US Army Corps of Engineers
BUILDING STRONG®BUILDING STRONG®
Hurricane Storm Damage andHurricane Storm Damage and
Risk Reduction SystemRisk Reduction System
MitigationMitigationLake Pontchartrain &Lake Pontchartrain &
VicinityVicinity
SLFPAE Coastal Committee Meeting
21 Sept 2010
BUILDING STRONG® 2
Mitigation - Where unavoidable construction impacts to the environment occur,
mitigation is the action to replace the loss of wetland and aquatic resource
functions in a watershed.
Projects to provide mitigation may also be required for non-wetland habitat
such as dry bottomland hardwood forests.
Compensatory mitigation, refers to the restoration, establishment,
enhancement, or in certain circumstances preservation of wetlands,
streams or other aquatic resources for the purpose of offsetting
unavoidable adverse impacts.
Habitat being mitigated for through mitigation banks or acquisition of real
estate and construction of mitigation are as follows: Bottomland Hardwood
– Dry & Wet; Fresh and Intermediate Marsh; and Brackish Marsh.
HSDRRS Mitigation BackgroundHSDRRS Mitigation Background
BUILDING STRONG®
Water Resources Development Act (WRDA) 1986, Section 906, as amended
• Mitigation is a project feature of the Lake Pontchartrain and Vicinity (LPV) project.
• LPV was authorized by the Flood Control Act of 1965.
Additional applicable authorities are:
• Public Law (PL) 84-99: emergency repairs performed by Task Force Guardian;
• 3rd Supplemental, PL 109-148;
• 4th Supplemental Inner Harbor Navigation Canal (IHNC) work, PL 109-234.
AuthorityAuthority
BUILDING STRONG® 4
Potential Mitigation SitesPotential Mitigation Sites
BUILDING STRONG® 5
Non-wet
BLH
AAHUs
Acres
needed
Marsh
AAHUs
Acres
needed
Swamp
AAHUs
Acres
needed
Wetland
BLH
AAHUs
Acres
needed
Protected
Side 68.79 58.81 0.00 0.00
Restore 0.54 127.39 0.27 217.81 0.48 0.00 0.54 0.00
Enhance 0.17 404.65 N/A 0.235 0.00 0.17 0.00Flood
Side 4.65 32.46 70.81 43.96
Restore 0.54 8.61 0.27 120.22 0.48 147.52 0.54 81.41
Enhance 0.17 27.35 N/A 0.235 301.32 0.17 258.59
Basin
1East Bank
(IERs 1-11+
Borrow)
LPV Mitigation Estimated Acreage Needed
As of this presentation (September 21, 2010)
BUILDING STRONG® 6
LPV Mitigation Milestones
Task Completion
Public Meetings May 2010
Initial Screening of Measures Summer 2010
Final Screening of Measures Spring 2011
Identify Proposed Mitigation Plan Summer 2011
Release Individual Environmental Reports Spring 2012
Individual Environmental Reports Signed Spring 2012
Design Mitigation Projects Fall 2012
Start Construction Fall 2013
BUILDING STRONG® 7
DiscussionDiscussion