4
 RINCIAN Petrosettel PROJE CT ROUL OUT KALTIM TE A M DT MONA NG Clutter  T ype Samarin da- Tenggar ong Rp. 250.000,00 20/6/2015  Speedometer awal Speedometer akhir Rp2500.000,00 25/06/2015 1 | P a g e

20150521-20150249Petrosette.docx

Embed Size (px)

Citation preview

RINCIAN Petrosettel

PROJECTROUL OUT KALTIMTEAMDTMONANGClutter TypeSamarinda-Tenggarong

Rp. 250.000,0020/6/2015

Speedometer awalSpeedometer akhirRp2500.000,0025/06/2015

Speedometer awalSpeedometer akhir

Rp. 350.000,0026/6/2015

Speedometer awalSpeedometer akhirRp350.000,0029/06/2015

Speedometer awalSpeedometer akhir

Rp. 300.000,001/7/2015

Speedometer awalSpeedometer akhirRp300.000,0002/07/2015

Speedometer awalSpeedometer akhir

Rp. 300.000,003/7/2015

Speedometer awalSpeedometer akhir

Speedometer awalSpeedometer akhir

4 | Page