Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks associated with block cave underground mining, international metal price uncertainty, project power supply, and impacts on water resources used by herders (Satellite image of Oyu Tolgoi Mine, November 2015, http://landsatlook.usgs.gov ) Prepared for CEE Bankwatch Network Prague, Czech Republic www.bankwatch.org and OT Watch http://www.minewatch.mn/ January 10, 2016 Prepared by Paul Robinson [email protected] Research Director, Southwest Research and Information Center Albuquerque, New Mexico 87107 USA www.sric.org

2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

Embed Size (px)

Citation preview

Page 1: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

OyuTolgoiPhase2:Plans,IssuesandRisksAnOverviewofOyuTolgoiPhase2MiningPlansandsomeoftheissuesandrisks

associatedwithblockcaveundergroundmining,internationalmetalpriceuncertainty,projectpowersupply,andimpactsonwaterresourcesusedbyherders

(SatelliteimageofOyuTolgoiMine,November2015,http://landsatlook.usgs.gov)

Preparedfor

CEEBankwatchNetworkPrague,CzechRepublicwww.bankwatch.org

andOTWatch

http://www.minewatch.mn/

January10,2016

[email protected]

ResearchDirector,SouthwestResearchandInformationCenterAlbuquerque,NewMexico87107USA

www.sric.org

Page 2: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

1

TablesofContents

Introduction 2WhoownstheOyuTolgoi(OT)Mine? 3WherearetheplansforOTPhase2described? 3WhatisplannedintheOTPhase2mineexpansion? 4Whatactionsareneededtocompleteapprovalofthe

OTPhase2expansion? 14WhatisBlockCaveMining? 16WhichBlockCavemineshasRioTintooperatedorplanned? 18WhataretheenvironmentalImpactsofBlockCaveMining? 19HowlargeistheSubsidenceZoneattheOTHugoNorthLift1 30 undergroundminepredictedtoextend? WhatareSomeoftheMajorImpactsofOTPhase1and2on WaterResourcesUsedbyHerders? 36HowdoInternationalMetalMarketPricesaffectOyuTolgoiPhase242 DevelopmentandFundingPlanandTechnicalReports?Howmuchhaveinternationalmetalmarketpricesfallensince 43

theOTPhase2TechnicalReport(OTTR2014)wasreleased?Whataresomeoftheplansandissuesassociatedwithdeveloping46 apowersupplyforOTPhase2?ArealternativesourcesofpowerpossibleforOTPhase2?49SourcesCited 51BriefBiographyoftheAuthor 55

Page 3: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

2

IntroductionOyuTolgoi’sPhase2planstomine1.5billiontonsoforearedescribedasthe“ReserveCaseMine”intheOctober27,2014OyuTolgoiTechnicalReport(OTTR2014),themostdetaileddescriptionofOTPhase2publicallyavailable.OTTR2014waspreparedusingtheCanadianNationalInstrument43-101“StandardsofDisclosureforMineralProjects,”whichisrequiredforminingcompanieslistedonCanadianStockExchangessuchasTurquoiseHillResources(TRQ),66%ownerofOyuTolgoiLLC).(OTTR2014atP.i)The“ReserveCase”oretobeprocessedduringPhase2willcomefromtwosources:

1) theSouthernOyuTolgoi(SOT)openpitand2) ThedeeperHugoNorth“Lift1”ore,minedusingtheundergroundblockcaving

method.OthermineralresourcesidentifiedattheOyuTolgoisitebutnotproposedforthe“ReserveCase”mine-“Phase2”-aredescribedaspartofthelong-term“LifeofMineCase”(OTTR2014).“LifeofMineCase”depositsinclude:HugoNorth“Lift2”–anoredepositbeneath“Lift1”,theHugoSouth,andtheHerugadeposits.OTTR2014identifiesaseriesofdecisionoptionsrelatedtotheminingofthe“LifeofMineCase”depositsduringthenext10years,andbeyond,thatcouldleadtodevelopmentoftheseadditionaldeposits,includingextractionduringtheminingofthe“ReserveCase”oreintheopenpitandHugoNorthLift1in“Phase2”thatwouldbecompletedintheyear2055.DevelopmentandfinancingplansforminingtheOT“ReserveCase”oreisthesubjectoftheMay18,2015OyuTolgoiUndergroundMineDevelopmentandFinancingPlan(OTUMDFP2015)signedinDubaibyGovernmentofMongoliarepresentativesandOyuTolgoiLLC’scorporateowners.TheOTUMDFP2015addressesarangeofsubjectsincludingthecostofconstructionofOTPhase2,OTPhase2impactsontheMongolianeconomy,proposedschedulesforactionondevelopmentofafutureOTpowersupply,aninvestigationoftheeconomicviabilityofacoppersmeltertorefinethe30%copperconcentratecurrentlyproducedatOT,andtaxandfinancialaccountingconsiderations,amongothermatters.ThisreportsummarizestheminingactivityproposedbyOTinitsPhase2developmentplan,describestheblockcavingundergroundminingtechnologyplannedforthelargedeeporebodytobeminedinPhase2,environmentalimpactsandreclamationpotentialofblockcavemines,andissuesandrisksassociatedwithafutureOTpowersupply,internationalmetalmarketpriceuncertainties,andOTPhase1and2impactsonwaterresourcesandherdersandtheirlivelihoodintheregionsurroundingtheOTminelicensearea.

Page 4: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

3

WhoownstheOyuTolgoi(OT)Mine?TheOyuTolgoicopperandgoldproject(OyuTolgoi)isbeingdevelopedbytheOyuTolgoiLimitedLiabilityCorporation(OTLLC).OTLLCis66%ownedbyTurquoiseHillResourcesLtd(TRQ)and34%ownedbyErdenesOTLLC.RioTintoplc(RioTinto)maintainsacontrollinginterestinthroughitsownershipof51%ofTRQandisthemanageroftheOTproject.TheGovernmentofMongolia(GOM),throughErdenesOTLLC,owns34%ofOT.(OTUMDFP2015)WherearetheplansforOTPhase2described?OTPhase2miningplansaredescribedintheOyuTolgoiTechnicalReportreleasedOctober27,2014(OTTR2014),a547-pagereportpreparedusingtheCanadianNationalInstrument43-101StandardsofDisclosureforMineralProjects,amineralresourceestimationandreportingregulation.OnAugust,27,2015,OTannouncedithadsubmittedrevisionsoftheschedulesinitsMarch2015FeasibilityStudytotheMongolianMiningCouncilthat“align”withtheMay18,2015OTUndergroundMineDevelopmentandFinancingPlan(OTUMDFP2015)andtheOTTR2014.(TRQ8-2015)OyuTolgoihasnotmadetheMarch2015OTFeasibilityStudyavailabletoinvestorsorthepublic.ItisnotlistedinSEDAR.comrecordsofCanadiancorporationpublicfilingforOTalongwithpreviousNI43-101complianttechnicalreports,orontheOTorTRQwebsites.AsOT’sMarch2015FeasibilityStudyisnotavailablefromtheOTsiteorotherpubliclyavailablesources,thisReportreliesontheOTTR2014asthemostcurrentavailableversionOT’splansforPhase2.OTTR2014isavailableathttp://www.turquoisehill.com/i/pdf/2014-10-27_OyuTolgoiTechReport.pdfandhttp://www.turquoisehill.com/s/oyu_tolgoi.asp?ReportID=379189CompletionofanupdatetotheMarch2015OTFeasibilityStudyisoneoftheobligationsrequiredundertheOTUMDFPrequiredbeforefinalapprovalbytheBoardsofDirectorsoftheOTowners.

Page 5: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

4

WhatisplannedinOyuTolgoi’sPhase2mineexpansion?OTPhase2proposestheextractionandprocessingoforefromthecurrentlyoperatingSouthernOyuTolgoiopenpit(SOT)whilealsoconstructingandoperatinganundergroundmineusingtheblockcavingminingmethodtoextractorefromaportionoftheHugoNorthoredepositcalled“Lift1”throughtheyear2055.OTTR2014forecastsoverallmineproductionduringPhase2,calledthe“ReserveCase”inOTTR2014,continuingthrough2055.OTPhase2oreproductionisprojectedtobeaverageabout115,000tonsperday(tpd),equaltoabout40milliontonsperyear,duringthe2020–2039periodwhentheundergroundHugoNorthLift1blockcavemineisproposedtooperate.FutureOTexpansionthatarenotincludedinOTPhase2couldinvolveadditionalundergroundminingatHugoNorthLift2beneathLift1,andundergroundminingattheHugoSouthDepositandtheHerugaDeposits.OTopenpitoreproductionwouldfallfromthecurrent100,000tonsperdayto20,000tonsperdayduring2019–2039period,whentheHugoNorthLift1mineisprojectedtoproduce95,000tonsoreperday.ThisproposedmixofopenpitandundergroundoreiswouldkeepthecombinedtonnageofOToreprocessedtoabout115,000tonsperdaybetween2019whenNorthHugo“Lift1”undergroundorewouldbegintobeextracted,and2039whenoreextractionfromtheOTPhase2portionoftheHugoNorthundergroundminewouldbecompleted.OTPhase2plans,schedulesandresourceestimatesareshowninFigures1–9thatprovideFiguresfromOTTR2014andanAugust2015OTInvestorandAnalystSiteVisitPresentation(TRQ8-2015b)withannotationsandcommentarybytheauthor..

Page 6: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

5

Figure1-OyuTolgoiandSurroundingLicenses–ProjectLocation

Page 7: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

6

Figure2-LocationandDepthofOyuTolgoiDeposits

Page 8: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

7

Figure3–OTPhase2RestartMilestones

Page 9: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

8

Figure4–OTPhase2ProbableDevelopmentSchedule

Page 10: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

9

Figure5–OTPhase2Medium-TermTimeline–2015–2026++

Page 11: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

10

Figure6–OTPhase2OreDescriptionandProductionSequence

Page 12: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

11

Figure7–OTMultipleDevelopmentOptionsbeyondPhase2

Page 13: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

12

Figure8–LocationofOTPhase2andOT“LifeofMineCase”depositsthatmaybeminedinadditiontothePhase2oredepositsinthefuture

Page 14: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

13

Figure9–“HugoNorthLift1MineDesignProject”and“Isometric[View]ofMineDesign”

Page 15: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

14

WhatactionsareneededtocompleteapprovaloftheOTPhase2expansion?TheMay18,2015OTUMDFPAgreementbetweentheGovernmentofMongoliaanditspartnersinOTLLC(OTUMDFP2015)identifiesaseriesofstepsneededtocompleteapprovalofOTPhase2.Thesteps“requiredbeforetheaspirationslistedinthatagreementcanbegintoberealized,”atsection4.7onp.6,include:

“[The]PartieswishtoproceedexpeditiouslywiththeconstructionoftheUndergroundStage.However,thePartiesagreethatconstructionofUndergroundStagewillcommenceonlyafter:

(a)OTLLChassatisfiedtherequirementstoobtainthirdpartyprojectfinancetofundtheUndergroundStage(the“UGProjectFinance”);and

(b)TheUndergroundStageisapprovedbyeachoftheBoardsofRioTinto,TRQandOTLLC”

Atsection5.5.a.atp.6,theMay2015GOM-OTAgreementsays,

“UptoUSD$6billionofexternalfundingwillberaisedthroughthirdpartyprojectfinancing(includingUGProjectFinance)andotherbankfinance,productoff-takearrangementsorotherformsoffinancing.”

OnDecember14,2015,TurquoiseHillResources(TRQ)announcedthatthesigningofa,“USD4.4billionprojectfinancingfacility”.(TRQ12-2015).ThefacilityprovidesloansthroughagroupofinternationalfinancialinstitutionsandexportcreditagenciesrepresentingthegovernmentsofCanada,theUnitedStatesandAustralia,alongwith15commercialbanks.The$4.4billionprojectfinancefacilityOT’sownerssignedprovidesasetoffourloanswithpaybacktermsof12–15years.TheloansagreedtobyOTLLCandthelendershaveadebtcapacityof$6.0billionforOyuTolgoi,providingtheoptionforanadditional$1.6billion.

FuturestepstocompletetheloanprocesssummarizedbyTRQinitsDecember14,2015releaseare:

“TurquoiseHill,RioTintoandOyuTolgoiwillnowcontinuetoworktowardscompletingthe2015feasibilitystudy,includingtheupdatedcapitalestimateandsecuringallnecessarypermitsforthedevelopmentoftheundergroundmine.“OncethesestepshavebeencompletedandsubjecttotheboardsofTurquoiseHill,RioTintoandOyuTolgoiapprovingaformal‘noticetoproceed’,thefull$4.4billionfacilitywillbedrawndownbyOyuTolgoisubjecttosatisfactionofcertainconditionsprecedenttypicalforafinancingofthisnature.”

TheMay2015OTUMDFPAgreementatsection5.2acknowledgesthat,“ApprovalofUGProjectFinanceisadecisionfortheBoardsofRioTinto,TRQandOTLLCandtheShareholdersofOTLLC.OyuTolgoiBoardapprovalofUGProjectFinanceisrequiredbythelendersundertheProjectFinancetobeunanimous.”

Page 16: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

15

TheOTUMDFPatP.3identifiestheCapitalCostofOTPhase2as$6.7billionUSD,including$4.7billioninundergrounddevelopmentcapital,$1.5billioninsustainingand$0.6billionUSDinValueAddedTax(VAT)andDutiesonCapital.TheOTUMDFP2015andOTTR2014donotincludeplansforeitherasupplementaloranewEnvironmentalandSocialImpactAssessment(ESIA)forOTPhase2.OTTR2014,atp.446says,“The[2012OT]ESIAaddressesaprojectwitha27-yeardesignlife.”OTPhase2isprojectedfora40-yeardesignlifefromfeasibilitystudiesandfinancialin2016through2055.OTTR2014,says,

“ItisanticipatedthattheProjectwillcontinueinoperationwellafterthatdate[of2055],possiblyathigherproductionrates.Suchplansarestillatanearlystage,sowhiletheyarereferredtointheESIA,theyarenotevaluatedintheESIAbecauseofthelimitedamountofinformationavailable.

“Similarly,anumberoffuturedevelopmentsofproject-associatedfacilitiesarestillunderevaluation,andnocleardecisionhasyetbeenmadeastothepreferredapproachtobeadoptedbytheProject,”includingarailroadlineandapowersupply.

OTPhase2plansprovidethat,

“certainotheractivitiesandfacilitiesareexpectedtobedevelopedovertime,eitheraspartoforinsupportoftheproject,whichdonotconstitutepartoftheProjectforthepurposesoftheESIA.Theseinclude:• Projectexpansiontosupportanincreaseinorethroughputfrom100–160ktpd.• Long-termProjectpowersupply.UnderthetermsoftheIA,OTLLCwillsource

electricityfromwithinMongoliawithinfouryearsofthecommencementofProjectoperations.OTLLCmaydevelopacoal-firedpowerplantwithintheOyuTolgoiMineLicenceAreatoprovidetherequiredpowerfromMongoliansources.

WhiletheimpactsandmanagementofthesefutureProjectelementsarenotdirectlyaddressedintheESIA,theyareconsideredinthecumulativeimpactassessment.”(OTTR2014,P.445)

Page 17: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

16

WhatisBlockCaveMining?The2005OyuTolgoiIntegratedDevelopmentPlan(IDP)ExecutiveSummarydescribestheblockcaveundergroundminingmethodthatwillbeusedinOTPhase2toextractorefromtheHugoNorthLift1undergroundmineas:

“[A]safe,proven,andhighlyproductivemethodforextractingbulkoretonnagesfromundergroundmines.Itinvolvesundercuttingpartoftheorebodyacrossaplanarea,causingtheoverlyingrocktocollapse.Thecollapseoftheore,or“cave,”is“bydesign”andisaccomplishedinadeliberate,controlled,andpredictablemanner.Initially,theoreisundercutandinducedtocavebyblasting.Thereafter,theblastedorefallsintoanarrayofdrawpointsbeneaththeinitialcaveareaandisremovedbyload-haul-dump(LHD)equipment.Asbrokenoreisremoved,thepilewithinthecaveslumps,creatingavoid,whichinturnpromotesfurthercaving.”(IDPES2005)“Blockcavingisexpectedtoresultinsurfacesubsidence.Topreservetheintegrityofthemineshaftsandprincipalinfrastructure,theshaftsandinfrastructurewillbegroupedtogetherina“farm”approximately1,500mduewestofthecentrelineoftheresource.”(IDPES2005P.47)(Emphasisadded)

TheSMEMiningEngineeringHandbook2011(SME2011)describesBlockCavingas,

“[A]massminingsystemthatusestheactionofgravitytofractureablockofunsupportedore,allowingittobeextractedthroughpreconstructeddrawpoints.Byremovingarelativelythinhorizontallayeratthebaseoftheorecolumnsusingstandardminingmethods,theverticalsupportoftheorecolumnaboveisremovedandtheorethencavesbygravity.Asbrokenoreisremovedfromtheorecolumn,theoverlyingorecontinuestobreakandcavebygravity.”

“Althoughsomerelativelysmallerblockcaveorebodiesarecavedandminedasasingleproductionblock,mostexistingandplannedblockcaveminesuseeitherofthefollowing:

•Anextendedblockcavingsystemthatdividesthedepositintodiscreteproductionblocks;or•Asinglecavefront(orseriesoffronts,or“panels”)advancingforward

throughtheorebody,continuallyopeningupnewproductionareasastheearliercavedareasbecomeexhausted.

“Theblockcavingmethodtypicallyallowsforrelativelylargevolumesofproductionaftertheminehasbeendevelopedandproductionramp-uphasbeenachieved.Thepreproductiondevelopmentperiodcanbesignificant(typically5–10years,dependingonthelengthoftimetoachievetheinitialaccess).Theup-frontcapitalrequiredpriortoanyreturnoninvestmentisveryhighbecausemuchoftheproductionlevelsandinfrastructuremustbeinplacebeforecavingcanbegin.“Aftertheminehasreacheditssustainedmaximumproductionrate,theoperating

Page 18: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

17

costtendstobeverylowwithminimaladditionalinfrastructurerequiredtomaintainthehighproductionvolumes.Blockcavingisgenerallytheleastexpensiveofallundergroundminingmethods,andcaninsomecasescompetewithopen-pitminingincost.”(SME2011atP.1356)

NorevisionofOyuTolgoi’s2012EnvironmentalandSocialImpactAssessment(ESIA2012)isproposedtoaddressOT“Phase2”asdefinedbythe“ReserveCase”inOTTR2014.TheProjectDescriptionportionoftheESIA2012providesan“OverviewofBlockCaving”thatsays,An“OverviewofBlockCaving”isprovidedintheOTESIA2012-ProjectDescription(A4),atP.21of77:

“Blockcavingisahigh-tonnageundergroundbulkminingmethodgenerallyappliedtolargehomogeneousoredeposits.Ideally,theoretobecavedshouldbestructurallyweak,andthewasteoverburdenshouldbeweakenoughtocollapseovertheorewithoutinducementastheoreisextracted.

“Blockcavinginvolvesexcavationofnaturalsupportfrombeneaththeore,causingthestructureoftheorebodytofailandcollapseintotheexcavatedvoidundertheforceofgravityandlocalgeo-mechanicalstresses.Thebrokenoreisthenpulledoutfromunderthecavedsectionthroughadrawpointarrangement,subsequentlyremovingsupportfromoreandoverburdenatincreasingheightabovetheinitialexcavation,andeventuallyextendingthecaveupwardtothesurface.“Theattractiveaspectofblockcavingisthatonlyarelativelysmallportionoftheoremustbedrilledandblastedpriortoextraction.Oncethecaveinitiates,productioncontinueswithoutfurtherprimarydrillingandblastinguntiltheorecolumnaboveisexhausted.“Theblockcaveminingsequencebeginswithaccessandinfrastructuredevelopment,followedbyexcavationoftheextractionlevel,andundercuttingtheore.Thesequenceculminatesinsteady-stateproductionfromindividualdrawpoints.“Oreinthecolumnisdilutedbymaterialinadjacentcolumnsandultimatelybyoverburdenandadjacentwasterock.Whenthecolumndrawdowniscompleteanddrawpointgradedropsbelowaminimumvalue,thedrawpointisabandoned.Greatcareistakeninestablishinguniformdrawpracticesthroughouttheminetomaximisedrawpointlifeandminimisedilutionandstressloadingfromundergroundworkings.“Blockcavingisacapital-intensiveminingmethod,requiringsignificantinvestmentearlyintheminelifeforinfrastructureandprimarydevelopment.Onceinplace,themethod’shighup-frontcostsareoffsetbyhighproductionratesandlowoperatingcosts(relativetootherundergroundmethods)overaconsiderablelengthoftime,resultinginalowoverallcostpertonne.Blockcaveminingisamongtheleastcostlyofallundergroundminingmethodspertonneoforeextracted.

Page 19: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

18

“Blockcavinghasanumberofpositiveattributesincludingnowasterockstorageonthesurfaceandnolargeopenpits.Oneconsequenceofblockcavemining,however,isthepotentialforsurfacesubsidenceorsettling.Surfacesubsidenceiscausedasthematerialabovetheorebodygraduallymovesdownwardtoreplacetheorethathasbeenmined”.

WhichBlockCavemineshasRioTintooperatedorplanned? FiveexistingandproposedblockcaveminesareorhavebeenownedinwholeorinpartbyRioTinto,currentmajorityowneroftheOyuTolgoi,LLC.Theseinclude:Closed-Palaboracoppermine,LimpopoProvince,SouthAfrica–57%RioTinto,26%public,17%Anglo-American;currentlyclosed.See,forexample,“PalaboraMineClosureFactSheet”athttp://www.palabora.com/documents/factsheet_closure.pdfOperating-Northparkescopperandgoldmine,CentralNewSouthWales,Australia–formerly80%ChinaMolybdenumCo.,Ltd.(acquiredfromRioTintoin2013),20%Sumitomo;See,forexample,http://www.geovia.com/sites/default/files/Australian_Journal_Mining_Jan2008_LR.pdf-DeepOreZone(DOZ)blockcavemine,GrasbergMine,Papua,Indonesia–40%RioTinto,60%PTFreeportIndonesia;See,forexample,GrasbergBlockCave”,athttp://www.infomine.com/publications/docs/InternationalMining/Chadwick2010k.pdf)Planned-HugoDummettNorthandSouthdeposits,OyuTolgoigoldandcopperproject,SouthGobiRegion,Mongolia;and-ResolutionCopperproject,Superior,Arizona,US-55%RioTinto,45%BHPBilliton.See,forexample,“UndergroundMining”athttp://resolutioncopper.com/the-project/underground-mining/)

Page 20: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

19

WhataretheenvironmentalImpactsofBlockCaveMining?Large-scalepermanentsurfacesubsidenceabovetheextractionzoneistheprimarylong-termenvironmentaldamageresultingfromblockcavemines. Thesurfacecollapse,subsidenceandfracturingofthelandsurfaceabovethemineresultingfromextractionoforeusingtheblockcaveminingmethodsleadstoenvironmentaldamagethatisnotamenabletotopographicorbiologicalreclamationtoestablishproductivepost-mininglandusesbecausethedamagedlandsurfaceaffectedbytheblockcave-inducedsubsidenceisphysicallyunstable.Asdescribedin“OreBodyAccess,”MiningMagazine,03May2011says:

“Oneoftheprimarydisadvantagesofblockcavingisthatitremovesmuchofthesupportingrockfromunderneaththeoverburden,whichoftenleadstosubsidenceofthesurface.Cavinginducedsubsidencemayendangermineinfrastructureandisamajorconcernforoperationalsafety.”Changestosurfacelandformsbroughtaboutbysubsidencecanbedramaticandmayleadtoapronouncedenvironmentalimpact.Therefore,theabilitytopredictsubsidencehasbecomeincreasinglyimportantforoperationalhazardandenvironmentalimpactassessments.”(emphasisadded)(MiningMag.2011)

Surfacesubsidencecratersareatypicalfeatureatblockcaveminesaroundtheworld.Thirtyoftheundergroundblockcavingminesaroundtheworldaresummarizedin“Characterizationandempiricalanalysisofblockcavinginducedsurfacesubsidenceandmacrodeformations,”Woo,K.,etal,ROCKENG09:Proceedingsofthe3rdCANUSRockMechanicsSymposium,Toronto,May2009,(Woo2009)at:http://www.geogroup.utoronto.ca/rockeng09/proceedings/innerFrames/PDF/Session19/4044%20PAPER.pdf.Woo2009identifiesthreezonesofsurfaceimpactfromblockcaving,aninner“CavedZone,”asurrounding“FracturedZone”anda“Subsidence”zonesurroundingtheinnerzoneofgreatersurfacedeformation.Figures10–17demonstrateblockcavingminingimpactstothelandsurfaceaboveandsurroundingtheoreextractionzone,including:

- a“cavedzone”directlyabovetheblockcavingminingarea,wherethesurfacecollapsesintothevoidbelowthesurfacefromwhichorehasbeenextracted;

- a“fracturedzone”overtheareaaroundthe“cavedzone”affectedbythecollapseovertheorebodywhere“tensioncracks”developatthesurfaceandbelowthesurface;and

- a“continuoussubsidencezone”affectedbysurfacedisruptionandinstability.

Page 21: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

20

Figure10–(IncludedinFigure12)“Definitionofblockcavingsubsidencezonesandits

quantificationwithrespecttoanglesex-tendingfromtheundercut”(Woo2009)TheillustrationofblockcavingfromWoo2009issimilartotheillustrationofblockcavinginOyuTolgoi’sIDOP2012showninFigure11.

Page 22: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

21

Figure11–(IncludedinFigure12)“DefinitionofSubsidenceZone(afterMMT–PermissionfromRioTinto)”fromOyuTolgoiIDOP2012,P.325,-Figure16.22

Figure12–22showtheblockcaveminingmethodproposedbyOTandtheassociatedcollapseandsubsidencezonesfromOTTR2014andothersourcesidentifiedintheFigureswithannotationsandcommentarybytheauthor.

Page 23: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

22

Figure12–“DefinitionofSubsidenceZones”

Page 24: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

23

Figure13–BlockCavingandSubsidence–“MostProbablePredictionofSubsidencefortheResolutionCopperMine,aRioTinto-BHPBillitonprojectinArizona,USA

Page 25: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

24

Figure14–IllustrationsofOTPhase2“OreFlow”and“CaveMonitoring,”andSurfaceSubsidencepredictionatRT-BHPResolutionCopperMine.

Page 26: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

25

Figure15–OTHugoNorthLift1SubsidenceZonepredictionsfrom2010and2012

Page 27: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

26

Figure16–ComparisonofOTPhase2SubsidenceAreapredictedin2012andCentralUlaanbaatar.

Page 28: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

27

Figure17–OverlayofOTPhase2SubsidenceZonepredictedin2012onCentralUlaanbaatar.

Page 29: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

28

Thesurfacesubsidenceresultingfromblockcaveminingleavesapermanentholeinthegroundabovetheminewherethesurfacecollapsesintothemine,aringofcontinuoussubsidencearoundtheedgeofthecollapsezone,andringoffracturelandaroundtheedgeofthecontinuoussubsidencezone.Reclamationtoreestablishtopographicallystablelandscapewithsustainablevegetationisnotpossibleatblockcaveundergroundminesasthelandsurfaceabovetheblockcavemineisphysicallyunstableandunsafeforoperationofreclamationequipment,andforpeopleandanimalsenteringthefracturedrockorsubsidencezone.Theextentofthe“cavedzone”isdefinedbya“caveangle”or“angleofbreak”illustratedinFigures10,11and12.Theextentofthefracturezoneisdefinedbyan“angleoffractureinitiation,”andtheextentofthecontinuoussubsidencezoneisdefinedbyan“angleofsubsidence.”Woo2009includes,inadditiontoanoverviewoftheblockcavingminingmethod,descriptionsandillustrationsoftheopencavezoneandsurroundingsubsidencezoneatoperatingminesat30blockcaveminesaroundtheworld,includingimagesofcollapseandsubsidencezoneat18blockcavingmines.Figure18below(Woo2009,Figure5),showssatelliteimageryofsurfacesubsidenceatblockcavemineswheretopographicconditionshaveasmallimpactonthestructureofthecollapsezone.

Page 30: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

29

Figure18–“Macrodeformationpatternsobservedinwhichtopographiceffectsareminor”

atblockcavemines(Woo2009)TheshapeofthesubsidencezonesintheFigureshow–the“macrodeformationpatterns”–asidentifiedinWoo2009are:TypeA=circular,TypeB=elliptical,TypeC1=irregularwithscarps,butwithoutadistinctcollapsezone,andTypeC2=irregularwithadistinctcollapse

structure/gloryhole“wheretopopographiceffectsareminor.”

NoscaleisprovidedfortheimagesinWoo2009.

Page 31: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

30

HowlargeistheSubsidenceZoneattheOTHugoNorthLift1undergroundminepredictedtoextend?SurfacesubsidencezonepredictionmapsfortheHugoNorthLift1blockcaveminehavebeenincludedintheOTIntegratedDevelopmentPlansfrom2005,2010and2012.Theprojectedextentofthelandarealikelytobeaffectedbythecaved,fracturedandsubsidencezoneattheHugoNorthminesiteincreasedsubstantiallyintheIDOP2012fromthatprojectedinIDP2010.TheIDP2010projectionofthecaved,fractureandsubsidencezonesabovetheHugoNorthLift1undergroundminebelowshowsthe“shaftfarm”area–thesiteshaft2–outsidetheprojectedcontinuoussubsidencezone.

Figure19-(AlsoinFigure15)“ProjectedSubsidenceZone”(IDP2010,P.373(Figure

23.89.8)InthisFigure,thegridlinesarespaced500metersapart.TheprojectedHugoNorthminesubsidencezonepresentedinIDOP2012,showninFigure20below,hasexpandedmore500meterstothewestresultinginthe“CavedZone”includingthe“ShaftFarm”areatheShaft2siteandotherinfrastructurefeatureswellinsidetheinnerring–theprojected“cavedzone”ofthesubsidencezone–inadditiontoShaft1.

Page 32: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

31

Figure20–(AlsoinFigures15-17)ProjectedSubsidenceZonefromIDOP2012:“TheprojectionshowninFigure16.33merelyillustratestheextentofsurfaceareathatthegeneralizedsubsidenceprojectionsencompass.Furtherstudyisrequiredtomore

accuratelypredictactualcavepropagation.”(IDOP2012,p.358).InthisFigure,thegridlinesarespaced1,000metersapart.

Propagationofthe“CavedZone”toincludetheShaftFarmArea–theShaft2,Shaft1andotherinfrastructurefeaturesisalsoillustratedintheProjectDescriptionportionoftheESIA2012,asshowninFigure21,below.

Page 33: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

32

Figure21–“ProjectedBlockCaveSubsidenceZone,”(ESIA2012-ProjectDescriptionFigure4-10p.23of77)

OyuTolgoi’sIDP2010acknowledgedtheseverityoftheimpactofthecavedzoneonShaft1noting,

“Thesubsidencezonefromtheextractionleveltothesurfaceisprojectedat60o,perSRK’sRecommendation[Figure3inthisreport](Figure23.8.8).Allplannedinfrastructureisoutsidethiszone,exceptforShaftNo.1.ShaftNo.1islocatedinsidethe60osubsidenceareaattheedgeof65osubsidenceline.ItisassumedthatShaftNo.1willbestrippedofallconveyancesoncefullproductionisachievedandwillbeusedforventilationonly.”

OyuTolgoi’sIDOP2012illustrationoftheprojectcaved,fractured,andsubsidencezones(Figure20inthisReport),showsthattheextentofthe60osubsidenceareahasexpandedtoincludeShaftNo.2andmostoftheShaftFarmarea.The60osubsidencelineindicatedinIDOP2012isapproximately500meterswestofthelocationofthe60osubsidencelineinIDP2010,engulfingtheShaftNo.2site.NeithertheIDOP2012northeESIA2012addressconsequencesoftheprojectedcave,fractureandsubsidencezonesonshaftNo.2,ortheotherinfrastructureidentifiedaswithintheprojectedsubsidencezone.WhiletheIDP2010assertedthatallinfrastructureotherthanShaftNo.1weretobelocatedoutsidethe60oangleofsubsidencezonetopreventimpactsfromcaving,fracturingandsubsidence,manyOTminefacilitiesareshownwithinthe60oangleofsubsidenceshownforthemineintheIDOP2012.TheseminefeaturesincludeShaftNo.2,andthe“ShaftFarm,”amongotherinfrastructure.Thelackof

Page 34: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

33

attentiontotheimpactsofsubsidenceonareaswithinthe60osubsidenceangleasprojectedinIDOP2012appearstobeasignificantdefectinESIA2012.WhileOTTR2014providesadiscussionofblockcaveminingontheHugoNorthLift1,itdoesnotprovideafigureorotherinformationthatillustratesthefullprojectedsubsidencezonefromtheOTPhase2,the“ReserveCase”mine.OTTR2014says,

“Thepredictedfracturelimits(determinedasthepointofhavinganotableimpactonkeyinfrastructuresuchashoistingshafts)bytheendofminingHugoNorthLift1areshownbytheredoutlineinFigure16.13.Afencewillbeconstructed100moutsidethisredoutlinetorestrictaccess.Thesubsidenceanglesarepredictedtobenearlyverticalatthenorthernandsouthernlimitsofthecave,whereconfinementishighest,andareapproximately55°intheeastandwest,whereconfinementislowest.Allshaftsandpermanentinfrastructureareplannedtobesituatedoutsidethepredictedfracturelimits.“Shaft1isclosesttothefracturelimits.Shaft1willbeusedasahoistingshaftuntiltheShaft2loadoutandprimarycrusherarecommissionedbyearly2019.ThereaftertheprimaryfunctionofShaft1isforintakeventilation.Thisprovidesadditionalcontingencyagainstanunexpectedlylargercavesubsidencedamagearea,asabaldconcretelinedshaftcanwithstandhighergroundmovementthanashaftreliantontheclosetolerancesofoperatinghoistinginfrastructure.”Constructingafence100metersoutsidethesubsidencezone–“theredline”inFigure22below–istheonlyreclamationmeasure,otherthanmonitoringtheextentofsubsidence,identifiedinOTTR2014.

Figure22belowisareproductionofFigure16.31inOTTR2014.NoscaleisprovidedfortheFigureinOTTR2014toallowcomparisonwiththeIDOP2012andESIA2012FiguresillustratingOT’sprojectedsubsidencezone.TheOTTR2014Figureappearstoprojectamuchsmallersubsidencezonethan2012IDOPbasedonthelocationofthe“ShaftFarm”inthelowerleftofFigure22.NoanalysisisprovidedorcitedfortherevisionoftheOTPhase2subsidencezoneinOTTR2014fromthatprojectedintheIDOP2012orESIA2012.

Page 35: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

34

Figure22 – “Figure16.31SubsidencePredictionsfromModeling”OTTR2014,p.310

AsisclearfromacomparisonofthesubsidencezoneillustrationsfromIDOP2012andOTTR2014,thefullextentofthesubsidencezoneisnotshownineitherofthedocuments.As2014OTTRhassolittledetailaboutblockcavingmethodsorconsequencesandnoESIAupdateassociatedwithit,the2012ESIAandsupplementremainthesoleavailableenvironmentalimpactassessmentforOyuTolgoi’sopenandundergroundmineplans.IntheESIA2012,aneightsquarekilometer – 8km2 – caved,fracturedandsubsidencezoneispredictedtodevelopedaboveOyuTolgoi’sHugoNorthUndergroundBlockCavingMine.ESIA2012,initsdiscussionofthe“NatureoftheImpact”ofproposedOyuTolgoimine,in“SECTIONC:IMPACTASSESSMENTCHAPTERC4:TOPOGRAPHY,LANDSCAPE,GEOLOGY&TOPSOILS(“ESIA2012C4”,filename:ESIA_OT_C4_Topography_EN.pdf)projectsthefullareaoftheprojectedcaved,fracturedandsubsidencezoneabovetheHugoNorthmineisprojectedasmorethan8squarekilometers.ESIA2012–C4atP.10of18states,

“[T]heremovaloforethroughtheblockcavingislikelytoresultinasubsidence

Page 36: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

35

zonelaterintheminelifeasthecavingpropagatestothesurface.Initialestimatesarethatthissubsidencezonewillcoveranareaofover8km2andbecharacterisedbyadepressionsurroundedbyacircularcliff-likefeaturewithanoverallcliffheightinexcessof20m,whichmightbemanifestasasingleclifformultiplesmallercliffs.Dependingonthenatureofthesurfacemanifestationofthisfeature,theimpactwillbeontopographyandlandscape;andalsoonhydrogeologyandhydrology(seeESIA2012SectionC5),andpotentiallypresentapotentialcommunitysafetyissueifcliffsareunstableonceherdersareallowedbackintotheareafollowingmineclosureandrestoration.”

TheESIA2012addsthat,

“thefullextentofthesubsidencezoneisprojectedtomorethanthreetimesthesizeoftheopenpitmineplannedatthesite,projectedtobetwosquarekilometers(2km2)”,atESIA2012,C4p.10.

Figure17showstheextentofOTPhase2undergroundblockcavingmineandassociatedcollapseandsubsidencezonebasedonthe2012IDOP“ProjectedSubsidenceArea,”byoverlayingtheprojectedOTPhase2subsidencezoneonanGoogleEarthimagesatelliteimageofcentralUlaanbaatar.OTTR2014doesnotidentifyspecificeffortstocontinueinvestigationstodelineatetheOTPhasecollapseandsubsidencezonethatwouldrespondtotherecognitioninIDOP2012atP.358that“furtherstudyisrequiredtomoreaccuratelypredictactualcavepropagation.”NosupplementalornewESIAisproposedbyOTtoaddresstheblockcavemineplannedinOTTR2014.

Page 37: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

36

WhatareSomeoftheMajorImpactsofOTPhase1and2onWaterResourcesUsedbyHerders?IssuesrelatedtotheimpactsofOToperationsonwaterresourcesusedbytheherderfamiliessurroundingthemineareahavebeenidentifiedin“IndependentEnvironmentalPanel(IEP)Report–ExecutiveSummary”developedfromtheinvestigationofKhanbogdSoumherdcomplaintsfiledtotheInternationalFinanceCorporation(IFC)ComplianceAdvisor-Ombudsman(CAO)andinIndependentAuditReportsavailableathttp://ot.mn/esia-audit-reports/.TheIndependentExpertPanelReportsummarizedintheExecutiveSummaryhavebeenpreparedpursuanttotwoformalcomplaintsfiledbyherdersandherdersupportorganizationswiththeInternationalFinanceCorporation(IFC)ComplianceAdvisor/Ombudsman(CAO)in2012and2013.AsofJanuary2016,onlytheIEPReportExecutiveSummary,ratherthanthefullreport,ispublicallyavailable.IFCisoneofthelenderscommittingfundstoOTPhase2identifiedintheDecember14,2015announcementoftheOTPhase2multi-bankfundingfacility.TheherdercomplaintsfiledwiththeIFCCAOandassociateddocumentsareavailableat:

Mongolia/OyuTolgoi-01/SouthernGobi:http://www.cao-ombudsman.org/cases/document-links/links-191.aspx

andMongolia/OyuTolgoi-02/SouthernGobi:http://www.cao-ombudsman.org/cases/document-links/links-196.aspx

TheIndependentAuditReports(IARs),preparedperiodicallysinceOctober2013,identifyissuesassociatedwithcompanyperformancetoaddressofnon-conformancewithOTprojectcommitmentsfromtheESIA(SeeIARApril2015,P.18)OTTR2014doesnotacknowledgeordiscusstheissuesrelatedtonon-conformancewithOT’scommitmentsaddressedintheIARsortheIEPES2015.The“ENVIRONMENTALSTUDIES,PERMITTINGANDSOCIALORCOMMUNITYIMPACT”sectionofOTTR2014,beginningatP.441,summarizesthetypesofimpactsidentifiedinESIA2012andDraftESIAspreparedtoaddressOToperations.ThatsectionoftheOTTR2014doesnotprovideanassessmentofthenature,extentofseverityofimpactsofOToperationstodateoranychangestopreviousESIAsnecessarytoaddressimpactsthathaveoccurred. Similarly,OTTR2014doesnotincorporaterecentlycompiledinformationonwaterresourceimpactsofcurrentOToperationsorprojecthowtheimpactsidentifiedintheIARs,IEPES2015andthefullIEPReportwillbeaddressedinthefuture,suchasanESIAforOTPhase2.

Page 38: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

37

Figure23–“WaterImpactsonHerderssurroundingOThavebeensignificantandaregrowing”

Page 39: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

38

TheinformationgatheredintheIARandIEPreviewsarecriticaltothepublicandinvestorawarenessofOT’simpactsonandriskstolocalwaterresources,socio-economicandculturalheritageconditionssincethemineoperationsbegan.Updatingwaterresource,socio-economicandculturalheritageconditionsisnecessarytoaddressdeficienciesorinaccuraciesinbaselinedatacompiledpriortoOTstart-up.UpdatingtheassessmentofimpactstothesecriticallyimportantelementsofthelivesofherdersandtheirfamiliessurroundingOTisessentialtodeterminingarewhetherimpactshaveoccurredaspredictedoraremoreorlessseverethatthanpredictedintheESIA2012.TheIndependentExpertPanel(IEP)foundimpactsonherderwaterresourcesthataffectherdersocio-economicandculturalconditionssignificantlyandmoreseverelythanpreviouslyidentified.IEPES2015reportsthat:

“ThedirecteffectoftherelocationoftheBorOvoospringontheherders’accesstowaterandwaterqualityisthecompletelossofthespring.ThetemporaryreplacementwatersourceattheSouthernfencelineoftheMLAdeliverswater,howeveritdoesnotreplicatethefunctionsforlivestockherdingneithertheecologicalfunctionsofwildlifehabitatofBorOvoospring.“ThelossoftheoriginalBorOvoospringhascausedlongerdistancesforherderstoaccesswateratthecurrentwateroutletofthediversionpipe;withtheestablishmentofthelatestfencelinealongtheMLAborder,thishasbecomeevenmorepronounced.”

and“ThelossofaccesstosummerpastureandlossofwatersourcesduetowatershedwideimpactsbytheOTmineandinfrastructuredevelopment(includingcoalroad)hasresultedinfarreachingandirreversibledisturbancetotraditionalnomadiclivestockhusbandryinKhanbogdSoum,especiallyinJavkhalantBageffectingthewholeherdingcommunity.Thesearchforwaterandpastureandinabilitytoletwinterpasturesrest,isdegradingremainingpastures;withtheeffectsoffragmentation,mechanicaldisturbance,dustandlitteralonginfrastructurecorridors,thecumulativeimpactsaresevereandwillcontinuetoincreaseasminedevelopmentproceeds.”(IEPES2015)

OTTR2014assertsthatOThasnot,“seen…anyconnectionbetweenthedeepaquiferandtheshallowherders’wellsinnear-surfacestreambedaquifers,”atP.413,failingtoacknowledgeorignoringthe“interaquiferflow”betweenshallowherders’wellsandthedeepaquifercausedbypoorboreholeconstructionidentifiedintheIARs.TheApril2015IndependentAuditReportisdescribedbyitsauthorsasa“DesktopAudit”asitwas“conductedasadesk-topreviewofthedocumentationprovidedandteleconferenceswithOTsitepersonnel”withoutsupportingfieldobservations,orinterviewswithareaherdersandotherauthorities.(IAR4-2015,P.18)WaterandWasteManagementNon-ConformanceIssuesidentifiedintheApril2015IARaddresscontinuingproblemsassociatedwiththeUndaiRiverDiversion(IssueM1.1)and

Page 40: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

39

InterconnectedHydrologicUnits(IssueM1.5)associatedwith“cascadingwells.”(SeeSchneider2013,Bale2014amongothersources)RegardingtheUndaiRiverDiversion,theIAR4-2015,atP.19,identifiesthecontinuingconcernthat,

“TheUndaiRiverDiversionhasnotbeencompletedinaccordancewiththeESIAduetoadelayinissuanceofaLandUsePermit.Atemporaryapproach(theUndaiRiverPartialAdjustmentandProtectionProject)hasbeencompletedtodivertsurfaceflowandtocaptureandre-routegroundwaterflowfromtheUndaiRiverandaroundthezoneofinfluenceoftheopenpit.ThecurrentUndaiRiverPartialAdjustmentandProtectionProjectdoesnotfullymeetthedesignrequirementsasspecifiedintheESIA.”

CommentsonthisissueintheIAP4-2015asaresultoftheDesktopAuditinclude,

“TheUndaiRiverDiversionhasnotbeencompletedinaccordancewiththeESIAduetoadelayinissuanceofaLandUsePermit.Atemporaryapproach(theUndaiRiverPartialAdjustmentandProtectionProject)hasbeencompletedtodivertsurfaceflowandtocaptureandre-routegroundwaterflowfromtheUndaiRiverandaroundthezoneofinfluenceoftheopenpit.ThecurrentUndaiRiverPartialAdjustmentandProtectionProjectdoesnotfullymeetthedesignrequirementsasspecifiedintheESIA.”

AtP.20,theIAP4-2015identifiesthecontinuingconcernthat,

“Mitigationsarerequiredintheeventofinterconnectionofhydrogeologicalunits.Thesemitigationshavenotyetbeenimplementedinallinstances.OTisprogressingeffortstoabandonorconverttoproductiveusetheseinterconnectingbores.”

CommentsonthisissueintheIAP4-2015asaresultoftheDesktopAuditinclude,

“EvidenceexistsofexplorationboresinterconnectinghydrogeologicalunitswithintheGuniiHooloiborefield,intheGalbynGobiregion,andwithintheMLA.FuturedispositionofthesewellsiscurrentlyunderevaluationbyaworkgroupestablishedwiththeKhanbogdsoum.Therearesomerequestsforconversionofthewellsforcommunityuse;thisrequesthasbeenforwardedtothecommunities’team.“BesteffortsarebeingmadebyOTtoprogressthesealingofinterconnectingboreswithinandoutsideoftheMLA,howevertheissueisoutstanding.PerrequestfromtheworkgroupOThasprovidedboringlogsforallinterconnectingbores.”

OTTR2014,atp.24,says,

“Althoughithasarequirementtomakeitsself-discoveredwaterresourcesavailabletobeusedforhouseholdpurposes,itisconfirmedinthe[OTInvestmentAgreement]IAthatOTLLCholdsthesolerightstousethesewaterresourcesfortheProject.OTLLChastherightundertheIAforawateruserightfortheperiodofitsmininglicence.”

Page 41: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

40

OTTR2014,atP.52says,“OTLLCwillmakeitsself-discoveredwaterresourcesavailabletobeusedforhouseholdpurposes,herderfamilies,andagriculturalactivitiesofthelocalsoumcommunities.”

NeithertheIARorOTTR2014describethe“bestefforts”thatOTisreportedtobemakingtoaddresstheinterconnectedaquiferproblemsaffectingshallowwellsusedbyherdersresultingfromOTwellconstruction,orhowtheperformanceofthosebesteffortswithbeevaluated.OTTR2014doesnotidentifywhether,when,how,andinwhatamount,OTwould“makeitsself-discoveredwaterresourcesavailabletobeusedforhouseholdpurposes,herderfamilies,andagriculturalactivitiesofthelocalsoumcommunities”throughthelifeoftheOToperation,orhowOTself-discoveredwaterresourceswillbeusedtoaddressreplacementofandcompensationforlossestoherderwaterresourcesintheUndaiRiverwatershedorareasofaquiferinterconnectionresultingfromfaultyboreholeconstruction.

OThasnotyetproposedaplanforuseof“itsself-discoveredwaterresourcesavailabletobeusedforhouseholdpurposes,herderfamilies,andagriculturalactivitiesofthelocalsoumcommunities”throughthelifeoftheOToperation.Herdershavebeenimpactedbyboreholesconnectingshallowanddeepaquifers – “cascadingwells” – formanyyears.Cascadingwellswerefirstidentifiedbyherdersin2004.Herders’livestockmanagementandculturalpatternshavebeenseverelydisruptedbytheineffectivenessoftheUndaiRiverDiversionandtheReplacementBorOvoospringsince2013whenthecurrentUndaiDiversionconstructionworkswerecompleted.Developmentandimplementationofplansto“makeitsself-discoveredwaterresourcesavailabletobeusedforhouseholdpurposes,herderfamilies,andagriculturalactivitiesofthelocalsoumcommunities”throughthelifeoftheOToperationwouldbeappropriatetoaddress:

“OTLLC....obligationswithregardtowaterutilisation:[including]-Notreduc[ing]fromthecurrentlevelthequalityandquantityoftheexistingpotableandlivestockwatersuppliesusedbyexistingusersatthedateoftheIA[OTInvestmentAgreement2009]withinthewaterresourcesareadefinedintheDEIAReports.”(OTTR2014P.53)

BoththeIARconsultantsandIFCCAOOyuTolgoi-01andOyuTolgoi-02ComplaintfilesacknowledgethataJune8,2015MemorandumofUnderstandingtoformaTri-PartiteCounciltohasbeenagreedtobyKhanbogdSoumadministration,RepresentativesofHerdersofKhanbogdSoumandOTLLCtoaddresstheHerderComplaintsfiledwiththeIFCCAO.TheCouncilprovidesanimportantnewvenuewherethepartiescan,

“consider,address,resolve,exchangeinformationabout,makeproposalsandrecommendationsinrespectof,implementandrelaytotheappropriatelevels,any

Page 42: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

41

issuesrelatingtoherders,pastureandwaterandanyotherrelevantissues…”associatedwiththeHerders’IFCCAOComplaints.”

MongolianandEnglishlanguageversionsoftheJune8,2015MoUareavailableontheIFCCAOpagesfortheOTComplaintsat:http://www.cao-ombudsman.org/cases/document-links/links-191.aspxandhttp://www.cao-ombudsman.org/cases/document-links/links-196.aspxThisrecentdevelopmentmayprovideaeffectivevenueforairingandresolvingherdersandSoumGovernmentcomplaintsregardingOTimpactsiffundedadequatelytoprovidesufficientsupportforsustainedparticipationbyherderandSoumrepresentativesincludingtheirtimeandtravelandsustainedprofessionaltechnicalsupport.

Page 43: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

42

HowdoInternationalMetalMarketPricesaffectOyuTolgoiPhase2DevelopmentandFundingPlanandTechnicalReports?AllprojectionsofthefuturevalueandeconomicimpactsofOTPhase2presentedintheMay18,2015OyuTolgoiUndergroundMineDevelopmentandFinancingPlan(OTUMDFP2015)arebasedontheinternationalmarketpricesforthecopper,goldandsilverthatwouldbeextracted.December1,2015marketpricesforcopper,goldandsilveraresignificantlylowerthanthepricesusedinthedevelopmentofOTPhase2expansionplansforcopper,gold,andsilver,thethreemetalcommoditiesbeingproducedatOT.Aslongaslowermetalpriceslast,thevalueofOTcopper,goldandsilverproductionwillbereducedbelowtheestimatedOTPhase2incomeandvaluewhichwerebasedonhigherprojectedprices.IncomederivedfromthemineandgovernmentpaymentsassociatedwithCurrentOTPhase1operationsthatreflectthevalueofmineproductionwillalsobereducedduetolowermetalpricesthanthoseprojectedintheOTTR2014.ThecentralroleofinternationalmarketpricesintheassumptionsregardingthefuturevalueandeconomicimpactofOTPhase2asprojectedinOTUMDFP2015,signedbyOT’sownershiponMay18,2015inDubai,isshownatP.4inthetableof“ImpactsontheDomesticEconomy”thatare,“basedonanumberofassumptionsrelatingtoscope,costs,schedule,technicalaspectsandmarketconditions.”TheOTUMDFP2015isanagreementbetweenthe“GovernmentofMongoliathroughErdenesOyuTolgoiLLC”(“EOT”–thecorporateentitycreatedbytheGovernmentofMongoliatorepresentits34%shareintheOyuTolgoi)andOyuTolgoi’scorporateownersoftheremaining66%oftheOyuTolgoiMine:TurquoiseHillResourcesLimited,THROyuTolgoiLtdandOyuTolgoiNetherlandsB.V.,(together“TRQ”)andRioTintoInternationalHoldingsLimited(“RioTinto”)andOyuTolgoiLLC(“OTLLC”).RioTintocontrolsthemajorityofsharesinOyuTolgoithroughitsownershipof51%ofTurquoiseHillResourcesLimited.TheOTUMDFP2015listsagreements“inprinciple”amongOT’sownersandnotes,atP.5,thattheactualcost–usingtheword“quantum”fortheestimated“actualamount”–“offundingrequirementswillbedeterminedbyanumberoffactorsincludingthebusinessperformanceofOTLLCandvariancesinthecopperandgoldprices.”TheDubaiAgreementsaysatP.5,thatformal“Approvalof[OTPhase2financing]isadecisionfortheBoardsofRioTinto,TRQandOTLLCandtheShareholdersofOTLLC.OyuTolgoiBoardapprovalof[OTPhasefinancing]isrequiredbythelenders…tobeunanimous.”InadditiontooutliningagreementsinprincipleandtheactionsnecessaryforformalapprovalofprojectfinancingtostartOTPhase2,theOTUMDFP2015includes

Page 44: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

43

commitmentsrelatedtoprogressonanOTpowersupply,researchonafutureOTcoppersmelter,andfinancialreportingandtaxconsiderationsandotheractivities.Uncertaintyregardingfuturepricesforcopper,goldandsilverandothercommoditiesreflectstheglobalmarketuncertaintyaboutwhetherthesteepfallinpricesforthosemetalssince2010willbealong-termorshort-termtrend.Ascopperisthesourceofmorethan75%ofthevalueofOyuTolgoiPhase2,thisuncertaintyfocusesonquestionsregardingfuturecopperprice.HowmuchhaveinternationalmetalmarketpricesfallensincetheOTPhase2TechnicalReport(OTTR2014)wasreleased?December2015internationalmarketpricesforcopper,goldandsilveraresignificantly:20–30%lowerthanthoseusedinOTTR2014resourceevaluationsandeconomicprojectsforOTPhase2.Copper,goldandsilverpriceshavebeendroppingsteadysincetheOctober2014releaseofOTTR2014,whichtheMay2015OTOTUMDFPand2015OTFeasibilityStudy(notdisclosedtothepublic)havebeen“aligned”with(THR2015).The“ReserveCase”isthetermintheOTTR2014fortheOTPhase2expansion.OT’s2014“ReserveCase”summary(OTTR2014atP.4)projectstheminingof1.5billiontonsoforeatcoppergrade(“content”)of0.83%,goldgradeof0.32gramspertonandsilvergradeof1.94gramspertons.OTPhase2oreisestimatedtocontain24.9billionpoundsofcopper,11.9millionouncesofgoldand78.0millionouncesofsilver.ThevalueofrecoveredmetalfromOTPhase2usedinOTTR2014are:

“[f]ormineplanning…themetalpricesused…werecopperat$3.01/lb,goldat$1,250/ozandsilverat$20.37/ozand….costfortheundergroundminearebasedon$15.32/t.”(OTTR2014atP.20).

Atthoseprices,thetotalvalueofthemetalrecoveredfromOTPhase2wouldbeabout$88.4billiondollars,ofwhichmorethan82%–$74.7billion–wouldcomefromcoppersales.SinceOTTR2014wasreleased,copper,goldandsilverprices(andothercommoditiesthatareimportanttotheMongolianeconomy)havefallensignificantly.IfDecember1,2015internationalmarketpricesforcopper-$2.11/lb,gold-$1,065/oz,andsilver-$14.21/oz,areusedtocalculatethevalueoftheoreproposedforminingatOTPhase2,thetotalvalueofthemetaltoberecoveredwouldfallmorethan$22billion,from$88.4billionto$66.1billion,withthecoppervaluefallingfrom$74.7billionto$52.4billion,alsomorethan$20billion.Figure24–“MarketPriceUncertainty”including“5YearCopperSpot”–included5-yeartrendincopperspotmarketpricesshowscoppersportmarketpricesbetweenNovember2010andDecember2015.

Page 45: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

44

Source: The source for the “5 year Copper Spot Chart” www.kitco.com, is alsothesourceusedforcommoditymetalpricesontheTurquoiseHillResourceswebsiteathttp://www.turquoisehill.com/s/commodity_metal_prices.asp.TheDecember1,2015copperpriceof$2.11/poundis30%lessthantheOTTR2014planningpriceforcopperof$3.01.TheDecember1,2015goldpriceof$1,065/ozis15%lessthantheOTTR2014planningpriceforgoldof$1,250/oz.(seewww.kitco.com forgoldpricecharts)TheDecember1,2015silverpriceof$14.21/pzis30%lessthantheOTTR2014planningpriceforsilver.(seewww.kitco.com forsilverpricecharts)ThereductionintotalmetalvalueforOTPhase2usingDecember1,2015metalpricesinsteadofOTTR2014metalplanningpricesisabout25%,withthetotalvalueofthecoppertobeminedintheOTPhase2falling30%.Howlongthecurrentdepressioninmetalcommoditypricesrelativetopeakpricesin2010and2011willlastisnotpredictablewithanycertaintyandisthefocusofintensespeculationbycopperproducers,investors,banksandcopperconsumers.

MarketPriceUncertainty-Marketpricesforthecopper,goldandsilverhavefalleninvaluesinceOTPhase2mineplanswerereportedinOTTR2014where“metalpricesused…werecopperat$3.01/lb,goldat$1,250/ozandsilverat$20.37/oz”(OTTR2014P.20).Atthoseprices,thetotalvalueofthemetalrecoveredfromOTPhase2wouldbeabout$88.4billiondollars,ofwhichmorethan82%-$74.7billion-wouldcomefromcoppersales.

Copperprices,aswellasgoldandsilverprices,havefallensteadyformorethan5years.Current,December2015,marketpricesforcopper,goldandsilverarewellbelowthoseusedforOTPhase2mineplanninginOTTR2014.IfDecember1,2015interna4onalmarketpricesforcopper-$2.11/lb,gold-$1,065/oz,andsilver-$14.21/oz,wereusedtocalculatethevaluetoberecoveredfromOTPhase2ore,thevalueofOTPhase2produc4onwouldfallfrom$88.4billionto$66.1billion-adropofmorethan25%;withthecoppervaluefallingfrom$74.7billionto$52.4billion–adropof30% 19

Metalmarketpricesfromwww.kitco.com

Page 46: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

45

Metalmarketpriceuncertaintymayinfluencetheultimatedesign,costandcorporateboardapprovalofOTPhase2,allofwhicharenecessarybeforeacceptanceofthemulti-bankloanfacilityofferedtoOTbyaconsortiumofbanksDecember14,2015.OTmanagementrecognizesthechangeinmetalpricesduringtherecentyearsaffecttheprojectedvalueofOT.TurquoiseHill,RioTintoandOTmanagementcontinuetobeoptimisticthatinvestmentinOTexpansionwillgeneratecopper,goldandsilverthatwillfindanimproved,higherprice,market,whentheOTPhase2expansioniscompleted.RioTintomanagement’sviewontheeffectsoftherecentfallinthecopperpriceonOTaresummarizedinaNovember26,2015articletitled,“CopperpricesmayweighonRioTinto’sloomingdecisiononOyuTolgoiexpansion,”thatreportsRioTinto’schiefexecutiveforcopperandcoalJean-SebastienJacques’sandRioTinto’sbeliefthat“thecoppermarketisfacingtwoorthreeyearsmoreofpain,itistheonecommoditytheyexpecttorecoverthefastest.”(Mining2015)Similarly,Mr.Jacqueswasreportedtohavesaidthat, “"Weareprettybullishaboutthecoppermarketinthelongtermandthereasonisweexpecta6to8milliontonneshortfall[ofcopper]inthenext10years,”hesaid.“OyuTolgoiwillbepartofthesolutiontoprovidethecopperthatisrequiredinChinaoranypartoftheworldatthatpointintime.”(INVEZZ2016).Forperspective,OTPhase2,the24.9billionpoundsofcopperOTPhase2isprojectedtoproduceisequalto1,250,000tonsofcopperallowingforanaverageof31,250tonsperyearfor40years.ThecopperproducedbyOTPhase2willbeintheformofcopperconcentrate,about100,000tonsperyearcontainingabout33%copper,unlessanduntilacoppersmelterorothercopperrefineryisconstructedtofurtherprocesstheOTcopperconcentrate.Whileavery,verylargemine,OT’sannualcopperproductionislessthan1%ofthe6-8millionton“shortfall”incoppersupplyprojectedbyMr.Jacques.OTPhase1producescopper,gold,andsilverfrom100,000tonsoforeperday.OTPhase2willproduce115,000tonsperdayofore–95,000tonsfromtheNorthHugoLift1UndergroundMineoncefullproductionisreached.FullproductionatNorthHugoLift1isprojectedtobeachievedintheearly2020s–about5-7yearsaway.OTmanagementprojectsthatthelowpriceconditionsinthecoppermarketwillendafteracouplemoreyears,beforeOTPhase2hasreachedfullproductionlevels.

Page 47: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

46

WhataresomeoftheplansandissuesassociatedwithdevelopingapowersourceforOTPhase2?ApowersupplysourcetooperateOTPhase2atfullcapacityhasnotyetbeenbuilt.OTTR2014discussionofthepowersupplyneedsfocusondevelopmentofan“IndependentPowerProject”[IPP]includingacoal-firedpowerplantusingcoalfromtheTavanTolgoidepositwestofOT.PowersupplyneedsforOTareprojectedtogrowfrom145Megawattsatstart,to246MWwhenundergroundminedevelopmentiscompleted.DevelopmentofaTavanTolgoiIPPintimetomeetOTPhase2demandbythe2020-2022periodasprojectedinOTTR2014facesmanyobstaclesincludingfundingchallenges,mixedpoliticalsupportandoperatingissues.AlternativesourcessuchaswindpowermaybeabletobeconstructedintimetomeetOTPhase2powerdemandandatlowercost,asatleastfiveutilityscalewindprojectsareinvolvedinpermittingorconstructingmorethan350megawattsinSouthernorEasternMongolia.OTPhase2“OperatingAssumptions,”asprovidedinOTTR2014atp.24,include,

“ThesupplyofpowerhasbeenrecognisedasbeingcriticaltotheprojectexecutionofOyuTolgoiinthe2009InvestmentAgreement].OTLLChasbeengiventherighttoimportpowerinitiallybutmustsecurepowerfromsourceswithinMongoliafromthefourthyearofoperation.SigningofaPSCAwiththeGOMinAugust2014hasresetthefouryearsobligationwhiletheopportunityfortheestablishmentofanIPPatTavanTolgoiisstudied.OTLLChasretainedtherighttoconstructapowerstationatOyuTolgoi.“(OTTR2014,P.24)

OTTR2014recognizesthat,

“TheOyuTolgoiProjectisenergy-intensive,withrequirementsofapeakof145MWsincestart-up,increasingto246MWinthelongertermaftercompletionoftheundergrounddevelopment.Areliableandstablepowersupplyisessentialforoperationsandsafety.”(OTTR2014,P.383)

Initsdiscussionof“Power”atP30,OTTR2014says,

“OTLLChasaPowerPurchaseAgreementwiththeInnerMongoliaPowerCorporationtosupplypowertoOyuTolgoi.Thetermofthisagreementcoversthecommissioningofthebusinessplustheinitialfouryearsofcommercialoperations.“InAugust2014,OTLLCsignedaPowerSectorCooperationAgreement(PSCA)withtheGOMfortheexplorationofaTavanTolgoi-basedindependentpowerproducer(IPP).TheaimofthePSCAistolayoutaframeworkforlong-termstrategiccooperationbetweentheGOMandOTLLCforacomprehensiveenergyplanfortheSouthGobiregion.ParticipationinthePSCAmeetsOTLLC’sobligationintheIAtoestablishalong-termpowersupplywithinMongoliawithinfouryearsfromthecommencementofcommercialproduction.SigningofaPSCAhasresetthefour

Page 48: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

47

yearsobligationwhiletheopportunityfortheestablishmentofanIPPatTavanTolgoiisstudied.

“ThePSCAprovidesaframeworkforabroadrangeofpower-relatedissues,includingtheestablishmentofapowergenerationsource,transmissionlines,andpowerimports.ThecentrepieceofthePSCAisanopen,internationaltenderprocesstoidentifyandselectanIPPtoprivatelyfund,construct,own,andoperateapowerplanttosupplyelectricity,withOyuTolgoiastheprimaryconsumer.“FullevaluationoftheIPPoptionisexpectedtotake9–12months.OTLLCplanstoactivelyparticipateintheprocessesofthePSCAtoensurethatthereisatimelyandreliablepowersupplysolutionforOyuTolgoiandthisapproachisendorsed.”

OTTR2014,atP.53recognizesthat,

“ThePowerPlantProjectwillimplementtheenvironmentalprotectionprovisionsoftheIAasdescribedintheESIA(July2012).ASupplementalESIAspecificallyforthePowerPlantProjectisforthcoming.”

TheOTTR2014discussionofaTavanTolgoiPowerPlantforOTPhase2donotacknowledgethemanychallengescurrentlythefacingdevelopmentoftheTavanTolgoiPowerPlantandtheoperationoftheassociatedcoalmineneededtofeedtheplant.SomeofthesechallengeshavebeenrecognizedbyErdenesMongolseniormanagement,theofficersoftheGovernmentofMongoliacorporationthatholdsa34%shareofOTLLC.InAugust,2015,threemonthsaftertheMay18,2015OTUMDFP,Mr.Ch.Otgochuluu,ErdenesMongolsenioreconomist,said,“TurquoiseHillhasissuedafinancialguaranteeworthonebillionUSdollarsfortheconstructionofTavantolgoiPowerPlant.TheGovernmenthasgivendirectionstoassociatedofficialstolaunchdevelopmentoftheplantfromspringof2016.”AsnofeasibilitystudyfortheTavanTolgoiPowerPlant,oranyalternativepowersupplyforOTPhasehasbeenreleased,itisuncleariftheUSDonebillionfinancialguaranteefromTurquoiseHillissufficientfortheconstructionof246-megawattpowersourceOTsaysitneedsfromTavanTolgoi.AtacostofUSDonebillion,the246-megawattplantwouldcostabout$4.06/watttoconstruct.Mr.OtgochuluunotedthatfullcostoftheOTPhase2projectislikelytorisesignificantly,notingthat“[t]hefirstestimationofrequiredinvestmentforundergrounddevelopmentislikelytoincreasefrom5.7billionto7-8billionUSdollars.”IfMr.Otgochuluuestimatesareaccurate,projectedOTPhase2costswouldriseto17–33%morethantheUSD6billionmaximumvalueofthemulti-bankloansforannouncedDecember18,2015.

Page 49: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

48

Developmentoftheupdated2015OTPhase2feasibilitystudyandrevisedconstructioncostsarecriticalstepsthatarerequiredtobecompletedpriortotheconsiderationoffinalOTPhase2projectapprovaloftheBoardsofalloftheOTLCCpartnersasrequiredbytheOTUMDFP2015.SignificantadditionalpowerbeyondOTPhase2demandwillbenecessaryforoperatinganycopperrefiningsmelterconsideredbyOTLLCoranyfutureexpansionbeyondPhase2.AninvestigationoftheeconomicviabilityofaddingacoppersmeltertotheOTcomplexisrequiredbySeptember2016intheOTUMDFP2015.AcoppersmelterwouldbeusedtoupgradeconcentrategradecoppercurrentlyproducedatOTwithabout33%coppercontenttorefinedcoppermetalwith95–99%+coppercontent-dependingonthespecificsmelting,refiningand/orconvertingprocessesselected.CurrentlytheupgradingofOTconcentratestothemorevaluable99%+coppermetalproductisconductedatsmeltersinChina.DevelopmentofcoalproductioncapacityattheTavanTolgoidepositthatwouldfeedaTavanTolgoiPowerPlantisalsofacingsignificantdifficultiesandmaybestalledforanextendedperiod.InearlySeptember2015,Forbesmagazinereportedthat,

“MongolianMinisterMendsaikhanEnkhsaikhansaidthatthelong-delayed$4billionTavanTolgoicoalmineprojectwasunlikelytogoahead,accordingtotheBusinessMongolianewsite,partlyduetoChina’sslowinggrowth.“It’snotonlybecauseofparliament[wheretheprojecthasfacedopposition],butalsobecauseoftheChinesesituation,”Mendsaikhansaid.ThenewsletternotesthatMongoliareliesonChinatobuy“nearlyallofitsmineralsandpetroleum,”whichaccountedfor86percentofexportsinthefirsthalfof2015.”(FORBES2015)

Justweekslater,thefailuretosecureloanstooperatetheTavanTolgoicoalminewasconfirmed,castingashadowoverthelikelihoodofdevelopmentofTavanTolgoidepositonalargeenoughscaletopowerOTPhase2whenthatpowerisneeded.LaterinSeptember2015,www.mining.comreported,

“Mongoliastrugglestodevelopitslargestcoalminingproject,TavanTolgoi,withreservesof7.4billiontonnesofcoal,aftertheMongolianGovernmentfailedtosecure$4billioninfunds.Developmentofthemine,haltedbypoliticsandweakgovernmentinstitutions,reflectstheresourcecurseasMongolia’sParliamentfailedtotransferownershipofthecoalmine.ThetransferofownershiptoaconsortiumofChineseandJapanesecompanies,waspartofMongolia’splantoincreaseinvestors’stakeholdingsin2015and2016.

“Mongolia’scontinuouslydevelopingminingsectorandvastresourcescauseobstaclesinmanagingMongolia’sresources.ThedevelopmentofOyuTolgoiandTavanTolgoirepresentaminingboomthatcouldbeshort-lastingasthecountryexperiencesboom-bustcyclesinlinewithinternationaldemandandinternationalcommoditymarketprices.Mongolia’sdouble-digitgrowthofthelastfewyearsandin2014slowedto7.8%.In2011,therewas17.3%GDPgrowth.”(Mining9-2015)

Page 50: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

49

ThecurrentdownturnincopperpricingisacauseofadownturninoperationsofmanycopperminesaroundtheworldthoughRioTintomanagementcontinuetoinvestmentinOTinanticipationofaupturnincopperpricesinthenext2-3years.(TRQ8-2015)ArealternativesourcesofpowerpossibleforOTPhase2?WhileOTTR2014atP.438notesthat,“Copperdemandwillalsobenefitfromagreaterlong-termfocusonrenewablesourcesofenergyandenergy-efficienttechnologiessuchaswindturbinesandelectric/hybridvehicles,whichareofcopper-intensivefabrication,”OTTR2014offersnorenewableenergyoptionsfortheOTpowersupply.AtthesametimethatForbes2015wasreportingonthelong-termobstaclesfacingTavanTolgoicoalproduction,itwasalsoreportingonenergyproductiontrendsinChinamovingawayfromcoaltorenewableenergyproduction.InSeptember2015Forbesalsoreportedthat,

“RenewableenergyisalsokeytoChina’stransitionawayfromcoal.Chinainvested$90billioninclean-techinvestmentslastyear,accordingtoBloombergNewEnergyFinance,farmorethantheU.S.Non-fossilfuelsources–solar,wind,hydroandnuclear–areexpectedtomakeup20%ofChina’senergymixin15years.Chinaalreadyhasmorewind-generatingcapacitythananycountryintheworldanditislikelythisyeartoovertakeGermanyastheworld’slargestsolarcountry,measuredbyinstalledcapacity.By2030,China’snon-fossil-fuelenergybasealonewillbealmostequivalenttothetotalelectricalcapacityoftheU.S.today.”(FORBES9-2015b)

OptionsforwindpowerproductioninMongoliaattheindustrialscaleneededbyOTareidentifiedinthe“ScalingUpRenewableEnergyinMongoliaInvestmentPlan”summarizedattheMongoliaNationalRenewableEnergyCenter’swebpageat:http://www.nrec.mn/web/data/main/main1441093417.pdf. TA-8757MONScalingUpRenewableEnergyinMongolia(InvestmentPlan),28August2015(NREC2015) The“ScalingUpRenewableEnergyinMongoliaInvestmentPlan”(NREC2015)identifiesfiveactivewindpowerdevelopmentprojects,withpotentialtogenerateatotalof350MW,asfollows:–OyuTolgoiWindPowerProjectbyQleantechLLC,102MW–SainshandWindPark,SainshandWindParkLLC,52MW–ChoirWindFarm,AydinerGlobalLLC,50.4MW–TsetsiiWindFarm,CleanEnergyAsiaLLC,50MWand-ABSolarWind,ABSolarWindLLC,100MWNREC2015saysthat,“Allhavegovernmentapprovalandtheirreadinessallowsconstructiontostartin2016.”

Page 51: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

50

OT’sownershipshouldconsiderinvestmentinrenewableenergysourcesforthemine’sfuturepowersupply.ThewindprojectslistedhavepotentialtocomeonlinebeforeaTavanTolgoicoal–firedpowerplantfedbyTavanTolgoicoalandatpotentiallylowercost.ProgressontheSainshandWindProjectthroughMarch,2015,includedanannouncementbyFerrostaalIndustrialProjectsGmbHthatitwillbeginconstructionofitsSainshandWindFarminApril,slatedtobeMongolia’ssecondandlargestwhenitiscompletedin2016.The$115millionparkwillhave27towersandaninstalledcapacityof54megawatts.Itwilldeliver54megawattstoMongolia’selectricalgrid,OliverSchnorr,directorofSainshandWindParkLLC,saidinatextmessage.(BLOOMBERG3-2015)TheSainshandprojectwouldbethesecondutilityscalewindprojecttobeconstructedinMongolia.Thefirst,the50-MWSalkhitWindFarmbeganoperationsin2013.Ifthe$115millioncostfor54megawattSainshandwindprojectisaccurate,thecostperwattfortheprojectwillbe$2.12/watt.EuropeanBankforReconstructionandDevelopment(EBRD)reportsthatcostdesignandconstructionofthe50megawattSalkhitWindProject,theonlyoperatingindustrialscalefindfarminMongolia,was$123million,acostof$2.46/watt.(EBRD2013)TheprojectcostofSainshandwindprojectwouldbeonly53%perwattoftheprojectedcostofa246-megawattTavanTolgoiPowerPlantifitwouldcost$1billion,acostof$4.06/watt.IfthemoreconservativecostoftheSalkhitWindFarmwereusedforcomparison,thecostofwindpowerforOTPhase2wouldbe40%lessthatthecostperwhatforTavanTolgoipowerat$4.06/watt.InApril2015,NewcomLLC,developeroftheSalkhitwithfundingfromtheEuropeanbankforReconstructionandDevelopment(EBRD)amongothersourcesannounced“The$100millionTsetsiiplantreceiveditspermitfromtheNationalDispatchingCenter,whichmanagesMongolia’sgrid.”NewcomChiefExecutiveBolorJargalsaikhansaid,“ThewindfarmisthefirstprojectofCleanEnergyAsiaLLC,whichis51percentownedbyUlaanbaatar-basedNewcomand49percentbyJapan’sSBEnergy,whichisSoftBankCorp.’senergyarm.Theoperatorsplantoexpandpowercapacityfrom50to250megawattswithin10years.”(BLOOMBERG4-2015)

Page 52: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

51

SOURCESCITEDBALE2014 “MassiveMongolianMineEndangersNomadsWater,WayofLife”,Rachel

Bale,September30,2014,https://www.revealnews.org/article-legacy/massive-mongolian-mine-endangers-nomads-water-way-of-life/

BLOOMBERG3-2015 “FerrostaalsettobeginworkonMongolia'sbiggestwind

farm”,MichaelKohn,BloombergNews,March17,2015,http://www.bloomberg.com/news/articles/2015-03-17/ferrostaal-set-to-begin-work-on-mongolia-s-biggest-wind-farm

BLOOMBERG4-2015 “Newcom,SBEnergyWinpermitfor50-MWWindFarmin

Mongolia”,MichaelKohn,BloombergNews,April,30,2015,http://www.bloomberg.com/news/articles/2015-04-30/newcom-sb-energy-win-permit-for-50-mw-wind-farm-in-mongolia

CAOIEP2015 Mongolia/OyuTolgoi-01/SouthernGobi–withdocumentsavailable

at:http://www.cao-ombudsman.org/cases/document-links/links-191.aspxandMongolia/OyuTolgoi-02/SouthernGobi-withdocumentsavailableat:http://www.cao-ombudsman.org/cases/document-links/links-196.aspx

EBRD2013 “DevelopmentImpactHonors:MongoliaSalkhitWindFarm”

http://www.ebrd.com/downloads/news/treasury-development-salkhit.pdfESIA2012 “EnvironmentalandSocialImpactAssessment”,2012,Allsectionsavailable

athttp://ot.mn/environmental-social-impact-assessment/FORBES9-2015b “China’sEconomicSlowdown:WeMayHaveSeenPeakCoal”,Mark

Clifford,ForbesMagazine,September3,2015,http://www.forbes.com/sites/mclifford/2015/09/03/chinas-economic-slowdown-we-may-have-seen-peak-coal/

IAR4-2015 ReportoftheIndependentEnvironmentandSocialConsultants–OyuTolgoi

Project;InterimReportApril2015,preparedbyD’Appolonia,S.p.A.,http://ot.mn/media/ot/content/esia-audits/OT_ESIA_Audit_report_Apr_2015_EN.pdf

IEPES2015 “IEPExecutiveSummary”–(CAOIndependentExpertPanelReport–

ExecutiveSummary),January30,2015,http://www.cao-ombudsman.org/cases/document-links/documents/ExecutiveSummary_edit_Jan_30_2015-ENG.pdf

Page 53: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

52

INVEZZ2016 “RioTintoshareprice:Mineragrees$4.4bnMongoliaminefinancing”,VeselinValchevValchev,January4,2016athttp://invezz.com/news/equities/21694-Rio-Tinto-share-price-Miner-agrees-4-4bn-Mongolia-mine-financing

IDPES2005 “OyuTolgoiProject,Mongolia-IntegratedDevelopmentPlan-Executive

Summary”,preparedbyAMECAusencoJointVenture,August2005,Revision1,http://www.turquoisehill.com/i/pdf/IDP_ExecutiveSummary.pdf

IDP2010 “OyuTolgoiProjectJune2010TechnicalReport,preparedbyAMECMinproc,http://www.turquoisehill.com/i/pdf/IDP10_June062010.PDF

IDOP2012 OyuTolgoiProjectIDOP[IntegratedDevelopmentandOperatingPlan]

TechnicalReport,preparedbyAMCConsultants,March12,2012athttp://www.turquoisehill.com/i/pdf/IDOP_2012Mar29_Tech_Rpt.pdf

Mining11-2015 “CopperpricesweighonRioTinto’sloomingdecisiononOyuTolgoi

Expansion”,CeceliaJamasmie,November26,2015athttp://www.mining.com/copper-prices-weigh-on-rio-tintos-looming-decision-on-oyu-tolgoi-expansion/

MINING9-2015 “MongoliastrugglestodevelopTavanTolgoicoalmine”,Samantha

Brletich,www.mining.com,September21,2015,http://www.mining.com/web/mongolia-struggles-to-develop-tavan-tolgoi-coal-mine/

MININGMAG2011 “OreBodyAccess,”MiningMagazine,03May2011at

http://www.miningmagazine.com/equipment/orebody-access)MONTSAME2015 “OTUndergroundMinefundingtobesettlednextmonth,”B.

Amarsaikhan,MontsameNews,October27,2015,http://en.montsame.mn/mining/ot-underground-mine-development-funding-be-settled-next-month-0

NREC2015 “ScalingUpRenewableEnergyInvestmentPlan”summarizedattheMongolia

RenewableEnergyCenter’swebpageat:http://www.nrec.mn/web/data/main/main1441093417.pdf. TA-8757MONScalingUpRenewableEnergyinMongolia(InvestmentPlan),28August2015

OTTR2014 OyuTolgoi2014TechnicalReport,preparedforOTLLCbyOreWin

Consultants,October27,2014http://www.turquoisehill.com/i/pdf/2014-10-27_OyuTolgoiTechReport.pdf

OTUMDFP2015 May2015OyuTolgoiUndergroundMineDevelopmentandFinancing

Page 54: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

53

Plan,http://www.turquoisehill.com/i/pdf/2015-05-18_OTUMDAFP.pdfTRQ8-2015 “OyuTolgoifilesrevisedschedulesfor2015feasibilitystudywith

MongolianMineralsCouncil,”TRQ,PressRelease,August27,2015,http://www.turquoisehill.com/s/news_releases.asp?ReportID=720655[submittalofrevisionstoaMarch2015Phase2FeasibilityStudyforapprovalbytheMongolianMiningCouncilthat“aligns”the2015FeasibilityStudywithboththeOTUMDFP2015andOTTR2014]

SCHNEIDER2013 “MongoliaCopperMineatOyuTolgoiTestsWaterSupplyandYoung

Democracy”,KeithSchneider,November5,2013,http://www.circleofblue.org/waternews/2013/world/mongolia-copper-mine-oyu-tolgoi-tests-water-supply-young-democracy/

SME2011 “SMEMiningEngineeringHandbookThirdEdition,SocietyforMining,

MetallurgyandExploration,2011,Darling,P.ed.,availableathttp://app.knovel.com/web/toc.v/cid:kpSMEMEHE5/viewerType:toc/root_slug:sme-mining-engineering

TRQ8-2015“OyuTolgoifilesrevisedschedulesfor2015FeasibilityStudywith

MongolianMineralsCouncil”,August27,2015corporatepressreleaseavailableat:http://www.turquoisehill.com/s/news_releases.asp?ReportID=720655. Includes:

“TurquoiseHillResourcestodayannouncedthatOyuTolgoihasfiledrevisedschedulesforthe2015OyuTolgoiFeasibilityStudy(OTFS2015)withtheMongolianMineralsCouncil(MMC).ThefilingalsoalignedOTFS2015withtheOyuTolgoiUndergroundMineDevelopmentandFinancingPlan(UndergroundPlan),whichwassignedinMay2015.TheMMChasalreadytentativelyacceptedOTFS2015,originallyfiledinMarch2015,pendingarevisionofschedulesandalignmentwiththeUndergroundPlan.OTFS2015isbasedonthesamefeasibilitystudyandalignswiththe2014OyuTolgoiTechnicalReport,whichwasdisclosedinOctober2014.”

TRQ8-2015b“AnalystandInvestorMineVisit”Presentation,August25-27,2015

http://www.turquoisehill.com/i/pdf/ppt/TRQ-SiteVisit-Aug2015.pdf TRQ12-2015“OyuTolgoisigns$4.4billionprojectfinancemarkinghistoricmilestone

towardrecommencementofundergrounddevelopment”,TRQPressRelease,December14,2015,http://www.turquoisehill.com/i/pdf/news/2015-12-14_NR_TRQ_YFb2vv.pdf

Woo2009 “Characterizationandempiricalanalysisofblockcavinginducedsurface

subsidenceandmacrodeformations,”Woo,K.,etal,ROCKENG09:Proceedingsofthe3rdCANUSRockMechanicsSymposium,Toronto,May

Page 55: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

54

2009,(Woo2009)at:http://www.geogroup.utoronto.ca/rockeng09/proceedings/innerFrames/PDF/Session19/4044%20PAPER.pdf.

5YearCopperSpotMarketPriceChart

Informationoninternationalmarketpricesandtrendsiscompiledfrom:www.kitco.com,thesourceusedforcommoditymetalpricesontheTurquoiseHillResourceswebsiteathttp://www.turquoisehill.com/s/commodity_metal_prices.asp.

Page 56: 2016-01-10 Final Oyu Tolgoi Phase 2 Report-Completed

BriefBiographyofPaulRobinson

[email protected]

SouthwestResearchandInformationCenterPOBox4524

Albuquerque,NewMexicoUSA87107www.sric.org

William“Paul”RobinsonworksasResearchDirectoratSouthwestResearchandInformationCenterinAlbuquerque,NewMexico,ascientificandeducationalorganizationworkingtopromotethehealthof people and communities, protect natural resources, ensure citizen participation, and secureenvironmentalandsocialjusticenowandforfuturegenerations,wherehehasemployedsince1976.Paulhaspreparedpeerreviewedtechnicalpapers,contractpublications,andeducationalmaterialsandexperttestimonyrelatedtomines,mills,andmineraldevelopmentpolicythroughouthis37-yearcareer.Hisconsultingclientshaveincludedlocalandinternationalnon-governmentalorganizations,law firms, industry trade associations, projectdevelopers,NativeAmericanTribes inTheUS, FirstNationsBandsinCanada,andgovernmentregulatoryandforeignassistanceagencies.PaulearnedhisMastersinCommunityandRegionalPlanning(aterminaldegree)withanemphasisonNaturalResourceManagementfromUniversityofNewMexico(UNM)in1992andaBAfromtheTechnology Assessment Program at Washington University, St. Louis, Missouri in 1974. TheprofessionalprojectforhisMastersaddressed“PlanningforReclamationoftheUraniumWasteSitesintheFormerEastGermany.”Paul’s peer reviewed professional papers have been published by; British Columbia Chamber ofMines, NM Bureau of Mining and Mineral Resources, CO School of Mines, Freiberg TechnicalInstitute–GermanyandEuropeanUnion–ScienceandTechnologyDirectorate..Paulhascoordinatedthree-country - Mongolia, Russia and US – educational and scientific exchanges addressing minereclamation,waterandrenewableenergyannuallysince2007.Paul’stechnicalreviewsofenvironmentalanalysesandmineoperatingplansinMongoliasupportofcivilsocietyorganizationsinvolvementinmulti-lateralbankloanapplicationshaveaddressedtheBigBend, Boroo andGatsuurt goldmines andOyu Tolgoi copper-goldmine. Paul provided an invitedpresentation on “Social and Environmental Responsibility inMining: International Experience andLessons Learned Regarding Accumulated Damage from Abandoned Mines, and Long-term RisksAssociated with Waste Management, and Renewable Energy Use” at Conference on Social andEnvironmental Responsibility in the Mineral Industry in Russia” in Moscow in October 2012available at http://www.wwf.ru/about/what_we_do/mining/conference. With co-author GalinaAnosova,Paulpreparedapeer-reviewpublicationon“MiningandMineralDevelopmentPolicyintheSelengeRiverWatershed”forScienceforWatershedConservation:MultidisciplinaryApproachesforNatural Resource Management Conference, Convened by United States Geological Survey (USGS),InstituteofGeneral andExperimentalBiology, SiberianDivision-RussianAcademyofSciences, andMongolian Academy of Sciences, September, 2004, available at:http://www.sric.org/mining/docs/USGS-siberia.pdf.HepreparedtechnicalreviewsaspartofPublicExpertizaCommitteereportsinRussiafortheDybycksagoldmine,AginskoeAutonomousOkrugandtheKhiagdauraniummine,BuryatRepublic.Afullresumeisavailableuponrequest.