Page 1: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

1

Your presentation titleor header goes here.

Waddell 230kV Switchyard: Principles of Performance for Repair

Fault Location

Transformer

Bus

230,000 volts

Switches

Agenda Number 6.

Page 2: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

2

Electrical Fault

Transformer 7A experienced an electrical fault that caused it to shut down.

The fault was originated with the C-Phase bus.

Electrical Fault

•Extremely dangerous failure •Additional damage may occur

Page 3: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

3

Electrical Fault

Normal Operation

Transformer 7B

Transformer 7A

Two pumps on each 

transformer

Page 4: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

4

After Fault Condition

Transformer 7B

Transformer 7A

Four pumps on one 

transformer

Principles of Performance in Project

Manage Assets to ensure system reliability

Build relationships among work groups: Internal Leadership

Involve all departments upfront: Improved Project Development

Achieve environmental excellence

Page 5: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

5

Multiple Groups Involved in Repair

Project Management

Waddell

Maintenance Engineering

Mechanical Maintenance

Purchasing

Safety

Environmental

Machine Shop

Engineering Resources

Warehouse

Planning

CAP and Global companies:MEPPI and CGIT

CAP

MEPPI

CGIT

Page 6: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

6

Sole Sources: MEPPI and CGIT

CGIT Compressed Gas

Insulated Transmission

MEPPI Mitsubishi Electric

Power Products Inc

Existing Conditions

Transformer

BusSwitches

Surge Arrestors

Page 7: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

7

Schedule

Team PlanningJanuary

2011

Award Contracts May 2011

Phase 1 June 2011

Phase 2March 2012

World Events during Planning

Team PlanningJan 2011

Major Earthquake,

Tsunami, and Nuclear Crisis in

Japan March 2011

Award Contracts May 2011

Phase 1 June 2011

Page 8: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

8

Phase 1: Repair of Surge Arrestors

Repair

Phase 2:Refurbished Surge Arrestors

Page 9: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

9

Phase 2: C Phase Bus

Phase 2: Install

Page 10: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

10

Phase 2: Working among the new switches

Phase 2: Flange Cleaning and Desiccant Replacement

Page 11: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

11

Phase 2:Preparing the Transformer for Test Conditions

Hi Pot Test Equipment

Page 12: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer

12

Test Equipment connected to Substation

Teamwork for CAP’s Improved Reliability