Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
A 3(M
)
Ward B
dy
200M
100M
P
P
P
PP
P
A 3(M
)
Ward B
dy
222222200000000000000000000MMMMM
11000MMM
PPPPPPPPPPPPPPPPPPPPPPPP
P
PPPPPPPPPPPP
PP
PPPPPPPPP
41a
14
16b
16
10a
Yew Tree Cottage
Yews
Sub Sta
66.4m
4 to 8
40
6a
2a
87.8m
Tree Tops
8
12
23
2
10
5
Park
1
32
2
1
Surgery
42a
TyfieldCottages
Coach House
Chu
rch
Path
Cottages
2
PORTSMOUTH ROAD
16
39a
8
34
El
Horndean
42
1a
Meml
10
12
Indu
stria
l Est
ate
Southfield
El Sub Sta
(PH)
43
9
38
2
Cadlington House
House
Rose Cott
1
KILDERKIN DRIVE
Church
Ellarona
1a
28
43a
24
TCB
22
29
War
Cottage
2
(PH)
44a
6
21
6b
Briar
Crookley Park
Greensleeves
24 to
43
16a
House
BLENDWORTH LANE
Stables Cottage
48
3
20
Cottages
2
Centre
Murray House
Track
13
EstateThe Lodge
The Orangery
4
HAVAN
T RO
AD
39
Motel
41c
41b
Shelter
PC
1
18
4
Red Lion
1
3
11
Park
9
Seymour House
Corisande
Blendworth
F Sta
43
1
Blendthorpe
Tel Ex
1 to 23
1
Flint
Starlings
19
The New
Car
House
PO
8
20
The
28
Deepwell Cottage
24
17
8
Car
17
5
Crookley
Gardeners Cottage
Centre
39b
2
Ship & Bell
Precinct
76.8m
28
Myrtle
Keepers C
The Paddock
COOPERS RISE
Horndean
El Sub Sta
drawtseW
House19
24
Trove
41d
39
El Sub Sta
Wes
tfiel
d
2
26
44
Cadlington House
LON
DO
N R
OAD
3
LB
Brewery
15
0
N
50m 100m
The Red Lion Pub The Gales Brewery Redevelopment
Parade of Shops
Centre
Brighterthinking
LAND SOUTH OF BLENDWORTH LANE HORNDEAN
BOARD 01
Site Location Plan
HA
VAN
T R
OA
D
PORTSMOUTH ROAD
CADLINGTON HOUSE
BLENDWORTH LANE
1
5
2
6
7 8 9
3
15
2
6
7
8
9
3
SITE BOUNDARYRETAILHOTEL/ GUEST HOUSECOMMUNITYEMPLOYMENTRESIDENTIALGARAGESGALES BREWERY REDEVELOPMENTUNKNOWNSUNLEY DEVELOPMENT UNDER CONSTRUCTIONFORMAL AND INFORMAL PARKING AREAS
P
14
10a
Yew Tree Cottage
Yews
Sub Sta
66.4m
4 to 8
6a
2a
Tree Tops
8
12
23
10
5
Park
2
1
SurgeryTyfield
Cottages
Coach House
Chu
rch
Path
Cottages
PORTSMOUTH ROAD
16
8
34
El
Horndean
1a
Meml
10
12
Southfield
El Sub Sta
(PH)
9
2
Cadlington House
House
Rose Cott
1
KILDERKIN DRIVE
Church
Ellarona
1a
28
22
War
Cottage
2
(PH)
21
6b
Briar
Greensleeves
2
House
BLENDWORTH LANE
Stables Cottage
3
2
Centre
Murray House
Track
13
EstateThe Lodge
The Orangery
4
HAVAN
T RO
AD
Motel
PC
1
18
4
Red Lion
3
11
Park
9
Seymour House
Corisande
Blendworth
F Sta
1
Blendthorpe
1 to 23
1
Flint
19
The New
Car
PO
8
20
The
Deepwell Cottage
24
17
Car
17
Crookley
Gardeners Cottage
Centre
2
Ship & Bell
Precinct
76.8m
Keepers Cottage
The Paddock
Horndean
drawtseW
House19
Trove
El Sub Sta
2
26
Cadlington House
DO
N R
OAD
3
LB
Brewery
15
ANENE
WORTTH LAN
76.8m
BLEND
C
Track
CottagesCrookley
200M
100M
Coach HouseHousese
Murray Ho
Seymour H
Ke
Cadlington House
SITE BOUNDARY
KEY |
EXISTING BUILDINGS
LISTED BUILDINGS
CONSERVATION AREA
SOUTH DOWNS NATIONAL PARK
WOODLAND HABITAT
EXISTING VEGETATION WITHROOT PROTECTION AREAS
STRATEGIC GAP
EXISTING PUBLIC RIGHT OF WAY
POTENTIAL TRAFFIC CALMING
PEDESTRIAN ACCESS POINT
ACCESS POINT
EMBANKMENT
the area as established within the
Statement.
will be retained.
Brighterthinking
LAND SOUTH OF BLENDWORTH LANE HORNDEAN
BOARD 02
Opportunity and Constraints Plan
Brighterthinking
LAND SOUTH OF BLENDWORTH LANE HORNDEAN
BOARD 03
There are over 72 trees on site. The small number of trees that are to be removed have been professionally
total only 6 trees will be lost and
development.
site. Please see Board 5 for how this
•
•
•
•
•
•
The development form
west of the footpath and 5dph to the east. women.
The Proposed Dwelling Mix for the Site is:
Conservation Area
to the north of the site.
Brighterthinking
LAND SOUTH OF BLENDWORTH LANE HORNDEAN
BOARD
area.
the area.
the development.
AB
Brighterthinking
LAND SOUTH OF BLENDWORTH LANE HORNDEAN
BOARD 05
•
•
•
•
• around the perimeter of the site will be retained to minimise the disruption to wildlife.
•
the wildlife area.•
the development and provide seasonal tones to embellish the
The following images illustrate some of the key landscape details that are proposed across the development.
A variety of Boundary Treatments are Proposed
Detailed on this board are the
area.
Park
Surgery
yfield
Cottages
Cottages
ouse
1
1
Flint
Car
Crookley
2
3
BLENDWORTH LANE Proposed give-waypoint with new signage
Priorityincoming traffic
Proposed new 1.8m footwayfrom site to link to existingfootway. Surfacing to matchexisting paving.
Narrow carriagewayto 3.7m wide
Existing Footway
Existing ChurchCentre Access
Foul manhole to berelocated / adjustedto suit new kerbline
Proposed new signpostand Diag 811 sign
Adjust embankment toallow for 1.8m footway
Relocate telegraphPole
Reduce embankmentheight by 0.45m to allowsightline
Reduce embankmentheight by 0.70m to allowsightline
5.5m Wide Access Roadto serve proposeddevelopment
2.4m x 43m Sightline
Proposed 1/15Gradient
All vegetation to be cutback / removed asnecessary
Public Footpath Route 33to remain through the site
2.4m x 43m Sightline
Stone wall to retainembankment
300mm widesafety margin
Relocate street light andremove existing no footwaysign to east of new footway
1.0m high stoned facedwall to match existingstreet scene
Extend kerb toprovide safetymargin
Provide tactilepaving and dropkerbs
kment tofootway
ed facedxisting
Proposed give-wayvepoint with new signagew
Narrow carriagewayto 3.7m wide
sig
2.4m x 43m Sightline
m
eneninlitlitlhthghghgigSiSSSSmmm3m3343444xxxxmmm4m4442 4222
gh
300mm widesafety margin
fety
mentm to allow
2.4m x 43m Sightline
43m S ghtli
All vegetation to be cutn tback / removed asd asnecessaryesssa yy
Exist
Prop
Prop
Exist
Prop
PrinSeco
Existing Pedestrian Access
Proposed Vehicular Access
Proposed Pedestrian Access
Existing Public Footpath
Proposed Footpath
Principal Vehicular RouteSecondary Vehicualr Route
Parking Space
Garage
Brighterthinking
LAND SOUTH OF BLENDWORTH LANE HORNDEAN
BOARD 06
Existing Lane
Proposed Highway Improvements
30
Brighterthinking
LAND SOUTH OF BLENDWORTH LANE HORNDEAN
BOARD 07
libraries.
• ability to implement partition walls to host one or more
• •
•
• •
•
within the site will be retained in situ and the
be removed. The new homes will provide
to the path.
meet the needs of both present and
privately. People will be
People
wide variety of needs
available.
Lane
A new footpath is also to be provided parallel to the lane
pedestrian safety.
Design Principles & Strategies
•
•
•
•
• •
•
•
•
1. Solar Hot Water Unit
2. Photovoltaic Arrays (Solar Panels/tiles)
3. Materials
4. Ecology
Foul Drainage
Surface Water Drainage
Drainage & Utilities
Gas
of the site.
Electricty
Water
Telecommunications
12
36
5
4
5. Drainage
water.
6. Heat Recovery
7. Bat Boxes
Brighterthinking
LAND SOUTH OF BLENDWORTH LANE HORNDEAN
BOARD 08
Brighterthinking
LAND SOUTH OF BLENDWORTH LANE HORNDEAN
BOARD 09
Legacy
for all future residents and the
themselves with.
important to us and will be individually assessed
them wherever possible.
important that you respond to us by no later
The Sunley Team
Thank you for taking the time to visit our exhibition. We need your feedback on the proposals so please
let us know what you think about them. If you would like more time to consider your views, please pick up a freepost envelope and use it to
return your completed comment form before Friday 6th December 2013.
Title: Initial (s):
Surname: Address:
Postcode: Telephone:
Email: I am: A resident [ ] A Councillor
[ ]
A representative of an organisation (please state) [ ] Other (please state)
[ ] Under the Data Protection Act 1998 we will ensure that the data you supply us is processed with skill
and care and in accordance with the legislation and codes and will be used only for the purposes relating
to the exhibition. Your details will not be passed to any third party. We take our responsibilities in respect
of your Personal Data extremely seriously. We will not contact you for promotional purposes unless you
specifically agree to be contacted for such purposes at the time you submit your information.