39
2013 Summer Recap and Discussion on ad scuss o o Rockaway Beach Reconstruction Reconstruction

2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

2013 Summer Recap and Discussion on a d scuss o oRockaway Beach ReconstructionReconstruction

Page 2: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Tonight’s Agenda• Summer Beach Update• Phase 2• Assumptions, Constraints and Regulations• Rebuilding the Boardwalk• Coastal Protection• Rockaway Peninsula Conceptual Plan• Next Steps• Questions

2

Page 3: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Summer Beach Update

Page 4: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Beach Season 2013

Rockaway Reconstruction: Summer 4

Page 5: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Army Corps Beach Replenishment

• Phase 1A: Creation of a berm between B86-B149

- 600,000 Cubic Yards

- August –September p2013

5Rockaway Reconstruction: Summer

Page 6: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Baffle Walls

• Replaced walls that were lost or damagedwere lost or damaged during the storm

• Sand migration• Sand migration prevention

• Spans B126 – B149 StSpans B126 B149 St.

• Supported by 25’ deep pilespiles

Rockaway Reconstruction: Summer 6

Page 7: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Interim Measures: Trapbags

• 4’ high and wide geotextile bags forgeotextile bags for interim protection against future storm eventsevents

• The bags contain over 17 000 cubic yards of17,000 cubic yards of sand in total

• Spans B55 B149 St• Spans B55 – B149 St

7Rockaway Reconstruction: Summer

Page 8: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Phase 2

Page 9: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Community Visioning

• NYC Parks engaged the community on their vision for parks and open space in the Rockawaysfor parks and open space in the Rockaways

• Hosted an April 2013 community visioning meeting with 100 participantswith 100 participants

• Launched an interactive online visioning tool to capture input from an even wider audience from p pApril - August

• Focused on coastal protection, recreation, p , ,economic development and aesthetics

• Nearly 25,000 votes on ideasy ,9Rockaway Reconstruction: Phase 2

Page 10: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Community Visioning Results

Create a natural dune system with plants, and build rock jetties, replenish reefs and oyster j , p y

bedsContinuous boardwalk

Include the it

with other recreation facilitiescommunity

in the decision-

facilitiesBuild an ocean pier on B116 Street and a marina along the bay wall. Hotels will follow

E h d C t lmaking process

Enhanced Coastal Protection

Rockaway Reconstruction: Phase 2 10

Page 11: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Phase 2 Scope

• Rebuild the Boardwalk

• Provide coastal storm risk reduction measures, both interim and long-term

• Develop a conceptual plan for replacing storm damaged play features and new recreation, concession and access opportunities in partnership with NPS and the Jamaica Bay Rockaway Parksthe Jamaica Bay Rockaway Parks Conservancy

11Rockaway Reconstruction: Phase 2

Page 12: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Community Meeting ScheduleSeptember 23 at PS437:00 PM B9-B72

September 24 at Knights of Columbus 7:00 PMB73-B109

• Far Rockaway• Bayswater• Wave Crest

• Hammels• Rockaway Beach• Seaside• Wave Crest

• Arverne• Seaside

September 25 at October 8September 25 at PS114 7:00 PMB110-B149

October 8 CB14 Full Board Meeting

• Rockaway Park• Belle Harbor• Neponsit

• Meeting to discuss boardwalk schematic

Rockaway Reconstruction: Phase 2 12

Page 13: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Milestones

• September 2013: Boardwalk Design BeginsSeptember 2013: Boardwalk Design Begins

O b D b 2013 C l Pl• October – December 2013: Conceptual Plan Development

• December 2013: Pre-construction Begins on Initial Ph f B d lkPhase of Boardwalk

13Rockaway Reconstruction: Phase 2

Page 14: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Assumptions, Constraints and Regulations

Page 15: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

SIRR Priorities and Solutions

•Develop comprehensive revitalization plans for Boardwalk, B. 116th St., B. 108th St. and Mott Ave.

Conceptual rendering of Beach 116th Street

•Work with USACE to install double dune system in Breezy Pt. and to study system for rest of Rockaway Peninsula

•Work with USACE to study and install wetland and wave attenuation in Howard Beach

D l l dd f id l i d i i B d Ch l d H il B h15Rockaway Reconstruction: Constraints

•Develop a plan to address frequent tidal inundation in Broad Channel and Hamilton Beach

Page 16: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Regulatory Agencies and Processes

Environmental Review Process

FEMA

SEQRACEQRCEHA

16Rockaway Reconstruction: Constraints

CEHA

Page 17: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Army Corps of Engineers: Reformulation Study Draft and publicStudy • Draft and public

review 2014

Environmental• Environmental Impact Statement

• Final submission• Final submission expected by late 2015

• Cost benefit ratio analysis

• Construction funding 100% f d l

17Rockaway Reconstruction: Constraints

federal

Page 18: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Rebuilding the gBoardwalk

Page 19: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

RFP Process and Selection

• NYCEDC will manage Consultants and Contractors on behalf of Parks• Selection of a Design Team:

• Public Design RFP Released per City Procurement Guidelines on July 23: six firms respondedGuidelines on July 23: six firms responded

• City Advisory Panel: Parks, EDC, DDC, OMB, Law • CH2MHill & Team Selected

• Future Solicitations:• Construction Management winner selected by 10/9• Pre-qualified subcontractors selected by 10/25

Rockaway Reconstruction: Reconstruction 19

Page 20: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

CH2MHill Team

Rockaway Reconstruction: Reconstruction 20

Page 21: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Boardwalk Design Goals• Resist storm forces

• Integrate with USACE work

• Incorporate rebuilt islands

• Design for varying elevationsg y g

Location Pile Cap Elevation

DesignFlood

Height above Cap

(ft) Elevation (ft)

p(ft)

Beach 50th 14.6 16 1.4Beach 110th 10.9 17 6.1Beach 121st 11.1 19 7.9

21Rockaway Reconstruction: Reconstruction

Page 22: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Boardwalk Design Assumptions

•Design Life: 50 years

•Structural Material: Concrete

•Vehicular Access: HS20 truck loading

•Account for new and varied elevations

22Rockaway Reconstruction: Reconstruction

Page 23: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Boardwalk Design Issues• Coordinate with USACE risk reduction projects

• Construction and funding issuesg

• Resist storm forces

• Boardwalk structure to remain intact

• No planks to come loose and float into neighborhood

• Reuse existing concrete foundations

• Determine their capacities and conditions

• Reinforce as required

• Connect to other structures

• Meet existing islands

• Restore access pointsRockaway Reconstruction: Reconstruction 23

Page 24: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Initial Field Work Underway

•Complete site survey• Ground and aerial• Ground and aerial

•Geotechnical Testing

• Pile dynamic analysis• Pile dynamic analysis

• Test pile drivingConcrete Materials testing•Concrete Materials testing

• Coring for chlorides

Wi d b• Windsor probes

Rockaway Reconstruction: Reconstruction 24

Page 25: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Coastal Protection

Page 26: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Coastal ProtectionImmediate Term•USACE Short Term Dune Construction

• 3.5 Million Cubic Yards of Sand• Reformulation Study

Immediate to Medium Term•City Betterment of USACE Duney

• Raise New Berm/Dune Elevations to FEMA 100 Yr Flood level

• Dune Plantings• Extended Dune/Sand to Underside and Back of

BoardwalkBoardwalk26Rockaway Reconstruction: Coastal Protection

Page 27: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Betterment Plan

100’ 200’ 300’ 400’ 500’

50’

27Rockaway Reconstruction: Coastal Protection

Page 28: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Elevated Boardwalk and Protection Options

Rockaway Reconstruction: Coastal Protection 28

Page 29: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Elevated Boardwalk and Protection Options

Rockaway Reconstruction: Coastal Protection 29

Page 30: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Elevated Boardwalk and Protection Options

Rockaway Reconstruction: Coastal Protection 30

Page 31: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Elevated Boardwalk and Protection Options

Rockaway Reconstruction: Reconstruction 31

Page 32: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Elevated Boardwalk and Protection Options

Rockaway Reconstruction: Reconstruction 32

Page 33: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Elevated Boardwalk and Protection Options

Rockaway Reconstruction: Reconstruction 33

Page 34: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Rockaway Peninsula yConceptual Plan

Page 35: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Conceptual DiscussionCenters on a plan for parks and open space on the Rockaway Peninsula from the Bay to the Ocean between Beach 9th and Beach 149th. The Conceptual Plan will focus on:

• Upland connections• Replacement of recreation and parks facilities

B d lk• Boardwalk access• Beach access

This plan will be worked on in a parallel timeline toThis plan will be worked on in a parallel timeline to the Boardwalk Reconstruction Schematic Design.

35Rockaway Reconstruction: Conceptual

Page 36: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Next Stepse t Steps

Page 37: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Community Meeting ScheduleSeptember 23 at PS437:00 PM B9-B72

September 24 at Knights of Columbus 7:00 PMB73-B109

• Far Rockaway• Bayswater• Wave Crest

• Hammels• Rockaway Beach• Seaside• Wave Crest

• Arverne• Seaside

September 25 at October 8September 25 at PS114 7:00 PMB110-B149

October 8 CB14 Full Board Meeting

• Rockaway Park• Belle Harbor• Neponsit

• Meeting to discuss boardwalk schematic

Rockaway Reconstruction: Phase 2 37

Page 38: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

Milestones Recap

• September 2013: Boardwalk Design BeginsSeptember 2013: Boardwalk Design Begins

O b D b 2013 C l Pl• October – December 2013: Conceptual Plan Development

• December 2013: Pre-construction Begins on Initial Ph f B d lkPhase of Boardwalk

38Rockaway Reconstruction: Phase 2

Page 39: 2013 Summer Recap aa d scuss o ond Discussion on Rockaway … · 2016. 5. 23. · September 24 at Knights of Columbus 7:00 PM B73-B109 • Far Rockaway • Bayswater • Wave Crest

QuestionsQuestions