    $300Million per km?

    $

    100M per km?What 10M per km bought for Sc

    Connecting CommunitiesA timely lesson from Scotland in affordability a

    the use of existing infrastructure

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    2/24

    A presentation comparing the just

    completed (Sept 2015) Border Rail pro

    connecting Edinburgh to the border re

    with the potential of the BC Hydro ow

    interurban corridor running from Ne

    Westminster to Chilliwack

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    3/24

    Scottish Border Rail Passenger Services1850s -1960s

    Fraser Valley Interurban RaServices 1910-50

    A little history

    Steam and later diesel powered Electric

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    4/24

    The Scottish border country lost its passen

    service to Edinburgh 46 years ago

    Rail service in 1960s - Galashiels Border Rail service restor

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    5/24

    Border Rail Corridor

    Dismantled & Abandoned

    Fraser Valley Lin

    Lightly Used but Opera

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    6/24

    Border Rail Passenger Rail ServicesRestored Sept 2015

    Fraser Valley Passenger Rail Se4 km Heritage Rail Weekend

    30 minute service to and from Edinburgh

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    7/24

    Why Scotlands order Rail

    success matter

    BC also has rail lines and corridors with great potential

    The BC Hydro owned, interurban corridor from Surrey through to Cserves a population of over 800,000

    Previous cost estimates to restore service on the interurban corridochallenged by Scotlands Border Rail experience

    TransLinks Oct 2006 DRL reports conclusions on the viability of secinterurban line looks to be highly suspect.

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    8/24

    Why Scotlands order Rail success matters to

    The Scottish business case for passenger service includes regiointerconnectivity and tourism (this is relevant for the Fraser Vacorridor)

    Border Rail is intended to accelerate economic activity in the

    Midlothian and Borders regions of Scotland. Project affordability issue is key to the Border Rail project. A re

    regular service using a lower cost solution but incorporating dfeatures that allow for future electrification of the system

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    9/24

    The Key Scottish Asset

    an existing rail corridor

    A 56km railway corridor, 46 kms totally dismantle

    and abandoned in 1969.

    Links downtown Edinburgh to the rura

    border country and beyond

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    10/24

    The Restored Route

    Edinburgh Waverley

    (below Edinburgh Castle)

    to

    Galashiels/Tweedbank

    Pop 15,000

    (home of Sir Walter Scott)

    Length 35 miles (57kms)

    Scotlands Border Railway

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    11/24

    Key Points

    Marginal business case based on community needs and preconomic benefits from tourism

    Strong community support but contentious project

    3 major line blockages due to buildings and new roads

    Original P3 collapsed; pseudo governmental agency succee Work began Nov 2008

    Operational Sep 9, 2015. Half-hourly service

    Cost < C$10M/km

    Scotlands Border Railway

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    12/24

    65km of single line track ( incl. 3 long dynamic passing loops)

    42 new bridges

    95 refurbished bridges

    2 refurbished tunnels

    1.5million tones of earth moved

    Non electrified but built to allow for future electrification

    Scotlands Border Railway

    Project Specifications

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    13/24

    Eskbank

    Hardengr

    Many challenges along the route..

    Scotlands Border Railway

    Bowshank Tunnel

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    14/24

    Scotlands Border Railway

    New Bridges & Refurbished Tunnels

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    15/24

    Project Info/CostAfter the original public private partnership (P3) process collapsed, Transport Scotland cNetwork Rail (Network Rail is an arms-length central government body and the owneoperator of UKs railway infrastructure) to lead the Border Rail Project.

    Network Rail appointed BAM Nuttall (Dutch based contractor) as the main contractor. UResearch Services (US Based Consultants) carried out major design work.

    First sod turned in March 2010 but construction only began in earnest April 2013. Line

    Sept 2015.

    Scotlands Border Railway

    Cost of Construction

    294 Million

    C$ 539.2M (Based on Jan 2015 Canadian CRA exchange data)

    C$9.46M per km

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    16/24

    The Fraser Valley lost its passenger service to V

    communities and Vancouver 75 years ago

    Electric Rail travel 1910 - 1950 Light Diesel Rail travel i

    Ottawa O-Tra

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    17/24

    Scott Road, Surrey

    (Skytrain Station)

    to

    Abbotsford

    Length 38 miles (61kms)

    Scott Road, Surrey

    (Skytrain Station)

    to

    Chilliwack

    Length 62 miles (99kms)

    Community Rail The Fraser Valley Rail Line

    The Potential Routes

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    18/24

    Key Points Project Specificatio

    Single line track utilizof current corridor

    New overpasses need

    New track to serve ke

    Non electrified in ear

    built to allow future iConsider potential of

    technology (Vossloh)

    By-pass Paige Sub-Div(Deltaport Traffic)

    Passenger rights in place

    Corridor owned by BC Hydro

    Can be built in phases

    Suitable for Tram-Trains*

    Integration with short line freightmovements. Temporal separationpossible

    Serves large population

    Connects South Fraser communities

    Community RailThe Fraser Valley Rail Line

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    19/24

    British Columbia (fully automated light rail)

    Project Characteristics Cost (CA

    Evergreen Line 11 km - Light Metro Skytrain-automated/underground/

    surface/elevated (opening 2017)$130.0M(Total $1

    Canada Line 19.2 km Light Metro-automated/underground/elevated/

    surface (opened 2009)$107.0M(Total $2

    Project Characteristics Cost (CA

    Border Rail 57km - Heavy rail*, Diesel Multiple Units at grade, restored

    rail corridor. Multiple bridges and road realignments. (Open

    2015) 294M

    $9.5M(Total $

    (Exchange ra

    Scotland UK (heavy rail)

    Actual Cost Comparisons

    *Heavy rail refers to rail stock that can operate in conjunction with freight services on same rail c

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    20/24

    Scott Rd KennedyWest NewtonNewton Centre Sullivan

    Cloverdale

    Langley City Kwantlen PU

    Trinity Western Gloucester

    Bradner C

    Abbot

    Surrey 24 kms Langleys 16kms Abbotsfo

    EdinburghWaverley

    Edinburgh

    6 kms

    Brunstane

    Newcraighall

    Shawfair

    Eskbank

    Newtongrange

    GorebridgeStow Galas

    Midlothian 15 kms Border Region 35 kms

    Pop. 718Midlothian Pop. 85,000

    Pop. 149*Pop. 468,251 Pop. 129,258

    *Pop. 495,400

    *

    Route Comparison

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    21/24

    Phased Approach

    Project Characteristics ( Diesel Light Rail - Single track with loops)Scott Rd to Newton 10kms - at grade, 2.9% grade New West Bridge to 96th Ave

    Newton to Cloverdale 9.3kms at grade. (Passes under major Hwy 15, 6 road Xings

    plus some farm Xings)

    Cloverdale to Langley

    City Centre

    5.5kms at grade. Would require overpass to cross main

    Deltaport rail link plus possible alternate route. Disused corridor

    available for part of route

    Langley to Abbotsford 28.52km at grade. Passes over Hwy 1, numerous road Xings.

    Numerous day-trip tourist destinations

    Abbotsford to

    Chilliwack

    38.55km at grade. Passes under Highway 1, numerous road

    and farm Xings. Serves historic small communities

    The route of the interurban line incorporates few bridges but has many at grade rail crossings. T

    almost all need to be upgraded to fully gated passenger grade.

    Community RailThe Fraser Valley Rail Line

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    22/24

    Observations

    Automated light metro systems are prohibitivelyexpensive and necessitate limited regional trans

    coverage.

    $300M tunnelled and $130M/km elevated trans

    systems are not affordable on a regional basis.

    We can learn from other regions that maximize ttransit coverage through integrating available

    infrastructure into the overall transit system.(We preach reuse in waste management why not infrastructure ?

  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    23/24

    Further information

    www.bordersrailway.co.ukwww.campaignforbordersrail.org

    https://en.wikipedia.org/wiki/Borders_rail

    *Vossloh - Tram Trains

    http://www.vossloh-kiepe.com/news/press-releases/vossloh-rail-vehicles-und

    kiepe-liefern-sieben-neue-train-trams-nach-grossbritannien

    http://www.bordersrailway.co.uk/http://www.bordersrailway.co.uk/http://www.bordersrailway.co.uk/http://www.campaignforbordersrail.org/http://www.campaignforbordersrail.org/http://www.campaignforbordersrail.org/https://en.wikipedia.org/wiki/Borders_railhttps://en.wikipedia.org/wiki/Borders_railhttps://en.wikipedia.org/wiki/Borders_railhttp://www.campaignforbordersrail.org/http://www.bordersrailway.co.uk/
  • 7/25/2019 160208f1 BorderRail InterU Compare2 Min

    24/24

    Thank you