2
LEASING Jon M. Varholak TRANSWESTERN | RBJ Direct: 617.439.8688 Mobile: 617.733.2294 Email:[email protected] Ron L. Friedman TRANSWESTERN | RBJ Direct: 617.439.6723 Mobile: 781.883.8083 [email protected] Robert L. Byrne TRANSWESTERN | RBJ Direct: 617.933.0163 Mobile: 617.827.7486 [email protected] Perry Beal TRANSWESTERN | RBJ Direct: 617.933.0043 Mobile: 781.635.5941 [email protected] SECOND FLOOR SPEC SUITE 9,213 SF Offices Workstations 6’x7’ Breakout areas Small conference room Pantry Reception Headcount: 52 3 49 2 1 1 1

200 Fifth Ave 2nd floor spec left

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: 200 Fifth Ave 2nd floor spec left

LEASINGJon M. VarholakTRANSWESTERN | RBJDirect: 617.439.8688Mobile: 617.733.2294Email:[email protected]

Ron L. FriedmanTRANSWESTERN | RBJDirect: 617.439.6723 Mobile: [email protected]

Robert L. ByrneTRANSWESTERN | RBJDirect: 617.933.0163Mobile: [email protected]

Perry BealTRANSWESTERN | RBJDirect: 617.933.0043Mobile: 781.635.5941 [email protected]

SECOND FLOOR SPEC SUITE9,213 SF

102 benching stations1 med conf rooms1 small conf rooms3 breakout/meeting areas1 coat closet1 reception desk

3 offices49 6x7 workstations2 breakout spaces1 small conf room1 pantry1 reception

OfficesWorkstations 6’x7’Breakout areasSmall conference roomPantryReception

Headcount: 52349

2111

Page 2: 200 Fifth Ave 2nd floor spec left

A Breath of Fresh Air Sometimes a second look is all it takes to see potential in a place. So take another look at Fifth Avenue at CityPoint, the emerging corporate epicenter of the Route 128 corridor. Enhanced access, amenities, and infrastructure promote a collaborative campus suited for the most forward-looking companies. Flexible office suites are available in existing, spec, or shell conditions.

· Attached to a beautiful 252 acre reserve

· On-site fitness center

· New cafe and social areas

· Cold and hot brew coffee bar with LeanBox healthy snacks

· Shuttle access to all CityPoint neighborhood amenities

· 3 minutes from I-95/128 10 minutes from I-90

200 FIFTH AVENUE AT CITYPOINT

200 FIFTH AVE NUE

INDUSTRIAL: SECOND FLOOR - FINISHES

GENERAL CARPETAVANT CONTRACT - STYLE: PATINA - COLOR: TIBER - INSTALL: QUARTER TURN

ACCENT CARPET - CONFERENCE 210SHAW CONTRACT - STYLE: APPLIED TILE - COLOR: LASER

GENERAL WALL COLORSHERWIN WILLIAMS - FLEUR DE SEL SW7666

ACCENT WALL COLORSHERWIN WILLIAMS - STAMPED CONCRETE SW7655

EXPOSED STRUCTURAL DECK - GENERALSHERWIN WILLIAMS - ARGOS SW7065

EXPOSED STRUCTURAL DECK - OPEN OFFICE 213SHERWIN WILLIAMS - CAVIAR SW6990

RUBBER BASEJOHNSONITE - 63 BURNT UMBER

200 FIFTH AVE NUE

INDUSTRIAL: SECOND FLOOR - LIGHTING

EXPOSED STRUCTURAL DECK - OPEN OFFICE 213SHERWIN WILLIAMS - CAVIAR SW6990

FIXTURE C - GENERAL LIGHTINGBARTCO - BODHI

FIXTURE F & I - RECEPTION 209 AND OPEN OFFICE 213V2 LIGHTING - CORE 300 LX(COLORS SHOWN TO RIGHT)

FIXTURE K - CONFERENCE 102 & 210, OPEN OFFICE 212, AND RECEPTION 101LUMENWERX - VIA 4 LED

FIXTURE L - OPEN OFFICE 212ONE KINGS LANE - RIVERSIDE PENDANT

FIXTURE M - OPEN OFFICE 213BEAUTIFUL HALO - ROPE CHAIN INDUSTRIAL COLORED LOFT GLASS PENDANT - SHADE C

FIXTURE N - OPEN OFFICE 213BARN LIGHTING ELECTRIC - WESCO CORD HUNG LED

FIXTURE O - OPEN OFFICE 213BARN LIGHTING ELECTRIC - CHICKEN WIRE BASKET PENDANT LAMP

EXPOSED STRUCTURAL DECK - GENERALSHERWIN WILLIAMS - ARGOS SW7065

LIGHT BRONZE

OLD COPPER

GENERAL OPEN OFFICE 213

200 FIFTH AVE NUE

NATURE: SECOND FLOOR - FINISHES

GENERAL AT OFFICES / 50% AT OPEN OFFICESHAW CONTRACT - STYLE: ACHROMATIC COLOR: SILVER INSTALL: BRICK AT OFFICES / HERRINGBONE AT OPEN OFFICE

50% AT OPEN OFFICESHAW CONTRACT - STYLE: DUOTONECOLOR: SILVER CHARTREUSEINSTALL: HERRINGBONE

WOOD FLOORING - RECEPTIONBOLE FLOOR - STYLE: BOLE FLOOR ML13 - SPECIES: MAPLE

WOVEN FLOORING - PANTRYFITNICE - STYLE: WICKER - COLOR: TBD

ALL EXPOSED LOWER CABINETSWILSONART - COLOR: MANITOBA MAPLE

SOLID SURFACE COUNTERTOPSLIVINGSTONE - COLOR: PEBBLE BEACH

BACKSPLASH AT PANTRYDALTILE - STYLE: COLOR WAVE GLASS MOSAICCOLOR: AUTUMN TRAIL

ALL EXPOSED UPPER CABINETSFORMICA - COLOR: WHITE - FINISH: GLOSSY

WALL COVERING - COLUMNS IN OPEN OFFICEDESIGNTEX - STYLE: OROS - COLOR: SILVERFROST

ACCENT PAINTSHERWIN WILLIAMS - LUAU GREEN SW6712

ACCENT PAINTSHERWIN WILLIAMS - AMAZING GRAY SW7044

GENERAL PAINTSHERWIN WILLIAMS - NATURAL CHOICE SW7011

EXPOSED STRUCTURAL DECKSHERWIN WILLIAMS - SIMPLE WHITE SW7021

RUBBER BASEJOHNSONITE - 48 GREY

200 FIFTH AVE NUE

NATURE: SECOND FLOOR - FINISHES

GENERAL AT OFFICES / 50% AT OPEN OFFICESHAW CONTRACT - STYLE: ACHROMATIC COLOR: SILVER INSTALL: BRICK AT OFFICES / HERRINGBONE AT OPEN OFFICE

50% AT OPEN OFFICESHAW CONTRACT - STYLE: DUOTONECOLOR: SILVER CHARTREUSEINSTALL: HERRINGBONE

WOOD FLOORING - RECEPTIONBOLE FLOOR - STYLE: BOLE FLOOR ML13 - SPECIES: MAPLE

WOVEN FLOORING - PANTRYFITNICE - STYLE: WICKER - COLOR: TBD

ALL EXPOSED LOWER CABINETSWILSONART - COLOR: MANITOBA MAPLE

SOLID SURFACE COUNTERTOPSLIVINGSTONE - COLOR: PEBBLE BEACH

BACKSPLASH AT PANTRYDALTILE - STYLE: COLOR WAVE GLASS MOSAICCOLOR: AUTUMN TRAIL

ALL EXPOSED UPPER CABINETSFORMICA - COLOR: WHITE - FINISH: GLOSSY

WALL COVERING - COLUMNS IN OPEN OFFICEDESIGNTEX - STYLE: OROS - COLOR: SILVERFROST

ACCENT PAINTSHERWIN WILLIAMS - LUAU GREEN SW6712

ACCENT PAINTSHERWIN WILLIAMS - AMAZING GRAY SW7044

GENERAL PAINTSHERWIN WILLIAMS - NATURAL CHOICE SW7011

EXPOSED STRUCTURAL DECKSHERWIN WILLIAMS - SIMPLE WHITE SW7021

RUBBER BASEJOHNSONITE - 48 GREY

EMBRACING THE NEW WORKDAY SECOND FLOOR SPEC SUITE INDUSTRIAL + NATURE