228 Bernhard Rd Total Cost: $46,257 Const Start Date: 3/7/2016 Completion Date: 3/14/2016 Est. Project Length: 1 Week Current Status: Complete Date Updated: 7/12/2016 Construction: Compete Right Of Way: Preliminary Eng: Utilities: Property Access: Contractor: McCoy Grading Cost Estimate: $5,520.98 Post Construction Photo Problem: Washout around an undersized 36 in. diameter corrugated metal pipe inlet caused shoulder and pipe failure. Construction Photo Pre-construction Photo Percent Complete: 100 Construction: Compete Propsed Solution: Replace the current pipe with a 42 in. reinforced concrete pipe and headwalls. Wednesday, July 13, 2016 Page 1 of 1

228 Bernhard Rd - Fayette County, Georgia

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

228 Bernhard Rd

Total Cost: $46,257

Const Start Date: 3/7/2016

Completion Date: 3/14/2016

Est. Project Length: 1 Week

Current Status: Complete

Date Updated: 7/12/2016

Construction: Compete

Right Of Way:

Preliminary Eng:

Utilities:

Property Access:

Contractor: McCoy Grading

Cost Estimate: $5,520.98

Post Construction Photo

Problem: Washout around an undersized 36 in. diameter corrugated metal pipe inlet caused shoulder and pipe failure.

Construction Photo

Pre-construction Photo

Percent Complete: 100

Construction: Compete

Propsed Solution: Replace the current pipe with a 42 in.reinforced concrete pipe and headwalls.

Wednesday, July 13, 2016 Page 1 of 1

Brittany Way

Total Cost: $67,432

Const Start Date: 5/27/2014

Completion Date: 9/14/2014

Est. Project Length: 3 Weeks

Current Status: Complete

Date Updated: 7/13/2016

Construction: In-House

Right Of Way:

Preliminary Eng: Complete

Utilities: Complete

Property Access: Complete

Contractor: Fayette County

Cost Estimate: $75,000.00

Post Construction Photo

Problem: Road floods during the 2-year storm event.

Construction Photo

Pre-construction Photo

Percent Complete: 100

Construction: In-House

Propsed Solution: Install a 3'x6' concrete box culvert 60' long under Brittany Way.

Wednesday, July 13, 2016 Page 1 of 1

105 Canterbury Ln

Total Cost: $101, 636

Const Start Date: 12/24/2015

Completion Date: 12/31/2015

Est. Project Length: 1 Week

Current Status: Completed

Date Updated: 7/11/2016

Construction: Complete

Right Of Way:

Preliminary Eng:

Utilities:

Property Access:

Contractor: Brent Scarbrough and Company

Cost Estimate: $24,671.06

Post Construction Photo

Problem: On 12/24/15, approximately 60 homes within the Chanticleer Subdivision were without water and had no access to and from their homes when a 72-inch diameter corrugated metal pipe failed, collapsing the road.

Construction Photo

Pre-construction Photo

Percent Complete: 100

Construction: Complete

Propsed Solution: 1 - 72-inch RCP pipe with headwall

Wednesday, July 13, 2016 Page 1 of 1

110 Lawson Ln

Total Cost: $94,509

Const Start Date: 7/1/2015

Completion Date: 8/15/2015

Est. Project Length: 3 Weeks

Current Status: Completed

Date Updated: 7/12/2016

Construction: Complete

Right Of Way:

Preliminary Eng: Complete

Utilities: Complete

Property Access: Complete

Contractor: Fayette County

Cost Estimate: $65,000.00

Post Construction Photo

Problem: Undersized pipes in Northridge Subdivision results in flooding of road, lots and several homes along Lawson Lane. Project would replace existing pipe and add additional drainage structures.

Construction Photo

Pre-construction Photo

Percent Complete: 100

Construction: Complete

Propsed Solution: Replace existing pipe and add additional drainage structures.

Wednesday, July 13, 2016 Page 1 of 1

144 Lowery Rd

Total Cost: $44,523

Const Start Date: 3/12/2016

Completion Date: 3/18/2016

Est. Project Length: 1 Week

Current Status: Complete

Date Updated: 7/11/2016

Construction: Complete

Right Of Way:

Preliminary Eng: Complete

Utilities: Complete

Property Access: Complete

Contractor: McCoy Grading

Cost Estimate: $23,543.16

Post Construction Photo

Problem: Washout around the 54 in. diameter corrugated metal pipe caused shoulder and pipe failure.

Construction Photo

Pre-construction Photo

Percent Complete: 100

Construction: Complete

Propsed Solution: Replaced the current pipe with a 60 in. reinforced concrete pipe and headwalls.

Wednesday, July 13, 2016 Page 1 of 1

456 Mcbride Rd

Total Cost: $41,820

Const Start Date: 3/1/2016

Completion Date: 3/4/2016

Est. Project Length: 1 week

Current Status: Completed

Date Updated: 7/12/2016

Construction: Complete

Right Of Way:

Preliminary Eng:

Utilities:

Property Access:

Contractor: McCoy Grading

Cost Estimate: $6,127.50

Post Construction Photo

Problem: Washout around the 54 in. diameter corrugated metal pipe caused complete road failure.

Construction Photo

Pre-construction Photo

Percent Complete: 100

Construction: Complete

Propsed Solution: Install a 54 in. reinforced concrete pipe and headwalls.

Wednesday, July 13, 2016 Page 1 of 1

155 Westbridge Cir

Total Cost: $68,419

Const Start Date: 1/12/2016

Completion Date: 1/14/2016

Est. Project Length: 1 week

Current Status: Completed

Date Updated: 7/13/2016

Construction: Complete

Right Of Way:

Preliminary Eng:

Utilities:

Property Access:

Contractor: Brent Scarbrough and Company

Cost Estimate: $3,846.48

Post Construction Photo

Problem: During the 2015 Christmas and New Years flooding events two-36 in. diameter corrugated metal pipes failed causing immanent road failure.

Construction Photo

Pre-construction Photo

Percent Complete: 100

Construction: Complete

Propsed Solution: Replace with two-36 in. diameter reinforced concrete pipes and headwalls.

Wednesday, July 13, 2016 Page 1 of 1