46
November 7 th , 2008 Embraer Day Industrial Operations Overview Artur Coutinho Executive Vice President Industrial Operations

2008* Embraer Day ApresentaçãO OperaçõEs Industriais

Embed Size (px)

Citation preview

Page 1: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

November 7th, 2008

Embraer Day

Industrial Operations Overview

Artur CoutinhoExecutive Vice President

Industrial Operations

Page 2: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Agenda

• Embraer Products

• Industrial Operation Overview

• January 2007 Scenario

• Industrial Operation Plan

• 2008 Results and Production Readiness

Page 3: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Embraer Products

Under Development

ERJ 145

EMBRAER 170 EMBRAER 175 EMBRAER 190 EMBRAER 195

Executive

AviationLegacy 450/500Legacy 600 Phenom 100 Phenom 300 Lineage 1000

Defense

EMB-314 AEW

Comercial

Aviation

F5 BR up grade E190 PR

Under Development

Page 4: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

• Embraer Products

• Industrial Operation Overview

• January 2007 Scenario

• Industrial Operation Plan

• 2008 Results and Production Readiness

Agenda

Page 5: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Embraer - Global Business

• Operations in Brazil, United States, Europe and Asia

BrazilSão José dos Campos

Eugênio de Melo Gavião Peixoto

BotucatuTaubaté

FranceVillepinte

Le Bourget

SingaporeSingapore

USANashville

Fort Lauderdale

ChinaBeijingHarbin

Portugal Alverca

Page 6: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Embraer Industrial Units - Brazil

Brazil

Eugênio de Melo - EGM

BOT

GPX

SJK São Paulo

EGMSão Paulo State

ELEB

São José dos Campos - SJK

TTE

Gavião Peixoto - GPX ELEB Botucatu - BOT Taubaté - TTE

Page 7: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

• Embraer Products

• Industrial Operation Overview

• January 2007 Scenario

• Industrial Operation Plan

• 2008 Results and Production Readiness

Agenda

Page 8: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Jan 2007 Scenario - A Big Challenge

Page 9: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Flight Preparation

Tubing

Labor

Outsourcing

Painting

Machining

Sub - AssyBOT

Structural and Final Assembly

Others/New ProductsChemical

Milling

Sheet Metal SJK

Harness

Suppliers

Sheet Metal BOT

Cabinetry Shop

Composite

Deliveries

Final AssemblyFuselage Equipage

Mating and Complementation

Segments Phenom100/300

Ph100/300 Wing BOT

Wing EquipagePhenom100/300

Fuselage Equipage

Final AssemblyMating and

ComplementationSegments

Legacy/145

Legacy/145Legacy/145 Wing Wing Equipage

Underbelly Tank Assembly

E170 DockFuselage Equipage

Fuselage Mating E170/175

Wing EquipageE170 Wing - SJK

Segments E170/190/Lineage

E190 DockFuselage Equipage

Fuselage Mating E190/195

Wing Equipage

E170/190

E190 Wing - GPX

Bottlenecks

Under Control

Jan 2007 - Bottlenecks Management

Page 10: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

jan feb mar apr may jun jul aug sep oct nov dec

Overtime - Actual Overtime Planned

2007 Scenario - Overtime

VOP Overtime

Page 11: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

• Embraer Products

• Industrial Operation Overview

• January 2007 Scenario

• Industrial Operation Plan

• 2008 Results and Production Readiness

Agenda

Page 12: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2006 VOP Organization

Industrial

Operation - VP

Industrial Operation Planning

Gavião Peixoto Unit

Procurement Botucatu UnitProductionProduct Quality

Logistics

CEO

Industrial Strategy

Page 13: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2007 VOP Organization

Industrial

Operation - VP

CEO

Logistics & Production

Control

Gavião Peixoto Unit

Supply Chain Botucatu UnitFabrication SJK/EGM

Product Quality

Final Assembly

SJK

Industrial Op. Integration

Commercial Aviation

Industrial Op. Integration

Executive Aviation

Industrial Strategy

Page 14: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Introduction to the ‘Lean Concept’

2006� Phenom 100/300 Final Assembly� Production ‘in line’ concept

� Standardized work

� Operator fixed at work station

� Supermarket concept

� Visual management

� Logistic� Delivery at point of use

� Production Control� Only one production order

� Outsourcing� Applied lean concept

SJK Plant

Page 15: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

P3E Program - Lean Concept

Co

nti

nu

ou

s

Imp

rove

men

t C

ell

s

Lean

P

roje

cts

(K

aiz

en

s)

Lean Philosophy

Results

Continuous

Culture

Leadership

People

Page 16: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2007/2008 - Extensive Application of Lean Philosophy

Tubing

Composite

E190 Wing Assembly

Phenom Final Assembly

Supply Chain

Legacy Fuselage Mating

E170/190 Structural Assembly

Surface Treatment

Chemical Milling

Cabinetry Shop

Harness

Page 17: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Harness

Jun/07

May/08

18/ju

n27

/jun

5/ju

l13

/jul

23/ju

l31

/jul

6/ag

o13

/ago

21/a

go29

/ago

6/se

t17

/set

26/s

et2/

out10

/out

18/o

ut26

/out

5/nov

20/n

ov30

/nov

3/ja

n14

/jan

7/fe

v25

/fev

11/m

ar27

/mar

11/a

br24

/abr

19/m

ai5/

jun

18/ju

n

Jun/07 Jun/08

Missing Items – All Programs

Lean Implementation

Released Area: 20%

Page 18: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Harness

Jun/07 Jun/08

Released Area: 20%

� Parts and tools close to their point of use

� Operator's ergonomic improvements

Lean Implementation

Page 19: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Tubing

� Production Increase: 1,400 to 2.000 parts/day

� Released area for future expansions

Mar/08Aug/07

Lean Implementation

Released area

Page 20: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Pylons

E190

� Production Flow Optimization

Mar/08Aug/07

E170

Page 21: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Composite

Mar/08Aug/07

� Working Cell

� Operator fixed on the working place

� Production Visual Management

� Production Increase: over 60%

� Operator’s movements/day: 49

� Walking distance: 3,600 ft

Lean Implementation

Page 22: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Composite Structural Assembly

Aug/07 May/08

� Layout Reviewed: assembly “line” concept

� Operator’s movements drastically reduced

� Visual Management� Production Increase: 121%

Operator’s movements(feet traveled)

Page 23: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Legacy 600 Fuselage Mating

Out/07 Mar/08

� Operator’s movements reduction

� Tool kit organized close to the assembly place

� Parts and tools close to their point of use

Page 24: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Leading Edge Assembly

Aug/07 May/08

� Leading and trailing edges assembly reorganization

� Operator’s movements reduction

� Parts and tools close to their point of use

Page 25: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2007-2008 SJK Plant – Investments

Painting Booth -Composites

Structural Assembly Building - Composites

Wing to Fuselage Mating -E170/190

Examples

New Router Machine -Composite

Page 26: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2007-2008 SJK Plant – Investments

Paint Booth Improvement (F210)

Shot Peening

Paint Booth Retrofit (F41)Examples

Page 27: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2007-2008 BOT Plant – Investments

BOT Plant Expansion

Examples

Skin Panel Fabrication

Hangar

PhenomStructural Assembly

Hangar (2nd)

Structural Assembly

Hangar Expansion

Page 28: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

CalenderStretch Press

Examples

2007-2008 BOT Plant – Investments

Page 29: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

� Panels Structural Assembly

Examples

Riveting Machines

Large Panels Riveting Machine

2007-2008 BOT Plant – Investments

Page 30: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2007-2008 Gavião Peixoto Plant – Investments

Phenom 100 & 300 Final Assembly & Completion Hangar

Phenom 100 & 300 Painting BoothCabinetry Shop Expansion

Gavião Peixoto Plant

Page 31: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2007-2008 Gavião Peixoto Plant – Investments

3Q/2007

1Q/2008

Phenom 100/300 Final Assembly Hangar

Total Area: 130,000 sq.ft

StorageCompletion Center

Supermarket

Final Assembly Line Phenom 100 & 300

Page 32: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2007-2008 Gavião Peixoto Plant – Investments

� Phenom New Painting Booth

Page 33: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2007-2008 Gavião Peixoto Plant – Investments

� E190 Wing and Defense Aircraft Painting Booth

Page 34: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2007 Deliveries

Page 35: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Robots

•Drilling

•Phenom 100/300 Horizontal Stabilizer

•E170 Wing

•E170/190 Fuselage Mating

• Inspection (Composite)

•Painting Preparation (Composite)

Machines (Composite)

•ATL

•Router

Logistic

•Automated Picking

System

2007-2008 Automation Projects

SJK BOT GPX

Robots

•Drilling

• Phenom 100 Wing

• Phenom 300 Wing

Machines

•Riveting

• Panels

• Large Panels

• Phenom 100&300

Nacelle

Robots

•E190 Wing Drilling

Machines

•E190 Spar Automatic

Riveting

Others

EGM

•Welding Robot

ELEB

•Shot Peening Robot

Paperless

Legacy 450/500

•Automatic Structural

Assembly Cell

•Automated Final

Assembly Line

Page 36: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Automation – Investments (1/3)

Wing Automatic Drilling

Phenom 100

Large Panels

Automatic Riveting

E190/195

Fuselage Mating

E170/190

Wing Automatic Drilling

E170/190

Page 37: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Automation – Investments (2/3)

Automatic Tubes Welding

Automatic Stripping Machine

Nacelle Riveting

Phenom 100&300

Bulkhead and Spar

Automatic Riveting Phenom 100

Page 38: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Automation – Investments (3/3)

Positioning

Drilling

Hinges / Drilling

Riveting Complementation Packing

Phenom 100

Start-up in 4Q/08

Phenom 300

� Phenom 100&300 Horizontal Stabilizer Assembly: Lean

Concept Automation

Page 39: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Centers of Excellence, Évora - Portugal

� New units to produce metallic airframe structures and composites

components and assemblies

Legacy 500

Page 40: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

• Embraer Products

• Industrial Operation Overview

• January 2007 Scenario

• Industrial Operation Plan

• 2008 Results and Production Readiness

Agenda

Page 41: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Flight Preparation

Tubing

Labor

Outsourcing

Painting

Machining

Sub - AssyBOT

Structural and Final Assembly

Others/New ProductsChemical

Milling

Points of Attention

Under Control

Sheet Metal SJK

Harness

Suppliers

Sheet Metal BOT

CabinetryShop

Composite

Deliveries

Final AssemblyFuselage Equipage

Mating and Complementation

Segments Phenom100/300

Ph100/300 Wing BOT

Wing EquipagePhenom100/300

Fuselage Equipage

Final AssemblyMating and

ComplementationSegments

Legacy/145

Legacy/145Legacy/145 Wing Wing Equipage

Underbelly Tank Assembly

E170/190

E170 DockFuselage Equipage

Fuselage Mating E170/175

Wing EquipageE170 Wing - SJK

Segments E170/190/Lineage

E190 DockFuselage Equipage

Fuselage Mating E190/195

Wing EquipageE190 Wing - GPX

4Q/2008 Scenario - Bottlenecks

Page 42: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

jan mar may jul sep nov jan mar mai jul set nov

Overtime - Actual Overtime - Planned

2007-2008 Scenario - Overtime

VOP Overtime

2007 2008

Page 43: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

2008 VOP Organization

Industrial

Operation - VP

CEO

Logistics & Production

Control

Gavião Peixoto Unit

Supply Chain Botucatu UnitFabrication SJK/EGM

Product Quality

Final Assembly

SJK

Industrial Strategy

Page 44: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

4552 48

0

10

20

30

40

50

60

70

80

90

100

1st Q 2nd Q 3rd Q

2008 Deliveries

Total Planned Deliveries: 195-200 A/C

Phenom 100 Planned Deliveries: 10-15 A/C

A/C

Page 45: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Phenom 100 – Production Readiness

� Status in Oct 29th

Phenom 100/300 Final Assembly Hangar

A/C in final assembly line: 11

Page 46: 2008* Embraer Day   ApresentaçãO OperaçõEs Industriais

Thank You!

Ready to go!