GENERAL SERVICES DEPARTMENT
UTILITY SERVICES DIVISION
EXECUTIVE SUMMARY
DECEMBER. 2009
OBJECTIVE/ACTIVITY MEASURES CY 2009 Target Nov-09 Dec-09
I. BUILDING OPERATION & MAINTENANCE
1. Energy Usage
a. POWER DEMAND Kilowatt (kw) 450 kW -
b. ENERGY USED Kilowatt-Hour (kwh) 97,000 kWhr -
c. POWER FACTOR Percent (%) 95% Minimum -
d. COST Peso variable -
e. EFFECTIVE RATE Peso per kwh variable -
2. Electrical
a. Major Electrical Works 10/month 13 16
b. Minor Electrical Works 150/month 263 219
c. Telephone System No. of telephone devices installed or repaired variable 1 2
d. Coordination Meeting variable 0 0
3. Airconditioning system
a. PM of Aircon Unit
- FCU 20 units/ month 18 9
- AHU 4 units/qtr 0 8 Washing of filter at s
- Chiller Units 4 units/month 6 10 Washing of chiller un
- 3 Tonner @ Computer Server Room variable 0 0
- 1.5 Tonner 1 unit/month 0 1
- 5 Tonner 1 unit/month 1 3
No. of electrical equipment operated,maintained, installed or repaired
Layout new wiring, Mtesting & check-ups,battery, troubleshoot
No. of electrical devices replaced, repaired ornewly installed
Replace busted lightielectrical devices, reseries light on christ
Repair telephone dir
Managers Office and
No. of coordination meetings attended thatrelates to departments functions
No. of air-conditioning equipment undergonepreventive maintenance, repair, new
installation, replacement or troubleshooting.
Washing of FCU filterfan motors and drain
Washing of AHU filteand Ground Floor Ar
8/8/2019 Accomplishment Dec09
2/17
OBJECTIVE/ACTIVITY MEASURES CY 2009 Target Nov-09 Dec-09
- Window Type per request 0 0
b. Install/Repair Aircon Units
- FCU variable 0 0
- AHU variable 0 0
- Chiller Units variable 0 2
-5 Tonner variable 1 1
- 3 Tonner @ Computer Server Room variable 0 0
- Window Type variable 1 0
c. Exhaust Fan variable
d. Power Management Activities Turn off chillers in under utilized areas 5 units/day 2
4. Plumbing Works 5 units/month 5 9
5. Elevator
Frequency of maintenance or repair 2 units/month 2 2
Elevator Power Management Activity Daily Daily Daily Turning on/off of ele
Special Service variable 0 0
II. GENERAL CLEANING & MAINTENANCE
- Main Office Building Daily Daily Daily Under contract w/ P
- Workshop Daily Daily Daily
- Laboratory Daily Daily Daily
- Villa Azul Training Center Daily Daily Daily
- Meter Rig Building Daily Daily Daily
- PMD-N Office Daily Daily Daily
- Basketball & Tennis Court Daily Daily Daily
Replaced new Circul# 15 @ 8th floor ACvalve and clogged u3rd Floor.
Repair burned termiswitch @ clinic split t
No. of plumming devices replaced, installedor repaired
Install piping system,hose, CR urinal & boand Talamban Faciliti
Under contract with IInc.
Frequency of cleaning and maintenance ofMCWD facilities
Done by regular emchart made
8/8/2019 Accomplishment Dec09
3/17
OBJECTIVE/ACTIVITY MEASURES CY 2009 Target Nov-09 Dec-09
Monthly Monthly Monthly Done b
III. REPAIR & RECONSTRUCTION WORK
22 days 40% 100%
- Fabrication of table w/ cabinet for MSSD used. 20 days 35% 100%
15 days 35% 100%
22 days 0% 60%
2 days 0% 100%
3 days 0% 100%
5 days 40% 100%
5 days 0% 100%
- Other carpentry works variable 5 6
IV. REPRODUCTION MACHINES1. Photocopier, copies No. of copies produced per month variable 13,192 8,519
2. Risograph, reams No. of copies produced per month variable 47.5
V. SPECIAL FUNCTIONS
1. Social Hall UsageTotal Hours of Usage variable Internal & external u
Total Revenue Generated, Peso variable
2. Training Room Usage Total Hours of Usage variable
VI. OTHER RELATED ACTIVITIES No. of other related activities handled variable
Prepared by: Noted:
JUANITO D. ANDO STEPHEN D. YEE
Division Manager Department Manager
Utility Division General Services Dept.
- Other facilities(pumping stations, reservoirs, etc.)
- Renovation and repair of W-17 Perimeter Fence.
Length of time the particular project orassignment been able to perform with
regards to desired performance
- Repair, re-paint canteen facilities in TalambanVilla Azul.
Installation of metal barricade for vehicle stoppage@ the main building vehicle entry.
Installation of glass wall @ 3rd floor area of mainbuilding.
Installation of new submersible pump unit for
basement waste water removal.Installation of fire suppresant inside MIS ServerRoom (5th Floor).
Fabrication and Construction of steel mating dooras per warehose concern @ Exit door 3rd floorarea.
Replacement of damaged door locks,repair of tables, etc. at main officebuilding & other satellite offices.
Repair of furnitures,blinds and other builoffices. fabrication ofworks
8/8/2019 Accomplishment Dec09
4/17
Remarks
Equal
Equal
Equal
Equal
Equal
ocial hall AHU units.
its, draining of Y-strainer.
ain office standby gensetrecharging of gensetelectrical at satellite office.
ng tubes, bulb, & otherpair bundy clock, install
as party activities.
ct line @ HRD Dept.
PAD Office.
s/ Done vacuuming of FCUpan.
units at Consumers areaa.
8/8/2019 Accomplishment Dec09
5/17
Remarks
ator during low peak hours.
rfect Clean General Services
ting Pump (3 Hp) on chillerield, Replaced expansionfilter drier on Chiller # 5 @
al of high side pressureye aircon
repair leak faucet, flexiblel closets @ Main Building
ies.
nt'l. Elevator & Equipment,
ployees Locator/Assignmentor better monitoring
8/8/2019 Accomplishment Dec09
6/17
Remarks
Pakiao workers
se
ubicles, doors, windowing facilities and satellitewooden barricades, Masonry
8/8/2019 Accomplishment Dec09
7/17
MINOR ELECTRICAL WORKS
Month of December 2009
LIGHTING ACCESSORIES CFL Hg BULB BALLAST STA
LOCATION INSTALLED 50 W 50 W 100 W 18 W 23 W 25 W 55 W 100 W 160 W 250 W 150 W 400W 20 W 40 W 18 W 20 W
MAIN OFFICE BUILDING 5 21 7 10
MOTORPOOL / GARAGE 2
BUHISAN DAM 3 4 3 3CASILI RESERVOIR & SATELLITE OFFICE 4
CANAMUCAN PUMPING STATIONS
CEBU PLAZA PUMP HOUSE 4
GUADALUPE BOOSTER PUMP
JACLUPAN DAM
JACLUPAN NURSERY 2
JACLUPAN PUMP HOUSE 8
LAHUG PUMPING STATIONSLAGTANG GENSET HOUSE 1
LAGTANG RESERVOIR & SATELLITE OFFICE 4
LAPULAPU MEPZ RESERVOIR 3
LAPULAPU PUSOK RESERVOIR & SATELLITE OFFICE 2 2
LAPULAPU PUMPING STATIONS 3
LILOAN PUMPING STATIONS 4
LILOAN RESERVOIR 4
MANDAUE BOOSTER PUMP
TALAMBAN D' FAMILY PARK
TALAMBAN (Perimeter Fence) and MSSD
TALAMBAN METER REPAIR SHOP 2
TALAMBAN MIS CONTROL HOUSE
TALAMBAN PMD-N OFFICE 3
TALAMBAN RESERVOIR
TALAMBAN TRAINING CENTER 6
TALAMBAN WAREHOUSE
TALAMBAN WORKSHOP
TALAMBAN NURSERY
TALAMBAN PUMPING STATION
TALAMBAN STOCKROOM
TALAMBAN FABRICATION
TISA FILTER PLANT
TISA RESERVOIR
(SPECIAL PROJECT) STREET LIGHTING, TALAMBAN
(SPECIAL PROJECT)
FLUORESCENTTUBE
HALO-GEN
INCANDESCENT BULB
SPOTLIGHT
HIDLAMP
PINLIGHT
18 W /20 W
36 W /40 W
15 W2U
18 W 3UCERES
8/8/2019 Accomplishment Dec09
8/17
MENT A
switch
2
1
1
3
1 1
LIGHT FIXTURE, BATTERY, SWITCHAND EXTENSION OUTLET
Receptacle andframe
Batteryreplacem
ent
Outlet (3GANG)
8/8/2019 Accomplishment Dec09
9/17
ATTACHMENT B
Month of July 1-31, 2009
PHOTOCOPIER MACHINES OUTPUT RESOGRAPH MACHINES OUTPUT
RANK OFFICES COPIES RANK OFFICES REAMS
1 BOARDs OFFICE 32 1 BOARDs OFFICE
2 GMs OFFICE 22 2 GMs OFFICE
3 AGM, ADMINISTRATION 3 AGM, ADMINISTRATION
4 AGM, FINANCE 94 4 AGM, FINANCE
5 AGM, OPERATION 28 5 AGM, OPERATION
6 AGM, PMG 6 AGM, PMG
7 AGM, TECH'L. SERVICES 20 7 AGM, TECH'L. SERVICES
8 ACCOUNTING DEPT. 192 8 ACCOUNTING DEPT. 23
9 INTERNAL AUDIT DEPT. 95 9 INTERNAL AUDIT DEPT.
10 BILLING DEPT. 188 10 BILLING DEPT. 5
11 COOP 214 11 COOP 2
12 CONSTRUCTION DEPT. 12 CONSTRUCTION DEPT. 1
13 CORPLAN DEPT. 30 13 CORPLAN DEPT.
14 ENGINEERING DEPT. 234 14 ENGINEERING DEPT. 2
15 EWRD 15 EWRD 7
16 FMD 16 FMD 14
17 GSD 489 17 GSD 6
18 HRD 1,039 18 HRD 8
19 LEGAL DEPT. 19 LEGAL DEPT. 1
20 MMD 2,612 20 MMD 1
21 MEU 21 MEU
22 MIS 51 22 MIS 3
23 MSSD 23 MSSD 4
24 PAD 196 24 PAD 13
25 PMD 206 25 PMD 16
26 PMO 26 PMO
27 PDD 98 27 PDD 1028 SCID 1,864 28 SCID 32
TOTAL RECORDED COPIES 7,704 TOTAL RECORDED COPIES 148
8/8/2019 Accomplishment Dec09
10/17
CARPENTER ACCOMPLISHMENT FOR MARCH 2005 (TEAM A)
By: Utility Division / General Services Department
NURSES HOMES W-18
MONTH FEBRUARY MARCH
DAY M T W T F S S M T W T F S S M T W T F S S
WORK DESCRIPTION 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13
Mobilization
Clearing of Area from Debris
Foundation Work
Columns and Walls
MONTH MARCH APRIL
DAY M T W T F S S M T W T F S S M T W T F S SWORK DESCRIPTION 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
Mobilization
Walls & Masonry Work
Roofing
Post concreting
Finishing
MONTH APRILDAY M T W T F S S M T W T F S S M T W T F S S
WORK DESCRIPTION 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Post concreting
Fabricate Steel Doors
Pathways
Finishing
Demobilization
LEGEND:
PLANNED
ACTUAL
TRANSFERRED TO OTHER ACTIVITIES
8/8/2019 Accomplishment Dec09
11/17
MINOR ELECTRICAL WORKS
Month of MAY 2008
LIGHTING ACCESSORIES FLUORESCENT TUBE
LOCATION INSTALLED 50 W 50 W
MAIN OFFICE BUILDING 1 50
MOTORPOOL
BUHISAN DAM
CASILI RESERVOIR & SATELLITE OFFICE
CANAMUCAN PUMPING STATIONS
CEBU PLAZA PUMP HOUSE
GUADALUPE BOOSTER PUMP
JACLUPAN DAMJACLUPAN NURSERY
JACLUPAN PUMP HOUSE
LAHUG PUMPING STATIONS 6
LAGTANG RESERVOIR & SATELLITE OFFICE
LAPULAPU MEPZ RESERVOIR
LAPULAPU PUSOK RESERVOIR & SATELLITE OFFICE
LAPULAPU PUMPING STATIONS
LILOAN PUMPING STATIONS
LILOAN RESERVOIR
MANDAUE BOOSTER PUMP
TALAMBAN D' FAMILY PARKTALAMBAN RESERVOIR
TALAMBAN METER REPAIR SHOP
TALAMBAN NURSERY
TALAMBAN FABRICATION
TALAMBAN WAREHOUSE 3
TALAMBAN WORKSHOP
HALO-GEN
INCANDBU
18 W / 20W
36 W / 40W
8/8/2019 Accomplishment Dec09
12/17
TISA RESERVOIR
TOTAL 1 59 0 0
TOTAL INSTALLATIONS 146
8/8/2019 Accomplishment Dec09
13/17
CFL
100 W 15 W 18 W 22 W 25 W 75 W 100 W 160 W 250 W 150 W
11
3 12 6
4 3
4
6
4
-SCENTLB
HgBULB
HgBULB
SPOTLIGHT
8/8/2019 Accomplishment Dec09
14/17
7 0 11 0 4 0 6 15 10 0
8/8/2019 Accomplishment Dec09
15/17
ATTACHMENT A
BALLAST STARTER ELECTRICAL WIRE
400W 20 W 40 W Halogen 20 W 40 W CKT QTY Wire Size
5 5 8,10 24,20
6 6
3 3
HIDLAMP
LIGHTFIXTURE
Length,Meters
8/8/2019 Accomplishment Dec09
16/17
5
0 0 14 0 0 14 0 - - 5
8/8/2019 Accomplishment Dec09
17/17
CARPENTER ACCOMPLISHMENT FOR MARCH 2005 (TEAM B)
By: Utility Division / General Services Department
W1.2, LAGTANG PUMPING STATION APRIL
DAY M T W T F S S M T W T F S S M T W T F S S
WORK DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Mobilization
Removal of scaling paintRepair of roofing, ceiling and door
Installation of wire mesh at windows
Repainting
SV-15, LILOAN APRIL
WORK DESCRIPTION W T F S S M T W T F S S M T W T F S
1. PERIMETER FENCE IMPROVEMENT 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Transport materials
Excavation & metal works for footing
Concreting of footing
Cutting & Welding of G.I. Post
Weld Interlink wire
Weld top barbed wire
Painting
SV-15, LILOAN MAY
WORK DESCRIPTION M T W T F S S
2. PUMPHOUSE STRUCTURE
Removal of scaling paint
Repair of roofing, ceiling and door
Repainting
LEGEND:
PLANNED
ACTUAL