges =5 (3 new, 2 repair)
Funding Source : JICA Loan Code : PHL 247 Implementation Schedule
Target Start Date : May 2013 Target Completion : November 2015
Total Project Cost (PhP Million) : 459.70
166.90 (CP1) 292.80 (CP2)
Beneficiaries : People within the project area, as well as businessmen, tourist and local travelers
Objective(s) : The project intends to promote better movement of goods,
services and people between Baler, Aurora and Nueva Ecija and fill the remaining unimplemented sections of Bongabon-Baler Road.
Description : This is composed of two sections, namely: Bongabon-
Rizal-Pantabangan and Canili-Bazal Sections with a road length of 29.90 km and 24.08 km (with exceptions), respectively. Scope of work is as follows:
Earthworks (roadway embankment and aggregate sub-base course;
Construction of new PCCP, (2.64 km)
Construction and widening of six (6) bridges - Construction of 2 bridges, NL=88.6 l.m. - Widening of 4 bridges, NL=105.5 l.m.
Drainage structures & slope protection works
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 70 of 96
CPs II (Pantabangan-Canili) and IV (Bazal-Ma. Aurora-San Luis) were completed in 2011 and 2006 respectively, except for the 6.5 km Bypass under CP II which remained unfunded. CP II was funded under the Local Strategic Project (SONA) while CP IV, JBIC Loan. The remaining two sections, CP1- Bongabon-Rizal-Pantabangan (Section 1) and CP3- Canili-Basal Junction (Section 3) as shown in Bongabon-Baler Road Map, are funded under RUPP.
STATUS OF IMPLEMENTATION [As of 25 December 2012)
Overall Assessment Construction Plans was already approved on 13 December 2012 by DPWH-Bureau of Design. The project was already advertized for bidding and project site visit was already conducted on 15 January 2013. Issuance of PQ and Bidding Documents is 0n-going. Bidding is scheduled on 11 April 2013. Pre-construction activities like review and evaluation of the Detailed Engineering and Design (DD) documents by Katahira Engineers Consultants Inc. are on-going. Major works to be undertaken are as follows:
Section Total Length
(Km) Total Cost (PhP M)
Major Works
Total 41.28 459.70
CP 1 (Bongabon-Rizal-Pantabangan)
14.76 166.90 Earthworks, road embankment and
aggregate sub base course/construction of
new PCCP/Slope protection
works/improvement of drainage/construction
of 2 bridges and widening of 4 bridges
CP 3 (Canili-Basal Section)
26.52 292.80
Estimated Employment To be Generated (Man-days):
Whole Project Duration 494,301
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 71 of 96
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 72 of 96
Spanish-Assisted DPWH Bridge Construction and Replacement Project Contract Package (CP) 3
Province : Aurora, Nueva Ecija and Zambales Sector/Sub-Sector : Infrastructure Support /Transportation/ Roads and Bridges Executing Agency : Department of Public Works and Highways (DPWH) – PMO for Special
Bridge Projects PROJECT DETAILS:
ORIGINAL REVISED Location : Baler and Casiguran in Aurora; Bongabon, Nueva Ecija
and Iba, Zambales Funding Source : Spain Implementation Schedule Date Started : 05 January 2012 Target Completion : 4 July 2013 05 September 2013 Total Project Cost (PhP Million): 222.47 (updated project cost as of 4
th qtr. 2011)
Beneficiaries : Communities within the bridges’ influence areas. Objective(s) : To provide structurally sound permanent bridges along
national roads and contribute to the development of the local economy by securing safe, smooth, and reliable traffic network in the rural areas.
Description: The project involves the construction/replacement of 91 new and temporary weakened bridges nationwide with a length of 3,670 lm using modular steel bridging technology readily usable from Spain with standard span lengths of 20, 25, 30, 35, 40, 45, 50, 55 and 60 lm. In Region III, six bridges were included in the project and will be implemented under contract package (CP) 3, to wit:
Name of Bridge/s
Location
Total Length (l.m.)
Scope of Works
Total Project
Cost (PhP M)
Contract Duration
(Jan. 2012-July 2013)
TOTAL 222.47
1. Dicaloyungan Bridge
Baler, Aurora
45 Construction of substructure consisting of two (2) concrete abutments all supported by spread footing/bored/pre-cast piles foundation; assembly/erection of one (1) steel truss/girder (Centunion Modular Steel Truss Type Bridge); construction of approaches/intersections, including road surfacing; bridge deck slab; drainage and slope protection works and other appurtenant structures.
34.572 20 months
2. Montay Bridge Casiguran
, Aurora 50 46.003 12 months
3. Minanga Bridge
Casiguran, Aurora
45 48.600 12 months
4. Simbahan Bridge
Casiguran, Aurora
25 21.464 9 months
5. Bangan-Talinga Bridge
Iba, Zambales
20 45.368 9 months
6. Vega 2 Bridge Bongabon
, Nueva Ecija
35 26.463 10 months
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 73 of 96
STATUS OF IMPLEMENTATION [As of December 2012] Overall Assessment
The six bridges were packaged under Contract Package 3 (CP3). Contract effectivity was issued on 05 January 2012. The DPWH Regional Office and PMO notified the contractor, OR Sarmiento/Revere Construction to submit a catch-up plan to overcome negative slippage of Dicaloyungan, Montay and Minanga bridges. The contractor has intensified their construction resources on site and worked overtime to overcome negative slippage. The other three bridges (Simbahan, Bangan-Talinga and Vega2) were ahead of schedule. The overall physical accomplishment was 48.48 percent with fund utilization rate of 33.01 percent.
*Construction was started ahead of schedule, no physical target reported
A.2 Financial Performance
222,470 73,432.00 73,432.00 33.01
1 Dicaloyungan Bridge 34,572 13,359.00 13,359.00 38.64
2 Montay Bridge 46,003 16,340.00 16,340.00 35.52
3 Minanga Bridge 48,600 8,442.00 8,442.00 17.37
4 Simbahan Bridge 21,464 9,414.00 9,414.00 43.86
5 Bangan Talinga Bridge 45,368 6,805.00 6,805.00 15.00
6 Vega 2 Bridge 26,463 19,072.00 19,072.00 72.07
(5)=(3)+(4) (6)=5/2 x 100
COMPONENTCOST (PhP
million)
EXPENDITURE EXPENDITURE
RATE /
ABSORPTIVE
CAPACITY
DISBURSEMENTUNPAID
OBLIGATIONTOTAL
(1) (2) (3) (4)
TOTAL/OVERALL
Problem Implementation Concerns: ISSUES/PROBLEMS PREVENTIVE MEASURES
Right of way problem. Bad weather.
Negotiation with the affected landowner is underway. Closed coordination of PMO and all concerned.
B. Immediate Results: INDICATOR BEFORE PROJECT DURING/AFTER PROJECT
Poor bridge condition; road accidents/loss of lives
Increasing incidence of road accidents resulting to loss of lives due to poor bridge condition
Decrease in road accidents due to improved traffic, safety and accessibility along the road network.
High cost of transport expenses and vehicle operating costs; traffic, congestion resulting to delays in the delivery of products
More savings in transport and vehicle operating costs through reduced travel time/routes.
Estimated Employment Generated: For the whole project duration (mandays): 202,245
A. Overall Performance
A.1 Physical Accomplishment
TOTAL 222,470 1.00 58.72 48.48 (10.23)
I Dicaloy ungan
Bridge
34,572 0.16 98.64 59.00 (39.64) 15.33 9.17 (6.16)
II Montay Bridge 46,003 0.21 87.04 60.51 (26.53) 18.00 12.51 (5.49)
III Minanga Bridge 48,600 0.22 64.54 47.22 (17.32) 14.10 10.32 (3.78)
IV Simbahan Bridge 21,464 0.10 49.85 58.55 8.70 4.81 5.65 0.84
V Bangan Talinga
Bridge*
45,368 0.20 - 5.50 5.50 - 1.122 1.12
VI Vega Bridge 2 26,463 0.12 54.49 81.68 27.19 6.48 9.72 3.23
(8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8) (11)=(9/8)x100(1) (2)(3)=
(2)/Total(4) (5) (6) (7)=(6)-(5)
PER FOR M A N C ETARGET ACTUAL TARGET ACTUAL
W EIGHTED IN D IC A TOR
S LI P P AGE/
VARI ANCE
C OM PON EN T C OST ( PhPmill ion) W EIGHT IN D IC A TOR
A C C OM PLISHM EN T ( %)
S LI P P AGE/
VARI ANCE
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 74 of 96
NorthRail2 Project, Phase I Section 1
Province : Caloocan City to Malolos City, Bulacan Sector/Sub-Sector : Infrastructure Support/Transportation/Railways Executing Agency : North Luzon Railways Corporation (NORTHRAIL) PROJECT CONTRACT DETAILS: ii
*Based on the Amended Contract
STATUS OF IMPLEMENTATION [As of December 2012]
Overall Assessment
The project was suspended in 2011 to allow Northrail and Sinomach resolve the issues affecting the project. For a significant time, it remained unresolved and eventually terminated. It is now under negotiation. A JICA Study Team is currently conducting a feasibility study for an Airport Express Rail between Metro Manila and Clark International Airport, to be completed by March 2013.
The project remained 22.94 percent accomplished as of June 2012 and about 36.48 percent of the total project cost was utilized.
2 The NorthRail Project Phase 1 is a 76.07 km (original length is 82.12 km) double track standard gauge railway running along the old PNR Right-
Of-Way. It is divided into two (2) sections: (i) Caloocan to Malolos; and (ii) Malolos to Clark Freeport Zone.
ORIGINAL REVISED (if any) Funding Source : China Exim Bank Loan Effectivity : 13 September 2004 29 September 2009 Closing Date : 12 September 2009 : 31 December 2012 Implementation Schedule (Section 1) Date Started : 13 September 2004 : Amended Contract signed
29 September 2009
Target Completion : 25 February 2010 : 30 June 2012* Total Project Cost (PhP Million): 22,169 : 28,916
(USD 602.42 million*) Beneficiaries : Residents and commuters coming from Caloocan,
Valenzuela and Malabon in Metro Manila, Meycauyan, Marilao, Bocaue, Balagtas, Guiguinto and Malolos in Bulacan.
Objective(s) : The project aims to attain the following:
Provide fast and reliable mass transport services for passengers and goods between Metro Manila and Central Luzon;
Accelerate socio-economic development in the Manila / Central Luzon growth corridor area; and,
Decongestion of traffic in Metro Manila population to the north.
Description : Section 1 of NORTHRAIL has a length of 31.938* railway
line that starts from Caloocan City to Malolos City, Bulacan. The Scope of Works includes execution and submission of complete design, construction, supply and installation of civil works, communications, signaling, power supply, buildings, stations, ticketing system, depot, main track & supply, and initial operation of Diesel-powered Multiple Units (DMU).
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 75 of 96
Reasons for achieving less than the physical targets:
The contract between NORTHRAIL and SINOMACH was first SUSPENDED for 2 months from March 28, 2011 to May 27, 2011 to allow both parties the opportunity to resolve the issues and problems affecting the project (i.e. slow progress of contractor, contractual issues, etc.). Further, the work suspension was continued on August 8, 2011 and extended indefinitely until both parties could find the solutions to the problems;
NORTHRAIL Management was focused on the inventory of SINOMACH accomplishments. Moreover, requested COA to conduct a special audit from September 2011 to March 2012.
A. Overall Performance (Cumulative)
A.1. Physical Accomplishment
Note: Project Cost excludes Project Management, Contingency and Other Costs.
A.2 Financial Performance
1 Pre-Construction Surv ey 2,388.51 1,641.19 13.65 1,654.84 69.28
2 Civ il and Trackworks 20,009.42 6,551.67 150.50 6,702.17 33.50
3 Signaling and Communications 1,881.53 446.03 - 446.03 23.71
4 Rolling Stocks 1,605.12 378.35 - 378.35 23.57
5
ROW Expenses and Public Utilities
Diversion 1,321.92 1,065.15 1,065.15 80.58
6 Project Management 409.92 279.39 - 279.39 68.16
7 Contingency / Others 1,299.75 23.47 - 23.47 1.81
28,916.17 10,385.25 164.15 10,549.40 36.48 TOTAL / OVERALL
(1) (2) (3) (4) (5)=(3)+(4) (6)=5/2 x 100
COMPONENTCOST (PhP
million)
EXPENDITURE EXPENDITURE
RATE /
ABSORPTIVE
CAPACITY
DISBURSEMENTUNPAID
OBLIGATIONTOTAL
* Conversion rate USD 1.00 = PHP 48.00
I Pre-Construction
Surv ey
2,388.509 0.08 Complete Survey, site Geo-
technical Invest igat ions, and
tests result ing in the
submission of the Preliminary
and Detailed Design
100.00 84.52 (15.48) 8.38 7.08 (1.30) 84.52
II Civ il and
Trackw orks
20,009.424 0.70 Complet ion of all civil and
track works, construct ion of
stat ion buildings, maintenance
depot and viaducts and river
bridges.
93.66 17.32 (76.34) 65.74 12.16 (53.59) 18.49
III Signaling and
Communications
1,881.533 0.07 Complete installat ion of the
railway system's signaling,
communicat ions, power
supply, electro-mechanical,
and t icket ing systems.
30.45 - (30.45) 2.01 - (2.01) 0.00
IV Rolling Stocks 1,605.120 0.06 Complete delivery of all t rain
coaches, motors, spare parts,
and other auxilliary equipment
for the train coaches.
22.38 - (22.38) 1.26 - (1.26) 0.00
V ROW Ex penses
and Public Utilities
Div ersion
1,321.920 0.05 Complete removal or
diversion of all ut ilit ies
affected by the project,
complete purchase of the
required addit ional right of
way (ROWA) for civil and
track works, complete
clearing of the right of way
from informal sett lers and all
obstruct ions.
100.00 79.64 (20.36) 4.64 3.69 (0.94) 79.64
VI Contingency /
Others
1,299.750 0.05 78.50 - (78.50) 3.58 - (3.58) 0.00
28,506.256 1.00 - 85.61 22.93 (62.68) 26.79
(8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8) (11)=(9/8)x100
TOTAL
(1) (2)(3)=
(2)/Total(4) (5) (6) (7)=(6)-(5)
PER FOR M A N C ETARGET ACTUAL TARGET ACTUAL
W EIGHTED IN D IC A TOR
S LI P P AGE/
VARI ANCE
C OM PON EN TC OST
( PhPmill ion)W EIGHT IN D IC A TOR
A C C OM PLISHM EN T ( %)
S LI P P AGE/
VARI ANCE
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 76 of 96
C. Project Implementation Concerns:
ISSUES AND PROBLEMS
PREVENTIVE MEASURES RECOMMENDATIONS
Project Delayed / Contract Suspension
NORTHRAIL requested SINOMACH to submit work plans based on the terms and conditions of the Original Contract.
NORTHRAIL requested COA to conduct special audit of the project.
NORTHRAIL Reduced manpower from 161 to 70 personnel last November 1, 2011.
NORTHRAIL reduced office space in St. Agatha Office (Guiguinto, Bulacan) from 2,100 sq.m to 1,400 sq.m in September 2011.
Termination of the Contract due to suspension of contract works.
Proposed Airport Express railway configuration to connect Metro Manila and Clark International Airport
NORTHRAIL and DOTC started discussions with JICA for the conduct of the Feasibility Study for the Airport Express. JICA is expected to commence work by March 2012. Estimated duration of the Feasibility Study is one year.
Reviewed Terms of Reference in case the conduct of Feasibility Study is by administration.
Feasibility Study for the Airport Express Railway Project must be completed immediately.
Closure of the PMST Contract with incomplete turn-over of deliverables.
Evaluation of the accomplishment of SES-JV as per contract and terms of reference (TOR) will be completed by March 2012.
Unfinished structures at the project construction site may face deterioration.
Provided rust protection on exposed re-bars of incomplete structure
Regular rust protection maintenance.
D. Immediate Results:
Indicator Before Project During / After Project
Travel Time Unpredictable travel time and out-of-vehicle waiting time.
Users of the rail service are expected to have a decrease in travel time by an average of 30 mins. (Caloocan-Malolos).
Travel Cost
Varies depending on trip origin and destination.
The diversion of passengers from road to rail is expected to reduce road congestion along the road corridor, resulting in higher speed, and fewer stops thereby lowering vehicle operating, repair and maintenance costs.
Urban Development Development is constrained by accessibility index derived from road network.
The project brings improvement in the feasibility studies of other projects along the NORTHRAIL corridor. Example: Food exchange program of Bulacan; Development of abandoned PNR stations and surrounding areas; etc.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 77 of 96
Indicator Before Project During / After Project
Investment opportunities for the private sector through NORTHRAIL’s business development and privatization
Private entities have shown interest to invest in the development of the various NORTHRAIL stations, rolling stock, and Operations and Maintenance (O&M).
Socialized housing for informal settlers relocated from the PNR right-of-way
Informal settlers are living in a poor and neglected living environment.
Informal settlers are provided by the NHA with permanent housing at Northville 1 to Northville 16 relocation sites.
Income generation for business establishments along the project site areas with ongoing construction.
Increase in income of existing businesses. New small businesses have opened to cater to the needs of the project and its workers along various work sites.
Increased sales in the local construction industry
Majority of construction materials are sourced locally.
Employment
Site clearing, post demolition and other site preparatory activities in 15 municipalities are being implemented by LGUs (by MOA and by administration) utilizing local labor.
Direct and indirect employment opportunities for residents along the NORTHRAIL corridor.
D. Employment Generated
For the whole project duration (man-days) : 26,287,427
As of reporting period (man-days) : work suspended
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 78 of 96
Pinatubo Hazard Urgent Mitigation Project (PHUMP), Phase III
Province : Pampanga Sector/Sub-Sector : Infrastructure Support /Water Resources/Flood Control Executing Agency : Department of Public Works and Highways (DPWH) Mt. Pinatubo Emergency – Project Management Office (MPE-PMO) PROJECT CONTRACT DETAILS:
STATUS OF IMPLEMENTATION [As of 25 December 2013]
Overall Assessment
ORIGINAL REVISED (Proposed) Funding Source : Japan International Cooperation Agency (JICA) Loan Code : PH-P241
Loan Effectivity : 15 April 2008 Closing Date : 17 April 2015
Implementation Schedule Date Started : 15 April 2008 03 November 2008(DD) Target Completion : March 2013 15 April 2015 (CW)
Total Project Cost (PhP Million) : 4,698.80 5,285.67* (ICC-Approved Revised Cost)
*updated cost as of March 2012 Beneficiaries : City of San Fernando, Lubao, Guagua, Sasmuan, Bacolor
and other adjacent towns Objective(s) : The project aims to achieve the following:
Protect life and minimize damages to properties from perennial flooding;
Improve drainage efficiency of the river channel network;
Formulate integrated plan for a comprehensive non-structural measure and conduct institutional capability building.
Description: The project consists of two parts, with details as follows: PART I. Detailed Engineering Design, Preconstruction and Construction Supervision of Flood/Mudflow Control Works for Porac-Gumain River basin in Pasac Delta and City of San Fernando. Contract Packages (CP) under this part are the following:
CP 1 Excavation/Dredging of Local Drainage Channels; CP2 Lower Porac-Gumain River Diversion Channel; CP3 City of San Fernando Flood Control Works
3A. San Fernando River 3B. Outlet Channels and Bridges
CP4 Excavation / Dredging of Major Rivers; CP5 Raising of Roads and Construction of New Bridges; and CP6 Flood Mitigation Works in Guagua, Pampanga CP7 Excavation/Dredging of Local Drainage Channels, Road Raising and Construction
of Bridges PART II.Monitoring and Planning of Non-Structural Measures and Institutional Capability Building (ICaB).This will be carried out to undertake the following tasks:
1) Formulation of Watershed Management Plan; 2) Formulation of Disaster Preparedness and Flood Management Plan including
Flood Forecasting and Warning System (FFWS); and, 3) Formulation of Land Use Management Plan.
Note: The ICaB will be conducted simultaneously with the implementation of Monitoring and Planning of Non-structural Measures and Flood / Mudflow Control Works in Part 1 r to strengthen the technical, managerial, evaluation and monitoring capability of concerned government agencies, LGUs, NGOs and stakeholders in the field of flood and watershed management.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 79 of 96
The project was 86.23 percent accomplished and about 90.61 percent of the total project cost was utilized. Four (4) contract packages CP2, CP3A, CP3B and CP6 were already completed, two on-going (CP4 & CP5) and another two (CP 1 & 7) pre-construction stage. Overall Performance (Cumulative) A.1Physical Accomplishment
5,044.00 1.00 77.42 86.23 8.81
1 Civil Works 3,992.77 0.79 67.64 67.47 (0.17) 99.75
CP1
Excavation /
Dredging of Local
Drainage Channels
146.77 0.03
CP2
Lower Porac -
Gumain River
Diversion Channel
1,667.80 0.33
6.7 km
road;4.88 dike
restored
100 100 - 33.07 33.07 - 100.00
CP3A
City of San
Fernando (SF)
Flood Control Works
- SF River
168.66 0.03 5.2 km river
improved100 100 - 3.34 3.34 - 100.00
CP3BOutlet Channels and
Bridges509.09 0.10
8.4 km channel
improvement,
106 km cut off
channel; 177 m
bridges
88.02 88.08 0.06 8.88 8.89 0.01 100.07
CP4
Excavation /
Dredging of Major
Rivers
923.15 0.18 16.97 km 100 99.86 (0.14) 18.30 18.28 (0.03) 99.86
CP5
Raising of Roads
and Construction of
New Bridges
45.22 0.01
1.1 km road
section raised,
2.4 km side
drainage
16.70 11.66 -5.04 0.14971729
CP6
Flood Mitigation
Works in Guagua,
Pampanga
196.28 0.04
1.6 km river
improved,
32 l-m bridge
constructed, 179
km road
improved
100 100 - 3.89 3.89 - 100.00
CP7
Excavation/Dredgin
g of Local Drainage
Channels Road
Raising and
Construction of
Bridges
335.80 0.07
2 Consultancy 496.97 0.10
1,339.6 man-
months 91.53 89.49 (2.04) 9.02 8.82 (0.20) 97.77
3 Land Acquisition 554.26 0.11 696 lots 89.00 90.50 1.50 9.78 9.94 0.16 101.69
4 Administrative Cost 170.00 0.03 92.00 82.00 (10.00) 3.10 2.76 (0.34) 89.13
427.58 0.005 100.00 100.00
0.55 0.55 - 100.00
Physical and Price
Contingencies
CONTRACT PACKAGE /
COMPONENTS
COST*
(PhPmillion)WEIGHT
OUTPUT
INDICATOR
PERFORMA
NCETARGET ACTUAL TARGET ACTUAL
ACCOMPLISHMENT (%) WEIGHTED INDICATOR
SLIPPAGE /
VARIANCE
SLIPPAGE/
VARIANCE
Winning Bidder (Tokwing Construction Corporation)
Pre qualification of contractors completed. PQ Resolution was concurred by JICA on December 20,2012. Issuance of
Bid documents to prequalified contractors is scheduled in January 2013.
TOTAL
(8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8) (11)=(9/8)x100(1) (2)(3)=
(2)/Total(4) (5) (6) (7)=(6)-(5)
*Proposed Updated Cost (Civil Works for funding out of loan proceeds) Note: Land Acquisition accomplishment was reduced to 90.50% due to the additional number of affected lots under Contract Package I
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 80 of 96
A.2 Financial Performance
Civ il Works 4,009.660 2,982.062 684.202 3,666.264 91.44
Consultancy Serv ices 496.970 434.748 20.552 455.300 91.62
Land Acquisition 554.260 289.267 183.033 472.300 85.21
Administration Cost 170.000 119.945 9.805 129.750 76.32
Contingency 27.580 28.630 12.290 40.920 148.37
5,258.470 3,854.652 909.882 4,764.534 90.61
*Proposed Updated Cost
(5)=(3)+(4) (6)=5/2 x 100
COMPONENTCOST*
(PhPmillion)
EXPENDITURE EXPENDITURE
RATE /
ABSORPTIVE
CAPACITYDISBURSEMENT
UNPAID
OBLIGATIONTOTAL
TOTAL
(1) (2) (3) (4)
B. Project Implementation Concerns
ISSUES/CONCERNS ACTION TAKEN RECOMMENDATION
Delayed ICC Approval of the request for Change in Scope and Increase in Cost of because of the inability of the proponent to provide adequate justification.
ICC resorted to the conduct of an ad referendum to facilitate approval.
Proponent went ahead with the preparation of bid documents
C. Immediate Results
INDICATOR BEFORE PROJECT DURING / AFTER
PROJECT
Properties (infrastructure and buildings)
PhP 392.42 million / year
Agri-production PhP319.18 million/year
6,549 tons of rice 2,214 tons of fish
Income losses
PhP 4,199 per person/year
D. Employment Generated
D.1 For the whole project duration (man-days) : 5,285,670 D.2 As of reporting period (man-days) : 3,583,211
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 81 of 96
PROGRESS PHOTOGRAPHS
CP 2: Manual Slope Trimming prior to Riprapping
CP 5: Concrete Pouring of Line Canal
CP 5: Breaking and Removal of Existing Canal
CP 3B: Concrete Pouring along Approach A
side at Del Pilar Bridge Slab
CP 2: Riprapping Works
CP 3B: Concrete Pouring along Approach B side at Del Pilar Bridge Slab
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 82 of 96
Post Ondoy and Pepeng Short Term Infrastructure Rehabilitation Project (POPSTIRP)
Location : Regionwide Sector/Sub-Sector : Infrastructure Flood Control/Roads and Bridges Executing Agency : Department of Public Works and Highways PROJECT DETAILS:
STATUS OF IMPLEMENTATION [As of December 2012] Overall Assessment Flood Control Component: The project was 91.14 percent accomplished and about 75.75 percent of the project cost was utilized. It is behind schedule by 8.86 percentage points. The budget utilized is less than the target because some contractors have yet to submit their billings, and works on some projects was suspended due to unworkable site condition and awaiting approval of variation order or time extension. Roads and Bridges Component: During the third quarter report, the Roads and Bridges Component (Pampanga Province) clustered as RB9 of the project was 72.41 percent accomplished and about 85.47 percent of the project cost was utilized. To date, the subproject (Baliwag Candaba, Sta. Ana Rd.) with actual weighted accomplishment of 6.87 percent was terminated. A mutual termination was approved and a joint inventory from COA Central Office and QAU Regional and Central Office was conducted on 21-25 January 2013.
REGION III COMPONENT Funding Source : JICA, PHP-246 Implementation Schedule Date Started : 09 March 2011 Target Completion : 20 February 2012 revised: November 16, 2012 Total Project Cost (PhP In Million) : 327.66 (Flood Control Component) 341.90 (Roads and Bridges Component)
Beneficiaries : Areas affected by Typhoon Ondoy and tropical storm
Pepeng. Objective(s) : To provide protection from further damages and restore
access to various socio-economic activities in the affected areas by rehabilitating the damaged roads and bridges and flood control facilities to at least their pre-typhoon status.
Description : The project is composed of two (2) components, namely:
(a) Rehabilitation of Flood Control Facilities and (b) Rehabilitation of National Roads and Bridges. This involves the repair and/or rehabilitation of flood control infrastructures, and roads and bridges damaged by Typhoons Ondoy and Pepeng to restore their conditions and functions prior to the onslaught of the typhoons. For flood control, repair works consist of restoration of embankments, slope protection, bank protection and other drainage facilities. For roads and bridges, repair and rehabilitation works consist of immediate restoration of cut road sections, clearing of landslides, asphalt overlay of damaged carriageways, restoration of damaged bridge structures and approaches, and installation of road signs and markers.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 83 of 96
Additional component amounting to PhP 80.9 million clustered as RB41 (Nueva Ecija and Pampanga II) is ongoing with actual weighted accomplishment of 57.44 percent and a positive slippage of 8.16 percent. The two subprojects already completed while the remaining three subprojects were suspended due to ongoing revision of detailed engineering design (DED). The subprojects clustered as RB 17, RB 10 and RB 8 were completed. Details of completed/ongoing clusters were shown below:
COST
( In Million) Start End
TOTAL 180.60
RB 17 52.80 09 May 2011 10 June 2012
Nueva Ecija-Aurora Road Km. 174+000-Km
214+80035.82
Baler Casiguran Road Ditawini, Mapalad and
Dinalungan Section (Km. 198+000-Km.
298+600; Km. 317+900-Km. 317+950; Km.
322+760_Km. 322+830)
12.95
San Luis-Ma. Aurora Castañeda Road
(Wenceslao-Dianawan Section) Km. 241+500-
Km. 248+000
4.03
RB 10 81.91 15 May 2011 19 May 2012
Daang Maharlika, Putlan, Carranglan Nueva,
Ecija (Km196+400 to Km 196+500)
Daang Maharlika, Putlan, Carranglan Nueva,
Ecija (Km194+943 to Km 195+050)
Daang Maharlika, Capintalan, Nueva, Ecija
(Km205+175 to Km 205+267)
Daang Maharlika, Putlan, Carranglan Nueva,
Ecija (Km 193+500)
Bongabon Rizal Aurora Road, Calaocan
Bridge (Km 153+460)
Nueva Ecija Pangasinan Road, Ilog Baliwag
Bridge (Km 142+335)
RB 8 45.89 29 March 2011 11 Jan 2012
Norzagaray-Bigte Road (Km 70+040 to km
76+000)
Daang Maharlika Road (km 52+800 to km
84+055 w/ exception)
Sta. Maria-Norzagaray Road (km 38+100)
Marilao Bridge (km 22+084)
Sta. Maria Bridge # 3 (km32+538)
Concepcion-La Paz Road, Lucung Bridge
Concepcion, Tarlac
IMPLEMENTATION SCHEDULECOMPONET
A.1a. Physical Accomplishment (Road and Bridges Component in Pampanga Province)
TARGET ACTUALSLIPPAGE/
VARIANCETARGET
ACTUAL
ACCOMP.
SLIPPAGE/
VARIANCE
(1) (2) (3)=(2)/TOTAL (4) (5) (6) (7)=(6)-(5) (8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8) (11) = (9)/(8)X100
RB-9 80.40 1.00 68.50 72.41 3.90 105.70
Baluag Candaba
Sta. Ana Road in
Pampanga (km
63+050 to Km
64+459)
27.71 0.34
2,540 lm slope
protection,
5,388 m2
PCCP
8.6 19.93 11.33 2.96 6.87 3.90 231.74
Bahay-Pare San
Luis-Sto.
Domingo Road
Pampanga
(Km65+000 to
Km 69+000 w/
exception
38.15 0.47
4,000 m2
PCCP, 3,300
cu.m.
embankment,
2290 cu.m
slope
protection
100 100 0 47.45 47.45 0.00 100.00
Mt. Arayat
National Road14.54 0.18
2710 m2
PCCP, 1090 lm
lined canal, 2
unit box culvert
100 100 0 18.09 18.09 0.00 100.00
PERFORMANCECOMPONENT
COST
(In
Million
Pesos)
WEIGHTOUTPUT
INDICATOR*
ACCOMPLISHMENT WEIGHTED INDICATOR
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 84 of 96
A.1b. Physical Accomplishment (Road and Bridges Component in Pampanga & Nueva Ecija)
TARGET ACTUALSLIPPAGE/
VARIANCETARGET
ACTUAL
ACCOMP.
SLIPPAGE/
VARIANCE
(1) (2) (3)=(2)/TOTAL (4) (5) (6) (7)=(6)-(5) (8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8) (11) = (9)/(8)X100
RB-41 80.90 1.00 49.28 57.44 8.16 116.55
Daang Maharlika
Rd., Putlan,
Carranglan, N.
Ecija (km
195+817-
km195+992)
10.40 0.13
Repair of
scoured/eroded
shoulder
Daang Maharlika
Rd., N. Ecija
(km 196+280-
km196+680)
7.06 0.09
Repair of
scoured/eroded
shoulder
66.92 100 33.08 5.84 8.73 2.89 149.43
San Juan
Pantabangan,
Nueva Eija (km
160+506-km
160+680)
9.62 0.12Concrete Slope
Protection
Rizal-
Pantabangan
Road, Nueva
Ecija (km
159+447.5-km
159+853 with
exeption)
14.42 0.18
Repair of
eroded
shoulder
Angeles-Porac
Rd., Pampanga II
(km 79+040)
39.41 0.49
Protection
works on
exposed Piers
of Mancatian
Br.
89.18 100 10.82 43.44 48.71 5.27 112.13
Suspended due to ongoing revision of DED
Suspended due to ongoing revision of DED
Suspended due to ongoing revision of DED
PERFORMANCECOMPONENT
COST
(In
Million
Pesos)
WEIGHTOUTPUT
INDICATOR*
ACCOMPLISHMENT WEIGHTED INDICATOR
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 85 of 96
A. Overall Performance (Cumulative) A.1c. Physical Accomplishment (Flood Control Component)
T A R GET A C T UA LSLIP P A GE/
VA R IA N C ET A R GET A C T UA L
SLIP P A GE/
VA R IA N C E
(1) (2) (3)=(2)/TOTAL (4) (5) (6) (7)=(6)-(5) (8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8) (11) = (9)/(8)X100
T OT A L (C P s 21 to 54) 377.15 1.00 100.00 91.14 -8.86 91.14
CP21: Repair/Restoration of Seawall Protection and Flood Contro l
Structures along Pudoc River in Baler, Aurora6.65 0.02
Seawall: 128m slope protection; Pudoc River:
166 m slope protection100 100 0 1.76 1.76 0.00 100.00
CP22: Repair/Restoration of Flood Contro l Structures along Calumpit
River in Bulusan and Sta. Lucia Section in Calumpit, Bulacan13.76 0.04
Bulusan: 47.2 slope protection; Sta. Lucia:
47.2m 100 100 0 3.65 3.65 0.00 100.00
CP 23: Repair/Restoration of Flood Contro l Structures along Bagbag
& Pampanga Rivers in Iba Este, M eysulao and Sto. Niño Section,
Calumpit, Bulacan
19.40 0.05Slope Protection: Iba Este Section (91.20m),
M eysulao (106m), Sto. Niño (54.8m)100 100 0 5.14 5.14 0.00 100.00
CP 24: Repair/Restoration of Damaged River Bank Protection along
Angat River and Creekbank, towerbill, M inoyan Proper in P laridel,
Pulilan, and San Jose Del M onte
16.01 0.04Slope Protection: Rueda (6.4m), Parulan
(35.2m), Tibag (74m), Creekbank (75m)100 100 0 4.25 4.25 0.00 100.00
CP 25: Rehabilitation of Paite-M aculcul Dike and Slope Protection at
Kiling Section in San Narcisio and Cabangan, Zambales20.14 0.05
1,668m dike heigthening w/ slope protection in
San Narciso, 152m slope protection in
Cabangan
100 100.00 0.00 5.34 5.34 0.00 100.00
CP 26: Rehabilitation of Slope Protection, M aculco l, M aloma Dike, and
Tambak dike in San Felipe and Iba in the Province of Zambales32.88 0.09
Slope Protection: M aculco l (1,060m), M aloma
(172m), Tambak (84 m)100 100 0 8.72 8.72 0.00 100.00
CP 27: Repair/Rehabilitation and heigthening of dike slope protection in
Consuelo Norte Sa M arcelino, Zambales8.91 0.02 772m dike heigthening w/ slope protection 100 100 0 2.36 2.36 0.00 100.00
CP 28: Restoration /Rehabilitation of Damaged dike at Apalit-Arayat
Setback Levee in Arayat, Pampanga47.47 0.13 290m slope protection 100 100 0 12.59 12.59 0.00 100.00
CP 29: Repair o f Checkgates along Bebe Anak, Pampanga Delta and
Sapang Iba in M asanto l, Pampanga24.33 0.06
6-cell combined flood gates (Bebe anak), 5-
panels checkate (Pampanga Delta), 1 unit
checkgate (Sapang Iba)
100 100 0 6.45 6.45 0.00 100.00
CP 30: Rehabilitation of co llapsed dike/riverbank in Candaba, Pampaga 58.39 0.15 347m slope protection 100 66.52 -33.48 15.48 10.30 -5.18 66.52
CP 31: Repair/Restoration of damaged slope protection along Sta. Fe
River in the Province of Zambales18.85 0.05 815m slope protection 100 100 0 5.00 5.00 0.00 100.00
CP 32: Restoration breached dike with slope protection and protection
wall inGuagua and Lubao, Pampanga9.22 0.02
317.8m dike w/ slope protectio (Guagua), 223m
protection wall (Lubao)100 100 0 2.45 2.45 0.00 100.00
CP 33: Restoration/ Rehabilitation of Existing dike with slope
protection and RC revetment in M oncada, Bamban and Tarlac City32.15 0.09
738.7m dike heigthening w/ slope protection
(M oncada), 470m slope protection & 1000m
channel excavation
100 100 0 8.52 8.52 0.00 100.00
CP 34: Restoration of damanged slope protection, breached dike and
eroded banks along Pampanga River, Digmala River and Nanduran
Creek in Bongabon and San Leonardo, Nueva Ecija
11.48 0.03
4 units spurdike in Pampanga River & 8 units
spurdike in San Leonardo, slope protection
(Digmala: 391m, Nanduran: 93m),
100 100 0 3.04 3.04 0.00 100.00
CP 35: Restoration of damaged slope protection and eroded banks
along Pampanga River, Peñaranda River and Inasan Creek in San
Isidro, Cabiao, Jaen and Gabaldon, Nueva Ecija
0.00
CP 48: Improvement of Pamatawan River Flood Contro l, Subic,
Za,bales8.02 0.02 420 m slope protection 100 100 0 2.13 2.13 0.00 100.00
A D D IT ION A L WOR KS
CP 54 Repair/Rehabilation of Flood Contro l Facilities in Baler San
Luis & Dingalan49.49 0.13
Restoration of revetment in Kanalapan rive
contro l, Restoration of gabion in Pudoc river
contro l, slope protection w/ gabion mattressin
Ditek flood contro l, Gabion (D/S) &
rechanneling in Langawan flood contro l
100 71.96 -28.04 13.12 9.44 -3.68 71.96
CP 55 Restoration of Flood Contro l Facilities in Candaba & San Luis,
Pampanga 47.60 Sheet pile (3.524 l.m); concrete (129 cu.m.)
Cancelled due to to tal change in site condition
P ER F OR M A N C EC OM P ON EN T
C OST ( In
M illio n
P eso s)
WEIGH T OUT P UT IN D IC A T OR *
A C C OM P LISH M EN T WEIGH T ED IN D IC A T OR
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 86 of 96
A.2c. Financial Performance (Flood Control Component)
TOTAL 377.15 285.69 0.00 285.69 75.75
CP 21 6.65 6.23 0.00 6.23 93.76
CP 22 13.76 13.76 0.00 13.76 100.00
CP 23 19.40 19.34 0.00 19.34 99.73
CP 24 16.01 15.16 0.00 15.16 94.69
CP 25 20.14 14.41 0.00 14.41 71.55
CP 26 32.88 32.16 0.00 32.16 97.81
CP 27 8.91 8.30 0.00 8.30 93.11
CP 28 47.47 47.41 0.00 47.41 99.87
CP 29 24.33 19.36 0.00 19.36 79.60
CP 30 58.39 34.89 0.00 34.89 59.75
CP 31 18.85 15.20 0.00 15.20 80.66
CP 32 9.22 9.22 0.00 9.22 100.00
CP 33 32.15 23.19 0.00 23.19 72.13
CP 34 11.48 11.48 0.00 11.48 100.00
CP 48 8.02 6.36 0.00 6.36 79.40
CP 54 49.49 9.19 0.00 9.19 18.58
(6)=5/2 x 100
COMPONENTCOST*
( In M illio n
P eso s)
EXPENDITUREEXPENDITURE RATE /
ABSORPTIVE CAPACITYDISBURSEMENTUNPAID
OBLIGATIONSTOTAL
(1) (2) (3) (4) (5)=(3)+(4)
*For LGUs, use allotment.
B. Project Implementation Concerns
ISSUES/CONCERNS ACTION TAKEN RECOMMENDATION
CP 30
About 100m of the completed section was damaged due to collapsed embankment
The DPWH Region III issued indefinite suspension of works and recommended extensive geotechnical investigation.
CP 54
Subprojects 3&4 cannot undertake full blast operation due to peace and order situation. Inclement weather condition has also affected the implementation.
The contractor is coordinating with DEO concerned and PMO-MFCDP II for the processing of time extension. Normal work operation will resume on first week of January 2013 as military personnel will be deployed in the area.
Employment Generated: Flood Control Component:
For the whole project duration (man days) : 342,867.32
As of 25 December 2012 (man-days) : 259,721.99
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 87 of 96
Balog-Balog Multi-Purpose Project3 Phase I
Province : Tarlac Sector/Sub-Sector : Infrastructure Support/Water Resources/Irrigation Executing Agency : National Irrigation Administration (NIA)
PROJECT CONTRACT DETAILS:
STATUS OF IMPLEMENTATION [as of 25 December 2012]
Overall Assessment BBMP Phase I is 100 percent accomplished and about 99.21 percent of the total project cost was utilized.
3Phase II of the project is under evaluation.
Funding Source : Local Implementation Schedule Date Started : 1999 Target Completion : 2011 (Phase I) Revised : Later years Total Project Cost (PhP Million) : 2,363 Beneficiaries : 7,340 Farmers in the Province of Tarlac Objective(s) : The project aims to boost agricultural productivity in the
project area by providing adequate irrigation facilities. Specifically, the project’s objectives are the following:
a) Rehabilitate and improve existing irrigation canals,
facilities and structures to adequately irrigate 8,600 hectares in the Tarlac River Irrigation System (TARRIS) area and 1,655 hectares in the San Miguel- O’ Donnell River Irrigation System (SMORIS) area or a total of 10,225 hectares;
b) Construct new irrigation and drainage facilities and structures to irrigate an area of 2,068 hectares;
c) Organize, develop and strengthen 42 irrigators’ association for the effective mobilization of 7,340 farmer-beneficiaries, and f0r the efficient operation and maintenance of the irrigation system;
d) Increase cropping intensity in the project area from 120 percent to 190 percent, thereby increasing crop production and farm income levels; and,
e) Create both on-farm and off-farm employment opportunities.
Description : The BBMP is being implemented in two phases distributed as follows:
Phase I which is already 100% completed as of December 2012, involves the rehabilitation of existing irrigation facilities and structures to restore irrigation services to existing service area of 10,225 hectares and construct new irrigation canals and structures to serve an aggregate area of 2,068 hectares.
Phase II involves the construction of the Balog-balog High Dam and Reservoir and new irrigation facilities in the remaining 21, 935 hectares service area of the Project.
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 88 of 96
On going activities utilizing savings (18,756,539.59) from BBMP Phase I includes the following: a. Resettlement works (under Phase II)
a.1 Continue inventory/assessment/evaluation of residential houses and improvements, plants/trees, home and farm lots affected by the project;
a.2 Topographic survey, design and detailed estimates of the proposed resettlement site at Madanak, Bulatain Area, Maambog.
a.3 Other resettlement related concerns. b. Local Minor Contract –
b.1 North main canal area (A-215 has; Lateral A and A-extra) b.2 Improvement of drainage channels
c. Other support works (IDD, Equipment utilization, maintenance) d. Detailed Engineering Activities for BBMP-Phase II
A. Overall Performance (Cumulative)
A.1. Physical Accomplishment
Note: Total Project Cost excludes Direct Cost of PhP 404.09 million that covers General Engineering Supervision and Administration, Contingencies, 5% EAOE and other costs.
1,959,261.50 100.00 99.48 99.44 (0.05) 100.0
I Pre-Construction
Works258,462.33 13.19 L.S. 100.00 100.00 - 13.19 13.19 - 100.00
II Div ersion Works10,095.58 0.52 L.S. 100.00 100.00
III Resettlement Works90,019.68 4.59 L.S. 100.00 100.00 - 4.59 4.59 - 100.00
IV Irrigation Sy stem1,066,895.32 54.45 L.S. 100.00 99.91 (0.09) 54.45 54.40 (0.05) 99.91
V Drainage Sy stem16,864.23 0.86 L.S. 100.00 100.00 - 0.86 0.86 - 100.00
VI Road Sy stem17,246.66 0.88 L.S. 100.00 100.00 - 0.88 0.88 - 100.00
VII Repair and
Restoration Works137,395.41 7.01 L.S. 100.00 100.00 - 7.01 7.01 - 100.00
VIII Agri-Institutional
Dev elopment110,050.23 5.62 L.S. 100.00 100.00 - 5.62 5.62 - 100.00
IX ROW Negotiation
and Acquisition111,304.97 5.68 L.S. 100.00 100.00 - 5.68 5.68 - 100.00
X Equipment Repair,
Utilization and
Maintenance
127,749.18 6.52 L.S. 100.00 100.00 - 6.52 6.52 - 100.00
XI Procurement by
Gov ernment13,177.91 0.67 L.S. 100.00 100.00 - 0.67 0.67 - 100.00
PER FOR M A N C E
( %)TARGET ACTUAL TARGET ACTUAL
SLIPPAGE /
VARIANCE
SLIPPAGE /
VARIANCE
WEIGHTED INDICATOR (%)
COMPONENT COST (PhP'000) WEIGHT IN D IC A TOR
ACCOMPLISHMENT (%)
(11)=(9/8)x100(1) (2) (3)= (2)/Total (4) (5) (6) (7)=(6)-(5)
TOTAL
(8)=(5)x(3) (9)=(6)x(3) (10)=(9)-(8)
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 89 of 96
A.2. Financial Performance
Direct Cost 1,959,261,491.01 1,940,504,951.42 1,940,504,951.42 99.04
I Pre-Construction Works 258,462,327.33 258,462,327.33 258,462,327.33 100.00
II Div ersion Works 10,194,157.07 10,194,157.07 10,194,157.07 100.00
III Resettlement Works 90,019,683.32 71,263,143.73 71,263,143.73 79.16
IV Irrigation Sy stem 1,068,746,233.12 1,068,746,233.12 1,068,746,233.12 100.00
V Drainage Sy stem 16,864,229.57 16,864,229.57 16,864,229.57 100.00
VI Road Sy stem 17,246,662.10 17,246,662.10 17,246,662.10 100.00
VII Repair and Restoration Works 135,445,917.74 135,445,917.74 135,445,917.74 100.00
VIII Agri-Institutional Dev elopment 110,050,225.90 110,050,225.90 110,050,225.90 100.00
IX ROW Negotiation and Acquisition 111,304,968.54 111,304,968.54 111,304,968.54 100.00
X
Equipment Repair, Utilization and
Maintenance127,749,178.61 127,749,178.61 127,749,178.61 100.00
XI Procurement by Gov ernment 13,177,907.71 13,177,907.71 13,177,907.71 100.00
Indirect Cost 403,210,694.45 403,210,694.45 403,210,694.45 100.00
General Engineering Superv ision &
Administration175,160,946.85 175,160,946.85 175,160,946.85 100.00
Other Costs 108,899,997.60 108,899,997.60 108,899,997.60 100.00
Contigencies
5% EAOE 119,149,750.00 119,149,750.00 119,149,750.00 100.00
2,362,472,185.46 2,343,715,645.87 2,343,715,645.87 99.21
Resettlement Works (Phase II) 18,756,539.59 18,756,539.59 0.793937
OVERALL/ TOTAL 2,362,472,185.46 2,362,472,185.46 100.00
Total (Phase I)
(1) (2) (3) (4) (5)=(3)+(4) (6)=5/2 x 100
COMPONENT COST (PhP
'000)
EXPENDITURE (P'000) EXPENDITURE
RATE /
ABSORPTIVE
CAPACITYDISBURSEMENT
UNPAID
OBLIGATIONSTOTAL
B. Immediate Results
INDICATOR BEFORE PROJECT DURING / AFTER
PROJECT
Restoration and improvement of irrigation canals and facilities covering 12,475 has.
12,260 ha
Increased average annual income of 7,329 farmers
PhP2,447.33 PhP 91,420.80
Increased production of palay 2.78 tons / ha (wet season) 3.04 tons / ha (dry season)
5.0 Tons / ha (wet season) 5.35 tons / ha (dry season)
D. Employment Generated
For the whole project duration (man-days) : 2,148
As of reporting period (man-days) : 2,148
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 90 of 96
PROGRESS PHOTOGRAPHS
Completed canal lining, Sta. 0+000 to Sta. 0+801.50, LMC-BBMP-11-022 (construction of New Irrigation Facilities) Lateral A-Extra at North Main Canal, Bgy. Tibag, Taralc City
Completed canal lining, Sta. 0+801.51 to Sta. 1+660.00, LMC-BBMP-11-023 (Construction of New
Irrigation Facilities) Lateral A-Extra at North Main Canal, Bgy. Sapang Maragul, Tarlac City
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 91 of 96
Luzon Substation Expansion Project I (Bantay, Bauang, Cabanatuan, Cruz na Daan, Laong S/Ss)
(Contract No. Sp09-LSEP.Lt-0028)
Province/Municipality : Cruz na Daan, San Rafael, Bulacan and Cabanatuan Sector/Sub-Sector : Infrastructure Support/Power, Energy and Electrification/
-Power Generation and Transmission Executing Agency : National Grid Corporation of the Philippines (NGCP) PROJECT DETAILS:
STATUS OF IMPLEMENTATION [As of December 2012] Overall Assessment The project was substantially completed with fund utilization rate of 98.32 percent.
A. Overall Performance (Cumulative)
A.1 Physical Accomplishment
Target ActualSlippage/
VarianceTarget
Actual
Accomp
Slippage/
Variance(2) (3)=(2)/T (4) (5) (6) (7)=(6)-(5) (8)=(5)*(3) (9)=(6)*(3) (10)=(9)-(8) (11)=(9/8)*100
111.16 66.02 66.02 0.00 100.00
26.77 1.00 100 100 35.30 35.30 0.00 100.00
*Supply/electrical 23.22 0.87 30 30 0 26.02 26.02 0.00
Civil Works 3.55 0.13 70 70 0 9.28 9.28 0.00
Cabanatuan SS 84.39 1.00 100 100 30.72 30.72 0.00 100.00
Supply/electrical 82.87 0.98 30 30 0 29.46 29.5 0.00
Civil Works 1.52 0.02 70 70 0 1.26 1.26 0.00
*1 unit 69 kV Power Circuit Breaker, 1 unit 100 MVA transformers
Component
(1)
Cruz na Daan SS
TOTAL
Performance
Accomplishment Weighted IndicatorCost (in PhP
Million)Weight
Output
Indicator
ORIGINAL REVISED (if any) Funding Source : NGCP thru Internal Cash Generation (ICG) Fund
Effectivity Date : November 2,, 2010 Completion Date: December 26, 2011 June 2012 (revised target expiry) Closing Date :
Total Project Cost (PhPMillion) : 703.492 (Entire Project- 7 substations nationwide) 111,161 (Cabanatuan & Cruz na Daan SubStations) Objective(s) : To increase the operational capabilities of each concerned
substation to ensure efficient, stable and reliable delivery of electrical power to load centers. Likewise, additional installation of capacities on the said substation would avert any overloading of the existing transformers.
Description :
Cruz-na-Daan S/S (San Rafael, Bulacan)
Transformer T2 from Mexico
Labor & transport cost of 100 MVA
1-69 KV PCB +SS Accessories
Cabanatuan S/S 1-300 MVA 230/69 KV Transformer
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 92 of 96
Disbursement Unpaid Obligation Total
(1) (2) (3) (4) (5)=(3)+(4) (6)=5/2*100
TOTAL 111.161 109.29 0 109.29 98.32
Contract Cost
(Cabanatuan &
Cruz na Daan SS)
111.161 109.29 0 109.29 98.32
Expenditure
Rate/Absorptive
Capacity
ExpenditureComponent
Cost (in PhP
Million)
B. Project Implementation Concerns Issues/Concerns Action Taken Recommendation
Remaining works for completion by the contractor (Transmission line and revamping works at the substation)
Filing for expropriation case against the affected property owner and rescheduling of equipment/facility shutdown
Contract time extension
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 93 of 96
Mariveles Coal Transmission Reinforcement Project (Transmission Line Connection Asset-Mariveles-Limay B)
(Contract No. Sp10-MLTP.Lt-0058)
Province/Municipality : Mariveles, Bataan Sector/Sub-Sector : Infrastructure Support/Power, Energy and Electrification/
-Power Generation and Transmission Executing Agency : National Grid Corporation of the Philippines (NGCP) PROJECT DETAILS:
STATUS OF IMPLEMENTATION [As of December 2012]
Overall Assessment As of December 2012, the project was 64.78 percent accomplished as against its physical target of 66.79 percent. It was behind schedule by 2.0 percentage points. Fund utilization was 87.44 percent. Reasons for achieving less than the targets:
Physical: Work stoppage/delay in construction due to Right of Way issues and Cease and
Desist order from the LGUs of Limay, Bataan due to non-payment of business tax by the Contractor.
ORIGINAL REVISED (if any) Funding Source : NGCP thru Internal Cash Generation (ICG) Fund
Date Started : March 17, 2011 Target Completion Date: February 9, 2012 October 2012 (revised)
Total Project Cost (PhP Million) : 433.186 (Contract Cost) Objective(s) : The project will reinforce the Hermosa-Limay B Line to
maintain N-1 during simultaneous maximum dispatch of Mariveles Coal and Limay Plants. The line was designed with a capacity of 2 x 1200 MW in order to facilitate the expansion of the GNPOWER Mariveles Plant.
Description : Mariveles-Limay CCPP B 230KV, 4-795 MCM ACSR, ST-
DC, 38 ckt-kms : Temporary By-Pass Line 230KV, 4-795MCM ACSR, SP-
DC, 6 ckt-kms
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 94 of 96
A. Overall Performance (Cumulative)
A.1 Physical Accomplishment
Target ActualSlippage/
VarianceTarget
Actual
Accomp
Slippage/
Variance
(2) (3)=(2)/T (4) (5) (6) (7)=(6)-(5) (8)=(5)*(3) (9)=(6)*(3) (10)=(9)-(8) (11)=(9/8)*100
433.19 1.00 66.79 64.78 -2.00
71.16 0.16 25 24.25 -0.75 4.11 3.98 -0.12 97.00
362.03 0.84 75 72.75 -2.25 62.68 60.80 -1.88 97.00
*38 circuit kms. Mariveles-Limay CCPP B230kV; 6 circuit kms. Temporary by-pass line
Performance
Accomplishment Weighted IndicatorCost
(in PhP
Million)
WeightOutput
Indicator*
Electro-Mechanical Works
Component
(1)
Civil Works
TOTAL
A.2 Financial Performance
Disbursement
Unpaid
Obligation Total
(1) (2) (3) (4) (5)=(3)+(4) (6)=5/2*100
TOTAL 472.97 413.55 413.55 87.44
Contract Cost 433.19 386.09 386.09
Extra Order #1** 39.785 27.46 27.46
**additional component /cost as of 3rd quarter 2012
Expenditure
Rate/Absorptive
Capacity
ExpenditureComponent
Cost (in
PhP Million)
A. Project Implementation Concerns
Issues/Concerns Action Taken Recommendation
Work stoppage due to Right of Way Issues & Cease and Desist order due to non-payment of business tax by the contractors
Directed contractor to pay
LGU allowed resumption of work after contractor settled their pending issue
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 95 of 96
END OF PROJEC REPORT Project Title : Angat Water Utilization and Aqueduct Improvement
Project (AWUAIP)- Phase 2 Location : San Jose del Monte City, Bulacan Total Cost (in Million Pesos) : PhP 6,089.504 million Funding Source : Export-Import Bank of China (95 %) Loan Code : Loan Effectivity : Closing Date : (Revised) : Implementing Agency : Metropolitan Waterworks and Sewerage System (MWSS) Implementation Schedule Date Started : March 17, 2010 Target Completion : March 16, 2013 Actual Completion : September 10, 2012 Description : The project involves the construction of 9.90 kilometers
aqueduct, the rehabilitation of existing Aqueduct No. 5 and the interconnection works of the aqueducts.
Actual and Expected Benefits : Half of the population served by MWSS or an estimated six
(6) million people benefitted from this project. The project helped address the risk of raw water shortage in Metro Manila since the aqueduct conveyed about 50 percent of the total water supply for MM.
Project Impact to Sector : The project provided safe and reliable raw water conveyance
system from Ipo Dam to La Mesa Dam portals, maintaining the security of water source for Metro Manila residents. Provision of safe water contributed to the health and wellness of Metro Manila residents in particular.
Lessons Learned : The used of improved/latest methodology and high tech
equipment, close supervision and monitoring contributed to the fast implementation of the project.
Remarks/Recommendations :
4th
Quarter 2012 RPMES ACCOMPLISHMENT REPORT
National Economic and Development Authority (NEDA) Regional Office III Page 96 of 96
Department of Public Works and Highways (DPWH) GENERAL APPROPRIATION ACT
i With End of Project Report
No. Project Title/ Description Location
Project Cost
(in thousand
PhP)
Status Remarks
1 Baler-Casiguran Road (Baler-Dinadiawan), K0263+641 -K0263+840 Aurora Lone 2,878.0 completed
2 Nueva Ecija-Aurora Road (3 stations) Aurora Lone 1,105.0 completed
3 Dingalan-Gabaldon Road, K0181+671 - K0181+844 Aurora Lone 4,040.0 97%
4Baler-Casiguran Road (Dinadiawan-Casiguran Sect.), K0309+085 -
K0311+270Aurora Lone 34,385.0 65%
5Baler-Casiguran Road (Dinadiawan-Casiguran Sect.), K0302+074 -
K0304+189Aurora Lone 38,455.0 70%
6Baler-Casiguran Road (Dinadiawan-Casiguran Sect.), K0295+-348 -
K0296+000, K0298+000 - K0298+700Aurora Lone 37,548.0 70%
7Nueva Ecija-Aurora Road, K0211+757 - K0211+989, K0212+100 -
K0212+265Aurora Lone 6,448.0 96%
8Nueva Ecija-Aurora Road, K0189+858 - K0191+326, K0185+254 -
K0185+486Aurora Lone 37,548.0 80%
9 Nueva Ecija-Aurora Road, K0183+698 - K0185+181 Aurora Lone 26,532.0 65%
10 Nueva Ecija-Aurora Road (Baler-Cemento Sect.), K0231+677 - K0262+000 Aurora Lone 1,320.0 completed
11 Diabuyo Bridge along Nueva-Ecija-Aurora Road Aurora Lone 5,500.0 completed
12 Baler-Casiguran Road (Baler-Dinadiawan), K0253+041 - K0253+539 Aurora Lone 7,191.0 completed
13 Nueva Ecija-Aurora Road, K0209+854 - K0210+000 Aurora Lone 5,712.0 completed
14 Nueva Ecija-Aurora Road , K0196+354 - K0199+000 Aurora Lone 39,694.0 w/ modification
15San Luis-Ma. Aurora-A. Castañeda Road, K0253+745-KO254+184.5,
KO253+440-KO253+720Aurora Lone 4,040.0 completed
16 Baler-Casiguran Road (Baler-Dinadiawan), K0259+328-K0250+808 Aurora Lone 10,100.0 completed
1 Gapan-San Fernando-Olongapo Road (Layac I & II), Dinalupihan Bataan 1st LD 2,880.0 completed
2Pagalanggang Bridge along Angeles-Porac-Floridablanca- Dinalupihan
RoadBataan 1st LD 23,000.0 80%
3 Roman Expressway (Hermosa, Abucay, Orani, Samal) Bataan 1st LD 9,360.0 completed
4 Jct. Layac-Balanga-Mariveles Port Road, K0107+393 - K0107+764 Bataan 1st LD 5,840.0 completed
5 Roman Expressway, K0105+091 - K0106+000 Bataan 1st LD 17,747.0 completed
6 Roman Expressway, K0113+484 - K0114+000, K0116+900 - K0117+300 Bataan 1st LD 13,244.0 completed
7 Gapan-Olongapo Road, K0115+000 - K0115+700 Bataan 1st LD 10,747.0 completed
8 Gapan-Olongapo Road, K0108+300 - K0108+600 Bataan 1st LD 8,595.0 completed
9 Ibayo Bridge along Balanga-Poblacion Road Bataan 2nd LD 17,000.0 completed
1 Daang Maharlika (LZ), K0044+471 - K0045+030 Bulacan 1st LD 10,208.0 completed
2
Widening of McArthur Highway (Manila North Road) including
rehabilitation/improvement of existing pavement, Loading and Unloading
Bays and ROW
Bulacan 1st LD 50,000.0 85%
3 Pulilan Railroad Station Road, K0044+-380 - K0044+-070 Bulacan 1st LD 4,007.0 completed
4 Bigaa-Plaridel via Bulacan & Malolos Road, K0047+555 - K0048+000 Bulacan 1st LD 2,789.0 completed
5 Old Cagayan Valley Road, K0043+261 - K0043+938 Bulacan 1st LD 4,646.0 completed
6Bigaa-Plaridel via Bulacan & Malolos Road, K0045+000 - K0046+000,
K0049+385 - k0050+000Bulacan 1st LD 9,133.0 completed
General Appropriation Act (GAA) - 2012 Funded Projects, Department of Public Works and Highway (DPWH) 3
AURORA
BATAAN
BULACAN
ROADS AND BRIDGES
ROADS
as of December 2012
No. Project Title/ Description Location
Project Cost
(in thousand
PhP)
Status Remarks
General Appropriation Act (GAA) - 2012 Funded Projects, Department of Public Works and Highway (DPWH) 3
ROADS AND BRIDGES
as of December 2012
7 Daang Maharlika (LZ), K0042+238 - K0043+673 Bulacan 1st LD 19,687.0 80%
9Bigaa-Plaridel via Bulacan & Malolos Road, K0045+000 - K0046+000,
K0049+385 - k0050+000Bulacan 1st LD 9,133.0 completed
10 Daang Maharlika (LZ), K0047+025-K052+044 Bulacan 2nd LD 43,976.0 completed
11 Daang Maharlika, K0037+(-978)-K0041+000 Bulacan 2nd LD 30,248.0 completed
12 Bocaue-San Jose Road, Chainage 0000- Chainage 0129 Bulacan 2nd LD 2,201.0 completed
13Baliwag-Candaba Road, K0052+-630 - K0053+000, K0053+000 -
K0053+169, K0055+076 - K0055+1078Bulacan 2nd LD 45,005.0 completed
14 Daang Maharlika (LZ), K0049+442 - K0052+000 Bulacan 2nd LD 43,976.0 completed
15 Daang Maharlika (LZ), K0039+690 - K0041+000 Bulacan 2nd LD 30,248.0 completed
16 Old Cagayan Valley Road, K0051+000 - K0051+1755 Bulacan 2nd LD 24,245.0 completed
17 Old Cagayan Valley Road, K0048+000 - K0049+000 Bulacan 2nd LD 10,004.0 completed
18 Daang Maharlika (LZ), K0041+221 - K0042+000 Bulacan 2nd LD 10,212.0 completed
19
Norzagaray-Bigte Road, K0071+-180 - K0071+000, K0073+806 -
K0073+889, K0076+000 - K0076+884, K0075+530 - K0075+840,
K0075+840 - K0075+910
Bulacan 3rd LD 17,108.0 completed
20 Daang Maharlika (LZ), K0053+000 - K0054+000, K0054+000 - K0054+316 Bulacan 3rd LD 17,536.0 completed
21 Daang Maharlika (LZ), K0077+26 - K0080+000, K0080+000 - K0080+367 Bulacan 3rd LD 45,462.0 completed
22San Miguel-Sibul Road, K0080+464 - K0080+614, K0080+014 - K0080+464,
K0082+688 - K0081+882, K0083+772 - K0084+746Bulacan 3rd LD 21,645.0 completed
23 Sta. Rita-Camias Road, K0073+-735 - K0073+987 Bulacan 3rd LD 12,846.0 completed
24 Daang Maharlika Road (San Rafael & San Ildefonso) Bulacan 3rd LD 2,330.0 completed
25 Daang Maharlika (LZ), K0069+357 - K0070+000 Bulacan 3rd LD 7,690.0 completed
26 Daang Maharlika (LZ), K0082+000 - K0084+172 Bulacan 3rd LD 10,002.0 completed
27 Sta. Maria Bridge 2 along Sta. Maria Bypass Road Bulacan 4th LD 10,000.0 completed
29 Bocaue-San Jose Road, K0034+0 - K0035+0 Bulacan 4th LD 9,659.0 completed
30Meycauayan-Camalig-Bahay Pari Road, K023+312 - K024+600, K0025+700 -
K027+000Bulacan 4th LD 23,413.0 completed
31 Sta. Maria By-Pass Road Bulacan 4th LD 41,396.0 completed
32 Malhacan-Iba-Camalig Road, Meycauayan Bulacan 4th LD 10,500.0 completed
33
Sta. Maria-Norzagaray Road, K0035+259 - K0035+970, K0037+611 -
K0030+852, K0037+775 - K0037+895, K0035+1449 - K0037+611,
K0040+398 - K0040+790, K0040+970 - K0041+150
Bulacan 4th LD 43,592.0 completed
34
Sta. Maria By-Pass Road, K0030+(-204) - K0030+307, K0030+475 -
K0030+852, K0033+709 - K0033+839, K0033+839 - K0033+919, K0032+0 -
K0032+915, K0033+40 - K0033+458
Bulacan 4th LD 41,396.0 completed
35 Bocaue-San Jose Road, K0035+000 - K0036+000 Bulacan 4th LD 12,255.0 completed
36NCR/Bulacan Bdry-Bigte-Ipo Dam Road, K0030+341 - K0031+000,
K0033+390 - K0033+800, K0035+641 - K0036+297
San Jose del
Monte City Lone35,002.0 completed
37 Flood Control Structures in San Jose Del Monte CitySan Jose del
Monte City Lone10,000.0 completed
38 Construction of river bank protection along Alat RiverSan Jose del
Monte City Lone15,000.0 completed
39 Construction of slope protection works protecting Tialo BridgeSan Jose del
Monte City Lone15,000.0 completed
40Construction of Drainage Canal along NCR/Bulacan Bdry-Bigte-Ipo Dam
Road
San Jose del
Monte City Lone25,000.0 completed
No. Project Title/ Description Location
Project Cost
(in thousand
PhP)
Status Remarks
General Appropriation Act (GAA) - 2012 Funded Projects, Department of Public Works and Highway (DPWH) 3
ROADS AND BRIDGES
as of December 2012
41 NCR/Bulacan Bdry-Bigte-Ipo Dam Road (Tungkong Mangga Section)San Jose del
Monte City Lone1,160.0 completed
43 Bocaue-San Jose Road, K0038+000 - K0042+140San Jose del
Monte City Lone35,993.0 completed
2 Daang Maharlika (LZ), K0131+000 - K0132+005 , K0133+000-K0134+000 Nueva Ecija 1st LD 39,251.0 completed
3Nueva Ecija - Pangasinan Road , K0151+000 - K0151+503 , K0154+000 -
K0155+000,K0158+000 - K0159+786Nueva Ecija 1st LD 32,208.0 completed
4Sta. Rosa - Tarlac Road , K0119+000 - K0119+730 , K0123 +000 -
K0123+520Nueva Ecija 1st LD 23,243.0 completed
5 Sta. Rosa - Tarlac Road , K0127+000 - K0128+253 Nueva Ecija 1st LD 20,082.0 completed
6Cabanatuan City Carmen Road , K0129+(-1091) - K0129+(-236),
K0132+000 - K0132+556 , K0135+278 - K0135+628Nueva Ecija 1st LD 21,433.0 completed
Jct. Pinagpanaan - Rizal - Pantabangan Road , Km. 125+563 - Km.
127+071.5Nueva Ecija 1st LD 10,000.0 completed
Daang Maharlika Road , Km. 137+000 - Km. 139+000 with exceptions Nueva Ecija 1st LD 10,000.0 completed
Daang Maharlika (LZ), K0129+000 - K0129+945, K0132+000 - K0133+000,
K0135+180 - K0136+000Nueva Ecija 1st LD 36,063.0 completed
Nueva Ecija - Pangasinan Road , K0140+00 - K0143+633 Nueva Ecija 1st LD 44,675.0 completed
7San Jose City - Rizal Road via Pinili-Porais-Villa Jos , K0169+000 -
K0171+000
Nueva Ecija 2nd
LD 3,277.0 completed
Jct. Pinagpanaan - Rizal - Pantabangan Road , K0138+1120 - K0139+000 ,
K0143+000 - K0143+302 , K0145+000 - K0146+000
Nueva Ecija 2nd
LD 22,109.0 completed
9Daang Maharlika(LZ), K0124+(-650) - K0124+000 , K0125+000 -
K0126+000
Nueva Ecija 2nd
LD 2,792.0 completed
10San Jose City - Rizal Road via Pinili-Porais-Villa Jos , K0161+917 -
K0163+905, K0166+582 - K0166+247
Nueva Ecija 2nd
LD 40,228.0 completed
11 Jct. Pinagpanaan - Rizal - Pantabangan Road , K0165+086 - K0165+162Nueva Ecija 2nd
LD 1,750.0 completed
12Pantabangan - Canili - Basal - Baler Road , K0276+343 - K0276+437 ,
K0278+252 - K0278+361
Nueva Ecija 2nd
LD 4,663.0 completed
13 Daang Maharlika Road , (2 stations), Science City of MunozNueva Ecija 2nd
LD 1,920.0 completed
16 Pantabangan - Canili - Basal - Baler Road , K0274+000 - K0276+000 Nueva Ecija 2nd
LD 16,118.0 completed
17 Daang Maharlika (LZ), K0159+247 - K0161+000Nueva Ecija 2nd
LD 31,031.0 completed
18 Cabanatuan City Circumferential Road, K0113+(-350_-k0113+300Nueva Ecija 3rd
LD5,508.0 completed
19Bangad - Fort Magsaysay Road , k0123+867 - K0124+000, K0127+000 -
K0127+486,K0128+955 - K0129+330
Nueva Ecija 3rd
LD16,115.0 completed
20 Jct. Tablang - Gabaldon Road, K0136+000 - K0138+765Nueva Ecija 3rd
LD6,783.0 completed
21Nueva Ecija - Aurora Road, K0126+300 - K0127+200, K0132+000 -
K0134+000
Nueva Ecija 3rd
LD25,437.0 completed
22 Nueva Ecija - Aurora Road, K0152+286 - K0152+700Nueva Ecija 3rd
LD3,803.0 completed
23 Bravo Bridge along Palayan City - Natividad Road, Palayan CityNueva Ecija 3rd
LD15,600.0 completed
24Nueva Ecija - Aurora Road, K0121+00 - K0121+800, K0128+410 -
K0129+300
Nueva Ecija 3rd
LD15,080.0 completed
25 Salabusob Bridge along Nueva Ecija RoadNueva Ecija 3rd
LD32,870.0 67%
26Sta. Rosa - Tarlac Road, K0108+(-174) - K0108+500, K0108+(-254) -
K0108+ (-174), K0113+000 - K0114+000, K0116+000 - K0116+700
Nueva Ecija 3rd
LD15,562.0 completed
27 Cabanatuan City- Papaya Road , K0115+350 - K119+577Nueva Ecija 3rd
LD2,039.0 completed
NUEVA ECIJA
No. Project Title/ Description Location
Project Cost
(in thousand
PhP)
Status Remarks
General Appropriation Act (GAA) - 2012 Funded Projects, Department of Public Works and Highway (DPWH) 3
ROADS AND BRIDGES
as of December 2012
28 Jct.Tablang - Gabaldon Road, K0140+000 - K0142+000Nueva Ecija 3rd
LD15,164.0 completed
29Gapan - Fort Magsaysay Road, K0101+297 - K0102+087 , K0106+352 -
K0107+352, K0117+589 - K0117+795
Nueva Ecija 4th
LD 22,078.0 completed
30 Gapan - San Fernando - Olongapo Road (6 stations)Nueva Ecija 4th
LD6,520.0 completed
31 Baluarte Bridge 2 along Daang Maharlika Road Nueva Ecija 4th
LD3,550.0 completed
32 Castellano Bridge 1 along Daang Maharlika Road Nueva Ecija 4th
LD8,400.0 completed
33 Baluarte Bridge 1 along Daang Maharlika Road Nueva Ecija 4th
LD3,550.0 completed
34 Daang Maharlika Road(9 stations) Nueva Ecija 4th
LD9,240.0 completed
35 Daang Maharlika (LZ), K0087+127 - K0089+611Nueva Ecija 4th
LD42,850.0 completed
36 Gapan - Fort Magsaysay Road, K0094+018 - K0096+604Nueva Ecija 4th
LD31,392.0 completed
37 Daang Maharlika(LZ), K092+755 - K093+710Nueva Ecija 4th
LD17,851.0 completed
38Daang Maharlika (LZ), K0102+360 - K0102+597 , K0100+826 - K0101+266 ,
K0101+800 - K0102+360
Nueva Ecija 4th
LD23,825.0 completed
39 Daang Maharlika (LZ) , K086+194 - K087+127, K093+710 - K095+105Nueva Ecija 4th
LD26,227.0 completed
1Angeles - Porac - Floridablanca - Dinalupihan Road, K0084+(-615) -
K0084+264Pampanga 1st LD 6,191.0 completed
2 Old Manila North Road, Chainage 0000 - Chainage 2079 Pampanga 1st LD 6,674.0 completed
3Angeles - Porac - Floridablanca - Dinalupihan Road, K0094+610 -
K0095+000Pampanga 2nd LD 4,218.0 completed
4 San Fernando-Lubao Road, K0076+457 - K0076+636 Pampanga 2nd LD 2,527.0 completed
5 San Fernando - Olongapo Road(1 station), Guagua Pampanga 2nd LD 1,997.0 completed
6 Palcarangan Bridge along San Fernando - Olongapo Road Pampanga 2nd LD 5,000.0 completed
7 San Antonio - Floridablanca Road, K0081+000 - K0081+080 Pampanga 2nd LD 1,240.0 completed
8San Fernando - Lubao Road, K0075+541 - K0076+000, K0077+000 -
K0078+000Pampanga 2nd LD 5,018.0 completed
9San Fernando - Lubao Road, K0075+541 - K0076+000, K0077+000 -
K0078+000Pampanga 2nd LD 5,018.0 completed
10 Lagundi Bridge along Gapan - San Fernando - Olongapo Road Pampanga 3rd LD 10,800.0 completed
11Gapan - San Fernando - Olongapo Road , K0069+000 - K0070+000,
K0071+(-455) - K0071+(-600)Pampanga 3rd LD 41,635.0 completed
12Apalit - Macabebe - Masantol Road, K0056+853 - K0057+044, K058+834 -
K059 +000, K0057+648 - K0057+698Pampanga 3rd LD 2,030.0 not yet started
13
San Simon - Baliwag Road, K0059+(-768) - K0059+(-572), K0059+880 -
K0060+368, K0060+368 - K0060+713, K0060+713 - K0061+166,
K0066+902 - K0067+000, K0067+000 - K0067+611, K0070+613 -
K0070+748
Pampanga 4th LD 33,594.0 completed
14Asphalting of the Apalit - Arayat - Masantol Setback Levee(Apalit -
Masantol Section) Pampanga 4th LD 46,650.0 completed
15 Arayat - Magalang - Mabalacat Road, K0116+(-145) - K0116+007 Pampanga 4th LD 2,225.0 completed
16San Simon - Baliwag Road, K0068+910 - K0068+951, K0069+388 -
K0069+409, K0070+113 - K0070+500, K0070+500 - K0072+000Pampanga 4th LD 33,906.0 completed
17 Bomba Bridge along Candaba-Baliuag Road Pampanga 4th LD 20,000.0 completed
18San Simon - Baliuag Road, K0059+(-572)- K0059+(-171), K0068+000 -
K0068+752, K0071+308 - K0071+479Pampanga 4th LD 7,985.0 completed
19 Tulaoc - Sto. Domingo Road, Chainage 0000 - Chainage 0183 Pampanga 4th LD 2,400.0 completed
PAMPANGA
No. Project Title/ Description Location
Project Cost
(in thousand
PhP)
Status Remarks
General Appropriation Act (GAA) - 2012 Funded Projects, Department of Public Works and Highway (DPWH) 3
ROADS AND BRIDGES
as of December 2012
20 Baliuag-Candaba-Sta. Ana Road K072+130 - K072+200 Pampanga 4th LD 428.0 completed
21Bahay Pare - San Luis - Sto. Domingo Road, K0069+312 - K0069+599,
K0070+627 - K0070+777Pampanga 4th LD 5,991.0 completed
2 Romulo Highway, K0143+000 - k0144+000, K0153+000 - K0153+329 Tarlac 1st LD 15,611.0 completed
3 Paniqui Poblacion Road, K0147+(-630) - K0147+014 Tarlac 1st LD 1,668.0 completed
4Paniqui - Camiling - Wawa Road, K0149+728 - K0149+818, K0162+000 -
K0163+000, K0163+711 - K0164+000Tarlac 1st LD 14,222.0 completed
5 Capas - San Jose - Mayantoc - Malacampa Road, K0144+193 - K0144+718 Tarlac 1st LD 5,000.0 completed
6
Paniqui - Camiling - Wawa Road,K0155+000 - K0155+666, K0158+000 -
K0158+740, K0158+910 - K0159+097 , K0167+000 - K0167+423,
K0171+200 - K0171+867
Tarlac 1st LD 25,873.0 completed
7 Romulo Highway, K0161+000 - K0162+000, K0165+000 - K0166+196 Tarlac 1st LD 36,859.0 completed
8Capas - San Jose - Mayantoc - Malacampa Road, K0121+(-357) -
K0122+700, K0123+688 - K0124+118, K0129+000 - K0129+322Tarlac 2nd LD 40,315.0 completed
9 Romulo Highway, K0124+(-667) - K0124+306, K0125+244 - K0125+525 Tarlac 2nd LD 23,369.0 completed
10 Tarlac - Sta. Rosa Road, K0136+(-045) - K0136+715 Tarlac 2nd LD 8,928.0 completed
11 Tarlac - San Miguel via Macabulos Road, K0119+(-890) - K0119+(-463) Tarlac 2nd LD 7,633.0 completed
12 Romulo Highway, K0126+000 - K0126+500 Tarlac 2nd LD 6,098.0 completed
13 Capas - San Jose - Mayantoc - Malacampa Road, K0143+187 - K0144+193 Tarlac 2nd LD 7,692.0 completed
14 Tarlac - Sta. Rosa Road, K0131+000 - K0133+000, K0133+787 - K0134+000 Tarlac 3rd LD 37,416.0 completed
15Tarlac - Sta. Rosa Road, K0131+200 - K0132+000, K0129+(-938) - K0129+(-
170)Tarlac 3rd LD 15,736.0 completed
16 Capas - San Jose Mayantoc - Malacampa Road, K0117+106 - K0117+399 Tarlac 3rd LD 3,588.0 completed
17Concepcion - La Paz Road, K0131+000 - K0133+190, K0135+320 -
K0135+746Tarlac 3rd LD 37,678.0 completed
18
Capas - San Jose - Mayantoc - Malacampa Road, K0116+701 - K0116+918,
K0117+630 - K0117+918, K0118+458 - K0118+658, K0118+876 -
K0119+120, K0116+919 - K0117+000, K0117+000 - K0117+106 -
K0117+399 - K0117+513
Tarlac 3rd LD 28,782.0 completed
19 Concepcion - Capas Road, K0112+000 - K0113+438 Tarlac 3rd LD 14,844.0 completed
1 Subic - Cawag -Balaybay Road, Castillejos Zambales 1st LD 8,328.0 completed
2 San Marcelino - Nagbayto Road, K0151+996 - K0152+346 Zambales 1st LD 2,000.0 completed
3 Gapan - San Fernando - Olongapo Road, K0125+080 - K0125+962 Zambales 1st LD 33,035.0 completed
4 Raising of grade, Vega - Maculcol Dike, San Narciso Zambales 2nd LD 20,000.0 completed
5 Construction of Maloma Dike (upstream section), San Felipe Zambales 2nd LD 10,000.0 completed
6 Construction of Bucao Dike (downstream section), Botolan Zambales 2nd LD 50,000.0 96%under
suspension
7Construction of Coconet Protection Works,(Landside of Bucao Dike
(upstream section) Zambales 2nd LD 20,000.0 completed
8 Iba- Tarlac Road Zambales 2nd LD 43,000.0 96%under
suspension
ZAMBALES
TARLAC
No. Project Title/ Description Location
Project Cost
(in thousand
PhP)
Status Remarks
General Appropriation Act (GAA) - 2012 Funded Projects, Department of Public Works and Highway (DPWH) 3
ROADS AND BRIDGES
as of December 2012
BRIDGES
Manila North Road Section
1. Labangan Bridge No. 2
Km. 48+800 14,000.0
Replacement/Widening to 4 lanes concrete bridge L=10 M
2. Labangan Bridge No. 3
Km. 48+950 28,000.0
Replacement/Widening to 4 lanes concrete bridge L=20 M
3. Labangan Bridge No. 4
Km. 48+900 14,000.0
Replacement/Widening to 4 lanes concrete bridge L=10 M
4. Labangan Bridge No. 5
Km. 49+100 28,000.0
Replacement/Widening to 4 lanes concrete bridge L=20 M
5. Labangan Bridge No. 6
Km. 49+200 28,000.0
Replacement/Widening to 4 lanes concrete bridge L=20 M
6. Labangan Bridge No. 7
Km. 49+500
Replacement/Widening to 4 lanes concrete bridge L=120M
7. Guiguinto Bridge
Km. 33+870
Replacement/Widening to 4 lanes concrete bridge L=57.80 M
8 Meycauyan Bridge
Km 18+200
Replacement/Widening to 4 lanes concrete bridge L=78.70 M
9 Bunlo Bridge
Km. 26+000 17,800.0
Replacement/Widening to 4 lanes concrete bridge L=12.70 M
10 Bocaue Bridge
Km. 27+000
Replacement/Widening to 4 lanes concrete bridge L=80 M
11 Tikay Bridge
Km. 36+300
Replacement/Widening to 4 lanes concrete bridge L=8.30 M
12 Dakila Bridge
Km. 39+150
Replacement/Widening to 4 lanes concrete bridge L=5 M
13 Balagtas Bridge
Km. 30+080
Replacement/Widening to 4 lanes concrete bridge L= 50 M
14 Ugong Bridge
Km. 31+750 16,800.0
Replacement/Widening to 4 lanes concrete bridge L=12 M
15 Tabang Bridge
Km. 35+740
Replacement/Widening to 4 lanes concrete bridge L=20 M
16 Tiaong Bridge
Km. 61+147
Replacement/Widening to 4 lanes concrete bridge L=46.20 M
17 Dalaquitan Bridge
Km. 62+532
Replacement/Widening to 4 lanes concrete bridge L=47.80 M
With approved
plans, for funding
With approved
plans, for funding
for CY 2013 Regular
Infrastructure
Balagtas, Bulacan on-going
Guiguinto,
Bulacan
due for
implementation
Balagtas, Bulacan
Completed
CompletedSto. Tomas,
Pampanga
Sto. Tomas,
Pampanga
Calumpit, BulacanWith approved
plans, for funding
Calumpit, BulacanWith approved
plans, for funding
Calumpit, Bulacan
Malolos, Bulacan
Bocaue, Bulacan
Calumpit, Bulacan
completed
Guiguinto,
Bulacan
Bocaue, Bulacanfor CY 2013 Regular
Infrastructure
on-going
CompletedGuiguinto,
Bulacan
completed
Meycauyan,
BulacanCompleted
completed
Calumpit, Bulacan
Calumpit, Bulacan
With approved
plans, for funding
No. Project Title/ Description Location
Project Cost
(in thousand
PhP)
Status Remarks
General Appropriation Act (GAA) - 2012 Funded Projects, Department of Public Works and Highway (DPWH) 3
ROADS AND BRIDGES
as of December 2012
18 Tinajero Bridge
Km. 66+050
Replacement/Widening to 4 lanes concrete bridge L= 22 M
19 Del Pilar Bridge
Km 67+000
Replacement/Widening to 4 lanes concrete bridge L=30M
20 Tulaoc Bridge
Km. 58+178
Replacement/Widening to 4 lanes concrete Bridge L=7.40 M
21 Sto. Domingo Bridge
Km. 60+084
Replacement/Widening to 4 lanes concrete bridge L=6.50 M
22 Are Bridge
Km. 55+511
Replacement/Widening to 4 lanes concrete bridge L= 7.40 M
23 Pulong Bulo Bridge
Km. 82+274
Replacement/Widening to 4 lanes concrete bridge L=35 M
24 Legazpi Bridge
Km. 163+037
Replacement/Widening to 4 lanes concrete bridge L= 18 M
25 Carmen Bridge
Km. 167+787
Replacement/Widening to 4 lanes concrete bridge L=12.60M
Completed
Completed
CompletedDel Pilar, City of
San Fernando
Del Pilar, City of
San Fernando
San Simon,
Pampanga
San Manuel,
Tarlaccompleted
Completed
completed
Angeles City completed
Apalit, Pampanga
San Manuel,
Tarlac
Minalin,
Pampanga
completed