Upload
tim-davis
View
21
Download
0
Embed Size (px)
Citation preview
Tim Davis135 Creek St #6
Wrentham [email protected]
508-384-3033
ELECTRO-MECHANICAL TECHNICIAN 12 years at Zymark/Caliper Life Sciences/Perkin Elmer January 19 2004 to April 6 2016Hopkington, MA 01748774-278-2251All phases of electro mechanical manufacturingAlso worked with Systems Integration GroupManaged Tool and Instrument Calibration ContractsSuccessfully transitioned product from Chicago facility to Hopkinton, and took on full responsibility for that product
10/2001- 01/2004 Various Temp Assignments Including:
12/2001-6/2002 General Dynamics C4 Systems Taunton MA.02780508-880-4000Built, wired, and soldered electronic modules including INTEL test fixtures for their P4 ENABLER; built, tested, and repaired Military communication devices. Certified for Military Spec. Manufacturing.
6/2002-9/2003 Temptronic CorporationSharon MA. 02067781-688-2349Automatic Test Equipment – Built, plumbed, and wired super chiller units used to test silicon wafers at extreme temperatures; built and installed cables and harnesses; hand soldered test probes; installed plumbing, wiring, and controls performed gas leak isolation and repair.
9/2003-1/2004 NetezzaFramingham MA.01702-4480508-665-6811Built Mainframes for Super Computers
12/1994-10/2001 Speedline Technologies /MPM Franklin Mass.Built automatic printing equipment used in the surface mount technology industry: worked with allaspects, from sub-assembly to final test, including building custom computers from customer specs; worked in clean room on research and development project; full knowledge of clean room procedure; worked with pneumatic controls, doing assembly, installation, and calibration; awarded for dedicated service; member of employee relations committee; implemented more efficient ways to modify assembly process, resulting in cost and timesaving on production line
SKILLSAll phases of Electro-mechanical assembly, testing, and troubleshooting 29 years’ experienceComputer assembly and calibration of computerized machinery 7 years’ experienceIncoming inspection 8 years’ experienceCable & Harness Assembly including hand crimping, and automatic crimping equipment 17 years Hand and Wave Soldering 3 years’ experience (Mil Spec. Certified)Wrote Procedure and methodologies for more efficient and accurate workflow
Tim Davis REFERENCES
Al Nyborn, President Purelab of America, Westwood, Mass. Phone number 339-225-0015
John Reilly Production Manager Perkin Elmer 508-435-9500
Tom Souter Production Coordinator Perkin Elmer 508-435-9500
Nha Tran Group Leader Perkin Elmer 508 -435-9500