SP XXXX-XX Insert Date DIVISION SS DELETE WHEN DONE: Statements in red are guidelines or instructional in nature. Remove these notes before completing the spec. When appearing at the top left of a provision, it pertains to the paragraph immediately beneath the note, as well as any indented items following it. All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting. I hereby certify that the Special Provisions for traffic control signal construction (Division SS) contained in this proposal were prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Minnesota. ________________________________________ Engineer Name Lic. No XXXXX Date MM/DD/YYYY 1-SS

(2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

DIVISION SSDELETE WHEN DONE: Statements in red are guidelines or instructional in nature. Remove these notes before completing the spec. When appearing at the top left of a provision, it pertains to the paragraph immediately beneath the note, as well as any indented items following it.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

I hereby certify that the Special Provisions for traffic control signal construction (Division SS) contained in this proposal were prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Minnesota.

________________________________________Engineer Name

Lic. No XXXXX Date MM/DD/YYYY

1-SS

Page 2: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

Table of ContentsSS-1 (2104) REMOVING TRAFFIC CONTROL SIGNAL SYSTEMS..........................................2

SS-1.1 DESCRIPTION................................................................................................................................SS-1.2 MATERIALS....................................................................................................................................SS-1.3 CONSTRUCITON REQUIREMENTS..................................................................................................SS-1.4 METHOD OF MEASUREMENT.........................................................................................................SS-1.5 BASIS OF PAYMENT.......................................................................................................................

SS-2 (2565) TRAFFIC CONTROL SIGNALS........................................................................8SS-2.1 DESCRIPTION................................................................................................................................SS-2.2 MATERIALS....................................................................................................................................SS-2.3 CONSTRUCTION REQUIREMENTS................................................................................................SS-2.4 AS BUILT DRAWINGS BASIS OF PAYMENT...................................................................................

SS-3 (2565) EMERGENCY VEHICLE PREEMPTION (EVP) SYSTEMS....................................31SS-3.1 DESCRIPTION..............................................................................................................................SS-3.2 MATERIALS..................................................................................................................................SS-3.3 CONSTRUCTION REQUIREMENTS................................................................................................SS-3.4 METHOD OF MEASUREMENT.......................................................................................................SS-3.5 BASIS OF PAYMENT.....................................................................................................................

SS-4 (2565) TRAFFIC CONTROL INTERCONNECT.............................................................32SS-4.1 DESCRIPTION..............................................................................................................................SS-4.2 MATERIALS..................................................................................................................................SS-4.3 CONSTRUCTION REQUIREMENTS................................................................................................SS-4.4 METHOD OF MEASUREMENT.......................................................................................................SS-4.5 BASIS OF PAYMENT.....................................................................................................................

SS-1 (2104) REMOVING TRAFFIC CONTROL SIGNAL SYSTEMS

SS-1.1 DESCRIPTIONUse the following language if one existing traffic control signal system will be removed on the project.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

This Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials in accordance with 2104, “Removing Pavement and Miscellaneous Structures” and as shown on the Plans, from the existing traffic control signal system at the intersection of ______ (______) and ______ in ________, _______ County and backfilling trenches, holes and depressions.

Use the following language if two or more existing traffic control signal systems will be removed on the project. Fill in the blank the number of existing traffic control signal systems to be removed on the project

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

This Work consists of backfilling trenches, holes and depressions, and removing and salvaging, or disposing of miscellaneous structures, equipment and materials as shown on the Plans, from _____ existing traffic control signal systems as follows:

SYSTEM "A" - at the intersection of ______ (______) and ______ in ________, _______ County,

and

SYSTEM "B" - at the intersection of ______ (______) and ______ in ________, _______ County,

2-SS

Page 3: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

SS-1.2 MATERIALSUse materials in accordance with 2104, “Removing Miscellaneous Structures” and

these Special Provisions.

SS-1.3 CONSTRUCITON REQUIREMENTS

A Remove and Salvage Traffic Control Signal Cabinet and EquipmentTo ensure proper care and prevent damage during removal, handling and shipping of

control signal cabinets and equipment, provide in order the following:

(1) De-energize the traffic control cabinet and equipment (2) Disconnect the power conductors (3) Unplug and remove removable control equipment including the controller unit,

detector amplifier units, conflict monitor, and load switches from the cabinet. (4) Package and secure the removed control equipment in a method and manner

that prevents damage to the equipment during handling and shipping(5) Coil together the connecting harnesses of the removed equipment (6) Fasten and secure the harnesses to a cabinet shelf in a method and manner

that prevents the harnesses from being damaged when closing the cabinet door and from falling through the bottom of the cabinet during removal, handling and shipping

(7) Secure the cabinet in an upright position when removing, handling and shipping

B Remove and Salvage Battery Backup Service (SSB) Cabinet and EquipmentTo ensure proper care and prevent damage during removal, handling and shipping of

SSB cabinets and equipment, provide in order the following:

(1) De-energize the SSB cabinet and equipment (2) Disconnect the power conductors (3) Remove the batteries and uninterrupted power supply (UPS) from the cabinet(4) Package and secure the removed batteries and UPS in method and manner

that prevents damage to the equipment during handling and shipping (5) Coil together the harnesses (6) Fasten and secure the harnesses to a cabinet shelf in a method and manner

that prevents the harnesses from being damaged (7) Secure the cabinet in an upright position when removing, handling and

shipping

C Remove and Dispose Miscellaneous StructuresRemove and dispose of the existing traffic control systems miscellaneous structures as

shown on the Plans and in accordance with 2104 “Removing Pavement and Miscellaneous Structures”. Miscellaneous structures includes the following:

(1) Pole shafts(2) Transformer bases(3) Mast arms(4) Luminaire extensions(5) Traffic signal pedestal shafts and bases(6) APS pushbutton stations(7) Foundations and equipment pads(8) Conduit systems

Destroy miscellaneous structures to the satisfaction of Engineer.

Except under roadway surfaces, remove and dispose of the existing traffic control signal system underground conduit systems unless otherwise specified in Contract Documents or as directed by the Engineer.

3-SS

Page 4: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

Replace in kind and restore general features of the excavation site including concrete pavement, bituminous surface, gravel surface, underlying base courses, sidewalks, curb and gutter, and sod removed by construction operations.

Include the following section when it is known that lead based painted structures have been used on the existing traffic control signal system that is being removed. If unsure that lead base painted structures exist, it is the district traffic office’s responsibility to find out before including this section in the special provisions. This is to ensure contractors bid the project accordingly.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

C.1 Structures Containing Lead Based PaintHandle, transport, and dispose of miscellaneous structures containing lead based paint

in accordance with Occupational Safety & Health Administration (OSHA) and the Minnesota Pollution Control Agency (MPCA) regulations and the following.

(1) Read, certify understanding, and agree to abide to the requirements in OSHA 29 CFR 1926.62 and Minnesota Rules Chapter 5206, 7025, 7035, 7045 relating to the removal and disposal of lead base painted miscellaneous structures as hazardous waste.

(2) Submit to the Engineer a completed “Contractor Certification of Disposal" form included in this section.

(3) Submit to the Engineer a copy of the “Tipping Receipt” from the scrap yard or recycler.

The form below is provided as an example. The actual form must be downloaded by the contractor. Keep the form on the next two pages in the document.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

4-SS

Page 5: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

5-SS

Page 6: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

The Office of Environmental Stewardship sets the policy and procedures for regulated materials management.

The contractor must follow the links below to obtain the current work order form and the list of approved waste contractors.

http://www.dot.state.mn.us/environment/regulatedmaterials/wastemgmt.html

Hazardous Waste Work Order Form (Word) MnDOT approved list of waste contractors (Word)  

SS-1.4 METHOD OF MEASUREMENT

A Traffic Control Signal System Removing and salvaging, or disposing of miscellaneous structures, equipment and

materials from the existing traffic control signal system at the intersection of __________ and ___________in ____________, ________ County, and backfilling trenches, holes, and depressions will be measured as an integral unit.

SS-1.5 BASIS OF PAYMENT

A Traffic Control Signal System Removing and salvaging, or disposing of miscellaneous structures, equipment and

materials from the existing traffic control signal system at the intersection of __________ and ___________in ____________, ________ County, and backfilling trenches, holes, and depressions will be paid for as specified for Item No. 2565.516 (TRAFFIC CONTROL SIGNAL SYSTEM).

Only use the paragraph below when the District is requiring materials to be salvaged from a project.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

B Haul Salvaged MaterialDelivery of salvaged materials to the Department at the location specified is paid for

under Item No. 2104.601 (HAUL SALVAGED MATERIAL) at the contract LUMP SUM price and is considered payment in full for costs relative to hauling the materials to, and depositing the materials, at the location specified.

6-SS

Page 7: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

SS-2 (2565) TRAFFIC CONTROL SIGNALS

SS-2.1 DESCRIPTIONUse the following language if one new traffic control signal system is being constructed for the project

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

This Work consists of providing and installing materials and electrical equipment, and installing Department provided materials as specified, for a complete operating new hardwire interconnected coordinated full-traffic-actuated traffic control signal system at the intersection of ______ (______) and ______ in ________, _______ County, in accordance with 2565 “Traffic Control Signals,” the Plans, and the following.

Use the following language if two or more new traffic control signal systems are being constructed for the project. Fill in the blank the number of new traffic control systems for the project.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

This Work consists of providing and installing materials, structures and electrical equipment; and installing Department provided materials as specified to complete ______ operating new hardwire interconnected coordinated full-traffic-actuated traffic control signal systems in accordance with the 2565 “Traffic Control Signals,” the Plans and these Special Provisions. Provide traffic control signal systems as follows.

SYSTEM "A" - at the intersection of ______ (______) and ______ in ________, _______ County,

and

SYSTEM "B" - at the intersection of ______ (______) and ______ in ________, _______ County,

A Acronyms and AbbreviationsAcronyms and abbreviation used in the Contract to represent full text in accordance

with 1102 “Abbreviations and Measurement Units” and as shown in Table 2565-1:

SS-2.2 MATERIALSEnsure Division S Special Provisions “As-Builts” are included in the Division S Special Provisions.This would include the pay item 2011.601.After the July 2015 Project letting date the As-Builts verbiage should automatically be included in Division S Special Provisions by MnDOT’s Project Management & Technical Support Office.Note required verbiage below in the measurement and payment section of these special provisions.

7-SS

Table 2565-1Acronyms and Abbreviations UsedAcronym or Short Form Full Name or MeaningAPL Approved/Qualified Products List

Page 8: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

A Department Provided MaterialsThe Department provides at no cost to the Contractor, the following materials and

electrical equipment for the Contractor to install:

(1) One traffic control signal cabinet and riser adaptor with a actuated controller unit and signal control equipment

(2) Four sets of anchor rods, nuts, and washers per cabinet (one set includes one anchor, one nut, and one washer)

(3) One rubber gasket per cabinet installed between the bottom of the cabinet and the concrete equipment pad

(The following language is to be used for required warning stickers on the backside of sign panels being installed on the signal system project. See additional verbiage under construction requirements. The Specification Writer must include the appropriate contact person and phone number to the following paragraph).

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

(4) Department Provided Warning Stickers on New Sign Panels

The Department provides at no cost to the Contractor, warning stickers to be applied to new sign panels. Coordinate quantity required for the project with the Engineer.

B Contractor Provided Equipment for Traffic Control Signal Cabinets Contractor provided equipment for traffic control cabinets when specified includes EVP

phase selectors, APS central control units, and video image processors.

Deliver equipment for integration into the Department provided traffic control signal cabinet at least 30 Business Days in advance of needing the traffic control signal cabinet on the Project to the following address:

MnDOT Electrical Services Section (ESS)6000 Minnehaha AvenueSt. Paul, MN. 55111- 4014

To ensure integration into the correct signal cabinet, before delivery to ESS label the equipment packaging with the following:

Assigned Traffic Engineering (TE) Number________________State Project Number_____________Contractor name_______________________Contact name and phone number_____________________

Notify ESS at least 3 Business Days in advance before delivering the equipment. Have the TE Number on hand before calling. Contact the following in the order listed until notification has been received: 

Electronic Maintenance Supervisor 651-366-5759Stockroom 651-366-5720Transportation Program Supervisor 651-366-5734

C Buy AmericaUse domestically manufactured products that are composed predominately of steel,

iron, or both for the permanent installation of MnDOT electrical systems in accordance with 23 CFR 635.410 Buy American requirements.

During the product quotation stage, inform the manufacturer that steel, and iron product must meet the Buy America requirements in accordance with 23 CFR 635.410 for

8-SS

Page 9: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

either State funded or federal aid Projects. MnDOT electrical systems products required to meet Buy America include the following:

Anchor Rods, Anchor Rod Templates, and HardwareStainless Steel and Steel Light PolesTraffic Signal Mast Arm Poles and BasesSteel Screw-in Light FoundationsPVC Coated RSC and Steel FittingsPVC Coated Junction BoxesPVC Coated Cast Steel Expansion and Deflection Fittings (23 CFR 635 Notice of

nationwide waiver of Buy America for Pig Iron)Pole Mounting AdapterNavigation Light Swing ArmSteel Vertical Mount Tenon Adapters Teflon Coated F436 Structural Washers Exceptions to the Buy America requirements are existing materials salvaged and

installed within the Project Site, and materials required for maintenance or temporary installations on the Project.

C.1 Verifying Compliance with Buy AmericaFor verifying compliance with Buy America requirements, obtain from the

manufacturer two out of the three following documents:

(1) Mill Test Report (MTR) issued and signed by the fabricator stating that the materials subject to Buy America were melted and manufactured in the United States; written certifications from factory

(2) Written certification on company letterhead and signed by an authorized representative from manufacturers providing additional treatment to the fabricated material (blasting, coating) stating the treatment process occurred in the United States

(3) Written certification on company letterhead and signed by an authorized manufacturer representative, declaring the supplied materials subject to Buy America requirements fully meet.

Submit documentation to the Engineer.

D Low Profile Hydraulic Torque Wrench

Use an approved low profile hydraulic torque wrench listed on MnDOT’s Approved/Qualified Products List under Lighting “Low profile hydraulic torque wrench” on the top nuts to tighten PA and BA traffic signal mast arm pole anchor rods to the required torque values specified in the MnDOT Anchor Rod Tightening Handbook. Use a working handheld digital pendant or, digital or analog gauge with the low-profile hydraulic torque wrench to ensure specified torque values have been met and can be verified in foot pounds by the installer and inspector during the tightening process.

If the gauge display is in pounds per square inch (PSI), convert PSI to foot pounds and ensure the calculations are correct. Submit the PSI to foot pounds converted values to the Engineer before installing the poles. The submittal and Engineer’s review does not relieve responsibility for tightening anchor rods to the required torque values.

Obtain Engineer’s approval of the wrench and provide proof of calibration done in the last 12 months from an accredited calibration service before installing the poles.

E Signal Head Pedestal PolesStandard Plate 8122 is hereby deleted, and the following is substituted therefore:

Provide signal head pedestal poles listed on MnDOT’s APL for Signals.

9-SS

Page 10: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

F Rodent Intrusion BarrierRodent intrusion barrier listed on MnDOT’s Approved Products List for Signals may be

used instead of stainless steel woven wire cloth specified in 2565.2.DD for traffic signal pole transformer bases Standard Plate No. 8121.

G Arc -Flash Hazard Warning LabelsProvide 4 in H x 6 in W vinyl or polyester labels meeting the following:

(1) White background(2) Orange background behind the WARNING text(3) Black text(4) Self-adhesive(5) Machine printed letters and numbers(6) Water-resistant

Figure 1 is for information and reference only.

Figure 1 ARC-Flash Warning Label Category 1Include the paragraphs below only if the signal system is going to be painted. Add required paint color

All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting.

H Painting Traffic Control Signal Pedestals, Shafts & Poles and Mast ArmsPaint metal structures and metal component parts at the factory in accordance with

MnDOT 2478 and 3532.

Provide painted steel traffic control signal pedestal shafts and painted pedestal bases at the locations shown on the Plans, in accordance with MnDOT Standard Plate No. 8112, 8122, 8129, MnDOT 3832, and the following requirements:

Add paint color here.

  All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting.

Provide painted traffic control signal poles and mast arms at the locations shown on the Plans, in accordance with MnDOT Standard Plate No. 8121, 8123, 8133, and the following.

Add paint color here.

10-SS

Page 11: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

  All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting.

The following language needs to be included if you are designing a signal system with flashing yellow arrow (FYA) with a combined thru and left turn lane. An additional application would be HAWK Pedestrian type ped crossing.

All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting.

I Cluster Head AdaptorProvide Cluster head adaptors at locations shown on the Plan.

Use MnDOT approved cluster head adaptors listed on MnDOT’s Approved/Qualified Products List for Signals:

http://www.dot.state.mn.us/products/index.html

The following language needs to be included if you are designing a signal system with flashing yellow arrow (FYA) with a combined thru and left turn lane. This indication is only intended to be used in this application.

All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting.

J Bi Modal Green and Yellow Arrow Signal IndicationsProvide green and yellow bi-modal signal indications at locations shown on the Plan.

Use MnDOT approved bi-modal signal indications listed on MnDOT’s Approved/Qualified Products List for Signals:

http://www.dot.state.mn.us/products/index.html

K Accessible Pedestrian Signals (APS)Provide Accessible Pedestrian Signals in accordance with MnDOT 3833 “Accessible

Pedestrian Signal Push Buttons and Mounting Hardware” and as follows:

APS push button manufacturer provided voice messages in each button as defined in this section and APS manufacturer supplied backup copies of the voice messages on compact disk or USB flash drive for MnDOT’s Electrical Services Section.

Deliver components, except push button units, for integration into the Department provided traffic control signal cabinet as specified in these Special Provisions, “Contractor Provided Equipment for Traffic Control Signal Cabinets”.

Present the order form in this section to the APS manufacturer to ensure the braille message is added to the pedestrian information sign and the correct voice messages are programmed in the pedestrian push buttons.

11-SS

Page 12: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

The following order form must be filled out by the special provisions writer before inclusion in the final set of special provisions. The order form should be left as separate pages so they can be removed.

All RED text must be removed from the special provisions prior to the Special Provisions being submitted for project letting.

Accessible Pedestrian Signal (APS)ORDER FORM

(Fill out one form per intersection)Intersection:

System I.D. ___________ T.E. No. ___________ Total Number of Pedestrian Push Buttons _____

Field Wiring Interface Board: One needed for each intersection Qty: 1 CCU: (Central Control Unit) One needed for each intersection Qty: 1

Push Button and Sign Braille InformationButton Arrow Direction R/L Street Name

(Street Being Crossed)

PB2-1 PB2-1PB2-2 PB2-2PB2-3 PB2-3PB2-4 PB2-4PB4-1 PB4-1PB4-2 PB4-2PB4-3 PB4-3PB4-4 PB4-4PB6-1 PB6-1PB6-2 PB6-2PB6-3 PB6-3PB6-4 PB6-4PB8-1 PB8-1PB8-2 PB8-2PB8-3 PB8-3PB8-4 PB8-4

Custom Voice Message Details

Voice on Location and Walk Message(s) Please give phonetic pronunciation on difficult street names so that the message will be recorded correctly. *Note that unless Street, Drive, Avenue etc…are absolutely necessary for intersection identification, it is recommended to not include them in the verbal message.

12-SS

Page 13: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

13-SS

PB2-1Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB2-2Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB2-3Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB2-4Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

Page 14: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

14-SS

PB4-1Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB4-2Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB4-3Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB4-4Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

Page 15: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

15-SS

PB6-1Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB6-2Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB6-3Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB6-4Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

Page 16: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

Walk Interval MessagesModel message for the walk interval, applicable to most intersections.“Howard. Walk sign is on to cross Howard.”

Pushbutton Informational MessagesModel message for pushbutton intersection identification information.“Wait to cross Howard at Grand.”

16-SS

PB8-1Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB8-2Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB8-3Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

PB8-4Wait Message:      Wait to Cross   at  

  (Street Being Crossed) (Intersecting Street)Walk Message: Walk

sign is on to cross

        (Street Being Crossed) (Street Being Crossed)

Page 17: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

All RED text must be removed from the special provisions prior to the Special Provisions being submitted for project letting.

L Equipment Pad Provide an equipment pad as shown on the Plans and specified in these Special

Provisions.

The equipment pad contains the following:

(1) Traffic control signal cabinet, anchor rods, nuts and washers and associated internal control equipment to be provided by the Department and installed by the Contractor.

(2) Signal service cabinet Type SSB to be provided and installed by the Contractor. SSB cabinets will be supplied from the manufacturer with anchor rods, nuts and washers used for attaching the service cabinet to the equipment pad.

Signal Service Cabinet, Type SSB (with Battery Back-up Equipment)

Use this paragraph if the District wants a full blown SSB cabinet with a battery backup system. The spec writer needs to use this or the other paragraph for an SSB Service cabinet.

All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting.

Provide a signal service cabinet in accordance with MnDOT 3837.2A.7 and as follows:

Type SSB with battery back-up equipment that includes an inverter, batteries, bypass switch, and external strobe.

M Signal Service Cabinet, Type SSB (without Battery Back-up Equipment) Use this paragraph if the District wants a SSB cabinet without batteries, inverter and bypass switch. The SSB service cabinet will not have any back up capabilities. The backup system can be added at a later date to the standard SSB cabinet that would be provided using this paragraph. The spec writer needs to use this or the other paragraph for an SSB Service cabinet.

All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting.

Provide a signal service cabinet in accordance with MnDOT 3837.2A.7 and the following.

Type SSB service cabinet without battery backup equipment. Do not provide an inverter, batteries, bypass switch or external strobe.

N Advance Warning Flashers (AWF)Provide traffic control signal pedestal shafts and pedestal bases listed on MnDOT’s APL

for Signals and in accordance with MnDOT Standard Plate 8129, MnDOT 2565, 3832, and as detailed on the Plan.

Provide materials and equipment to complete four operating advance warning flashers (Signal Base No.'s __, __, __, and __) at the locations shown on the Plans, in accordance with the "ADVANCE WARNING FLASHER DETAILS" on the Plans and with the following:

Traffic control signal pedestals in accordance with 3832.

Flashing Beacon Assemblies as follows:

(1) 12 inch, polycarbonate vehicle signal heads for flashing beacon assemblies in accordance with 3834.

17-SS

Page 18: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

(2) 12 inch "Yellow" signal indications in accordance with MnDOT 3834 and as follows:

(3) Affix to the back of each "yellow" flasher indication a permanent label showing the date of installation in accordance with 2565.3L.6

(4) Include a cut away visor and background shield for each flashing beacon assembly as shown on the Plan

(5) Attach flasher beacons as shown on the Plans

Provide aluminum flashing beacon assembly bracketing with anodic coating in accordance MIL-A-8625C for Type II, Class I Coating.

Provide a 4/c 14 AWG signal control cable in accordance MnDOT 3815.2 between the pole base connector in the pedestal base and each flashing beacon atop each advance warning flasher assembly.

Provide and install W3-X4 (PREPARE TO STOP WHEN FLASHING) signs in accordance with 2564.

Mount each sign as shown on the Plan.

SS-2.3 CONSTRUCTION REQUIREMENTS

A Storing MaterialsStore and handle materials in accordance with 1606 “Storage of Materials”, 1607

“Handling Materials” and the manufacturer’s requirements. 

B Splicing Conductors Splicing of traffic signal control cable and other cables used in the traffic control signal

system is not permitted. Install signal cables from the termination points in the signal control cabinet to the field devices with no splices in the cable.

Loop detector lead in cable may be spliced to the loop wire in the adjacent handhole only.

C Conduit UndergroundPlace conduit underground in accordance with 2565.3.D.2.b “Underground” and as

follows:

Place conduit at least 24 in below roadway surfaces.

D Installation of Department Provided MaterialsInstall the Department provided traffic control signal cabinet and riser adaptor

complete with actuated controller unit and the required traffic control signal equipment.

Provide and install additional materials and equipment for a complete operating traffic control signal cabinet installation, including:

(1) A cabinet concrete foundation as part of the equipment pad concrete foundation using Department provided anchor rods, nuts, and washers

(2) Bonding and grounding materials and connections(3) Place a bead of %100 clear silicone between the top of the riser adaptor and

the bottom of the traffic signal control cabinet prior to assembly.(4) Terminating field conductor connections in each traffic control signal cabinet

as directed by the Engineer to make each traffic control signal system fully operational

The following paragraph needs to be modified to give contractor specific location to deliver the pallet back to MnDOT.

All RED text must be removed from the special provisions prior to the Special Provisions being

18-SS

Page 19: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

submitted for project letting.

Protect the Department provided cabinet pallet from damage and return the pallet to MnDOT Central Electrical Inventory Center or the District Headquarters.

E Pick Up Department Provided Materials Pick up materials and equipment described at MnDOT’s Electrical Services Section,

6000 Minnehaha Avenue, St. Paul, MN. 55111- 4014. Follow these requirements:

(1) Request from MnDOT’s Electrical Services Section the materials and electrical equipment

(2) Direct the Electrical Services Section to the T.E. Request No. ______ (3) Request Department provided materials at least 30 Business Days in advance

of needing the material on the Project (4) Notify MnDOT’s Electrical Services Section at least 3 Business Days in advance

of intention to pick up materials and electrical equipment. Contact the following:

Electronic Maintenance Supervisor 651-366-5759Stockroom 651-366-5720Transportation Program Supervisor 651-366-5734

(5) Pick up the Department provided materials and electrical equipment at the specified location and transport them to the job site

(6) Secure each cabinet in an upright position when transporting to the job site. Ensure that each cabinet being transported will not tip and be damaged

Notify the Engineer in advance of contacting MnDOT’s Electrical Services Section.

F Rodent Intrusion Barrier Install rodent intrusion barrier in accordance with 2545.3W.

Rodent intrusion barrier listed on MnDOT’s Approved Products List may be installed instead of stainless steel woven wire cloth as specified in 2545.3.W for traffic signal pole transformer bases Standard Plate No. 8121.

Install the MnDOT APL barrier in accordance with the manufacturer’s installation instructions. Fill gaps between the barrier and base plate, and between the barrier and the foundation with 100% silicone sealant.

G Arc-Flash Hazard Warning LabelingCalculate available fault current in accordance with 2545.3X and 2565.3 CC.

Establish available fault current and apply the appropriate label as follows.

Use the current edition of NFPA 70E “Standard for Electrical Safety in the Workplace” to determine the required PPE category and personal protective equipment.

If the available fault current is ≤ 25,000 amps then provide a label with the following information shown in Example 1.

19-SS

Page 20: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

If the available fault current is ˃ 25,000 amps:

Determine PPE requirements in accordance with the current edition of NFPA 70E Standard for Electrical Safety in the Workplace

Provide a label with the following information shown in Example 2. Fill in the ___ (blank) with the required arc-flash PPE category and arc-flash boundary distance

Install labels on the front of the dead front door of the electric service cabinet at eye level.

The following Section should only be included in projects when the contractor is going to be required to do excavation work.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

H Maintenance of Existing Electrical SystemsMaintain and keep in operation new and existing electrical systems in accordance with

2565.3B and as follows:

The Contractor is responsible for locating underground facilities of existing traffic control signal systems including temporary, and newly constructed signal systems within the

20-SS

Example 1

Warning Arc Flash HazardAppropriate PPE RequiredArc Flash Boundary 19 inches Arc Flash PPE Category ____1____Working Distance 18 Inches Arc Flash Personal Protection Equipment (PPE)

List required clothing, Min Arc Rating of 4 cal/cm², and protective equipment in accordance with the PPE Table from the current edition of NFPA 70E Standard for Electrical Safety in the Workplace

Equipment ID

Example 2

Warning Arc Flash HazardAppropriate PPE RequiredArc Flash Boundary ____Feet Arc Flash PPE Category ________Working Distance 18 Inches Arc Flash Personal Protection Equipment (PPE)

List required clothing, Min Arc Rating of ___ cal/cm², and protective equipment in accordance with the PPE Table from the current edition of NFPA 70E Standard for Electrical Safety in the Workplace

Equipment ID

Page 21: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

limits of the construction project, for the duration of the construction project in accordance with the applicable provisions of MnDOT 1514 and in accordance with Minnesota State Statute 216D.

The responsibility for locating underground traffic control signal system facilities shall be transferred to the Contractor on the project start date as shown on the proposal.

MnDOT’s locating group will provide an initial locate of the underground traffic control signal system facilities within the project limits at the request of the Contractor at the start of the project. The request for the initial locate must be submitted to MnDOT’s Locating Office a minimum of 4 business days prior to the project start date.

Locate requests that are within the construction project limits will continue to be received by MnDOT’s Locating Office. These locate tickets will be forwarded to the Contractor’s representative responsible for coordinating locate requests within the project limits. The locate tickets will be forwarded via e mail or fax. Confirmation of receipt of the locate ticket must be sent by the Contractors representative back to MnDOT’s locating office within 2 hours of MnDOT’s sending the Contractor’s representative the locate request.

The Contractor responsible for locating underground traffic control signal system facilities will repair damage as the result of improperly located or unmarked underground traffic control signal system facilities within the project limits.

The repair the damaged underground traffic control signal system facilities in accordance with 2545.3A, 2565.3B and RTMC design and construction requirements.

Until final written acceptance of the project by the Engineer (MnDOT 1716), locate underground traffic control signal facilities as required in this section. This Work is included in the Pay Item Traffic Control Signal System.

It is the Contractor’s responsibility to notify MnDOT’s Locating Office to provide contact information and establish the contractor has assumed responsibility for locating MnDOT’s underground traffic control signal system facilities within the project limits. The form in this section is filled out by the Contractor’s representative and provided to the Engineer at the pre-construction meeting. A copy of the completed form sent to the following:

Electrical Services Dispatch Phone: (651)366-5750Fax: (651)366-5742E mail: [email protected] Minnehaha Ave. St. Paul, MN 55111-4014andLocating Supervisor Phone: (651)755-9061Fax: (651)366-5742E mail: [email protected] Minnehaha Ave. St. Paul, MN 55111-4014

(The following Section should be filled out by the specification writer to direct the contractor and project engineer to the correct person in the District.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

MnDOT District Signal Operations Name:_______________Phone:_______________Fax:_________________E mail:_______________Address:______________

21-SS

Page 22: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

(The following Section should be left on its own page so the contractor can remove it and use the blank page)

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

22-SS

Page 23: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

23-SS

Locating Responsibility FormJob S.P. Number __________________________________

Job Type __________________________________

Start Date __________________________________

End Date __________________________________

T.H. __________________________________

Location __________________________________

Lighting/ Signal Inspector __________________________________

Contractor __________________________________

Contractor (24 Hour Contact) __________________________________

Project Manager __________________________________

Phone Number __________________________________

Fax Number __________________________________

Email __________________________________

Electrician __________________________________

Phone Number __________________________________

Locator Area __________________________________

Project Engineer __________________________________

Phone Number __________________________________

Chief Inspector __________________________________

Phone Number __________________________________

Weekly Meeting __________________________________

Page 24: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

During any periods of authorized work suspension, the contractor is responsible for maintenance of the existing, temporary, and newly constructed traffic control signal systems.

Provide to the Department contact information with the names and telephone numbers for 24 hours a day, 7 days a week maintenance as defined above.

This Work is included in the Unit Prices of the Pay Items that are part of the Traffic Control Signal System.

I Traffic Signal Mast Arm Pole Installation

Install traffic signal mast arm poles in accordance with 2565.3O “Traffic Signal Mast Arm Pole Installation”, and the following.

If equipment downtime is a concern for meeting completion of the pole installation process in accordance with 2545.3H “Pole Installation”, then provide at least two crews; one crew to stand the pole and the other crew to complete the anchor rod tightening procedure in accordance with the Contract Documents on the same day of standing the pole.

Erect structural steel members in a manner that will provide safety to workers, Inspectors, the public, and without damaging the steel members.

I.1 Traffic Signal Mast Arm Pole Structural Bolting

Use high strength bolts with a hardened washer placed either under the nut being turned during tightening for bolting mast arms and transformer bases to the poles.

Before structural bolt tightening of mast arms, luminaire extensions (plate to plate connections), and pole bases to the poles, ensure the slope of surfaces and bolted parts in contact with the bolt head and nut is no greater than 1:20 with respect to a plane normal to the bolt axis. Ensure the joint surfaces including bolt heads, nuts and washers are free of scale, dirt, loose scale, burrs, foreign material, and other defects that would prevent solid seating of parts.

Before assembling bolted connections, ensure bolt and nut threads, and the face of the nuts being turned into the washers are lubricated with an approved anti-seize lubricant listed on MnDOT’s Approved/Qualified Products List,

Place a calibrated torque wrench on the nuts to tighten the bolts to the required torque values shown on Table SS-2.3-1. Tighten bolts in steps of 20%, 60% and 100% of the required torque value respectively and use a cross tightening pattern for each step. Allow the bolts to relax for 10 minutes and retighten to 100

Table SS-2.3-1ASTM A325 and ASTM A354 Bolts

Bolt Diameterinches

20% 60% 100%Required Torque for Tightening Lubricated Bolts, ft.lbs.

1/2 10 30 553/4 40 120 2007/8 60 190 3201 ½ 300 900 15001 ¾ 550 1650 2800

24-SS

Page 25: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

J Traffic Signal Mast Arm Pole Anchor Rod Tightening

Tighten traffic signal mast arm pole anchor rods in accordance with the MnDOT Anchor Rod Tightening Handbook “New Installation Procedures” and the MnDOT Anchor Rod Tightening Form.

Use the required low- profile hydraulic torque wrench on the top nuts to tighten anchor rods to the required torque values specified in the MnDOT Anchor Rod Tightening Handbook. Obtain Engineer’s approval of the wrench and provide proof of calibration performed within the last 12 months form an accredited calibration service before installing traffic signal mast arm poles.

Complete a MnDOT Anchor Rod Tightening Form for each traffic signal mast arm pole. Submit completed forms to the Engineer. Keep the form on the next page on a separate page so the contractor can remove it from the special provisions and use it in the field.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

25-SS

Page 26: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

MnDOT ANCHOR ROD TIGHTENING FORMDate of Report: Project No: Pole Unit No: Pole Type Torque Wrench Type: Model & Make: Serial No: Wrench Calibration Cert. Date: Contractor: Contractor Rep. Initials Construction Inspector Initials:

Directions: Use the MnDOT Anchor Rod Tightening Handbook “New Installation Procedures” with this form when installing the pole. Complete this form in accordance with Contract Documents.1. Verify the Installation

a. Followed Step 1 of the New Installation Procedures in the Anchor RodTightening Handbook? ❏ Yes ❏ No

b. Used special washers when required by the pole manufacturer or as ❏ Yes ❏ No ❏ NA specified in contract documents?c. Notes:

2. Level the Leveling Nuts and Place Pole(DO NOT APPLY LUBRICANT UNTIL DIRECTED)a. Followed Step 2 of the New Installation Procedures in the Anchor Rod

Tightening Handbook? ❏ Yes ❏ No

b. Used pole manufacturer’s standoff distance when required? ❏ Yes ❏ No ❏ NAc. Notes:

3. Lubricationa. Followed Step 3 of the New Installation Procedure in the Anchor Rod

Tightening Handbook? ❏ Yes ❏ Nob. Notes:

*Lubricant applied only to the areas shown in the “Lubrication Areas” section of the Anchor Rod Tightening Handbook.

4. Bring Top Nuts to Hand Tight and Tightening Leveling Nutsa. Followed Step 4 of the New Installation Procedure in the Anchor Rod

Tightening Handbook? ❏ Yes ❏ No

b. Notes: *Cross tightening pattern required to tighten leveling nuts.

5. Tighten Top Nuts in 3 Torque Value Steps (20%, 60% and 100%)a. Followed Step 5 of the New Installation Procedure in the Anchor Rod

Tightening Handbook? ❏ Yes ❏ Nob. Notes:

*Cross tightening pattern required to tighten top nuts for each step.6. Allow Rods to Relax for 10 Minutes

a. Followed Step 6 of the New Installation Procedure in the Anchor RodTightening Handbook? ❏ Yes ❏ No

b. Notes: 7. Re-Tighten to 100% Torque

a. Followed Step 7 of the New Installation Procedure in the Anchor Rod ❏ Yes ❏ No Tightening Handbook?

b. Notes:

26-SS

Page 27: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

Include the verbiage below if the traffic control signal will not have an Emergency Vehicle Preemption system installed. State law requires all traffic control signals to be pre wired for EVP.

https://www.revisor.mn.gov/statutes/?id=169.06 The plan should include the 3/C14 AWG Signal Control Cable and the 3/C20 AWG EVP Detector Cable on the wiring diagram. These conductors should be pulled from the signal cabinet to the EVP round outlet box

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

K Wiring for Future Emergency Vehicle PreemptionProvide Signal Control Cable (3/C14 AWG) and Emergency Vehicle Pre-emption (EVP)

Detector Cable (3/C 20 AWG) in accordance with 2565.3J and as detailed in the Plans.

Provide an EVP Round Outlet Box in accordance with 3814.2D.

Install signal control cable and EVP detector cable from the traffic control signal cabinet to the EVP round outlet box mounted on the mast arm.

L Compliance with NEC Article 110. 24Provide fault current calculations in accordance with 2565.3 CC and as follows:

Fill out the following electric service information form shown below for traffic control signal systems.

Provide to the Engineer, before final acceptance of the project, four copies of the electric service information form for traffic control signal systems and the Engineer will distribute the copies as follows:

MnDOT Electrical Services SectionMnDOT Traffic Electrical Systems EngineerMnDOT District Traffic EngineerCity of _________ or County of________

The Contractor provided "electrical service information form for traffic control signal systems" and available fault current calculations and labeling are included in the Unit Prices of the Pay Items that are part of the Traffic Control Signal System.

(The following form should be left on its own page so it can be removed from the special provisions and used by the contractor) See the next page of this document

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

27-SS

Page 28: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

28-SS

Page 29: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

(The following language is to be used for required warning stickers on the backside of sign panels being installed on the signal system project. The Specification Writer must include the appropriate District contact person and phone number to the following paragraph).

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

M Sign Panel Warning StickersInstall Department furnished warning stickers on new sign panels in accordance with

MnDOT 2564.3H.

Give 30 Business Days advance notice to___________________ at ___-___-____ before picking up the Department furnished warning stickers.

SS-2.4 AS BUILT DRAWINGS BASIS OF PAYMENTEnsure Division S Special Provisions “As-Builts” are included in the Division S Special Provisions.This would include the pay item 2011.601.

2011.601/01000 AS BUILT AS BUILT LS LUMP SUM 2018

The District needs to include the verbiage below to trigger installation of Divisions S Special Provisions.Add the pay item as shown above to your pay item list.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

A As Built Drawings and GPS CoordinatesAs Built drawings and GPS coordinates in accordance with Division S Special Provisions

“AS-Builts” including Pay Item No. 2011.601 (AS BUILT).

29-SS

Page 30: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

SS-3 (2565) EMERGENCY VEHICLE PREEMPTION (EVP) SYSTEMS

SS-3.1 DESCRIPTIONThis Work consists of providing and installing emergency vehicle preemption (EVP)

system at the intersection of _________ (_________) and _________ in ___________, __________ County in accordance with 2565 “Traffic Control Signals”, the Plans, and the following.

SS-3.2 MATERIALS

A Contractor Provided EquipmentProvide Emergency Vehicle Preemption (EVP) equipment in accordance with 3814

“Emergency Vehicle Pre-emption (EVP) Equipment”. Phase selectors (or other EVP equipment to be installed in the traffic control signal cabinet) will be installed in the Department provided cabinet by MnDOT personnel.

Deliver EVP phase selectors or other required EVP equipment to be installed in the traffic control signal cabinet to the Department at MnDOT’s Electrical Services Section for installation into the Department provided traffic control signal cabinet. Provide the equipment at least 30 Business Days in advance of when the Department provided traffic control signal cabinet is required on the job site.

Deliver Contractor provided equipment for integration into the Department provided traffic control signal cabinet on the project to the following address:

MnDOT Electrical Services Section (ESS)6000 Minnehaha AvenueSt. Paul, MN. 55111- 4014

Contractor provided equipment when specified includes EVP phase selectors, APS central control units, and Video image processors.

To ensure integration into the correct signal cabinet, before delivery to ESS label the Contractor provided equipment packaging with the following:

Assigned Traffic Engineering (TE) Number_____________________State Project No.__________________Contractor name__________________________Contact name and phone number_________________________

Notify ESS at least 3 Business Days in advance before delivering Contractor provided equipment. Have the TE Number on hand before calling. Contact the following in the order listed until notification has been received. 

Electronic Maintenance Supervisor 651-366-5759Stockroom 651-366-5720Transportation Program Supervisor 651-366-5734

SS-3.3 CONSTRUCTION REQUIREMENTS

A EVP EquipmentInstall EVP equipment in accordance with 2565 “Traffic Control Signals” and as shown

on the Plans.

SS-3.4 METHOD OF MEASUREMENTProviding and installing emergency vehicle preemption (EVP) system at the

intersection of T.H. ____ and _______ in ___________, __________ County as specified is measured as an integral unit complete in place and operating

30-SS

Page 31: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

SS-3.5 BASIS OF PAYMENTThe emergency preemption system (EVP) is paid for under Item No. 2565.501

[EMERGENCY VEHICLE PREEMPTION SYSTEM] at the Contract price per LUMP SUM, which price is compensation in full for costs.

SS-4 (2565) TRAFFIC CONTROL INTERCONNECT

SS-4.1 DESCRIPTIONThis Work consists of providing and installing conduit, handholes, interconnect cable,

and system loop detectors, for traffic control interconnect on T.H. ___, at the locations shown on the Plans, in accordance with MnDOT 2565, the Plans, and the following.

SS-4.2 MATERIALS

A Department Provided EquipmentUse the following language if a department provided master controller unit and equipment will be needed for the traffic control signal cabinet on the project.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

As part of the traffic control interconnect, the Department will provide the master controller unit when required and required master control equipment as part of the traffic control signal cabinet at ___________ to operate the interconnected coordinated traffic control signal systems on T.H. ____ between ____ Street and ____ Street.

Use the following language if the in-place master controller unit and equipment will be used on the project.

All Red text must be removed from the special provisions prior to the special provisions being submitted for project letting.

The master controller unit and required master control equipment to operate the interconnected coordinated traffic control signal systems on T.H. ___ is in place and located at the intersection of T.H. ___ and ________.

B Interconnect Cable Provide interconnect cable (___ PAIR 19 AWG shown on the Plans) in accordance with

MnDOT 3815.2C.6b.

SS-4.3 CONSTRUCTION REQUIREMENTS

A Interconnect Cable InstallationPlace interconnect cable in accordance with MnDOT 2565.3J2.

The Department will make interconnect cable connections in each intersection traffic control signal cabinet to make the interconnected coordinated portion of the traffic control signal system operational.

31-SS

Page 32: (2104) REMOVING TRAFFIC CONTROL SIGNAL ... - dot.state.mn.us  · Web viewThis Work consists of removing and salvaging, or disposing of miscellaneous structures, equipment and materials

SP XXXX-XXInsert Date

SS-4.4 METHOD OF MEASUREMENTProviding and installing conduit, handholes, interconnect cable, and system loop

detectors for traffic control interconnection on ____, at the locations shown on the Plans, as contained in these Special Provisions and in the Plans will be measured as an integral unit complete in place and operating.

SS-4.5 BASIS OF PAYMENTTraffic signal control interconnection will be paid for under Item No. 2565.501 (TRAFFIC

CONTROL INTERCONNECT) at the Contract price per LUMP SUM, which price will be compensation in full.

32-SS