November 7th, 2008
Embraer Day
Industrial Operations Overview
Artur CoutinhoExecutive Vice President
Industrial Operations
Agenda
• Embraer Products
• Industrial Operation Overview
• January 2007 Scenario
• Industrial Operation Plan
• 2008 Results and Production Readiness
Embraer Products
Under Development
ERJ 145
EMBRAER 170 EMBRAER 175 EMBRAER 190 EMBRAER 195
Executive
AviationLegacy 450/500Legacy 600 Phenom 100 Phenom 300 Lineage 1000
Defense
EMB-314 AEW
Comercial
Aviation
F5 BR up grade E190 PR
Under Development
• Embraer Products
• Industrial Operation Overview
• January 2007 Scenario
• Industrial Operation Plan
• 2008 Results and Production Readiness
Agenda
Embraer - Global Business
• Operations in Brazil, United States, Europe and Asia
BrazilSão José dos Campos
Eugênio de Melo Gavião Peixoto
BotucatuTaubaté
FranceVillepinte
Le Bourget
SingaporeSingapore
USANashville
Fort Lauderdale
ChinaBeijingHarbin
Portugal Alverca
Embraer Industrial Units - Brazil
Brazil
Eugênio de Melo - EGM
BOT
GPX
SJK São Paulo
EGMSão Paulo State
ELEB
São José dos Campos - SJK
TTE
Gavião Peixoto - GPX ELEB Botucatu - BOT Taubaté - TTE
• Embraer Products
• Industrial Operation Overview
• January 2007 Scenario
• Industrial Operation Plan
• 2008 Results and Production Readiness
Agenda
Jan 2007 Scenario - A Big Challenge
Flight Preparation
Tubing
Labor
Outsourcing
Painting
Machining
Sub - AssyBOT
Structural and Final Assembly
Others/New ProductsChemical
Milling
Sheet Metal SJK
Harness
Suppliers
Sheet Metal BOT
Cabinetry Shop
Composite
Deliveries
Final AssemblyFuselage Equipage
Mating and Complementation
Segments Phenom100/300
Ph100/300 Wing BOT
Wing EquipagePhenom100/300
Fuselage Equipage
Final AssemblyMating and
ComplementationSegments
Legacy/145
Legacy/145Legacy/145 Wing Wing Equipage
Underbelly Tank Assembly
E170 DockFuselage Equipage
Fuselage Mating E170/175
Wing EquipageE170 Wing - SJK
Segments E170/190/Lineage
E190 DockFuselage Equipage
Fuselage Mating E190/195
Wing Equipage
E170/190
E190 Wing - GPX
Bottlenecks
Under Control
Jan 2007 - Bottlenecks Management
jan feb mar apr may jun jul aug sep oct nov dec
Overtime - Actual Overtime Planned
2007 Scenario - Overtime
VOP Overtime
• Embraer Products
• Industrial Operation Overview
• January 2007 Scenario
• Industrial Operation Plan
• 2008 Results and Production Readiness
Agenda
2006 VOP Organization
Industrial
Operation - VP
Industrial Operation Planning
Gavião Peixoto Unit
Procurement Botucatu UnitProductionProduct Quality
Logistics
CEO
Industrial Strategy
2007 VOP Organization
Industrial
Operation - VP
CEO
Logistics & Production
Control
Gavião Peixoto Unit
Supply Chain Botucatu UnitFabrication SJK/EGM
Product Quality
Final Assembly
SJK
Industrial Op. Integration
Commercial Aviation
Industrial Op. Integration
Executive Aviation
Industrial Strategy
Introduction to the ‘Lean Concept’
2006� Phenom 100/300 Final Assembly� Production ‘in line’ concept
� Standardized work
� Operator fixed at work station
� Supermarket concept
� Visual management
� Logistic� Delivery at point of use
� Production Control� Only one production order
� Outsourcing� Applied lean concept
SJK Plant
P3E Program - Lean Concept
Co
nti
nu
ou
s
Imp
rove
men
t C
ell
s
Lean
P
roje
cts
(K
aiz
en
s)
Lean Philosophy
Results
Continuous
Culture
Leadership
People
2007/2008 - Extensive Application of Lean Philosophy
Tubing
Composite
E190 Wing Assembly
Phenom Final Assembly
Supply Chain
Legacy Fuselage Mating
E170/190 Structural Assembly
Surface Treatment
Chemical Milling
Cabinetry Shop
Harness
Harness
Jun/07
May/08
18/ju
n27
/jun
5/ju
l13
/jul
23/ju
l31
/jul
6/ag
o13
/ago
21/a
go29
/ago
6/se
t17
/set
26/s
et2/
out10
/out
18/o
ut26
/out
5/nov
20/n
ov30
/nov
3/ja
n14
/jan
7/fe
v25
/fev
11/m
ar27
/mar
11/a
br24
/abr
19/m
ai5/
jun
18/ju
n
Jun/07 Jun/08
Missing Items – All Programs
Lean Implementation
Released Area: 20%
Harness
Jun/07 Jun/08
Released Area: 20%
� Parts and tools close to their point of use
� Operator's ergonomic improvements
Lean Implementation
Tubing
� Production Increase: 1,400 to 2.000 parts/day
� Released area for future expansions
Mar/08Aug/07
Lean Implementation
Released area
Pylons
E190
� Production Flow Optimization
Mar/08Aug/07
E170
Composite
Mar/08Aug/07
� Working Cell
� Operator fixed on the working place
� Production Visual Management
� Production Increase: over 60%
� Operator’s movements/day: 49
� Walking distance: 3,600 ft
Lean Implementation
Composite Structural Assembly
Aug/07 May/08
� Layout Reviewed: assembly “line” concept
� Operator’s movements drastically reduced
� Visual Management� Production Increase: 121%
Operator’s movements(feet traveled)
Legacy 600 Fuselage Mating
Out/07 Mar/08
� Operator’s movements reduction
� Tool kit organized close to the assembly place
� Parts and tools close to their point of use
Leading Edge Assembly
Aug/07 May/08
� Leading and trailing edges assembly reorganization
� Operator’s movements reduction
� Parts and tools close to their point of use
2007-2008 SJK Plant – Investments
Painting Booth -Composites
Structural Assembly Building - Composites
Wing to Fuselage Mating -E170/190
Examples
New Router Machine -Composite
2007-2008 SJK Plant – Investments
Paint Booth Improvement (F210)
Shot Peening
Paint Booth Retrofit (F41)Examples
2007-2008 BOT Plant – Investments
BOT Plant Expansion
Examples
Skin Panel Fabrication
Hangar
PhenomStructural Assembly
Hangar (2nd)
Structural Assembly
Hangar Expansion
CalenderStretch Press
Examples
2007-2008 BOT Plant – Investments
� Panels Structural Assembly
Examples
Riveting Machines
Large Panels Riveting Machine
2007-2008 BOT Plant – Investments
2007-2008 Gavião Peixoto Plant – Investments
Phenom 100 & 300 Final Assembly & Completion Hangar
Phenom 100 & 300 Painting BoothCabinetry Shop Expansion
Gavião Peixoto Plant
2007-2008 Gavião Peixoto Plant – Investments
3Q/2007
1Q/2008
Phenom 100/300 Final Assembly Hangar
Total Area: 130,000 sq.ft
StorageCompletion Center
Supermarket
Final Assembly Line Phenom 100 & 300
2007-2008 Gavião Peixoto Plant – Investments
� Phenom New Painting Booth
2007-2008 Gavião Peixoto Plant – Investments
� E190 Wing and Defense Aircraft Painting Booth
2007 Deliveries
Robots
•Drilling
•Phenom 100/300 Horizontal Stabilizer
•E170 Wing
•E170/190 Fuselage Mating
• Inspection (Composite)
•Painting Preparation (Composite)
Machines (Composite)
•ATL
•Router
Logistic
•Automated Picking
System
2007-2008 Automation Projects
SJK BOT GPX
Robots
•Drilling
• Phenom 100 Wing
• Phenom 300 Wing
Machines
•Riveting
• Panels
• Large Panels
• Phenom 100&300
Nacelle
Robots
•E190 Wing Drilling
Machines
•E190 Spar Automatic
Riveting
Others
EGM
•Welding Robot
ELEB
•Shot Peening Robot
Paperless
Legacy 450/500
•Automatic Structural
Assembly Cell
•Automated Final
Assembly Line
Automation – Investments (1/3)
Wing Automatic Drilling
Phenom 100
Large Panels
Automatic Riveting
E190/195
Fuselage Mating
E170/190
Wing Automatic Drilling
E170/190
Automation – Investments (2/3)
Automatic Tubes Welding
Automatic Stripping Machine
Nacelle Riveting
Phenom 100&300
Bulkhead and Spar
Automatic Riveting Phenom 100
Automation – Investments (3/3)
Positioning
Drilling
Hinges / Drilling
Riveting Complementation Packing
Phenom 100
Start-up in 4Q/08
Phenom 300
� Phenom 100&300 Horizontal Stabilizer Assembly: Lean
Concept Automation
Centers of Excellence, Évora - Portugal
� New units to produce metallic airframe structures and composites
components and assemblies
Legacy 500
• Embraer Products
• Industrial Operation Overview
• January 2007 Scenario
• Industrial Operation Plan
• 2008 Results and Production Readiness
Agenda
Flight Preparation
Tubing
Labor
Outsourcing
Painting
Machining
Sub - AssyBOT
Structural and Final Assembly
Others/New ProductsChemical
Milling
Points of Attention
Under Control
Sheet Metal SJK
Harness
Suppliers
Sheet Metal BOT
CabinetryShop
Composite
Deliveries
Final AssemblyFuselage Equipage
Mating and Complementation
Segments Phenom100/300
Ph100/300 Wing BOT
Wing EquipagePhenom100/300
Fuselage Equipage
Final AssemblyMating and
ComplementationSegments
Legacy/145
Legacy/145Legacy/145 Wing Wing Equipage
Underbelly Tank Assembly
E170/190
E170 DockFuselage Equipage
Fuselage Mating E170/175
Wing EquipageE170 Wing - SJK
Segments E170/190/Lineage
E190 DockFuselage Equipage
Fuselage Mating E190/195
Wing EquipageE190 Wing - GPX
4Q/2008 Scenario - Bottlenecks
jan mar may jul sep nov jan mar mai jul set nov
Overtime - Actual Overtime - Planned
2007-2008 Scenario - Overtime
VOP Overtime
2007 2008
2008 VOP Organization
Industrial
Operation - VP
CEO
Logistics & Production
Control
Gavião Peixoto Unit
Supply Chain Botucatu UnitFabrication SJK/EGM
Product Quality
Final Assembly
SJK
Industrial Strategy
4552 48
0
10
20
30
40
50
60
70
80
90
100
1st Q 2nd Q 3rd Q
2008 Deliveries
Total Planned Deliveries: 195-200 A/C
Phenom 100 Planned Deliveries: 10-15 A/C
A/C
Phenom 100 – Production Readiness
� Status in Oct 29th
Phenom 100/300 Final Assembly Hangar
A/C in final assembly line: 11
Thank You!
Ready to go!