27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 1 Strategy on Sustainable Development of the Warsaw Transport System Tamás Dombi, ZTM Warsaw

27.04.2009, ValenciaTamás Dombi, ZTM Warsaw1 Strategy on Sustainable Development of the Warsaw Transport System Tamás Dombi, ZTM Warsaw

Embed Size (px)

Citation preview

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 1

Strategy on Sustainable Development of the Warsaw

Transport SystemTamás Dombi, ZTM Warsaw

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 2

Reasons to develop the Strategy

1. Need of a planned and sustainable development of the transport system

2. Negative effects of the growth of the individual motorisation

3. Use of EU structural funds

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 3

Fundaments of the Strategy

• City Transport Policy from 1995

• Study on grounds and directions of the spatial management (main spatial planning document due to Polish law), 2006

• Strategy of the city development to 2020

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 4

Parts of the Strategy

1. Diagnosis of the currant status

2. SWOT analisis

3. Transport policy

4. Sustainable transport development plan

5. Rules of dissemination and indicators

+ Ecological impact analysis

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 5

Goals of the strategy

• Diagnosis: provides actual information of the current situation

• Transport policy: sets general and specific objectives

• Transport development plan: defines particular tasks to fulfill

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 6

Tasks of the transport development plan concerning PT

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 7

1. Setting up a common metropolitan transport authority

• At the moment bilateral agreements with >30 municipalities

• Plan to set up a common coordinating, organizing and controlling entity on the metropolitan level

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 8

2. Modernization and development of the tram system

• 2008 – centenario of the Warsaw trams

• Huge need on modernization

• Main tracks modernized from EU funds 2007-2015 (4 projects)

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 9

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 10

3. Further development of the metro system

• The first metro line was ended in October, 2008

• Soon the building of the second line should begin

• In first step: central part

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 11

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 12

4. Improvement of the railway transport

• Bringing together the railways with other means of transport

• New railway stations, system of a local railway

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 13

5. Integration of different transport subsystems

• Fare integration with the railways

• Functional integration – intermodal junctions, route network adjusting

• Timetable integration• Organizational integration

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 14

6. Development of the city and suburban bus transport

• More traffic priority

• Low-emission buses

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 15

7. Modernization of the tram and bus rolling stock

• 30% of the buses do not meet any modern quality standards – 500 new buses to buy until 2012

• 50% of the tram rolling stock is older than 20 years – replacement until 2016

• The largest recent procurement on new tram cars has just ended – 186 new 100% low-floor trams will be provided until 2013

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 16

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 17

8. Rationalization of the route network

• Setting up a network of main routes with guaranteed high frequency and high rolling stock quality

• Better adjusting the supply to the demand

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 18

Other parts of the transport development plan

• Road network development plan– Includes restrictions in individual mobility in

the centre and the possibility to set up a congestion charge

• Increase of the safety on the roads

• Cycling transport development plan

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 19

Road to the implementation

• Coordination: Road and Transportation Department of the Warsaw City Hall

• 2007: Setting up the first draft of the Strategy (Authors: Group of experts from the Warsaw Technology University)

• 2008: Public consultations• 2009: Acceptation by the City Council

(May/June)

Public consultations

• 2 meetings: with NGOs and with inhabitants

• 205 written proposals received, where 702 remarks were identified

• 266 remarks were adopted, 436 declined

• Most remarks on public transport

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 20

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 21

Difficulties and experiences

Implementation has not began yet, because the legislation process is much longer than expected

→Need to plan more time for this process!

27.04.2009, Valencia Tamás Dombi, ZTM Warsaw 22

Thank you for your attention!

Tamás Dombi

ZTM Warsaw