EPIC FOR POWER SUPPLY PROJECT THROUGH SUBMARINE CABLES FROM RAS LAFFAN TO HALUL SITE ACCEPTANCE TEST FOR 132kV GIS Client Qatar Petroleum Document No. 3433-HW08-2-05-0003-F20 Contractor LSC / L&T Date / Rev. 05/03/2015 / Rev. - 1 Location Page No 1 of 3 Equipment Tag Test Date Make Name / Type of Equipment Serial Number Rating Power Voltage Current Secondary Injection Test Panel Tag/location CT Tag Type of CT Core-1 Core-2 Core-3 Ratio Class Purpose L&T Vendor LSC QP Signature Name Designati on Date

3433-HW08-2-05-0003-F20

Embed Size (px)

DESCRIPTION

132 KV GIS PD test format

Citation preview

Page 1: 3433-HW08-2-05-0003-F20

EPIC FOR POWER SUPPLY PROJECT THROUGH SUBMARINE CABLES FROM RAS

LAFFAN TO HALUL

SITE ACCEPTANCE TEST FOR 132kV GISClient Qatar Petroleum Document No. 3433-HW08-2-05-0003-F20

Contractor LSC / L&T Date / Rev. 05/03/2015 / Rev. - 1

Location Page No 1 of 2

Equipment Tag Test Date

MakeName / Type of EquipmentSerial Number

RatingPower VoltageCurrent

Secondary Injection Test

Panel Tag/location

CT Tag

Type of CT

Core-1 Core-2 Core-3

Ratio

Class

Purpose

L&T Vendor LSC QP

Signature

NameDesignatio

nDate

Page 2: 3433-HW08-2-05-0003-F20

EPIC FOR POWER SUPPLY PROJECT THROUGH SUBMARINE CABLES FROM RAS

LAFFAN TO HALUL

SITE ACCEPTANCE TEST FOR 132kV GISClient Qatar Petroleum Document No. 3433-HW08-2-05-0003-F20

Contractor LSC / L&T Date / Rev. 05/03/2015 / Rev. - 1

Location Page No 2 of 2

Equipment Tag Test Date

1. Measurement:

Test PointsSecondary

Current Injected

Measured value at

LCC Panel……………………………

Relay panel……………………………

Relay Panel……………………………

2. Test Equipment’s used

Sr. No. Equipment / Instrument Make Equip. Sr. No.Calibration due

date

Remarks:…………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

L&T Vendor LSC QP

Signature

NameDesignatio