WELCOME!

For technical questions, contact Bridger Wineman ([email protected] or call mobile: 503.267.9688)

Science and Traditional Ecological Knowledge (S‐TEK) working group webinar

January 26, 2015

Page 2: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

Adobe Connect webinar tips

(Screen shot of adobe connect with circle for raise your hand and chat functions)

Click here to “raise your hand”

Type comments here

Page 3: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

3

1/26/2015GBLCC S‐TEK Working Group

S‐TEK Strategic Plan Outline

Re‐visit priority topics

Implementation approach

2015 S‐TEK priorities

Today’s agenda topics

Page 4: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

S‐TEK Strategic Plan Outline

Page 5: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

5

1/26/2015GBLCC S‐TEK Working Group

Strategic Plan Outline

Proposed plan sections Introduction Strategic planning process and methodology Priority topics Potential activities to achieve LCC goals Implementation 2015 focused activities

Page 6: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

Priority topics

Page 7: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

Cross‐cutting topics and cultural resources• Direct effects, interactions and cumulative effects on ecosystem processes related to climate change with other change agents

• Cultural resource topics in relation to ecology and climate change and identified by Native American tribes and cultural resource practitioners

Rivers/streams, riparian • Precipitation, temperature, variability and extreme climatic events

• Surface water• Changes in ecosystem structure, processes, function and interaction

• Surface water‐groundwater interaction

Lake/reservoirs • Surface water availability• Changes in ecosystem structure, processes, function and interaction

• Precipitation, temperature and extreme events

Shrublands• Fire (wildfire/prescribed fire)• Invasives• Changes in ecosystem structure, processes, function and interaction

• Precipitation, temperature and extreme events

Alpine/subalpine• Precipitation, temperature and extreme events• Changes in ecosystem structure, processes, function and interaction

• Surface water/groundwater

Wetlands, groundwater, springs, playas• Groundwater‐surface water interaction• Changes in ecosystem structure, processes, function and interaction

• Precipitation, temperature and extreme events

Forest and woodlands • Fire (wildfire/prescribed fire)• Invasives• Changes in ecosystem structure, processes, function and interaction

• Insect disease and pathogens• Precipitation, temperature and extreme events

Page 8: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

8

1/26/2015GBLCC S‐TEK Working Group

Priority Topics: feedback from GB Forum

Priorities identified to include in the strategy:• Emphasize data management • A specific focus on intermittent and 

ephemeral streams • Research to understand disturbance 

regimes, beyond fire and invasives • Research into sagebrush recovery as a form 

of resilience • Irrigation practices and intensity

Page 9: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

9

1/26/2015GBLCC S‐TEK Working Group

Priority Topics: feedback from GB Forum

Themes of identified critical research needs:• Monitoring protocols for springs and seeps• Landscape‐scale data on vegetation, springs, 

soils• Groundwater availability changes• Grazing impacts• Wildland fire restoration techniques• Species distribution• Protection of sacred sites

Page 10: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

Implementation approach

Page 11: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

11

1/26/2015GBLCC S‐TEK Working Group

Implementation approach outline

Annual focal topics determination Recurring short‐term prioritization process  Activities Funding

Updating the strategic plan Evaluation

Page 12: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

12

1/26/2015GBLCC S‐TEK Working Group

Implementation: annual process

Prior to plan year Plan year Q1‐Q3 Plan year Q4

• Explore partnerships and

gather input

• Designate focal topics

• Recommend short‐term 

priorities, annual activities 

and funding

• Implement work 

plan

• Reporting

• Strategy evaluation

• Planning for next year

Page 13: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

13

1/26/2015GBLCC S‐TEK Working Group

Implementation: Focal topicsTimely: address pressing landscape‐scale ecological opportunities and challenges 

Regionally coordinated: align with goals and activities of LCC‐member organizations

Nationally coordinated: compliment the National LCC strategy 

Page 14: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

14

1/26/2015GBLCC S‐TEK Working Group

Implementation: annual activities

Relevant: activities are directly tied to focal topics

Feasible: activities are scaled to available resources, including anticipated level of effort by staff and any direct costs

Value added: degree to which activities leverage partnerships and enhance outreach

Page 15: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

S‐TEK activities and 2015 priorities

Page 16: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

Potential LCC activitiesGBLCC initiatives Hold the Great Basin Climate Forum* Hold Great Basin Consortium Conference * Tribal engagementFunding Large projects with ecoregional/basin‐wide relevance (partnerships/solicitation planning) * Small projects* TEK‐focused funding*Conservation planning Support continuing Klamath Basin conservation planning * Support continuing Bear River Basin conservation planning * Support continuing Intermountain Joint Venture conservation planning* Hold climate adaptation trainings promoting the use of climate smart principles and scenario‐based 

adaptation strategies * Explore the application of priority science to existing and new management and decision‐making tools 

across the BasinData and monitoring Coordinate issue‐based workshops to identify available data, data gaps, and synthesis needs not being met 

by other Great Basin organizations  Support landscape‐level mapping across jurisdictional boundaries that can support shared research 

priorities  Host a GIS summit with Great Basin conservation practitioners Engage tribes in developing protocols for long term monitoringCommunicating about science Support development of interactive educational tools, including maps 

* = current/ongoing activitygreen text = proposed ‘15 priority

Page 17: 20150126 STEK Presentation DRAFTv2.1 · Microsoft PowerPoint - 20150126_STEK_Presentation_DRAFTv2.1.pptx Author: bwineman Created Date: 1/26/2015 3:29:28 PM

GBLCC S‐TEK Working Group 1/26/2015

17

1/26/2015GBLCC S‐TEK Working Group

Next steps

Potential activities (3‐5 year horizon) 2015 priority activitiesWorking draft to GB LCC Steering Committee 

at Feb. 17 meeting Plan review, finalization(March)