3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity [email protected]

3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity [email protected]

Embed Size (px)

Citation preview

Page 1: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

3.25.2008 RSC

An Overview ofFill-In-the-Blanks (FIB) Reliability

Standards

Farzaneh TafreshiManager, Reliability Standards

Texas Regional [email protected]

Page 2: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

2

Regional Reliability Standards

● Any Regional Entity may develop, through its own processes, separate Standards that go beyond, add detail to, or implement NERC Reliability Standards

● A Regional Standard shall be more stringent than a continent-wide reliability standard, including a regional difference that addresses matters that the continent-wide reliability standard does not, or shall be a regional difference necessitated by a physical difference in the bulk power system

Page 3: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

3

Regional Reliability Standards (Cont.)

● Proposed Reliability Standards shall be subject to approval by NERC, as the Electric Reliability Organization (ERO) , and by FERC before becoming mandatory and enforceable under Section 215 of the FPA.

● No Standard shall be effective within the Texas RE area unless filed by NERC with FERC and approved by FERC.

Page 4: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

4

Regional Reliability Standards (Cont.)

● The NERC Regional Reliability Standards Working Group (RRSWG) was established in May of 2006

● Manage the development of specific regional reliability standards and the development of regional information for certain NERC reliability standards, based on the NERC three-year standards work plan

Page 5: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

5

Regional Reliability Standards (Cont.)

● The RRSWG group coordinates regional activities that are intrinsically related to the development of Regional Reliability Standards between the eight Regional Entities, NERC staff, and industry volunteers working on NERC reliability standards

● The RRSWG has identified 4 NERC standards to have FIB characteristics and has recommended to have four Regional Reliability Standards to be developed by each region in support of those NERC standards

Page 6: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

6

Intended Number of Regional Standards

● NERC’s 3 year plan (2008 through 2010) has listed specific projects to address various issues by grouping similar standards.

● Reliability Standards Work Plan: 2008-2010

● Volume III: Regional Reliability Standards Projects

Page 7: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

7

Fill in the Blank Standards

● Project 2007-01 Underfrequency Load Shedding

● Project 2007-05 Balancing Authority Controls

● Project 2007-11 Disturbance Monitoring

● Project 2008-04 Protection Systems

Page 8: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

8

Project 2007-01 Underfrequency Load Shedding

PRC-006 — Development and Documentation of Regional ReliabilitOrganizations Underfrequency Load Shedding ProgramsPRC-007 — Assuring Consistency with Regional UFLS Programs

PRC-009 — UFLS Performance Following an Underfrequency Event

http://www.nerc.com/~filez/standards/Underfrequency_Load_Shedding.html

StatusFirst draft to be posted for comments around April 2008

Page 9: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

9

UFLS Project Schedule

Page 10: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

10

Project 2007-05 Balancing Authority Controls

BAL-002, and BAL-004 to BAL-006

BAL-002 — Disturbance Control Performance

http://www.nerc.com/~filez/standards/Balancing_Authority_Controls_Project_2007-05.html

Status 

The Standards Committee is seeking industry experts to serve on the Balancing Authority Control Standard drafting Team beginning January 2, 2008.

Page 11: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

11

BA Project Schedule

Page 12: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

12

Project 2007-11 Disturbance Monitoring

PRC-002 — Define and Document Disturbance Monitoring and Equipment Requirements

PRC-018 — Disturbance Monitoring Equipment Installation and Data

http://www.nerc.com/~filez/standards/Disturbance_Monitoring_Project_2007-11.html

StatusMay change to a continent wide standard

Page 13: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

13

DM Project Schedule

Page 14: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

14

Project 2009-06 Protection Systems

PRC-003,PRC-004, PRC-012, PRC-014, and PRC-016

PRC-012 — Special Protection System Review

Status No update is available at this time

Page 15: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

15

Next Step/ Updates

● An update on the status of all NERC FIB standards projects will be provided to the RRSWG at the March 26 meeting in Charlotte

● The regions will also discuss their regional standards activities

● An update will be provided to RSC at the April meeting

Page 16: 3.25.2008 RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity Farzaneh.Tafreshi@texasre.org

RSC3.25.2008

16

Farzaneh TafreshiTexas Regional Entity

[email protected]