    PRESTRESSEDPRESTRESSED

    CONCRETECONCRETE

    STRUCTURESSTRUCTURES

    BY,BY,

    A.DINESHA.DINESH

    ROLL NO:137R5A0101ROLL NO:137R5A0101

    CMRTC.CMRTC.

    Department ! C"#"$ En%"neer"n%Department ! C"#"$ En%"neer"n%

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    2/42

    CONTENTSCONTENTS

    IntroductionIntroduction

    How to make prestressed concreteHow to make prestressed concrete

    AdvantagesAdvantages

    Difference between RCC !SCDifference between RCC !SC

    !SC in Construction Industr"!SC in Construction Industr"

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    3/42

    INTRODUCTION-INTRODUCTION-

    A Brief HistoryA Brief History

    E&%ene 're())"net *1+7-1/ e#te m&2 ! ")E&%ene 're())"net *1+7-1/ e#te m&2 ! ")

    $"!e t te re)ear2 e#e$pment an 2n)tr&2t"n !$"!e t te re)ear2 e#e$pment an 2n)tr&2t"n !

    pre)tre))e 2n2rete )tr&2t&re) an ") r"%t$( namepre)tre))e 2n2rete )tr&2t&re) an ") r"%t$( name

    4te !ater ! pre)tre))e 2n2rete. It ") tr&% ")4te !ater ! pre)tre))e 2n2rete. It ") tr&% ")

    e"2ate re)ear2 tat man( ! te te2n"6&e) ane"2ate re)ear2 tat man( ! te te2n"6&e) an

    pra2t"2e) &)e ta( t &"$ )pe2ta2&$ar anpra2t"2e) &)e ta( t &"$ )pe2ta2&$ar an

    ae)tet"2 )tr&2t&re) are p))"$e.ae)tet"2 )tr&2t&re) are p))"$e.

    're())"net a2"e#e te 8r)t )&22e)) 9"t pre)tre))e're())"net a2"e#e te 8r)t )&22e)) 9"t pre)tre))e

    2n2rete "n mar"ne 2n)tr&2t"n, a#"n% )e2&re te2n2rete "n mar"ne 2n)tr&2t"n, a#"n% )e2&re te

    tener t 2rre2t te treatene !&nat"n) ! tetener t 2rre2t te treatene !&nat"n) ! te

    LeHar#e mar"ne term"na$ &)"n% pre)tre)) te2n"6&e).LeHar#e mar"ne term"na$ &)"n% pre)tre)) te2n"6&e).

    TheThe

    beginningbeginning

    E&%ene !re())"net*1+7-1/E&%ene !re())"net*1+7-1/

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    4/42

    PrecastPrecast

    pretensionepretensione

    ho!!o" for#eho!!o" for#e

    s!abss!abs re)tre))e 2n2rete ") &)e ta( !rre)tre))e 2n2rete ") &)e ta( !r$ar%e &"$"n% 9r;) "n man( 2"#"$$ar%e &"$"n% 9r;) "n man( 2"#"$en%"neer"n% 8e$) )&2 a)en%"neer"n% 8e$) )&2 a)....

    Ra)Ra) B&"$"n%)B&"$"n%) Br"%e)Br"%e)

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    5/42

    INTROD#CTIONINTROD#CTION

    contd$contd$

    A prestressed concrete member is one in w%ic% t%ere %aveA prestressed concrete member is one in w%ic% t%ere %ave

    been introduced interna& stresses of suc% a magnitude' and a&sobeen introduced interna& stresses of suc% a magnitude' and a&so

    distribution' t%at t%e stresses resu&ting from e(terna& &oading aredistribution' t%at t%e stresses resu&ting from e(terna& &oading are

    counteracted to a desired degree)counteracted to a desired degree)

    *H+ !RESTRESS ,*H+ !RESTRESS ,

    !restressing app&ies an initia& compressive a(ia& force to t%e!restressing app&ies an initia& compressive a(ia& force to t%e

    concrete w%ic% great&" reduces or e&iminates t%e interna&concrete w%ic% great&" reduces or e&iminates t%e interna&

    stresses)stresses)

    It does t%is app&"ing a tensi&e stress to a stee& cab&e runningIt does t%is app&"ing a tensi&e stress to a stee& cab&e running

    t%roug% t%e concrete) T%e stee& cab&e is t%en anc%ored and t%et%roug% t%e concrete) T%e stee& cab&e is t%en anc%ored and t%e

    compressive force is t%en transferred to t%e concrete b" t%ecompressive force is t%en transferred to t%e concrete b" t%e

    bond forces$bond forces$

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    6/42

    Te ene8t) ! pre)tre))"n% are :-Te ene8t) ! pre)tre))"n% are :-1.1. Cra2;"n% ") %reat$( re&2e r e$"m"nate, anCra2;"n% ") %reat$( re&2e r e$"m"nate, an

    /./. App$("n% te pre)tre))"n% !r2e e$9 teApp$("n% te pre)tre))"n% !r2e e$9 te

    ne&tra$ a=") "n&2e) te mment) 9"2 pp)ene&tra$ a=") "n&2e) te mment) 9"2 pp)e

    t)e 2a&)e ( te e=terna$$( app$"e $a),t)e 2a&)e ( te e=terna$$( app$"e $a),t&) )"%n"82ant$( re&2"n% e>e2t"n.t&) )"%n"82ant$( re&2"n% e>e2t"n.

    3.3. Memer )e2t"n) are )ma$$er tan re"n!r2eMemer )e2t"n) are )ma$$er tan re"n!r2e

    2n2rete )e2t"n) !r te )ame "mp)e $a)..2n2rete )e2t"n) !r te )ame "mp)e $a)..

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    7/42

    Base on the #etho of app!yingBase on the #etho of app!yingprestress to the concrete #e#ber, theprestress to the concrete #e#ber, the

    Prestressing can be c!assie as.-Prestressing can be c!assie as.-

    PRE-TENSIONIN/ 0ETHOD +PRE-TENSIONIN/ 0ETHOD +

    POST-TENSIONIN/ 0ETHOD+POST-TENSIONIN/ 0ETHOD+

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    8/42

    PRE-TENSIONIN/PRE-TENSIONIN/

    re ten)"n"n% ") ne met ! app$("n% pre)tre)),t&) ?re ten)"n"n% ") ne met ! app$("n% pre)tre)),t&) ?

    Tenn) e"ter pa)) tr&% a )"n%$e m&$ r a $"ne ! m&$)Tenn) e"ter pa)) tr&% a )"n%$e m&$ r a $"ne ! m&$)!r m&$t"p$e memer) arran%e en t en an 2an e atta2e!r m&$t"p$e memer) arran%e en t en an 2an e atta2eat ne en t 8=e an2ra%e.at ne en t 8=e an2ra%e.

    Te tenn) are ten ten)"ne !rm te 8=e an2ra%eTe tenn) are ten ten)"ne !rm te 8=e an2ra%eet9een an e=terna$ "nepenent an2ra%e t %"#e teet9een an e=terna$ "nepenent an2ra%e t %"#e tere6&"re ten)"$e !r2e "n te tenn.re6&"re ten)"$e !r2e "n te tenn.

    Te tenn) are ten e$ "n p$a2e 9"$e te 2n2rete ") p&re.Te tenn) are ten e$ "n p$a2e 9"$e te 2n2rete ") p&re.

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    9/42

    Te tenn) are ten 8na$$( tr"mme @ a)Te tenn) are ten 8na$$( tr"mme @ a)

    )9n e$9)9n e$9..

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    10/42

    POST-TENSIONIN/POST-TENSIONIN/

    )t-Ten)"n"n% ") anter met ! app$("n% pre)tre)) t a 2n2rete)t-Ten)"n"n% ") anter met ! app$("n% pre)tre)) t a 2n2retememer, t&)-memer, t&)-

    Te tenn ") p$a2e "n te 2rre2t p)"t"n "n te !rm9r;Te tenn ") p$a2e "n te 2rre2t p)"t"n "n te !rm9r;9"t te ea-en an2ra%e an $"#e en an2ra%e, tr&%9"t te ea-en an2ra%e an $"#e en an2ra%e, tr&%9"2 te tenn pa))e).9"2 te tenn pa))e).

    Te 2n2rete ") ten p&re an $e!t t aren.Te 2n2rete ") ten p&re an $e!t t aren.

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    11/42

    Dea-enDea-enanchorageanchorage

    T pre#ent te tennT pre#ent te tenn!rm )$"pp"n% a2; "t ")!rm )$"pp"n% a2; "t ")$2;e "nt te$2;e "nt te

    an2ra%e ( mean) !an2ra%e ( mean) !a )p$"t 9e%e $2ate "na )p$"t 9e%e $2ate "nte arre$ ! tete arre$ ! tere2e))e an2ra%e.re2e))e an2ra%e.

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    12/42

    Tenn) &)e !r pre)tre))"n% %enera$$(Tenn) &)e !r pre)tre))"n% %enera$$(2n)")t) ! )e#era$ "% )tren%t )tee$ 9"re) !2n)")t) ! )e#era$ "% )tren%t )tee$ 9"re) !)ma$$ "ameter 9rappe ar&n a )"m"$ar 9"re.)ma$$ "ameter 9rappe ar&n a )"m"$ar 9"re.

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    13/42

    T%is is ca&&ed aT%is is ca&&ed aprestressingprestressingstrand -strand -Tendons) .adeTendons) .ade

    of %ig% strengt%of %ig% strengt%stee&' it wi&&stee&' it wi&&

    soon besoon be

    embedded inembedded in

    concrete)concrete)

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    14/42

    Ba)e n 9 te tenn) are &)e ,te( 2an eBa)e n 9 te tenn) are &)e ,te( 2an e2$a))"8e a)2$a))"8e a)

    1.1. Bne tenn)Bne tenn)/./. nne tenn).nne tenn).

    Bne tenn) 2an a$) e &)e. Te pr2e)) ")Bne tenn) 2an a$) e &)e. Te pr2e)) ")

    e))ent"a$$( te )ame e=2ept tat te pre)tre))"n%e))ent"a$$( te )ame e=2ept tat te pre)tre))"n%!r2e ") tran)!erre t te 2n2rete t ( rea2t"n)!r2e ") tran)!erre t te 2n2rete t ( rea2t"n)at te an2ra%e) an ( te n )tre))e) et9eenat te an2ra%e) an ( te n )tre))e) et9eente 2n2rete an te ne tenn.te 2n2rete an te ne tenn.

    nne tenn) are nrma$$( a))em$e &nernne tenn) are nrma$$( a))em$e &ner!a2tr( 2n"t"n). Te( 2n)")t) ! )tran) r!a2tr( 2n"t"n). Te( 2n)")t) ! )tran) r9"re) tat are 9rappe r en2a)e "n p$a)t"2 a#"n%9"re) tat are 9rappe r en2a)e "n p$a)t"2 a#"n%een 8r)t 2ate 9"t %rea)e r a "t&m"n&)een 8r)t 2ate 9"t %rea)e r a "t&m"n&)mater"a$.mater"a$.

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    15/42

    In t") >rIn t") >r

    2n)tr&2t"n2n)tr&2t"n

    ne tenn)ne tenn)

    are pr#"e "n teare pr#"e "n teeam) an teeam) an te

    &nne tenn)&nne tenn)

    "n te r") ! te"n te r") ! te

    tr&% )$a.tr&% )$a.

    BONDEDBONDED

    UNBONDEDUNBONDED

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    16/42

    Te pt%rapTe pt%rap

    )9) te)9) te

    tenn $a(&t !rtenn $a(&t !r

    a p)t-ten)"nea p)t-ten)"ne

    >at )$a.>at )$a.

    Te tenn) are p$a2e "n p)"t"n e!re te 2n2rete ")Te tenn) are p$a2e "n p)"t"n e!re te 2n2rete ")

    p&re.

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    17/42

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    18/42

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    19/42

    How !restressed concrete is madeHow !restressed concrete is made

    It a&& begins at t%e prestressed concrete p&ant)

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    20/42

    T%e prestressingT%e prestressing

    strand is stretc%edstrand is stretc%ed

    across t%e castingacross t%e casting

    bed)bed)

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    21/42

    An2ra%e) emee "n te 2n2rete memer are %enera$$(An2ra%e) emee "n te 2n2rete memer are %enera$$(

    re6&"re n$( !r p)t ten)"n"n%. re ten)"ne memer) arere6&"re n$( !r p)t ten)"n"n%. re ten)"ne memer) are

    man&!a2t&re an are an2re ( n )tre))e) rater tanman&!a2t&re an are an2re ( n )tre))e) rater tan

    an2ra%e).an2ra%e).

    One an2ra%e )"mp$( $) te en ! te tenn "n p)"t"n ,One an2ra%e )"mp$( $) te en ! te tenn "n p)"t"n ,9"$e te ter ") &)e 9"t te a2; t )tre)) te tenn. Ea29"$e te ter ") &)e 9"t te a2; t )tre)) te tenn. Ea2

    an2ra%e ") atta2e t te en ! te tenn e!re tean2ra%e ") atta2e t te en ! te tenn e!re te

    2n2rete ") p&re .Te t(pe ! an2ra%e &)e epen) n te2n2rete ") p&re .Te t(pe ! an2ra%e &)e epen) n te

    n&mer ! tenn) an 9eter te( are )tran) r 9"re).n&mer ! tenn) an 9eter te( are )tran) r 9"re).

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    22/42

    A pre)tre))"n% a2; ")A pre)tre))"n% a2; ")atta2e t te &t)"eatta2e t te &t)"ep$ate ! te an2ra%ep$ate ! te an2ra%e

    tr&% 9"2 te en)tr&% 9"2 te en)! te tenn) pre2t.! te tenn) pre2t.On2e te a2; a) eenOn2e te a2; a) een2nne2te t te2nne2te t tetenn), )tre))"n% 2antenn), )tre))"n% 2ane%"n. Tee%"n. Tepreeterm"nepreeterm"ne)tre))"n% !r2e 2an e)tre))"n% !r2e 2an eapp$"e t ea2 tennapp$"e t ea2 tenn

    "n"#"&a$$(. Te !r2e ")"n"#"&a$$(. Te !r2e ")app$"e a22r"n% t teapp$"e a22r"n% t tee)"%n en%"neer)e)"%n en%"neer))pe2"82at"n).)pe2"82at"n).

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    23/42

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    24/42

    Specia& trucks bringSpecia& trucks bringt%e concrete to t%et%e concrete to t%ecasting bed w%erecasting bed w%ere

    t%e pouring begins)t%e pouring begins)

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    25/42

    Once t%eOnce t%e

    pouring ispouring is

    comp&ete' acomp&ete' atarp is p&acedtarp is p&acedover t%e formover t%e formand app&ied toand app&ied to

    cure t%ecure t%e

    cementcement

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    26/42

    T%e prestressing strandsT%e prestressing strandsare cut and t%e concreteare cut and t%e concreteform is removed from t%eform is removed from t%e

    casting bed)casting bed)

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    27/42

    T%e ends areT%e ends are

    c&eaned and t%ec&eaned and t%e

    prestressingprestressingstrands are sea&edstrands are sea&edwit% a protectivewit% a protectivecoatingcoating

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    28/42

    T%e end/productT%e end/productis s%ipped to ais s%ipped to a

    bui&ding site)bui&ding site)

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    29/42

    Bon StressesBon Stresses Te pre)tre)) !r2e "n a ne tenn ")Te pre)tre)) !r2e "n a ne tenn ")

    tran)!erre t te 2n2rete ( n )tre))e).tran)!erre t te 2n2rete ( n )tre))e). Tere are t9 )ta%e) at 9"2 n )tre))e) areTere are t9 )ta%e) at 9"2 n )tre))e) are

    2n)"ere "n te e)"%n ! pre)tre))e 2n2rete2n)"ere "n te e)"%n ! pre)tre))e 2n2rete

    e$ement).e$ement).

    At Tran)!er,At Tran)!er, te tenn) ! a preeterm"nete tenn) ! a preeterm"ne

    e$ement are re$ea)e, an te pre)tre)) !r2e ")e$ement are re$ea)e, an te pre)tre)) !r2e ")

    tran)!erre t te 2n2rete ( n )tre))e).tran)!erre t te 2n2rete ( n )tre))e).

    '$e=&ra$ n )tre))e)'$e=&ra$ n )tre))e)e#e$p 9en memer) aree#e$p 9en memer) are)&e2te t e=terna$ $a"n%. H9e#er ,)&2)&e2te t e=terna$ $a"n%. H9e#er ,)&2

    )tre))e) are $";e$( t e ne%$"%"$e &nt"$ te)tre))e) are $";e$( t e ne%$"%"$e &nt"$ te

    memer a) e#e$pe >e=&ra$ 2ra2;).memer a) e#e$pe >e=&ra$ 2ra2;).

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    30/42

    AD0ANTA1ESAD0ANTA1ES

    Improved resistance to s%earing forcesImproved resistance to s%earing forces

    Reduce t%e s%ear forces deve&oped at t%e supportReduce t%e s%ear forces deve&oped at t%e support

    sectionssections

    StifferStiffer

    Indirect &ong term savings is more)Indirect &ong term savings is more)

    Econom" for &ong span structuresEconom" for &ong span structures

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    31/42

    CO.!ARISON 2ET*EEN RCC !SCCO.!ARISON 2ET*EEN RCC !SC

    Tensi&e Strengt%Tensi&e Strengt%

    StiffnessStiffness

    S%earS%ear

    Cracking def&ectionCracking def&ection

    Serviceabi&it"Serviceabi&it"

    Econom"Econom"

    Safet"Safet"

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    32/42

    !restressed concrete in construction!restressed concrete in construction

    industr"industr"

    It is we&& estab&is%ed fact t%at t%e basic econom" ofIt is we&& estab&is%ed fact t%at t%e basic econom" ofprestressed concrete &ies in its %ig% strengt% to weig%tprestressed concrete &ies in its %ig% strengt% to weig%tand strengt% to cost ratios ' its resistance to fire and strengt% to cost ratios ' its resistance to fire corrosion' its versati&it" and adaptabi&it")corrosion' its versati&it" and adaptabi&it")

    It is idea&&" suited forIt is idea&&" suited for

    3ong span 2ridges3ong span 2ridges

    .u&tistor" bui&dings/4&at s&abs.u&tistor" bui&dings/4&at s&abs

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    33/42

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    34/42

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    35/42

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    36/42

    Hig%wa" 56 2ridge over Osage River in .issouri 3and Crossing /

    *est Span and Abutment

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    37/42

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    38/42

    T%e 4&at S&ab f&ooring

    s"stem incorporates

    prestressed concreteunits designed for eas"

    and fast p&acement

    w%i&e re7uiring t%e

    minimum on site work

    to obtain a finis%ed

    f&oor and cei&ing)

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    39/42

    T%e &arge component

    units are craned into

    position' providing an

    immediate working

    p&atform w%ic%' wit% t%eaddition of an in situ

    concrete topping' gives a

    suspended f&oor wit% a

    f&at' stee& formed soffit)

    Temporar" propping isre7uired for &onger

    spans)

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    40/42

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    41/42

    S%##aryS%##ary

    H9 t ea$ 9"t te $9 ten)"$e )tren%t ! 2n2rete (H9 t ea$ 9"t te $9 ten)"$e )tren%t ! 2n2rete (

    pre)tre))"n% te memer.pre)tre))"n% te memer. Te me2an"2) ! te pre)tre))"n% )()tem &)"n% a r9 !Te me2an"2) ! te pre)tre))"n% )()tem &)"n% a r9 !

    ;) a) e=amp$e.;) a) e=amp$e.

    H9 te pre)tre))"n% !r2e ") app$"e t a memer at )"te.H9 te pre)tre))"n% !r2e ") app$"e t a memer at )"te.

    A r"e! ")tr( ! te e#e$pment ! pre)tre))"n% !rm "t)A r"e! ")tr( ! te e#e$pment ! pre)tre))"n% !rm "t)

    "n#entr E&%ene 're())"net &p t te mern a(."n#entr E&%ene 're())"net &p t te mern a(.

    Te met) ! pre)tre))"n%-Te met) ! pre)tre))"n%-

    re ten)"ne pre)tre))"n%,re ten)"ne pre)tre))"n%,

    )t ten)"ne re)tre))"n%,)t ten)"ne re)tre))"n%,

    Bne an &nne tenn),Bne an &nne tenn), An2ra%e),An2ra%e),

    Bn )tre))e).Bn )tre))e).

  • 7/25/2019 137695864 Pre Stressed Concrete Structures

    42/42

    THANK YOUTHANK YOU