    GENERAL SERVICES DEPARTMENT

    UTILITY SERVICES DIVISION

    EXECUTIVE SUMMARY

    DECEMBER. 2009

    OBJECTIVE/ACTIVITY MEASURES CY 2009 Target Nov-09 Dec-09

    I. BUILDING OPERATION & MAINTENANCE

    1. Energy Usage

    a. POWER DEMAND Kilowatt (kw) 450 kW -

    b. ENERGY USED Kilowatt-Hour (kwh) 97,000 kWhr -

    c. POWER FACTOR Percent (%) 95% Minimum -

    d. COST Peso variable -

    e. EFFECTIVE RATE Peso per kwh variable -

    2. Electrical

    a. Major Electrical Works 10/month 13 16

    b. Minor Electrical Works 150/month 263 219

    c. Telephone System No. of telephone devices installed or repaired variable 1 2

    d. Coordination Meeting variable 0 0

    3. Airconditioning system

    a. PM of Aircon Unit

    - FCU 20 units/ month 18 9

    - AHU 4 units/qtr 0 8 Washing of filter at s

    - Chiller Units 4 units/month 6 10 Washing of chiller un

    - 3 Tonner @ Computer Server Room variable 0 0

    - 1.5 Tonner 1 unit/month 0 1

    - 5 Tonner 1 unit/month 1 3

    No. of electrical equipment operated,maintained, installed or repaired

    Layout new wiring, Mtesting & check-ups,battery, troubleshoot

    No. of electrical devices replaced, repaired ornewly installed

    Replace busted lightielectrical devices, reseries light on christ

    Repair telephone dir

    Managers Office and

    No. of coordination meetings attended thatrelates to departments functions

    No. of air-conditioning equipment undergonepreventive maintenance, repair, new

    installation, replacement or troubleshooting.

    Washing of FCU filterfan motors and drain

    Washing of AHU filteand Ground Floor Ar

  • 8/8/2019 Accomplishment Dec09

    2/17

    OBJECTIVE/ACTIVITY MEASURES CY 2009 Target Nov-09 Dec-09

    - Window Type per request 0 0

    b. Install/Repair Aircon Units

    - FCU variable 0 0

    - AHU variable 0 0

    - Chiller Units variable 0 2

    -5 Tonner variable 1 1

    - 3 Tonner @ Computer Server Room variable 0 0

    - Window Type variable 1 0

    c. Exhaust Fan variable

    d. Power Management Activities Turn off chillers in under utilized areas 5 units/day 2

    4. Plumbing Works 5 units/month 5 9

    5. Elevator

    Frequency of maintenance or repair 2 units/month 2 2

    Elevator Power Management Activity Daily Daily Daily Turning on/off of ele

    Special Service variable 0 0

    II. GENERAL CLEANING & MAINTENANCE

    - Main Office Building Daily Daily Daily Under contract w/ P

    - Workshop Daily Daily Daily

    - Laboratory Daily Daily Daily

    - Villa Azul Training Center Daily Daily Daily

    - Meter Rig Building Daily Daily Daily

    - PMD-N Office Daily Daily Daily

    - Basketball & Tennis Court Daily Daily Daily

    Replaced new Circul# 15 @ 8th floor ACvalve and clogged u3rd Floor.

    Repair burned termiswitch @ clinic split t

    No. of plumming devices replaced, installedor repaired

    Install piping system,hose, CR urinal & boand Talamban Faciliti

    Under contract with IInc.

    Frequency of cleaning and maintenance ofMCWD facilities

    Done by regular emchart made

  • 8/8/2019 Accomplishment Dec09

    3/17

    OBJECTIVE/ACTIVITY MEASURES CY 2009 Target Nov-09 Dec-09

    Monthly Monthly Monthly Done b

    III. REPAIR & RECONSTRUCTION WORK

    22 days 40% 100%

    - Fabrication of table w/ cabinet for MSSD used. 20 days 35% 100%

    15 days 35% 100%

    22 days 0% 60%

    2 days 0% 100%

    3 days 0% 100%

    5 days 40% 100%

    5 days 0% 100%

    - Other carpentry works variable 5 6

    IV. REPRODUCTION MACHINES1. Photocopier, copies No. of copies produced per month variable 13,192 8,519

    2. Risograph, reams No. of copies produced per month variable 47.5

    V. SPECIAL FUNCTIONS

    1. Social Hall UsageTotal Hours of Usage variable Internal & external u

    Total Revenue Generated, Peso variable

    2. Training Room Usage Total Hours of Usage variable

    VI. OTHER RELATED ACTIVITIES No. of other related activities handled variable

    Prepared by: Noted:

    JUANITO D. ANDO STEPHEN D. YEE

    Division Manager Department Manager

    Utility Division General Services Dept.

    - Other facilities(pumping stations, reservoirs, etc.)

    - Renovation and repair of W-17 Perimeter Fence.

    Length of time the particular project orassignment been able to perform with

    regards to desired performance

    - Repair, re-paint canteen facilities in TalambanVilla Azul.

    Installation of metal barricade for vehicle stoppage@ the main building vehicle entry.

    Installation of glass wall @ 3rd floor area of mainbuilding.

    Installation of new submersible pump unit for

    basement waste water removal.Installation of fire suppresant inside MIS ServerRoom (5th Floor).

    Fabrication and Construction of steel mating dooras per warehose concern @ Exit door 3rd floorarea.

    Replacement of damaged door locks,repair of tables, etc. at main officebuilding & other satellite offices.

    Repair of furnitures,blinds and other builoffices. fabrication ofworks

  • 8/8/2019 Accomplishment Dec09

    4/17

    Remarks

    Equal

    Equal

    Equal

    Equal

    Equal

    ocial hall AHU units.

    its, draining of Y-strainer.

    ain office standby gensetrecharging of gensetelectrical at satellite office.

    ng tubes, bulb, & otherpair bundy clock, install

    as party activities.

    ct line @ HRD Dept.

    PAD Office.

    s/ Done vacuuming of FCUpan.

    units at Consumers areaa.

  • 8/8/2019 Accomplishment Dec09

    5/17

    Remarks

    ator during low peak hours.

    rfect Clean General Services

    ting Pump (3 Hp) on chillerield, Replaced expansionfilter drier on Chiller # 5 @

    al of high side pressureye aircon

    repair leak faucet, flexiblel closets @ Main Building

    ies.

    nt'l. Elevator & Equipment,

    ployees Locator/Assignmentor better monitoring

  • 8/8/2019 Accomplishment Dec09

    6/17

    Remarks

    Pakiao workers

    se

    ubicles, doors, windowing facilities and satellitewooden barricades, Masonry

  • 8/8/2019 Accomplishment Dec09

    7/17

    MINOR ELECTRICAL WORKS

    Month of December 2009

    LIGHTING ACCESSORIES CFL Hg BULB BALLAST STA

    LOCATION INSTALLED 50 W 50 W 100 W 18 W 23 W 25 W 55 W 100 W 160 W 250 W 150 W 400W 20 W 40 W 18 W 20 W

    MAIN OFFICE BUILDING 5 21 7 10

    MOTORPOOL / GARAGE 2

    BUHISAN DAM 3 4 3 3CASILI RESERVOIR & SATELLITE OFFICE 4

    CANAMUCAN PUMPING STATIONS

    CEBU PLAZA PUMP HOUSE 4

    GUADALUPE BOOSTER PUMP

    JACLUPAN DAM

    JACLUPAN NURSERY 2

    JACLUPAN PUMP HOUSE 8

    LAHUG PUMPING STATIONSLAGTANG GENSET HOUSE 1

    LAGTANG RESERVOIR & SATELLITE OFFICE 4

    LAPULAPU MEPZ RESERVOIR 3

    LAPULAPU PUSOK RESERVOIR & SATELLITE OFFICE 2 2

    LAPULAPU PUMPING STATIONS 3

    LILOAN PUMPING STATIONS 4

    LILOAN RESERVOIR 4

    MANDAUE BOOSTER PUMP

    TALAMBAN D' FAMILY PARK

    TALAMBAN (Perimeter Fence) and MSSD

    TALAMBAN METER REPAIR SHOP 2

    TALAMBAN MIS CONTROL HOUSE

    TALAMBAN PMD-N OFFICE 3

    TALAMBAN RESERVOIR

    TALAMBAN TRAINING CENTER 6

    TALAMBAN WAREHOUSE

    TALAMBAN WORKSHOP

    TALAMBAN NURSERY

    TALAMBAN PUMPING STATION

    TALAMBAN STOCKROOM

    TALAMBAN FABRICATION

    TISA FILTER PLANT

    TISA RESERVOIR

    (SPECIAL PROJECT) STREET LIGHTING, TALAMBAN

    (SPECIAL PROJECT)

    FLUORESCENTTUBE

    HALO-GEN

    INCANDESCENT BULB

    SPOTLIGHT

    HIDLAMP

    PINLIGHT

    18 W /20 W

    36 W /40 W

    15 W2U

    18 W 3UCERES

  • 8/8/2019 Accomplishment Dec09

    8/17

    MENT A

    switch

    2

    1

    1

    3

    1 1

    LIGHT FIXTURE, BATTERY, SWITCHAND EXTENSION OUTLET

    Receptacle andframe

    Batteryreplacem

    ent

    Outlet (3GANG)

  • 8/8/2019 Accomplishment Dec09

    9/17

    ATTACHMENT B

    Month of July 1-31, 2009

    PHOTOCOPIER MACHINES OUTPUT RESOGRAPH MACHINES OUTPUT

    RANK OFFICES COPIES RANK OFFICES REAMS

    1 BOARDs OFFICE 32 1 BOARDs OFFICE

    2 GMs OFFICE 22 2 GMs OFFICE

    3 AGM, ADMINISTRATION 3 AGM, ADMINISTRATION

    4 AGM, FINANCE 94 4 AGM, FINANCE

    5 AGM, OPERATION 28 5 AGM, OPERATION

    6 AGM, PMG 6 AGM, PMG

    7 AGM, TECH'L. SERVICES 20 7 AGM, TECH'L. SERVICES

    8 ACCOUNTING DEPT. 192 8 ACCOUNTING DEPT. 23

    9 INTERNAL AUDIT DEPT. 95 9 INTERNAL AUDIT DEPT.

    10 BILLING DEPT. 188 10 BILLING DEPT. 5

    11 COOP 214 11 COOP 2

    12 CONSTRUCTION DEPT. 12 CONSTRUCTION DEPT. 1

    13 CORPLAN DEPT. 30 13 CORPLAN DEPT.

    14 ENGINEERING DEPT. 234 14 ENGINEERING DEPT. 2

    15 EWRD 15 EWRD 7

    16 FMD 16 FMD 14

    17 GSD 489 17 GSD 6

    18 HRD 1,039 18 HRD 8

    19 LEGAL DEPT. 19 LEGAL DEPT. 1

    20 MMD 2,612 20 MMD 1

    21 MEU 21 MEU

    22 MIS 51 22 MIS 3

    23 MSSD 23 MSSD 4

    24 PAD 196 24 PAD 13

    25 PMD 206 25 PMD 16

    26 PMO 26 PMO

    27 PDD 98 27 PDD 1028 SCID 1,864 28 SCID 32

    TOTAL RECORDED COPIES 7,704 TOTAL RECORDED COPIES 148

  • 8/8/2019 Accomplishment Dec09

    10/17

    CARPENTER ACCOMPLISHMENT FOR MARCH 2005 (TEAM A)

    By: Utility Division / General Services Department

    NURSES HOMES W-18

    MONTH FEBRUARY MARCH

    DAY M T W T F S S M T W T F S S M T W T F S S

    WORK DESCRIPTION 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13

    Mobilization

    Clearing of Area from Debris

    Foundation Work

    Columns and Walls

    MONTH MARCH APRIL

    DAY M T W T F S S M T W T F S S M T W T F S SWORK DESCRIPTION 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3

    Mobilization

    Walls & Masonry Work

    Roofing

    Post concreting

    Finishing

    MONTH APRILDAY M T W T F S S M T W T F S S M T W T F S S

    WORK DESCRIPTION 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Post concreting

    Fabricate Steel Doors

    Pathways

    Finishing

    Demobilization

    LEGEND:

    PLANNED

    ACTUAL

    TRANSFERRED TO OTHER ACTIVITIES

  • 8/8/2019 Accomplishment Dec09

    11/17

    MINOR ELECTRICAL WORKS

    Month of MAY 2008

    LIGHTING ACCESSORIES FLUORESCENT TUBE

    LOCATION INSTALLED 50 W 50 W

    MAIN OFFICE BUILDING 1 50

    MOTORPOOL

    BUHISAN DAM

    CASILI RESERVOIR & SATELLITE OFFICE

    CANAMUCAN PUMPING STATIONS

    CEBU PLAZA PUMP HOUSE

    GUADALUPE BOOSTER PUMP

    JACLUPAN DAMJACLUPAN NURSERY

    JACLUPAN PUMP HOUSE

    LAHUG PUMPING STATIONS 6

    LAGTANG RESERVOIR & SATELLITE OFFICE

    LAPULAPU MEPZ RESERVOIR

    LAPULAPU PUSOK RESERVOIR & SATELLITE OFFICE

    LAPULAPU PUMPING STATIONS

    LILOAN PUMPING STATIONS

    LILOAN RESERVOIR

    MANDAUE BOOSTER PUMP

    TALAMBAN D' FAMILY PARKTALAMBAN RESERVOIR

    TALAMBAN METER REPAIR SHOP

    TALAMBAN NURSERY

    TALAMBAN FABRICATION

    TALAMBAN WAREHOUSE 3

    TALAMBAN WORKSHOP

    HALO-GEN

    INCANDBU

    18 W / 20W

    36 W / 40W

  • 8/8/2019 Accomplishment Dec09

    12/17

    TISA RESERVOIR

    TOTAL 1 59 0 0

    TOTAL INSTALLATIONS 146

  • 8/8/2019 Accomplishment Dec09

    13/17

    CFL

    100 W 15 W 18 W 22 W 25 W 75 W 100 W 160 W 250 W 150 W

    11

    3 12 6

    4 3

    4

    6

    4

    -SCENTLB

    HgBULB

    HgBULB

    SPOTLIGHT

  • 8/8/2019 Accomplishment Dec09

    14/17

    7 0 11 0 4 0 6 15 10 0

  • 8/8/2019 Accomplishment Dec09

    15/17

    ATTACHMENT A

    BALLAST STARTER ELECTRICAL WIRE

    400W 20 W 40 W Halogen 20 W 40 W CKT QTY Wire Size

    5 5 8,10 24,20

    6 6

    3 3

    HIDLAMP

    LIGHTFIXTURE

    Length,Meters

  • 8/8/2019 Accomplishment Dec09

    16/17

    5

    0 0 14 0 0 14 0 - - 5

  • 8/8/2019 Accomplishment Dec09

    17/17

    CARPENTER ACCOMPLISHMENT FOR MARCH 2005 (TEAM B)

    By: Utility Division / General Services Department

    W1.2, LAGTANG PUMPING STATION APRIL

    DAY M T W T F S S M T W T F S S M T W T F S S

    WORK DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Mobilization

    Removal of scaling paintRepair of roofing, ceiling and door

    Installation of wire mesh at windows

    Repainting

    SV-15, LILOAN APRIL

    WORK DESCRIPTION W T F S S M T W T F S S M T W T F S

    1. PERIMETER FENCE IMPROVEMENT 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

    Transport materials

    Excavation & metal works for footing

    Concreting of footing

    Cutting & Welding of G.I. Post

    Weld Interlink wire

    Weld top barbed wire

    Painting

    SV-15, LILOAN MAY

    WORK DESCRIPTION M T W T F S S

    2. PUMPHOUSE STRUCTURE

    Removal of scaling paint

    Repair of roofing, ceiling and door

    Repainting

    LEGEND:

    PLANNED

    ACTUAL