46
Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110. Telephone No.(02836) 242656 Fax No.(02836) 241588 Web site: getcogujarat.com Email: [email protected] 1 Sr. No. DESCRIPTION 1 Tender Notice 2 Required Documents – Technical Bid 3 Section-I Special instruction to the tenderer. 4 Section-II General terms & Conditions. & safety bond 5 Section-III Commercial terms & Conditions. 6 Modality of shifting of control Room of 220 KV Anjar 7 list of new panels to be erected & control cables 8 constructional details of bay marshalling kiosks 9 Specification of work 10 safety related terms & condition 11 Schedule – VI : Schedule-B & price schedule

2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

  • Upload
    dothuan

  • View
    218

  • Download
    2

Embed Size (px)

Citation preview

Page 1: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

1

Sr. No.

DESCRIPTION

1 Tender Notice

2 Required Documents – Technical Bid

3 Section-I Special instruction to the tenderer.

4 Section-II General terms & Conditions. & safety bond

5 Section-III Commercial terms & Conditions.

6 Modality of shifting of control Room of 220 KV Anjar

7 list of new panels to be erected & control cables

8 constructional details of bay marshalling kiosks

9 Specification of work

10 safety related terms & condition

11 Schedule – VI : Schedule-B & price schedule

Page 2: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

2

Tender no. : Anj/e-Tn - 46/2015

Superintending Engineer, Transmission Circle GETCO Anjar invites “On line Tenders” (e-

tendering) for the Work of 220KV Control Room shifting at 220KV Anjar Substation under TR Div

Anjar “from registered contractors in appropriate class with GETCO/Central/State Government/Railway/Semi. Govt. and who has executed similar nature of work successfully as mentioned in Qualification requirement criteria given in the tender document. Bidders should fulfill all the qualification criteria. Otherwise their bids will not be considered & price bid will not be opened. All the bidders should have valid e-tender vender registration. Tender papers & specifications may be down loaded from web site https://getco.nprocure.com (for view, download and online submission) and GUVNL/GETCO websites www.gseb.com & www.getcogujarat.com (for view & download only). Tender fee may be paid along with submission of tender in EMD cover, for respective tender. “All the relevant documents of tender to be submitted physically will be received only by registered Post A.D. or Speed Post addressed to :

The Superintending Engineer (TR) Gujarat Energy Transmission Corporation Limited.,

Circle office GETCO – Anjar, Near ST stand , First Floor Anjar – 370110 District : Kutch, Gujarat

“NO COURIER SERVICE OR HAND DELIVERY” will be allowed. Sr.No. Name of work Estimated

Cost Rs. Time limit

Tender Fee Rs.

EMD Rs. Approx. Class

1.

Work of 220KV Control Room shifting at 220KV Anjar Substation, under TR DO anjar

1545017.02 4 Months

1500.00 15450.00 As per norms

1 On line (e-tendering) tender/offer submission last date up to 16:00 hours only (This is mandatory)

21.07.15

2 Physical submission of all the relevant documents, last date up to 14:00 hrs. by RPAD or SPEED POST only.

23.07.15

3 Date of opening of Tender Fee, EMD cover, and technical bid physical as well as – on line opening at 16:01 hrs.

24.07.15

4 Tentative Date of online opening of price bid Shall be intimated separately.

IMPORTANT:

1. All the relevant documents as per requirement of the tender also to be submitted physically i.e.

Technical bid, Qualification requirement data, detail specification along with the Tender Fee, EMD

cover in sealed cover superscripted with the Work of 220KV Control Room shifting at 220KV

Anjar Substation, under TR DO anjar & tender notice no Anj/e-Tn -46/2015.) on or before

due date and time. All such documents should be strictly submitted by RPAD/SPEED POST only.

Otherwise the offer will not be considered and no any further communication in the matter will be

Page 3: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

3

entertained. The tender in physical form is to be submitted in single copy only. (The price bid

is not to be submitted with the physical documents).

2. Any deviation found in Data/Details/Documents in on line offer (e-tendering) and physically submitted

documents (Tender document fee, EMD, Vendor Registration, Technical and commercial documents

etc.) of bidder, offer of the same bidder will not be considered and no any further communication in

the matter will be entertained. Physical copy is for reference only and tender will be evaluated on

Data/Details/Documents of the “on line” offer. For any discrepancy between online & physical

bid, online bid is considered as final.

3. It is mandatory for all the bidders to submit their tender documents by both forms viz. on-line (e-

tendering) and physically in schedule time. If tender documents submitted in only any one form, say

either by online or physically, in that case the same tender will not be considered.

4. The bidders are required to fill up all the online appendices (annexure)/forms. This is intended for

transparency and speedy evaluation of the bids. Instead of simply confirming/attached in bid/refer

physical offer, the bidder shall fill in the particulars against appropriate place in respect of each line

appearing in each online annexure. Wherever required, bidder shall invariably have to submit

supporting authentic documents in the physical bid.

(In the absence of required details in the online annexure, the purchaser has every right to evaluate the bids accordingly and bidder cannot raise any objection against any point during evaluation.)

5. Bidders are requested to remain in touch with the web site for any amendment/corrigendum or

extension of due date etc.

6. No tender shall be accepted/opened in case of receipt after due date and time of tender, irrespective

of delay due to postal services or any other reasons and the Corporation shall not assume any

responsibility for late receipt of tender.

7. The Earnest Money Deposit and tender fee will be accepted by Demand Draft on any Nationalized

Bank only situated at ANJAR drawn in favor of “GUJARAT ENERGY TRANSMISSION

CORPORATION LTD.” Tender without EMD and tender fee shall be rejected. Two separate demand

draft for Tender fee and EMD should be submitted with technical bid.

8. The GETCO reserves the right to award the work to one or more bidders, considering their technical

and financial capacity OR to reject any or all tenders or accept any tender without assigning any

reason thereof.

Any technical questions, information and clarification that may be required pertaining to this enquiry should be referred to: The Superintending Engineer (TR), Gujarat Energy Transmission Corporation Limited., Circle office , Anjar. GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof. ( To view the PDF file please use “Acrobat Reader” software which can be download from web ) Superintending Engineer (TR) GETCO CO Anjar

Page 4: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

4

Following document copies are required to be attached along with Technical Bid:-

1. Copy of Provident Fund No: 2. Copy of Service Tax registration No. 3. Partnership deed copy, if any 4. Power of attorney if given 5. Experience Certificate of similar work carried out 6. Registration class approved GETCO. 7. Pan card no. 8. List of tools & tackles available for the work. 9. Payment of tender Fee & EMD by DD in favour of GETCO Anjar. 10. Copy of VAT No. 11. Latest solvency certificate

Signature of contractor with Seal & Date. Superintending Engineer (TR).

GETCO, Anjar.

Page 5: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

5

SECTION – I

SPECIAL INSTRUCTIONS TO TENDERERS

1. The tender should be submitted in original & Tender Notice no. may be quoted on envelop. Technical bid filled and sealed in to separate cover marked ’’Technical Bid”. Rates should be quoted online only.

2. The tenders may be sent by Registered Post/Speed Post only as to reach this office on or

before up to 16:00 hours. Due care should be taken to see that the tenders sent by post are posted well in advance to ensure the delivery by the prescribed date or even earlier.

Tenders which are received late after due date of receipt, will not be considered. 3. The tenderer who offers the lowest in percentage (%) i.e. lowest total amount will be

awarded/recommended for placement of order. Item wise lowest % / value will not be considered for placement of order.

4. Failure to furnish full and complete details or furnishing vague information will make the

tender liable for rejection. The tenderer is at full liberty to give information about his capacity and establishment to execute the work/contract.

5. The offer should be valid for a minimum period of 180 days from the date of opening of

Tender.

6. The Technical bid shall be opened on Dt. ----------at 16:00 hours in the office of Superintending Engineer (TR), GUJARAT ENERGY TRANSMISSION CORPORATION LTD, Transmission Circle, ANJAR (if possible).

7. The tenderer offering their “Technical Bid” against this specification should satisfy following

criteria. The proof of such criteria be submitted in the “Technical Bid”. 8. The tenders are to be submitted by the intending bidders with forwarding letter on their letter head

showing list of documents attached with the tender duly signed by Authorized Person of their firm, affixing stamp of their firm, in single envelop with separate sealed and super scribed envelope

Stamp & signature of Contractor Superintending Engineer (TR),

GETCO, ANJAR

Page 6: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

6

SECTION – II

GENERAL TERMS & CONDITIONS

01 VALIDITY :

The rates for the work quoted by the contractor will be valid for the period of SIX MONTHS from the date of opening of the tenders.

02 PAYMENT OF SECURITY DEPOSIT :

The contractor will have to pay the security deposit at 5% of the order value. On placing the order 2.5% will have to be paid by Demand draft drawn in fever of GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Within seven days from the date of the issue of work order and remaining 2.5% will be recovered from list two running bills.The SD can also be paid by auto renewal FDR of any scheduled bank in the name contractor & not in the name of company, i.e it shall be GETCO A/C.

03 SIGNING OF AGREEMENT :

The contractor will have to sign agreement as per GETCO’s rule, in the prescribed Performa of the GETCO. The cost of the required stamp paper will have to be born by the contractor.

04 PAYMENT OF BILLS :

Normally one R.A.Bill will be paid every Month. However looking to the progress of the work it will be reviewed full way. The 90% cost of the work done will be paid to the contractor on his presentation of R.A. bills along with giving the material account and singing the joint measurement of the work done with our D.E.(TR/Const.) concerned. The bill should be submitted to the D.E.(TR/Const.) concerned with a copy to the E.E.(TR/Const.) concern. The final bill will be prepared by our D.E.(TR/Const.) concerned within about fortnight from the date of completion of the work by the contractor. The contractor have to submit the final bill with complete material account of the work contract to enable the D.E.(TR/Const.) for submission to E.E.(TR/Const.) for passing and payment thereof.

05 DEPARTURE FROM SPECIFICATION AND DRAWINGS :

Should be tenderer wish to depart from the specification in any respect, they should draw attention to such departure giving his reasons thereof and should get approved the case. However, in case of any clarification the decision of Engineer-in-charge will be final and binding.

06 AVAILIBILITY OF MATERIALS AND IDEAL LABOUR CHARGES :

Most of the materials are readily available and arrangements are made to procure the rest. However, the contractor should be prepared to carry out the work as and when the materials are received. No idle labour arises due to want of any materials will be allowed. However, this idle period will be counted for the period of assessing the limit for completing of work as mentioned in the work order.

07 Board does not accept any responsibility as regards to factory acts or any other acts. Rules

or regulations that have to be observed by the contractor for carrying out the work. 08 The contract will be governed by the General condition of works contract of the GETCO. A

Page 7: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

7

copy of booklet will be available along with the tender, the contractor is deemed to have studied the same thoroughly before filling up the tenders.

10 PROGRESS OF WORK AND PENALTY: If it is found that the work is unsatisfactory or not progressing as per schedule, then any action be taken by the GETCO as may be deemed fit to see that work is completed at the risk and cost of contractor. If the work is not completed within the schedule period 1/2 % penatly per week of the balance value of the work subject to the maximum of 10% will be levied.

11 SPECIAL CONDITIONS OF THE CONTRACTOR : (a) The undersigned reserve the rights to reject any or all the tenders without assigning any

reasons thereof. (b) The tenderer should furnish the tender along with the details of past experience of such

erection works handled by him. (c) The tenderer will abide by any fulfill all the terms and provisions of the tenderer and

contractor for works as applicable and in case of any default there to the GETCO shall forfeit the deposit etc. and the money due in respect of completion of works through other agency on failure of tenderer to complete the work as required in the order.

12 BANK GAURANTEE OR SOLVENCY CERTIFICATE :

The successful contractor will have to produce Bank Guarantee or solvency certificate at the value 20% of the contractor value and shall have to execute the agreement on the stamp paper as may be required as per the rules of GETCO in force.

13 SPECIAL CONDITION OF CONTRACT : (a) Should this tender be accepted, I/We hereby agree to abide by and fulfill all the terms and

conditions of the Tender contractor for work’s as applicable and in default thereof to forfeit and pay GETCO the same sum of money due.

(b) The full value of the “Earnest Money Deposit’ paid herewith should be absolutely forfeited by the GETCO. Should I/We not deposit the full amount of specified security deposit.

15 TIME LIMIT :

The work will have to be completed within 4 months and tender have to complete the same within the time limit only. The time is the essence of this contract, the same will have to be adhered to the tenderer otherwise the penalty as per the GETCO’s rules will be recovered which should be noted.

16 SPECIAL NOTES: 1. The rate should be quoted both in words and figures as per units specified in the tender.

Should there be any discrepancy between the rate a quoted in words and figure, the rate quoted in words shall prevail. Further should there be any discrepancy between rates and amount the rates will prevail.

2. Quantities mentioned in scheduled are approximate and before ordering any materials prior

permission from the Deputy Engineer in-charge shall be taken and nothing extra will be paid for the material collected in excess.

Page 8: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

8

3. Two books viz. tender and contractor for works and detailed specification for various Civil

Engineering works are available for reference in this office. The contractors quoting for this tender are deemed to have gone through both these books and same will be treated as binding upon them.

17. TERMS AND CONDITIONS REGARDING INDUSTRIAL LAW AND RELATED MATTERS

TO BE INCORPORATED IN THE TENDER DOCUMENTS:

1. WAGES TO BE PAID IN TIME BY THE CONTRACTOR. The contractor shall pay minimum of Rs. 25-15 per day or as may be specified here after or rates fixed under the minimum wages act whichever is higher. The wages of every contract labour employed by him under this contract shall be paid by him before the expiry of 7 days of the last day of the month in respect of which the wages are payable i.e. wages of a month have to be paid by him before the first week of the next month. The payment shall be disbursed in the presence of management representative during the work hours in factory premises and the contractor shall get the entries certified in the register of wages by the representative of the GETCO. Any default will result in cancellation of the contract forth with or else the contractor shall be punishable to the extent of Rs. 100-fine per each day.

2. The contractor shall give his telephone number and address to the GETCO so that incase of

labour trouble etc. the contractor can be contacted the contractor shall arrange to have his office the factory premises and the contractor keep himself present through the working hours.

3. LABOURS LAWS:

(a) Person below the age of 18 years shall not be employed for this work.

(b) No female worker shall be employed in the night shift between 7p.m. to 6 a.m..

(c) Contractor shall maintain a valid labour lenience under the contractor Labour(Relation and abolition) Act for employing necessary manpower to required by him in the absence of such license the contract shall be liable to be terminated without aligning any reasons thereof.

(d) The contractor shall at his own expenses comply with all labour laws and keep the

GETCO indemnified in respect thereof. Some of the major liabilities under various labours and industrial laws which the contractor shall comply which are as under.

Page 9: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

9

(1) Payment of contribution by way of employer’s contribution towards provident payment fund Family Pension Scheme, Deposit Scheme deposit liked Insurance Scheme administrative charges etc. at the rates made applicable from time to time by Government of Gujarat/Government of India or other statutory authority.

(2) Payment of deposit in respect of each contract labour at the rates of Rs. 30/- with the

office of the Commissioner of the labours per the contract labour (Regulation and Abolition Act)

(3) License fee as prescribed under the contract Labour (Regulation and Abolition) Act

rules formed there under depending upon the number of workmen employee be the contractor.

(4) Paid leave facility and wages as per provision of the factories Act and the rate of one

day for every 20 days of working. (5) Identity cards as prescribed under the factories Act. With photo affixed there to the

same for identification. (6) Payment of retrenchment compensation Notice pay other liabilities as per industrial

disputes Act any payment to the contractor’s employees arising out of any claim of disputes under the industrial disputes Act 1947 or any other labour laws.

(7) Payment of compensation in case of accidental injury. (8) Provision of charge if the female labours employed are more than 30 members. (9) Maternity leaves as per the provision of the Maternity benefit Act.

4. PROVIDENT FUND AND FAMILY PENSION SCHEME: The contractor shall submit along with his bill(month wise) statement regarding deduction against employees provident fund and family pension scheme in respect of each concerned employees provident fund and family pension scheme at the rate of Rs. 8.33% (or at the rate made applicable by the Government form time to time) of the wages the contractor’s contribution and his workers contribution towards provident fund and family pension scheme shall be deposited by the contractor with Regional provident Fund commissioner, Ahmedabad.

5. DEPOSIT LINED INSURANCE SHCEME: The contractor shall have deposit ½% of the wages in respect of a employees who is member of the Provident fund as the contribution to the deposit link insurance scheme with Regional Provident Fund Commissioner, Ahemadabad.

6. ADMINISTRATIVE CHARGES:

Administrative charges for maintaining provident Fund Administrative A/c shall be deposited by the contractor with Regional Provident fund Commissioner, Ahmedabad at the rate applicable.

7. PAID LEAVE FACILITY: Paid leave facility at the rate of one day for every twenty days worked by the contractor labour shall be provided by the contractor to his workers. He shall maintain leave Record,

Page 10: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

10

Leave cards for individual labourer which shall be duty verified and approved/certified by the authorized officer of the GETCO.

8. Workmen’s Compensation Fund and Employer’s Liabilities Insurance. The contractor shall cover all his employees under workmen’s compensation Fund and under the liability insurance.

9. The contractor shall employ adequate number of experienced staff at site for daily supervision and for maintenance of various registers and records required under the law and contract. No payment for supervision shall be admissible under the law and contract. No payment for supervision shall be admissible.

10. CONTRACT TO INDEMNITY THE BOARD:

The contractor shall identify the GETCO and every member office and employees of GETCO also Engineer-in-charge and his staff against all actions proceeding claims, demands costs and expenses what so arising out of or in connection with the matter referred in here in above elsewhere and against all actions proceedings claims demands cost and expenses which may be made against the GETCO of Government for or in respect of or for manse of his obligation under the contract documents. The GETCO shall not be liable for or in respect of or in consequence of any accident or injury to any workmen or other person in the employment of any accident or injury to any workmen or other person in the employment of the contractor or sub-contractor and the contractor shall indemnity any keep indemnified the GETCO against all such damage and compensation so ever in respect thereof or in relation thereof.

11. WORKMENS COMPENSATION AND EMPLOYER INSURANCE: Insurance shall be affected or the entire contractor’s employee engaged in the performance of this contract if any of the work is subject the contractor shall require the sub-contractor to provide workmen’s compensation and employee. Liability Insurance for the letter’s employees unless employee are covered under the contractor’s insurance.

12. The GETCO reserves the right to terminate this rat contract at any time during its tendency without giving notice of termination or any reasons thereof.

13. The GETCO will be entitled to deduct directly from the bills to be paid to the contractor any sums payable by you and which sums the GETCO is required to pay as a principal employer on account of your default in respect of all liabilities referred to in above clause.

14. SAFETY CUM INDEMNITY BOND

(On Non-judicial Stamp paper of value not less than Rs. 100.00) KNOW ALL MEN BY THESE PRESENTS that we, _______ by this SAFETY CUM INDEMNITY BOND Executed on this _____________ Day of _________ 2013. I/We Having Registered Office _______________________________(herein after called “THECONTRACTOR” which expression shall mean and includes my /our heirs, executors, administrators and legal representatives, successors and permitted assigns) do hereby binds myself/ourselves and also our company/firms after having the power to bind by this promise and undertaking in favour of the Gujarat Energy Transmission Corporation Limited (GETCO), Vadodara a State Transmission Utility under The Electricity Act, 2003 having its registered office at Sardar Patel Vidyut Bhavan, Race course, Vadodara.( hereinafter called as GETCO, which expression

Page 11: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

11

shall mean and include its legal representative, administrators assigns) has agreed under the terms and conditions of the contract no.______ dated_______made between __________ and ___________for the contract of the ____________value of Rs. __________ interalia on production of Safety Cum Indemnity Bond. We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to time to the extent of Rs.______ Rupees________only against any losses or damages, costs, charges and expenses caused to or suffered by reason of the CONTRACTOR while Project, R&M, O&M work including work carried out by outsourcing agency, failing to take proper care or not complying the guidelines given hereunder as per Annexure-A and instructions which may be given from time to time during the continuance of the contract and we further undertake to unconditionally pay the amount claimed by the GETCO on demand and without demur to the extent aforesaid. Whereas the CONTRACTOR has/have been awarded to execute the job/works under order no._____, dated ______ for _________ issued by the GETCO after having observing necessary formalities, the details of which is described in the order no.______ dated ______ and whereas the said job/works will be /likely to be done in places covered under Employees’ State Insurance Act,1948 (ESI) and /or the Workmen Compensation Act,1923 and /or other laws relating to the Labour Management and Welfare Act. (Respective Amendments) And whereas according to the condition of the Contract the CONTRACTOR is under obligation to execute this Safety cum Indemnity Bond before the commencement of actual execution of work Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the guidelines as per Annexure-A prepared by the GETCO. Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether there has been any breach of the guidelines as per Annexure-A of this bond and as to the extent of the loss, damages, costs, charges and expenses caused to or suffered by the GETCO. We the CONTRACTOR further agree that our liability under this bond shall not be discharged because of the change in the constitution of the GETCO or for the extension of the time limit or for any other reason. We the CONTRACTOR further agrees to the given terms and conditions

a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the GETCO from all claims, actions, proceedings and risk, damage danger to any person whether belonging or not belonging to the. CONTRACTOR.

b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation, damages any proceedings in respect of any of its employee / workmen under the Workmen Compensation Act or any other laws for the timebeing in force.

c. That, if during the course of execution of work as stated in the contract order mentioned hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not complied with guidelines as per Annexure-A or terms and conditions / formalities within the meaning of Employees’ State Insurance Act,1948 (ESI) or Workmen Compensation Act 1923 or any other laws relating to the Labour Welfare for the time being in force, and also has not observed the safety norms in accordance with the law prevailing at the place of work/job to the satisfaction of the GETCO, the GETCO shall have the right to stop the execution of work/job and the period of such stoppage shall not be taken into account for the calculation of the total period of completion of work for which the CONTRACTOR is responsible to complete the work/job and it will be deemed that discontinuance was due to default of the CONTRACTOR .

Page 12: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

12

d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay any such compensation mentioned hereinabove, whether on failure of the CONTRACTOR or for any other reason, the GETCO shall have the right to recover the said amount from any amount receivable by GETCO or any bank guarantee deposited or anything payable whether in connection with this contract or other contract by the CONTRACTOR to the OBLIGEE.

e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated violation of any guidelines as per Annexure-A and terms and conditions mentioned in this Safety cum Indemnity Bond, GETCO shall have right to terminate the contract of work issued to the CONTRACTOR .

f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of agency or outsider due to negligence or non-compliance of GETCO safety norms then in addition to the compensation and liability as per statutory requirement, contractor / agency is hereby agreed to pay the penalty amount as given below: Sr. No Amount of Contract in Rs. Penalty amount 1 Up to _1 Lac Rs.5000/- 2 Above1 Lac to _ 10 Lacs Rs.40000/- 3 10 to --_ 100 Lacs Rs.100,000/- 4 100 Lacs 1.0 % of contract value

g. I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for settlement of claims under this Safety Cum Indemnity bond the courts in Gujarat State wherever job/work is performed or as per GETCO norms shall have the jurisdiction to decide the rights & liabilities of the parties while adjudicating the matter of claims under this Safety Cum Indemnity Bond.

h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the GETCO in Writing on the CONTRACTOR’s application after the Contractor has discharged all his obligations under the order mentioned hereinabove and submitted a “NO DEMAND CERTIFICATE” from the GETCO under the said order. The Safety cum Indemnity Bond shall be valid for a CONTRACT PERIOD and renewable thereof (Claim Period).

i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are in addition to And not by way of limitation or substitution for any other guarantee, indemnities Hereto before given to the GETCO by the CONTRACTOR and this indemnity does not Revoke or limit such indemnities or guarantees. IN WITNESS WHEREOF the Parties hereto have executed this indenture the day the year First hereinabove written.

---------------------------- (Signature with seal of The CONTRACTOR) In the presence of:

1. 2. .

Page 13: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

13

ANNEXURE-A OUR ENDEVOUR - Safety a habit

To create environment where Business Confidence is built through Best Business Practices and is fostered in an atmosphere of trust and respect between providers of goods and services and their users for the ultimate benefit of society a the nation, safety guidelines are agreed upon by the agency as under. Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while execution of works in indoor and outdoor systems of GETCO, the following guideline and preventive measures are identified.

Indoor safety precaution Outdoor safety precaution

The method of work required T&P and manpower should be discussed between GETCO supervisor, contractor’s supervisor and gang leaders.

The method of work required T&P and manpower should be discussed between GETCO supervisor, contractor’s supervisor and gang leaders.

Prior to execution of work a joint survey must be conducted by GETCO supervisor and contractor’s supervisor for risk assessment. ��Clearly identify the work location, to distinguish between the equipment that is dead and other equipment / part that may be live. ��Disconnect equipment from supply. ��Protect against other live parts. ��Take special precautions when close to bare conductors / Bus bar

Prior to execution of work a joint survey must be conducted by GETCO supervisor, contractor’s supervisor and DISCOM line man in order to identify the following : a. HT/LT line or tap line crossing under each span of line of the work. b. Isolation point of each line crossing. c. Each line crossing & isolation point under each span must be discussed and noted in maintenance register with sketch.

Following safety guidelines are mandatory for all contractors operating in GETCO premises for Electrical, non-electrical & civil works. 1. The contractors must provide advance planning of work to concerned in-charge of substation in writing. 2. Before starting any work whether switch yard, “permit to allow to work” must be taken from control room in-charge. 3. Utilizing Electrical / non-electrical equipments, safety rules must be implemented. 4. If the work is to be carried out on Sunday or public holiday, the necessary permission must be taken in advance, requesting in writing.

Contractor’s supervisor and GETCO Supervisor must ensure all isolations physically with adequate earthing technically prior to give clearance to gang leader for taking up job. While execution of stringing work, the identified line crossing must be isolated / de-energized and written clearance should be obtained from concerned DISCOM supervisor. The isolation of Tap line must be physically seen and verified by Contractor and GETCO supervisor. At D.O. fuse junction contractors person should be posted to ensure that no person restore D.O. supply while work is under execution Contractor’s supervisor must ensure that concern officer take LCP for EHV line and

Page 14: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

14

5. Unwanted person including children of labours will not be allowed at working site/ in the switchyard and in the prohibited area. 6. Any electrical work or electrical connections to equipment for any other work must be carried out by certifiedelectrician/wiremen with adequate size of wire through MCB as per I.E. Rule. - Live penal area / bus bar must be isolated and sealed / bifurcated with red colour tape for visible warning. - Display Board must hang on LCP panel. - Transformer must be switched off whenever and wherever contractor and line workers are not satisfied with isolation, earthing or any equipment performance of GETCO, it will be pointed out and work shall begin only after resolution. Contractor shall not take up job in absence of GETCO authorized person. All wire temporary connection & material whenever erection activity has any connection and disconnection work of bus bar, string bus.

power line crossing.

All workers / labour of contractor & supervisors must use personal protective equipment (PPE) during the work like gloves, safety belt, Safety shoes, Helmet, earthing rods, etc, duly approved by GETCO.

All workers / labour of contractor & supervisors must use personal protective equipment (PPE) during the work like gloves, safety belt, Safety shoes, Helmet, earthing rods, Live line detector etc, duly approved by GETCO.

The local earthing must be done at the place of work before execution of any work.

The local earthing must be done at the place of work before execution of any work.

11 kV breaker in panel must be switched off and racked out only after ensuring no voltage in breaker and without door opening.

Circuit breaker opening is not an isolation and isolator on either side must be opened. No work during rains and cloudy weather condition.

Transmission line activities. 1) Used of Voltage detector to ensure outage. 2) Earthing at three point, local, left & right side of bus bar / string bus. 3) Match line colour code with colour of wrist band.

Page 15: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

15

Local earthing of electrical equipments like filter M/c, welding machine, testing kits etc. is must. Crane shall only be used for material handling and erection. Working platform shall only be used for work in switchyard

Stamp & Signature of Contractor Superintending Engineer (TR),

GETCO, ANJAR

SECTION – III

COMMERCIAL TERMS & CONDITIONS 1. Bidders who are authorized dealers of approved principal supplier and who have executed

such works successfully of jobs are entitled to obtain the Tender only. 2. Only those Vendors who have applied for registration with GETCO, H.O. Vadodara will be

issued the tenders upon production of the receipt of payment of registration fees. 3. Copy for valid registration with RPFC with PF code no. should be submitted along with the

tender without fail. 4. The quantities of work to be carried out will be according to the required site conditions. The

amount of works executed will be calculated at the rate given in the schedule of order. 5. The contractor shall be responsible for the breakages/losses and theft of materials from site

and the appropriate cost will be recovered from the contractor for any damage/loss to the GETCO’s equipments.

6. As regards damages to the materials/equipments and worker of the Contractor, the

contractor will only be responsible and the Contractor is liable to pay compensation as per the “WORKMAN COMPENSATION ACT”.

7. The Tenderer has to produce experience Certificate of the requisite order value along with

the tender. Offers without the same will be liable for rejection.

8. The competent authority can delete any item in the schedule of Tender if he feels that the rate quoted by the Contractor for that particular estimate are abnormally high.

9. The successful tenderer will have to pay the security deposit of 5% value of the work contract.

Page 16: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

16

10. The contractor will be covered by the GETCO’s general conditions working contract. 11. The GETCO does not bind itself to accept the lowest of any tender. The undersigned

reserves the right to reject/accept any tender without assigning any reason whatsoever.

12. The payment shall be made against the work carried out as per the actual requirement. & I.T. will be ducted as per prevailing rules.

13. The party has to carry out the work immediately and the sub-order will be issued by the concerned EE (TR)/ (Const.)

12. In the event of any damage, theft, loss, pilferage, fire etc. contractor will be responsible to lodge, pursue and settle all the claims with the insurance company for all items, materials and the corporation shall be kept informed about it. Contractor shall replace the lost/damaged materials/items promptly irrespective of the settlement of the claims by underwriter and ensure that the work progress is as per agreed schedule. The loss, if any, such replacement will have to be borne by the contractor and Board will not entertain any claim/representation in this regard. However it will be contractor’s responsibility to insure the entire project till the line is taken over by the Board.

13. Terms & conditions of Welfare cess

• As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items for

supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects

and civil works.

• Contractor shall get registered under Welfare Cess Act before commencement of work. Office of the

Factory Inspector is authorized at present as a registering authority.

• The welfare cess@1% is considered in the price schedules so, the bidders are requested to quote

accordingly.

• GETCO shall pay the welfare cess by way of reimbursing to contractors on production of

documentary evidence of payment.

• The contracts for which supply or part supply of material are in the scope of GETCO, then

contractors shall deposit welfare cess on estimated cost of supplied items to GETCO on progressive

basis of utilization. As this part of welfare cess is on GETCO account, the same shall be reimbursed

to the contractor on receipt of request letter along with documentary evidence of payment. For

calculation of welfare cess on supply part, valuation as per MR shall be taken and informed to the

contractor for payment. This will be over and above the A/T value.

The modality of payment/ reimbursement of welfare cess will be as under.

• On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and

submit the documentary evidence to the concern office.

• Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence

of registration. Only thereafter, the bill will be processed for payment.

• Before release of payment of subsequent R.A.Bills, the contractor has to submit the documentary

evidence of payment of welfare cess of previous R.A.Bill.

Page 17: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

17

• Before release of payment of final bill,the contractor has to submit documentary evidence of

payment of welfare cess of previous R.A.Bill as well as of this final bill.

• If the R.A.Bill happens to be first and final bill, then before release of payment, contractor has to

submit documentary evidence of registration under Welfare Cess Act and evidence of payment of

welfare cess.

• The welfare cess shall be reimbursed to the contractor on submission of copy of documentary

evidence of payment by observing due formalities.

Stamp & Signature of Contractor Superintending Engineer (TR),

GETCO ANJAR

Page 18: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

18

MODALITY OF SHIFTING OF 220KV ANJAR CONTROL ROOM

Shifting of 220KV Feeder Panel .

220KV Kukma Line 1 Day 1st - 1. B.M.K. box erection work.

2. DCDB Panel erection with DC supply double source from old CR 110V Battery Charger

1 & 2

3. New 220KV feeder bay panel erection work at new control room.

4. LT panel erection and commissioning.

Day 2nd

- 1. Laying of All Control Cable i. e 19C X 2.5sqmm & 12C X 2.5sqmm , Battery Cable

laying work

with noting down before dismantling wiring of panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

at

Panel & BMK box, feruling etc. (1’st , 2’nd day planning W/o outage )

Day 3’rd - 1. 220KV Anj- Kukma Line No. 1 SHUT DOWN of feeder bay , old M.K. Box cable

removal and

termination to new spare 220KV erected panel

2. PLCC panel removal , 48V supply taken from existing charger to new C. Room

Day 4th

- 1. Complete termination including PLCC , testing & line charge new feeder panel as 220KV

Anjar - Kukma Line No. 1. (3’rd ,4’th day planning With outage )

220KV Kukma Line 2

Day 5th

- 1. Spared 220KV Kukma 1 panel wiring removal dismantling work shifting at new CR

erection

work as 220KV Anj – Kukma Line No. 2

2. B.M.K. Box erection work.

Day 6th

- 1. .Laying of All Control Cable i. e 19C X 2.5sqmm & 12C X 2.5sqmm , Battery Cable

laying

work with noting down before dismantling wiring of panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

at

Panel & BMK box, feruling etc. (5’th , 6’th day planning W/o outage )

Day 7th

- 1. 220KV Anj- Kukma Line No. 2 SHUT DOWN of feeder bay , old M.K. Box cable

removal and

termination to new spare 220KV erected panel

2. PLCC panel removal , 48V supply taken from existing charger to new C Room

Day 8th

- 1. Complete termination including PLCC , testing & line charge new feeder panel as 220KV

Anjar - Kukma Line No. 2. (7’th ,8’th day planning With outage )

Page 19: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

19

220KV Welspun

Day 9th

- 1. Spared 220KV Kukma 2 panel wiring removal dismantling work shifting at new CR

erection

work as 220KV Welspun panel.

2. B.M.K. Box erection work.

Day 10th

- 1.laying of All Control Cable i. e 19C X 2.5sqmm & 12C X 2.5sqmm , Battery Cable laying

work

with noting down before dismantling wiring of panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end

termination

at Panel & BMK box, feruling etc. (9’th ,10’th day planning W/o outage )

Day 11th

- 1. 220KV Anj- Kukma Line No. 1 SHUT DOWN of feeder bay , old M.K.Box cable

removal and

termination to new spare 220KV erected panel

2. PLCC panel removal, 48V supply taken from existing charger to new CRoom

Day 12th

- 1. Complete termination including PLCC , testing & line charge new feeder panel as 220KV

Welspun panel . (11’th ,12’th day planning With outage )

220KV Shivlakha

Day 13th

- 1. Spared 220KV Welspun panel wiring removal dismantling work shifting at new CR

Erection work as 220KV Shivlakha

2. B.M.K. Box erection work.

Day 14th

- 1. .laying of All Control Cable i. e 19C X 2.5sqmm & 12C X 2.5sqmm , Battery Cable

laying

work with noting down before dismantling wiring of panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

at

Panel & BMK box,v feruling etc. (13’th ,14’th day planning W/o outage )

Day 15th

- 1. 220KV Anj- Shivlakha SHUT DOWN of feeder bay , old M.K. Box cable removal and

termination to new spare 220KV erected panel

2. PLCC panel removal & erection, 48V supply taken from existing charger to new C

Room

Day 16th

- 1. Complete termination including PLCC , testing & line charge new feeder panel as 220KV

Shivlakha line. (15’th ,16’th day planning With outage )

Shifting of Shivlakha Panel Erection and Spare of Alloted Spare panel

Day 17th

- 1. Spared 220KV Shivlakha panel wiring removal dismantling work shifting at new CR

For removal of 220KV Feeder panel allotted - return back & Erection work as 220KV

Anj –

Kukma Line No. 1 . . (17’th ,day planning W/o outage )

Page 20: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

20

Day 18th

- 1. 220KV Anj- Kukma Line No. 1 SHUT DOWN of feeder bay termination to new spare

220KV

erected panel

2. Complete termination including PLCC , testing & line charge new feeder panel as

220KV

Anjar - Kukma Line No. 1.

3. Removal of existing allotted spare panel. (18’th day planning With outage )

Shifting of TRANSFORMER panel : 220/66KV 100MVA Trf No.01 Day 19

th - 1. B.M.K. Box ,HV & LV C&R Panel erection work

Day 20th

- 1. . Laying of All Control Cable i. e 19C X 2.5sqmm & 12C X 2.5sqmm , Battery Cable laying work with

noting down before dismantling wiring of panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc. (19’th & 20’th day planning W/o outage )

Day 21th

- 1. SHUT DOWN of 220/66KV 100MVA Trf No.01 , dismantling of HV & LV C&R Panel & RTCC panel

removal , PLCC panel removal shifting to new control room & erection.

Day 22th - 1. SHUT DOWN of 220/66KV 100MVA Trf No.01 termination at both end with RTCC ,PLCC

2. SHUT DOWN of 220/66KV 100MVA Trf No.01 termination complete ,Testing and charging

of Transformer. (22’th ,23’th day planning With outage )

Shifting of TRANSFORMER panel : 220/66KV 100MVA Trf No.02

Day 23th

- 1. B.M.K. Box erection work. Both HV & LV side

Day 24th

- 1. . Laying of All Control Cable i. e 19C X 2.5sqmm & 12C X 2.5sqmm , Battery Cable

laying

work with noting down before dismantling wiring of panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc. (24’th & 25’th day planning W/o outage )

Day 25th

- 1. SHUT DOWN of 220/66KV 100MVA Trf No.02 , dismantling of HV & LV panel

old M.K. Box cable removal and shifting to new control room

2. RTCC panel removal, PLCC panel removal shifting to new control room.

Day 26th

- 1. SHUT DOWN of 220/66KV 100MVA Trf No.02 termination at both end with RTCC

,PLCC

- 1. SHUT DOWN of 220/66KV 100MVA Trf No.02 termination complete ,Testing and

Charging of Transformer. (26’th ,27’th day planning With outage )

Shifting of TRANSFORMER panel : 220/66KV 100MVA Trf No.04

Day 27th

- 1. B.M.K. Box erection work. Both HV & LV side

Day 28th

- 1. . Laying of All Control Cable i. e 19C X 2.5sqmm & 12C X 2.5sqmm , Battery Cable

laying

work with noting down before dismantling wiring of panel.

Page 21: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

21

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc. (29’th & 30’th day planning W/o outage )

Day 29th

- 1. SHUT DOWN of 220/66KV 100MVA Trf No.04 , dismantling of HV & LV panel

old M.K. Box cable removal and shifting to new control room

2. RTCC panel removal, PLCC panel removal shifting to new control room with erection

Day 30th

- 1. SHUT DOWN of 220/66KV 100MVA Trf No.04 termination at both end with RTCC

,PLCC

2. SHUT DOWN of 220/66KV 100MVA Trf No.04 termination complete ,Testing and

Charging of Transformer. (30’th ,31’th day planning With outage )

Shifting of 220KV Class 25MVAR REACTOR panel :

Day 31th

- 1. B.M.K. Box erection work.

Day 32th

- 1. . Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc. (33’th & 34’th day planning W/o outage )

Day 33th

- 1. SHUT DOWN of 25MVAR REACTOR , dismantling panel old M.K. Box cable

removal and

shifting to new control room

Day 34th

- 1. SHUT DOWN of 25MVAR REACTOR termination at both end

2. SHUT DOWN of 25MVAR REACTOR termination complete ,Testing and

Charging . . (34’th ,35’th day planning With outage )

Shifting of 66KV Class Feeder panel :

66KV Khokhara

Day 35th

- 1. .M.K. Box erection & new Panel erection work.

2. . Laying of All Control Cable work with noting down before dismantling wiring of

panel.

Day 36th

1. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. (35’th & 36’th day planning W/o outage )

Day 37h - 1. SHUT DOWN of 66KV Khokhara, dismantling panel old M.K. Box cable removal and

shifting to new control room & termination at both end testing and charging. (37’th day planning With

outage )

66KV Ratnal

Day 38th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Day 39th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. (38’th & 39’th day planning W/o outage )

Day 40th

- 1. SHUT DOWN of 66KV Ratnal dismantling panel old M.K. Box cable removal and

shifting to new control room & termination at both end testing and charging. (40’th day planning With

outage )

Page 22: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

22

66KV KPT

Day 41th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Day 42th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. (41’th & 42’th day planning W/o outage )

hDay 43th

- 1. SHUT DOWN of 66KV KPT dismantling panel old M.K. Box cable removal and

shifting to new control room & termination at both end testing and charging. (43’th day

planning With outage)

66KV FTZ TOWER

Day 44th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Day 45th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. (44’th & 45’th day planning W/o outage )

Day 46th

- 1. SHUT DOWN of 66KV FTZ TOWER dismantling panel old M.K. Box cable removal

and shifting to new control room & termination at both end testing and charging. (46’th

day planning With outage)

66KV GIM B -2

Day 47th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Day 48th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. . (47’th & 48’th day planning W/o outage )

Day 49th

- 1. SHUT DOWN of 66KV GIM B -2 dismantling panel old M.K. Box cable removal and

shifting to new control room & termination at both end testing and charging.

shifting to new control room (49’th day planning With outage)

66KV VIDI

Day 50th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Day 51th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. . (50th & 51’th day planning W/o outage )

Day 52th

- 1. SHUT DOWN of 66KV VIDI dismantling panel old M.K. Box cable removal and

shifting to new control room & termination at both end testing and charging.

shifting to new control room (52’th day planning With outage)

66KV CHIRAI SUKHPAR

Day 53th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Page 23: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

23

Day 54th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. . (53’th & 54’th day planning W/o outage )

Day 55th

- 1. SHUT DOWN of 66KV CHIRAI SUKHPAR dismantling panel old M.K. Box cable

removal and

shifting to new control room & termination at both end testing and charging. (55’th day

planning

With outage)

66KV FTZ – H -FRAME

Day 56th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Day 57th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. (56’th,57’th th day planning W/o utage)

Day 58th

- 1. SHUT DOWN of 66KV FTZ – H -FRAME dismantling panel old M.K. Box cable

removal and shifting to new control room & termination at both end testing and

charging. (58’th day planning With outage)

66KV GIM B -1

Day 59th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Day 60th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. . (59’th,60’th th day planning W/o utage)

Day 61th

- 1. SHUT DOWN of 66KV GIM B -1 dismantling panel old M.K. Box cable removal and

shifting to new control room & termination at both end testing and charging. (61’th day planning

With outage)

66KV VARSANA

Day 62th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Day 63th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. (62’th,63’th th day planning W/o utage)

Day 64th

- 1. SHUT DOWN of of 66KV VARSANA dismantling panel old M.K. Box cable removal

and shifting to new control room & termination at both end testing and charging. (64’th

day planning With outage)

66KV KUKMA

Day 65th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Page 24: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

24

Day 66th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc.(65’th,66’th th day planning W/o utage)

Day 67th

- 1. SHUT DOWN of of 66KV KUKMA dismantling panel old M.K. Box cable removal

and

shifting to new control room & termination at both end testing and charging. (67’th day

planning With outage)

66KV RELDI

Day 68th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Day 69th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. .(68’th,69’th th day planning W/o utage)

Day 70th

- 1. SHUT DOWN of of 66KV RELDI dismantling panel old M.K. Box cable removal and

shifting to new control room & termination at both end testing and charging. (70’th day planning

With outage)

66KV CAPACITOR BANK

Day 71th

- 1. .M.K. Box erection & 66KV feeder panel dismantalling shifting & erction work.

Day 72th

1. Laying of All Control Cable work with noting down before dismantling wiring of

panel.

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & MK box, feruling etc. (71’th,72th day planning W/o utage)

Day 73th

- 1. SHUT DOWN of of 66KV CAPACITOR BANK dismantling panel old M.K. Box

cable removal and shifting to new control room & termination at both end testing and

charging. (73’th day planning With outage)

66KV BUS COUPLER

Day 74th

- 1. .M.K. Box erection & Laying of All Control Cable work with noting down before

dismantling wiring of panel.

Day 75th

2. Laying of All Control Cable ,Cable Schedule wiring preparation , gland filling, . MK box,

feruling etc. . (74’th,75th day planning W/o utage)

Day 76th

- 1. SHUT DOWN of of 66KV BUS COUPLER dismantling panel, old M.K. Box cable

removal and shifting to new control room & termination at both end testing and

charging. (76’th day planning With outage)

Shifting of 220KV BUS BAR PROTECTION PANEL :

220KV Kukma Line 1

Day 77th - 1. . Dismentaling of 220KV Bus Bar Panels removal of cables and Shifting to New Control Room

2. Laying of All Control Cable

Day 78th

- 1. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

Page 25: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

25

At Panel & BMK box, feruling etc.

Day 79th

- 1. SHUT DOWN of 220KV Kukma line No. 1 termination complete ,Testing and charging of Line (79’th day

planning With outage)

220KV Kukma Line 2

Day 80th

- 1. Laying of All Control Cable

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc.

Day 81th

- 1. SHUT DOWN of 220KV Kukma line No. 2 termination complete ,Testing and charging of Line (81’th day

planning With outage)

220KV Welspun

Day 82th - 1. Laying of All Control Cable

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc.

Day 83th - 1. SHUT DOWN of 220KV Welspun termination complete ,Testing and charging of Line (83’th day

planning With outage)

220KV Shivlakha

Day 84th

- 1. Laying of All Control Cable

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc.

Day 85th

- 1. SHUT DOWN of 220KV Shivlakha termination complete ,Testing and charging of Line (85’th day

planning With outage)

220/66KV 100MVA Trf No. 1

Day 86th

- 1. Laying of All Control Cable

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc.

Day 87th

- 1. SHUT DOWN of 220/66KV 100MVA Trf No. 1termination complete ,Testing and charging of Line

(87’th day planning With outage)

220/66KV 100MVA Trf No. 2

Day 88th

- 1. Laying of All Control Cable

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc.

Day 89th - 1. SHUT DOWN of 220/66KV 100MVA Trf No. 2 termination complete ,Testing and charging of Line

(89’th day planning With outage)

220/66KV 100MVA Trf No. 4

Day 90th - 1. Laying of All Control Cable

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc.

Page 26: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

26

Day 91th

- 1. SHUT DOWN of 220/66KV 100MVA Trf No. 4 termination complete ,Testing and charging

of Line (91’th day planning With outage)

220KV Class 25MVAr Reactor

Day 92th

- 1. Laying of All Control Cable

2. Cable Schedule wiring preparation , gland filling, cable entry in panel, end termination

At Panel & BMK box, feruling etc.

Day 93th

- 1. SHUT DOWN of 220KV Class 25MVAr Reactor termination complete ,Testing and charging of Line

(93’th day planning With outage)

Page 27: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

27

Page 28: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

28

Page 29: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

29

Page 30: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

30

Page 31: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

31

Page 32: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

32

Page 33: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

33

Page 34: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

34

Page 35: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

35

Page 36: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

36

Page 37: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

37

Page 38: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

38

Page 39: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

39

Page 40: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

40

TENDER FOR THE WORK OF:

Work of 220KV Control Room shifting at 220KV Anjar Substation under TR Div Anjar

Price Bid

Page 41: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

41

TENDER FOR THE WORK OF: Work of 220KV Control Room shifting at 220KV Anjar Substation under TR Div Anjar

Sr. No.

Description Qty. Rate Unit Amount

1 Providing and Fixing of bay BMK box as per technical specification mentioned 8 52094 nos 416752

2 Providing & Fixing of MK box for 66KV Bays with necessary fabrication work. The MK box should be of such a type that 2 nos. of 66KV bays can be accommodate in one M.K Box

9 11550 nos 103950

3 Laying of 1.1 KV PVC armored copper / aluminum cable inside hume pipe/ cable trench including binding/clamping of cable with G.I. wire as per requirement including supply and fixing of identification tags on both ends and at distance every 100 mtrs. for following size.

a. a) 2C x 2.5mm2, 2C X 3.5 mm2 4C x 2.5mm2, 7C x 2.5mm2, 4C x 4mm2 copper control cable or any equivalent size of all L.T. cable.

19152 6.62 Per RMtr

126786.24

b. b) 12C x 2.5mm2, 12C x 4mm2, 12C x 6mm2, 19C x 2.5mm2, 27C x 2.5mm2, copper control cable, 3.5C or 4C x 10mm2 to 70mm2 aluminum armored or unarmored L.T. power cable.

17815 10.97 Per RMtr

195430.55

4 Termination of control cable at Panel/MK box, equipment including supply of required size of PVC biding Tags, Buttons etc for up to 7C control cable

325 210 Each 68250

5 Termination of control cable at Panel/MK box, equipment including supply of required size of PVC biding Tags, Buttons etc for Above 7C control cable

290 367.5 Each 106575

Page 42: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

42

6 Erection of 220Kv C&R Panel / RTC panel including grouting of panels required fabrication for entry of control cables and complete vermin proofing. Job includes supply of required bolts and nuts etc and shifting of panels from ss site store to work site.

22 873.18 nos 19209.96

7 Dismantling of 220Kv C&R Panel / RTC panel including de-grouting of panels required fabrication for removal of control cables and removing of vermin proofing. Job includes shifting of panels from ss site store to work site.

22 436.59 nos 9604.98

8 Erection of 66Kv C&R Panel or RTC panel including grouting of panels including required fabrication for entry of control cables and complete vermin proofing. Job includes supply of required bolts and nuts etc and shifting of panels from ss site store to work site.

22 727.65 nos 16008.3

9 Dismantling of 66Kv C&R Panel or RTC panel including de-grouting of panels including required fabrication for removal of control cables and removal of vermin proofing. Job includes shifting of panels from ss site store to work site.

22 363.82 nos 8004.04

10 Erection of LT panel including grouting of panels including fixing of all switches bus bar etc and grouting of panels including required fabrication for entry of control cables and complete vermin proofing. Job includes supply of required bolts and nuts etc and shifting of panels from ss site store to work site.

2 1018.71 nos 2037.42

11 Dismantling of Battery Charger of any make. 2 509.35 nos 1018.71

12 Erection of Battery Charger of any make as per manufacture's instruction manual including grouting, vermin proofing.

2 1018.71 nos 2037.42

Page 43: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

43

13 Dismantling of 250AH DC battery set on wooden stand as per instruction manual of supplier including first dis- connection of cells and shifting from ss site store to work site as per manufacturer's/Instruction of engineer in charge.

2 3274.43 nos 6548.85

14 Erection 100AH /250AH DC battery set on wooden stand as per instruction manual of supplier including first filling of battery solutions, proper connection of cells and applying charging/discharging cycle as per manufacturer's/Instruction of engineer in charge.

2 6548.85 nos 13097.7

15 Installation of earthling strips / MS round as shown below including digging of 600 mm depth and 450 mm wide trench/fixing on structure as per attached drawing including digging of 600 mm depth and 450 mm wide trench/fixing on structure as per attached drawing including fixing arrangement, jointing with nut bolts and lap welding and applying zinc rich paint on added joints including supply of GI nuts ans bolts as per specification. For 75 X 10 mm GI strips

300 55.3 Mtr 16590

Page 44: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

44

16 Installation of maintence free earthing pits as per drawing herewith by providing copper bonded earth rod having dia of 20mm ,Length 3 mtr. The rod shall have steel core with molecular bonding of 250 micron of copper as per IS. The nickle layer is alpplied to steel core bt electrolyte process forming metallurgical bond between three. The copper used shall be type DHP alloy no122 CDA & rated at 99.95%Cu.The thickness of CU layer shall be uniform 250Micro ohm .The Rod should be mfg by comply of high repute ,each earh rod must be provided with suitable clamp to fesilated interconnection of rod & connection of equipment earth by using GI strips are conductor. Following are the specification for casting bore (1) 300MM dia hole to depth up to 6 mtr.(2) fill up the bore using Black cotton type soil /ag. soil(3) at the center of field up soil 100mm dia hole to depth up to 3 mtr dia of auger hole for other cases made different.(4) fill up the hole using ground in hencemnt material around the rod as per IEEE -80-2000 clause no-14.5 (d) further this includes providing of brick mansonary chamber of size 650mmx650mm and depth up 1200mm as per the instruction of EIC including light type CI cover to All required materials for this job shall be arranged by Contractor. .

5 13950.09 nos 69750.45

17 Erection of PLCC/RTU panels including grouting of panels required fabrication for entry of control cables and complete vermin proofing. Job includes supply of required bolts and nuts etc and shifting of panels from ss site store to work site.

20 727.65 nos 14553

Page 45: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

45

18 Dismantling of PLCC/RTU panels including de-grouting of panels required fabrication for removal of control cables and removal of vermin proofing. Shifting of panels from ss site store to work site.

20 363.82 nos 7276.4

19 Preparation of Cable and Wiring schedule. 62 2100

Job Work

130200

20 Providing and fixing of DCDB having 110Volt double source DC 63 A two pole switch 02 nos., digital voltmeter (0-500V) 02 nos., digital ampere meter (0-60A) 02 nos., change over switch with 25 feeders along with LED including grouting of panels required fabrication for entry of control cables and complete vermin proofing. Job includes supply of required bolts and nuts etc and shifting of panels from ss site store to work site.

2 103418 nos 206836

21 GPS based Time Synchronizing Unit Dismantling ..

1 1500 nos 1500

22 GPS based Time Synchronizing Unit Erection .. 1 3000 nos 3000

Total Amount 1545017.02

In Words: - Rupees fifteen lacs forty five thousand seventeen only Service tax & welfare cess shall be reimbursed on production of proof of such payments made by the contractor to the appropriate department.

I/We have read and clearly understood the terms, conditions, Schedule ‘B’ and Technical

specifications put by GETCO on WEB site.

I/We hereby accept all the conditions and specifications of this tender document, and

accordingly,

Page 46: 2 Required Documents – Technical Bid 3 Section-I … Office/Anjar Trans Circle/0...6 Modality of shifting of control Room of 220 KV Anjar ... download and online ... his presentation

Office: Transmission Circle, Near S.T. Station, ANJAR - KUTCH – 370 110.

Telephone No.(02836) 242656 Fax No.(02836) 241588

Web site: getcogujarat.com Email: [email protected]

46

I/We am/are willing to carry out the work at _________________% (in words

__________________________________________________percentage) above/below the

estimated cost. Accordingly the total amount of my/our tender works out to

Rs.____________________________________________________________________

(Rupees________________________________________________________________

______________________________________________________________________)

SIGNATURE OF CONTRACTOR. Sup Engineer (TR) (With rubber stamp/seal of the company) GETCO, Anjar