  • Pharma: Stability Study in Quality

    Management (P65)

    SAP Best Practices

  • 2012 SAP AG. All rights reserved. 2

    Purpose, Benefits, and Key Process Steps

    Purpose

    Stability studies or shelf-life studies are conducted to track and examine how different environmental conditions (such as temperature, brightness, or moisture) affect a compound, a material, or a batch over

    a specified period of time.

    For this purpose, you create physical samples of the material or batch and store them under controlled conditions for the duration of the study.

    At specified intervals during the study, you remove these physical samples or parts of these samples from the various conditions and test them according to predefined inspection plans.

    Benefits

    The test results from the study can be used, for example, to confirm if the desired or guaranteed life expectancy of the product conforms to predefined recommendations for storage.

    Expiry date determination (needed for market approval of a product)

    Retest samples (in case of complaints)

  • 2012 SAP AG. All rights reserved. 3

    Purpose, Benefits, and Key Process Steps

    Key Process Steps

    The overall stability study process is made up of the following subordinate process

    stages:

    1)Initiating the Stability Study

    To initiate the stability study, create a quality notification (type QS or QR,

    depending on whether or not you are conducting a study about a material).

    Perform the following additional activities in any desired sequence:

    a)Create a physical-sample record for the initial sample to be delivered to your

    laboratory. *

    b)Assign a stability bill-of-material to the stability study (only if the study is being

    conducted regarding a material). *

    c)Confirm the receipt of the initial sample when it arrives in your laboratory. *

  • 2012 SAP AG. All rights reserved. 4

    Purpose, Benefits, and Key Process Steps

    Key Process Steps-2

    2)Initial Testing

    Test the initial sample. Depending on the results of this test, decide if you want

    to continue the stability study. During the initial test, perform the following

    activities:

    a)Create an inspection lot for the initial sample. *

    b)Perform the initial test by inspecting the initial sample and recording your test

    results.

    c)Complete the initial test by making the usage decision for the inspection lot.

  • 2012 SAP AG. All rights reserved. 5

    Purpose, Benefits, and Key Process Steps

    Key Process Steps-3

    3)Stability Planning

    In the stability planning phase, perform the following activities:

    a)Specify the storage conditions under which the stability samples is stored in this stability study.

    b)Create a testing schedule to plan the scope and frequency of the stability tests.

    c)Create separate inspection plans for each storage condition.

    d)Process the testing schedule to assign the inspection plans to the respective storage conditions.

    e)Complete the testing schedule.

    f)Print the storage list. The system automatically calculates the quantities needed for the stability

    samples and prints these quantities on the storage list.

    g)Maintain the storage data for the stability samples in the system.

    h)Physically create the stability samples, print and affix the physical-sample labels, and place the

    samples in storage under the predefined storage conditions.

    i)Define a start date for the stability study.

    The system automatically calculates all test dates for the duration of the study.

  • 2012 SAP AG. All rights reserved. 6

    Purpose, Benefits, and Key Process Steps

    Key Process Steps-4

    4)Stability Testing

    You perform the stability tests. This process phase may last several weeks or

    months, or as much as several years. During this phase, you perform the

    following activities:

    a)Monitor the testing dates. If necessary, you can influence the test dates (for example, by creating

    additional test dates, skipping certain test dates, restarting the scheduling process, and so on).

    b)Schedule a background job that periodically creates the inspection lots on the scheduled testing

    dates. You can flexibly create a work list of inspection lots in advance by specifying a lead time before

    the test dates.

    c)Remove the stability samples from storage on the specified test dates and perform the stability tests.

    Following each test, you return each stability sample to storage.

    d)Analyze the stability study process by performing evaluations.

  • 2012 SAP AG. All rights reserved. 7

    Purpose, Benefits, and Key Process Steps

    Key Process Steps-5

    5)Completing the Stability Study

    Once all planned stability tests have been performed, you complete the

    stability study.

    You do not have to complete the stability study as you originally planned at the

    beginning of the study. If necessary, you can:

    a)Cancel the stability study for all storage conditions or for selected storage conditions at any time

    b)Deactivate the stability study for all storage conditions or for selected storage conditions, for an

    indefinite period of time (for example, if you want to resume testing at a later date)

  • 2012 SAP AG. All rights reserved. 8

    Required SAP Applications and Company Roles

    Required SAP Applications

    Enhancement package 6 for SAP ERP 6.0

    Company Roles

    Quality Specialist

    Maintenance Employee

    Warehouse Clerk

  • 2012 SAP AG. All rights reserved. 9

    Process Flow Diagram Pharma: Stability Study in Quality Management

    SAP 2008 / Page 9

    Creating Physical Sample Record for the stability

    Study

    Wa

    reh

    ou

    se

    C

    lerk

    Creating Stability Study

    Confirm the Receipt of the Initial Sample

    Ma

    inte

    na

    nc

    e

    Em

    plo

    ye

    e

    Qu

    ali

    ty S

    pe

    cia

    lis

    t

    Creating the initial Test Inspection

    Lot Assign Stability BOM

    Results Recording

    Usage Decision

    Specifying Storage

    Condition

    Creating the Testing Schedule

    Processing the Testing Schedule

    Completing the Testing Schedule

    Printing the Storage List

    Maintaining the Storage Data

    Defining the Start date for the

    Stability Study

    Deadline Monitoring

    Display Stability History

    Goods Issue of sample (CO cost

    center)

    Completing the Stability Study

  • 2012 SAP AG. All rights reserved. 10

    Legend

    Symbol Description Usage Comments

    To next / From last Diagram: Leads to the next / previous page of the Diagram

    Flow chart continues on the next / previous page

    Hardcopy / Document: Identifies a printed document, report, or form

    Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

    Financial Actuals: Indicates a financial posting document

    Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

    Budget Planning: Indicates a budget planning document

    Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

    Manual Process: Covers a task that is manually done

    Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the process flow.

    Existing Version / Data: This block covers data that feeds in from an external process

    Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any incoming flow lines

    System Pass / Fail Decision: This block covers an automatic decision made by the software

    Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed.

    Exte

    rnal

    to S

    AP

    Business Activity / Event

    Unit Process

    Process Reference

    Sub-Process

    Reference

    Process Decision

    Diagram Connection

    Hardcopy / Document

    Financial Actuals

    Budget Planning

    Manual Process

    Existing Version /

    Data

    System Pass/Fail Decision

    Symbol Description Usage Comments

    Band: Identifies a user role, such as Accounts

    Payable Clerk or Sales Representative. This band

    can also identify an organization unit or group,

    rather than a specific role.

    The other process flow symbols in this table go

    into these rows. You have as many rows as

    required to cover all of the roles in the scenario.

    Role band contains

    tasks common to that

    role.

    External Events: Contains events that start or end

    the scenario, or influence the course of events in

    the scenario.

    Flow line (solid): Line indicates the normal

    sequence of steps and direction of flow in the

    scenario.

    Flow line (dashed): Line indicates flow to

    infrequently-used or conditional tasks in a

    scenario. Line can also lead to documents involved

    in the process flow.

    Connects two tasks in a scenario process or a non-step event

    Business Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside Process that happens during the scenario

    Does not correspond to a task step in the document

    Unit Process: Identifies a task that is covered in a step-by-step manner in the scenario

    Corresponds to a task step in the document

    Process Reference: If the scenario references another scenario in total, put the scenario number and name here.

    Corresponds to a task step in the document

    Sub-Process Reference: If the scenario references another scenario in part, put the scenario number, name, and the step numbers from that scenario here

    Corresponds to a task step in the document

    Process Decision: Identifies a decision / branching point, signifying a choice to be made by the end user. Lines represent different choices emerging from different parts of the diamond.

    Does not usually correspond to a task step in the document; Reflects a choice to be made after step execution

  • 2012 SAP AG. All rights reserved. 11

    No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

    Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

    Microsoft, Windows, Excel, Outlook, PowerPoint, Silverlight, and Visual Studio are registered trademarks of Microsoft Corporation.

    IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, z10, z/VM, z/OS, OS/390, zEnterprise, PowerVM, Power Architecture, Power Systems, POWER7, POWER6+, POWER6, POWER, PowerHA, pureScale, PowerPC, BladeCenter, System Storage, Storwize, XIV, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, AIX, Intelligent Miner, WebSphere, Tivoli, Informix, and Smarter Planet are trademarks or registered trademarks of IBM Corporation.

    Linux is the registered trademark of Linus Torvalds in the United States and other countries.

    Adobe, the Adobe logo, Acrobat, PostScript, and Reader are trademarks or registered trademarks of Adobe Systems Incorporated in the United States and other countries.

    Oracle and Java are registered trademarks of Oracle and its affiliates.

    UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

    Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems Inc.

    HTML, XML, XHTML, and W3C are trademarks or registered trademarks of W3C, World Wide Web Consortium, Massachusetts Institute of Technology.

    Apple, App Store, iBooks, iPad, iPhone, iPhoto, iPod, iTunes, Multi-Touch, Objective-C, Retina, Safari, Siri, and Xcode are trademarks or registered trademarks of Apple Inc.

    IOS is a registered trademark of Cisco Systems Inc.

    RIM, BlackBerry, BBM, BlackBerry Curve, BlackBerry Bold, BlackBerry Pearl, BlackBerry Torch, BlackBerry Storm, BlackBerry Storm2, BlackBerry PlayBook, and BlackBerry App World are trademarks or registered trademarks of Research in Motion Limited.

    Google App Engine, Google Apps, Google Checkout, Google Data API, Google Maps, Google Mobile Ads, Google Mobile Updater, Google Mobile, Google Store, Google Sync, Google Updater, Google Voice, Google Mail, Gmail, YouTube, Dalvik and Android are trademarks or registered trademarks of Google Inc.

    2012 SAP AG. All rights reserved

    INTERMEC is a registered trademark of Intermec Technologies Corporation.

    Wi-Fi is a registered trademark of Wi-Fi Alliance.

    Bluetooth is a registered trademark of Bluetooth SIG Inc.

    Motorola is a registered trademark of Motorola Trademark Holdings LLC.

    Computop is a registered trademark of Computop Wirtschaftsinformatik GmbH.

    SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer, StreamWork, SAP HANA, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

    Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects Software Ltd. Business Objects is an

    SAP company.

    Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Sybase Inc. Sybase is an SAP company.

    Crossgate, m@gic EDDY, B2B 360, and B2B 360 Services are registered trademarks of Crossgate AG in Germany and other countries. Crossgate is an SAP company.

    All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

    The information in this document is proprietary to SAP. No part of this document may be reproduced, copied, or transmitted in any form or for any purpose without the express prior written permission of SAP AG.