13
24th May 2002 1 PARTICIPATION OF IFIC Coordinated Project Plan Nacional de Altas Energías y Grandes Aceleradores IFIC (Instituto de Física Corpuscular) Universitat de València-CSIC

24th May 20021 PARTICIPATION OF IFIC Coordinated Project Plan Nacional de Altas Energías y Grandes Aceleradores IFIC (Instituto de Física Corpuscular)

  • View
    217

  • Download
    3

Embed Size (px)

Citation preview

24th May 2002 1

PARTICIPATION OF IFICCoordinated Project

Plan Nacional de Altas Energías y Grandes Aceleradores

IFIC

(Instituto de Física Corpuscular)

Universitat de València-CSIC

24th May2002 2

Contents

I.- Main Areas of Interest II.- Infrastructure in Valencia III.- GRID activities IV.- ATLAS Computing

24th May2002 3

I.- Main Areas of Interest

Fabric Management and Operation– Automatization– Monitoring

Experiment -oriented use of the farm– Data Challenges in ATLAS (Monte Carlo

Production)– Data Analysis

24th May2002 4

II.- Infrastructure at IFIC GoG (Grupo de Ordenadores para el GRID) Farm

192 Athlon PC (134 IFIC + 58 ICMOL)– VIA KT133A & KT266A based MotherBoard– CPU: AMD Athlon K7 @ 1.2 & 1.4 GHz– RAM: 2x512 Mbytes (SDRAM & DDR SDRAM)– HD: 40 Gbytes– NIC: 3COM 905CX & RealTek RTL8139 (Fast

Ethernet + PXE)– 2U chassis

24th May2002 5

GoG Farm

9 racks (800x600 mm) 22 PCs + 1 network switch per rack 2U chassis with 3 fans

– pros:• less space required

– cons:• add 240 euros per PC (aprox.)

• heat concentration

24th May2002 6

GoG Farm

24th May2002 7

GoG Farm (front view)

24th May2002 8

GoG Farm (back view)

24th May2002 9

Local Network

24th May2002 10

Local Network All Worker Nodes have private IP addresses in the net 192.168.4.0/22

– secure environment– administrative independence from University

network management staff

Communication equipment have public IP addresses in the net 147.156.149.64/26– can be monitored and upgraded from University

centralized service

24th May2002 11

Infrastructure in Valencia :Human resources

5 staff persons + 1 postdoc ( EDP = 3.5) support from the Informatic Section of

IFIC ...(2 new contracts in the next two months)

24th May2002 12

III - GRID Activities

In DataGrid, involved in WP6 (Testbed and Demonstrators)

In CrossGrid:– HEP Data Analysis (CrossGrid Appl. Development)– New GRID Services and Tools (Resource

Management and Integration)– International Testbed Organisation–

24th May2002 13

IV- ATLAS Computing

Data Challenges, involved in phase 1: • full chain implemented and tested at IFIC

•Event generator • Det. Simulation •Reconstruction •Analysis

• Files: Dijets and Zjets (10 Kevts)

• Computing Resources available from June to December:• 100 PC’s (4 KSpecInt95)

•Massive Production (10**7 evts for the whole ATLAS Coll.): •with EDG 1.2

•by the end of June