  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 1

    QM-GEN-18, Rev.0

    Venue: IRPC TET site office Recorded By: Deaunphen R.

    Initiator: Kanok P.

    PROJECT: EBSM UPGRADING PROJECT 2013

    SUBJECT: MEETING DATE: Attachment

    Internal Weekly HSE Meeting # 36 May 22, 2013 Attendee List weekly HSE meeting #036 Picture of weekly HSE audit #036 (page 15-21) Picture of ABB instrument equipment at site (page 22)

    ATTENDEES: DISTRIBUTION TO:

    COMPANY NAME COMPANY NAME

    IRPC

    Kanok P.

    IRPC Somchai T. Anutin C. Pongsapak A.

    Nares N.

    TET Deaunphen R. Kanakorn J. Preerati N.

    TET Worachart P.

    AS first - Aphisuk K.

    ABB Suwasan P. Taradol L./Chaiwit J.

    Ensure

    MACS

    Chatchai S. Nattapon D.

    All disciplines ABB

    TCC Udorn P. CONTRACTOR - ENSURE PTEC Veerapong Th. PTEC MACS

    TCC

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 2

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    Meeting started: 14.00 PM 0

    Remind Items 1. Drainage water, Dewatering to IRPC/EBSM gutter must

    be treated before discharge.

    2. Gutter protection (No blue sheet)

    3. Project & Company sticker

    4. First aid kit & Log book

    5. Need MS for construction equipment/machine

    mobilization & demobilization

    6. Scan/take a picture inspection sticker

    7. Violation and penalty (detail in item 2)

    8. Rule and regulation of prohibited object (transparent

    bag)

    9. Material storage need support

    10. EBSM Main gate for vehicle & small gate for pedestrian

    11. No flooding on EBSM road

    12. Install sump at flooding area before start working

    13. Fire extinguisher location & safety sign at Lay down area

    14. No obstruction access to fire hydrant

    15. TET induction training Every Monday, Wednesday &

    Friday

    16. Specific training work at height, Lifting work, Hot work ,

    confined space etc.

    17. Tool & Equipment inspection by IRPC (3 month)

    18. Electrical tool inspection by contractor (weekly)

    19. Chemical substance & SDS

    20. No material store on valve pit cover(03B&05)

    21. Heavy equipment not allow to stand on gutter cover if no

    protection by steel plate

    22. All contractor HSE, Site management & supervisor need

    to study and through understand about IRPC scaffolding

    All

    contractors

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 3

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    procedure/manual

    23. Need to fix plant gravel damage by backhoe (ASF)

    24. EBSM Color code for lifting gear

    25. Appointment letter HSE & Fire watch man

    26. Safety Milestone Celebration

    26.1 200,000 MH on November 22,2012

    26.2 500,000 MH

    26.3 900,000 1,000,000 MH

    27. Modify scaffolding to inform IRPC(K.Rattasart) & get

    approve before execute

    28. Evacuate Drill Monthly basis Every Wednesday 3

    week of month

    29. Daily report to TET Daily tool box talk, Site

    walkthrough checklist & Find n Fix

    30. Gas detector need calibrate every 3 months

    31. Lifting work Certificate (Supervisor, Operator, Signal

    man & Rigger)

    32. PTW, what if, SDS must be in place at site

    33. Lay down area need daily request form

    34. Lifting plan need to have calculation of weight to

    outrigger

    35. Dusty activity need to reduce dust by water spraying

    36. Need wheel wash for vehicle if needed

    37. Need copy of IRPC badge of D personnel

    38. All vehicles need to park safe at lay down area

    39. Mobile toilet in EBSM plant by ratio 1:50 and outside

    ratio is 20 person per 1 toilet

    40. Holiday plan

    41. Monthly Management Walkthrough

    42. Additional Assembly Point

    43. HSE booklet

    All contractors

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 4

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    44. To provide enough shelter/tent for all workers not allow

    to sleep in front of/beside EBSM plant

    45. Avoid unsafe action to damage IRPC property

    46. Aware car/motorcycle parking at IRPC scrap yard

    47. Weekly tool box talk schedule by TET

    48. Project Incentive Plan

    49. Monthly Lay Down Area Audit & Meeting Every

    Wednesday 3th week of month

    50. Safety net

    51. Hard & Soft barricade

    52. Co-sign PTW

    53. WHAT IF

    54. To avoid middle of EBSM plant

    55. Special Housekeeping team

    56. PTW box & company name

    57. Picnic CUP

    58. All incident/accident must be reported to TET

    immediately

    59. No glass/plastic bottle inside EBSM plant

    60. Keep scaffold tag in good condition

    61. PTW coordinator need to know/understand work

    62. Weekly HSE audit every Wednesday 10.00 am and

    meeting at 14.00 pm

    63. Project Monthly Action Plan Drug & Alcohol test

    64. HSE organization chart & Appointment Letter

    65. Man basket certificate

    66. Safety Meeting Tour

    67. Parking at prohibited area

    68. Qualification fire watch man

    69. Road closure plan

    70. Pig shooting & playing during working

    All contractors

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 5

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    71. Hook up during work at height

    72. No electrician, no OT

    73. Internal Milestone Celebration Plan

    74. No Site Management , no work

    75. Safety officer to work at site not only in the office

    76. Update MP & MH related to PTW

    77. Need male safety personnel to work at height

    78. Scaffolding not touch the existing plant pipe

    79. EBSM plant unplanned shut down

    80. Install statistic board at lay down area

    81. 824 & 825 (IRPC tool & equipment inspection)

    82. Scaffolding tag rule : sign by authorized person

    (K.Rattasart) only

    83. Cutting existing EBSM plant handrail (Ensure)

    84. Motorcycle accident

    85. Step on insulation jacket

    86. Training PSSR before shut down

    87. Hazard of drain and vent line

    88. Proper steel plate for crane outrigger

    89. Bicycle to park along fence. Not allow to ride middle of

    plant

    90. To provide banksman/flagman for vehicle

    91. Monthly Lay Down Area audit & meeting

    92. PTW station 7.30 8.30 am

    93. Safety is one team

    94. G.5(EBSM) open for vehicle

    95. RT work information board

    96. Road at 03 B cracks (under pipe rack-pipe bridge line

    18-19).

    97. Escort man can ride a bicycle

    98. Big housekeeping every Tuesday & Thursday

    All contractors

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 6

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    1

    99. Fire protection Fire ball Reject FWM

    Remaining item from previous 1.1 TET requested ABB to submit LOTO procedure and asked

    about IRPC procedure. LOTO

    ABB was already submitted LOTO procedure to TET. TET

    waiting IRPC procedure to comply with.

    LOTO

    1.2 K.Pongsapak requested PTEC to provide project information

    board at Lay Down Area.

    1.3 K.Pongsapak reminded about HSE booklet/handbook.

    - All to provide ( ABB=150, MACS=125, TCC=125, PTEC=300

    & Dialog=300). Confirm price 25.50 bath/1 book. Delivery date

    before shut down (10June2013)

    1.4 TET requested all to prepare scaffolding log book.

    1.5 TET will set schedule for training safety personnel and fire

    watch warden soon. TET set meeting all safety and fire watch

    personnel every Monday. TET invited IRPC safety team to join

    for discussing about safety issue at shut down period.

    1.6 TET waiting detail of lesson learn - IRPC about electrical

    shock on scaffolding so all need to be careful about avoid

    hanging electrical cable on scaffolding or else use S hook with

    the effective insulator.

    1.7 TET informed about TET home office audit #02 results is all

    to improve about pressure cylinder storage. Chain was needed

    for cart.

    1.8 TET requested all to submit the Safety certificate of

    ABB&IRPC

    IRPC

    ABB(Done)

    PTEC

    ALL

    TET

    TET,All contractors

    &IRPC

    IRPC

    ALL

    ALL

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 7

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    Management and Supervisor level.

    1.9 S-hook needed for electrical cable hanging.

    1.10 ABB informed that all junction boxes and instrument

    equipment have already installed around EBSM plant. Remind

    all to be aware. (see attached picture page 22)

    ALL

    ALL

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 8

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    2 HSE statistics IRPC KPI

    1. ZERO recordable case = 0

    2. No fire accident = 0

    3. No Chemical spillage (over 100 liter) = 0

    4. No Property Damage (over 300,000 bath) = 0

    5. No complaint from community = 0

    EBSM record Fatalities = 0 case

    Days Away From Work Cases (DAFWC) = 0 case

    Restricted Work Cases (RWC) = 0 case

    Medical Treatment Injuries (MTI) = 0 case First Aid = 0 case

    Near Misses = 3 case Damage Incidents = 6 case Reportable Environmental Incidents = 0 case Detail of incident

    1. On March 14, 2012 Near-miss case (ENSURE) lifting stair

    (1.2 ton) and one of sling slip off hook of hiab truck at 6 meter

    height. 2. On June 2, 2012 - Property damage case (TBC) pile driller

    machine hit to fire hydrant hand wheel. 3. On June 19, 2012 Property damage case (TBC) tremie pipe

    stuck in drilling hole. 4. On January 19,2013 Near-miss case (AS First) smoke from

    combustible material cover oil sand.

    5. On March 5,2013 Property damage (Dialog) 2 boxes fell

    down from forklift

    6. On March 6,2013 Property damage (PTEC) found insulation

    jacket damage by PTEC workers

    7. On April 29,2013 Property damage (TCC) chain of chain box

    damage during working adjustment structural line.

    8. On May 18,2013 Near miss (PTEC) Pipe 10 hit to orifice

    INFO

    INFO

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 9

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    existing line.

    9. On May 20,2013 Property Damage (PTEC) Web sling 2 ton

    was torn by wrong method lifting.

    Violation & Penalty 1. NCR issue = 5 cases

    - To ASF about ASF safety manager leave without inform to TET - To ENSURE about working without TET acknowledgement and safety

    officer has no safety glasses. - To ENSURE about outrigger plate

    - To ASF about unsafe lifting work

    - To TCC about lifting work not comply to risk assessment (what if)

    2. Suspension = 4 + 9 cases - TBC site engineer took cell phone in plant.

    - ABB added lifting work in PTW after authorized personnel signed

    - PTEC site engineer allow to work outside PTW approval

    - PTEC worker smoked at lay down area

    - First check ABB = 2 Ensure = 2 PTEC = 3

    - Second check Ensure = 2

    3. Termination = 2 cases - ASF crane operator intend to lift without extending outrigger. - ASF safety officer (Professional level) no responsibility

    4. Warning = 14 cases - ABB S/V PTW violation

    - Ensure Store keeper & user- grinding machine without guard

    - MACS Hiab operator pressure cylinder transportation

    - ABB Worker used a damage machine

    - TCC S/V, Rigger, Operator & Safety Unsafe lifting

    - 2 TCC & 3 PTEC not wearing safety glasses on Monday 20,2013

    Man Hour Update 1 week (13-19 May 2012)

    Previous This Week Cumulative

    638,788 46,107 684,895

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 10

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    Confined space record

    Company Confined space trained Remark

    ENSURE 20 - MACS 19 -

    Safety Team Update

    Company Safety Personnel FWM

    ABB 3 5 ENSURE 5 4

    MACS 5 2 PTEC 8 14 TCC 4 5 Total 25 30

    HOUSEKEEPING TEAM

    Every Tuesday and Friday at 13.30 am all contractors need to provide

    a housekeeper for EBSM plant. ABB 3, Ensure 5, MACS 2,

    PTEC -5 and TCC 3.

    Every working day for PTEC to take care EBSM smoking area in the

    morning and Ensure to take care in the afternoon

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 11

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    Safety Tool Box Talk Topic

    No. This week Next week 1 Ready of body(health) Ready of body(health)

    2 Ready of mind Ready of mind

    3 Ready of tool & equipment Ready of tool & equipment

    4 Ready of system Ready of system

    5 Ready of team Ready of team

    6 Risk of falling object Work at

    height

    Risk of falling object

    Work at height

    Project TET-KPI = 0.19 Actual = 0

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 12

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    3

    4

    General / Information 3.1 IRPC invited all safety personnel to join the meeting about

    EBSM plant turn around period on May 23, 2013 at 8.30 -12.00

    am.

    3.2 TET informed that PTEC need to move 4 tents between

    Dialog and ASF within this Friday (May 24, 2013).

    3.3 TET reminded to all about OT request need to submit before

    16.00 pm

    3.4 About smoking area at lay down area need the good

    housekeeping and schedule to all contractors to take care by

    ABB - Monday, Dialog - Tuesday & Wednesday, MACS

    Thursday & Friday, TCC Saturday & Sunday.

    3.5 TET reminded about no hand over anything between EBSM

    fence and outside.

    3.6 IRPC reminded about hanging all bags along fence.

    3.7 MACS informed about flushing and test work is ongoing and

    the pressure is not over 10 bar.

    3.8 TET requested PTEC to provide 10 workers for

    housekeeping at height starting May 23, 2013 afternoon.

    3.9 TET informed that about parking vehicle in front of lay down

    area is permitted by memo of K.nares to K.Rachin as attached.

    Comment 4.1 Observed 2 empty drums obstruct the access to IRPC waste

    bin.

    4.2 Observed 2 ABB workers walk across lifting barricade.

    4.3 Observed TCC worker try to fix the hook of land yard by

    using welding scrap for pin.

    - To be replaced at once and tool box to all workers.

    4.4 Observed ABB electrical cable tie off with scaffolding.

    4.5 Observed PTEC welding area at 02 has no welding scrap

    container. Bad housekeeping.

    Info.

    Info.

    Info.

    Info.

    Info.

    Info.

    Info.

    Info.

    Info.

    ABB

    ABB

    TCC

    ABB

    PTEC

    To be recorded

    ASAP

    ASAP

    ASAP

    May 23, 2013

    ASAP

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 13

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    4.6 Observed PTEC workers were sitting under scaffolding

    storage. Line of fire.

    4.7 Observed Ensure hard barricade to protect the fire hydrant

    obstruct the access to fire hydrant in case of emergency.

    4.8 Observed the waste is not segregated in bag and the

    unused material not remove.

    4.9 Observed the under reactor unused material scatter all area.

    Ensure to remove ASAP.

    4.10 Observed the argon pressure cylinder on cart need to have

    more chain to lock.

    4.11 Observed the access to the plant fire extinguisher was

    blocked by scaffolding at area 05. PTEC need to move fire

    extinguisher to outside and noted that the fire extinguisher

    shelter was damage before relocate it as picture attached.

    4.12 Observed PTEC 05 working area need to do housekeeping

    ASAP.

    4.13 Observed TCC fire watch warden wearing safety shoe not

    meet standard.

    4.14 Observed PTEC painting work need a container for all

    paint can.

    Good Observation - ABB The new workers wearing full PPE.

    - ABB Picnic cups were used by all workers for hygiene of

    all. EXELLENT!!!!

    - PTEC The fire ball protection is good.

    - PTEC The worker is wearing correct PPE during grinding

    work.

    - PTEC The S hook is shown up all area of electrical cable

    running.

    - MACS Very good practice for flushing work. 3 times

    whistle before working. The protection is Good. The air

    PTEC

    Ensure

    Ensure

    Ensure

    Ensure

    PTEC

    PTEC

    TCC

    PTEC

    ABB ABB

    PTEC

    PTEC

    PTEC

    MACS

    ASAP

    May 23, 2013

    ASAP

    ASAP

    May 23, 2013

    May 23, 2013

    ASAP

    May 23, 2013

    May 23, 2013

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 14

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    compressor at connection point is double lock.

    Meeting ended at 16.30 PM

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 15

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    Picture of Weekly HSE audit # 036

    4.1 Observed 2 empty drums obstruct the access to IRPC waste bin.

    4.2 Observed 2 ABB workers walk across lifting barricade.

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 16

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    4.3 Observed TCC worker try to fix the hook of land yard by using welding scrap for pin.

    4.4 Observed ABB electrical cable tie off with scaffolding.

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 17

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    4.5 Observed PTEC welding area at 02 has no welding scrap container. Bad housekeeping.

    4.6 Observed PTEC workers were sitting under scaffolding storage. Line of fire.

    4.7 Observed Ensure hard barricade to protect the fire hydrant obstruct the access to fire hydrant in

    case of emergency.

    4.8 Observed the waste is not segregated in bag and the unused material not remove.

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 18

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    4.9 Observed the under reactor unused material scatter all area. Ensure to remove ASAP.

    4.10 Observed the argon pressure cylinder on cart need to have more chain to lock.

    4.11 Observed the access to the plant fire extinguisher was blocked by scaffolding at area 05. PTEC

    need to move fire extinguisher to outside and noted that the fire extinguisher shelter was damage

    before relocate it as picture attached.

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 19

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    4.12 Observed PTEC 05 working area need to do housekeeping ASAP.

    4.13 Observed TCC fire watch warden wearing safety shoe not meet standard.

    4.14 Observed PTEC painting work need a container for all paint can.

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 20

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    Good Practice

    - ABB The new workers wearing full PPE.

    - ABB Picnic cups were used by all workers for hygiene of all. EXELLENT!!!! Including the drinking water container is good for all worker hygiene.

    - PTEC The fire ball protection is good.

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 21

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    - PTEC The worker is wearing correct PPE during grinding work.

    - PTEC The S hook is shown up all area of electrical cable running.

    - MACS Very good practice for flushing work. 3 times whistle before working. The

    protection is Good. The air compressor at connection point is double lock.

  • MINUTES OF MEETING

    CONTRACT NUMBER

    PROJECT NUMBER MEETING NUMBER DATE PAGE

    - 2013 2013-MOM-HSE-036 May 22, 2013 22

    ITEM SUBJECT ACTION BY DATE DUE

    QM-GEN-18, Rev.0

    PICTURE OF ABB instrument equipment at site